USDA Feasibility Study Consultant in Georgia

    Independent USDA feasibility study consultant for Business & Industry, SPUR, REAP and Community Facilities projects across rural Georgia, prepared to 7 CFR Part 5001 standards for lenders and for review by USDA Rural Development's Georgia state office in Athens.

    Data as of October 2026.

    On this page
    $1M
    B&I guarantee to a new business above which USDA requires an independent feasibility study
    7 CFR 5001.306
    $906M
    USDA Rural Development investment in Georgia over the prior year: $501M across 59 projects plus $405M in housing
    USDA RD Georgia, December 2025
    $25M
    B&I guarantee for a 127-bed assisted living and memory care community in Spalding County
    USDA RD, December 2022
    $90M
    USDA financing stack for Hardee Fresh's indoor farm in Americus: $25M B&I, $25M REAP and $40M Food Supply Chain guarantee
    Rep. Sanford Bishop, January 2024
    1.317B
    Broilers produced in Georgia in 2025, first in the nation by head
    USDA NASS
    5.67M
    TEU through the Port of Savannah in FY2026
    Georgia Ports Authority
    $57.3M
    Unused balance of Georgia's $100M 2026 Rural Hospital Tax Credit cap as of July 22, 2026
    Georgia DOR
    $5.5B
    Minimum cost of Hurricane Helene to Georgia's economy, in 2024 present value
    UGA Extension

    When a Georgia Project Needs a USDA Feasibility Study

    Under the OneRD guaranteed loan rule, an independent feasibility study is mandatory for Business & Industry guarantees above $1,000,000 to a new business. Section 5001.306(a)(3)(i) requires a study "prepared by an independent qualified consultant acceptable to the Agency," with its scope set by the Agency according to the complexity of the project and the borrower.

    For loans of $1,000,000 or less, and for existing businesses, the study is discretionary. USDA may require one when the lender's analysis does not establish technical feasibility or economic viability, or when the project will significantly affect an existing borrower's operations and historic cash flow (§5001.306(a)(3)(ii)). Across OneRD programs, §5001.303(c)(4) allows the Agency to require an independent study whenever it cannot determine a basis for repayment from the five feasibility components: economic, market, technical, financial and management feasibility.

    Community Facilities runs on a parallel standard. Every CF guarantee requires a financial feasibility report "prepared by a qualified firm or individual acceptable to the Agency," and an independent study is required above $1,000,000 to a new entity or an entity conducting a new activity (§5001.304). Projections for assisted living, skilled nursing and similar residential facilities must be based on no more than 90 percent occupancy.

    When USDA requires a feasibility study
    SituationStudy statusRule
    B&I guarantee above $1M to a new businessRequired7 CFR 5001.306(a)(3)(i)
    B&I guarantee of $1M or less, or an existing businessAt Agency discretion7 CFR 5001.306(a)(3)(ii)
    Any OneRD program where the basis for repayment is unclearAt Agency discretion7 CFR 5001.303(c)(4)
    Community Facilities guarantee, any sizeFinancial feasibility report required7 CFR 5001.304
    Community Facilities guarantee above $1M to a new entity or new activityIndependent feasibility study required7 CFR 5001.304(a)(4)(i)

    In Georgia, studies are reviewed by USDA Rural Development's state office in Athens as part of the Conditional Commitment process.

    What USDA Means by an Independent Feasibility Study Consultant

    Part 5001 defines the role directly. A qualified consultant is "an independent third-party person possessing the knowledge, expertise, and experience to perform the specific task required," and a feasibility study is a report "conducted by an independent qualified consultant(s) evaluating the economic, market, technical, financial, and management feasibility of the proposed project" (7 CFR 5001.3). For B&I guarantees, the consultant must also be "acceptable to the Agency" (§5001.306(a)(3)(i)). In practice, that sets three tests for a Georgia project:

    • Independence

      No ownership or financial interest in the borrower, the project or the loan.

    • Qualification

      Demonstrated experience with the asset class, with Georgia's consolidated-government, hurricane and anchor-employer conditions, and with USDA Rural Development review.

    • Acceptability

      The Agency, not the borrower, decides whether the consultant and the study scope are sufficient. Engaging the consultant before the lender submits the application avoids scope rework during Conditional Commitment review.

    For Community Facilities financial feasibility studies issued with an examination opinion, §5001.304(b) requires preparation under AICPA attestation standards and professional liability insurance. USDA does not publish a list of approved feasibility study consultants. The Georgia state office assesses acceptability application by application.

    Georgia's USDA Record: Senior Care, Food Systems and Secondary-Market Hotels

    Georgia does not appear among the ten largest B&I states for 2015–2024 in the national assessment commissioned by the National Rural Lenders Association. Its 2015–2024 core B&I total is therefore below the $438 million tenth-place threshold. Georgia's named deals are large, however, and they cluster in three classes:

    • Senior care: a $25 million guarantee for assisted living and memory care in Spalding County.
    • Food systems: a $90 million USDA stack for an indoor agricultural facility in Americus.
    • Secondary-market hotels: guarantees in Milledgeville and Kingsland.

    USDA Rural Development reported $906 million invested in Georgia over the prior year. Six named B&I guarantees total $85.7 million (calculated from the named sample, not a complete census).

    Where B&I Financing Can Go in Georgia

    B&I eligibility excludes any city or town above 50,000 population, measured by the latest decennial census, together with the urbanized area contiguous and adjacent to it (7 CFR 5001.3). Nineteen Georgia cities exceeded 50,000 in 2020. They held 2,284,785 of the state's 10,711,908 residents, so at most 78.7 percent of Georgians live in B&I-eligible territory (calculated). The real share is materially lower, because the Atlanta, Savannah, Augusta, Columbus, Macon and Athens urbanized areas are also excluded.

    Georgia cities above 50,000, 2020 Census
    City2020 population
    Atlanta498,715
    Columbus (consolidated)206,922
    Augusta-Richmond County (balance)202,081
    Macon-Bibb County157,346
    Savannah147,780
    Athens-Clarke County (balance)127,315
    Sandy Springs108,080
    South Fulton107,436
    Roswell92,833
    Johns Creek82,453
    Warner Robins80,308
    Albany69,647
    Alpharetta65,818
    Marietta60,972
    Stonecrest59,194
    Smyrna55,663
    Valdosta55,378
    Brookhaven55,161
    Dunwoody51,683

    Source: Georgia General Assembly Reapportionment Office (2020 Census).

    Consolidated City-Counties

    Augusta-Richmond, Columbus-Muscogee, Macon-Bibb and Athens-Clarke are consolidated governments, and each exceeds 50,000. On our analysis, essentially the whole of Richmond, Muscogee, Bibb and Clarke counties is ineligible, not just an urban core. Blythe and Hephzibah, independent towns within Richmond County, still need a map check.

    Cities Incorporated After 2020

    Mableton (2023) and Mulberry (2024) had no 2020 count as incorporated places, so under the decennial rule they are not measured as cities until the 2030 Census. Their eligibility turns on urbanized-area contiguity instead. Both sit within or beside the Atlanta urbanized area and are likely ineligible.

    Eligibility Screen for Buyer-Intent Markets

    These are desk screens under the 5001.3 rule, not USDA map determinations. Every study confirms the address.

    Georgia regional eligibility screen
    RegionScreens eligibleMap check required
    North Georgia mountains and lakesBlue Ridge, Ellijay, Helen, Dahlonega, Clayton, Blairsville, Hiawassee, Dawsonville, GainesvilleSouth and east Lake Lanier shoreline
    Northwest corridorRome, Dalton, CalhounCartersville
    Lake OconeeGreensboro, Eatonton, Madison—
    Industrial anchorsEllabell (Hyundai), Social Circle (Rivian), SpringfieldRichmond Hill, Rincon
    CoastBrunswick, St. Simons Island, Jekyll Island, Kingsland, St. Marys—
    Middle GeorgiaHinesville, Statesboro, Milledgeville, Dublin—
    South GeorgiaVidalia, Waycross, Tifton, Cordele, Americus, Thomasville, Moultrie, Bainbridge—
    West GeorgiaPine Mountain, LaGrange, West Point—

    2026–2027 Program Terms Monitor

    As of late October 2026, USDA has not published a FY2027 OneRD guarantee fee notice; the FY2026 notice appeared five months into its fiscal year. USDA's March 27, 2026 stakeholder announcement set the 85 percent guarantee for B&I loans under $5 million. A continuing resolution (P.L. 119-103) funds USDA at FY2026 levels through December 11, 2026. The President's FY2027 budget proposes terminating B&I, while the House-passed bill raises B&I loan authority to $2.0 billion. B&I credits are underwritten on the current schedule: an 85 percent guarantee under $5 million and 80 percent at $5 million or more, a 3 percent upfront fee and a 0.55 percent annual retention fee. Community Facilities guaranteed loans carry an 80 percent guarantee and a 1.25 percent fee, up to $100 million.

    USDA guaranteed loan terms relevant to Georgia
    ProgramGuaranteeUpfront feeRetention feeNotes
    B&I, under $5M85%3.0%0.55%Maximum $25M per borrower
    B&I, $5M to $25M80%3.0%0.55%—
    B&I, reduced-fee tier80%1.0%0.50%Subject to annual cap
    SPUR (meat, poultry, seafood processing)90%3.0%0.55%Lender holds at least 10%; no rural-area restriction
    Pre-completion loan note guarantee—+0.50%—All programs

    SPUR for Georgia Poultry and Food Processors

    Federal Register Doc. 2026-21858, published October 27, 2026, makes at least $5 billion in loan level available for facilities that establish, reopen, retrofit, expand or improve meat, poultry or seafood processing "in America's rural or urban areas, as there are no geographic restrictions." The guarantee is 90 percent, at a 3 percent fee and 0.55 percent retention, with the lender holding at least 10 percent. USDA announced a maximum of $175 million per borrower. For the top broiler state by head, SPUR is now the strongest USDA guarantee for poultry processing, inside or outside excluded cities. USDA also added Georgia to its Cooperative Interstate Shipment program for meat processors on July 28, 2026, widening the market for state-inspected plants.

    REAP After the October 2026 Rule

    Under USDA's revised REAP rule (91 FR 62600), effective October 16, 2026, REAP becomes a post-completion, performance-validated program. Applicants submit 12 months of actual production or savings data with 12 months of pre-installation data, through a single national competition. Grants are capped at 25 percent of project cost, with maximums of $500,000 for renewable energy systems and $250,000 for efficiency improvements. A REAP guaranteed loan may still be paired with the grant. The rule requires cost sharing for at least 75 percent of project cost, and combined REAP grant and guaranteed-loan funding cannot exceed 75 percent.

    Capital Stacking in Georgia

    Georgia Rural Hospital Tax Credit

    Donors receive a 100 percent state income tax credit, subject to a $100 million annual aggregate cap and a $4 million cap per hospital. The program is extended through December 31, 2029. As of July 22, 2026, $42,668,498 had been preapproved and $57,331,502 remained, which gives rural hospital projects an equity source available on a first-come basis.

    Job Tax Credit

    Tier 1 counties earn $3,500 per new job, with a minimum of two new jobs. Tier 1 counties for 2026 include Bulloch (Hyundai supplier belt), Liberty (Fort Stewart), Baldwin (Milledgeville), Sumter (Americus), Richmond, Bibb, Clarke, Dougherty and Lowndes, among others ranked by the Department of Community Affairs.

    Appalachian Regional Commission, FY2027

    Thirty-seven north Georgia counties are in ARC's service area. FY2027 applications were due to DCA on October 30, 2026.

    Georgia ARC counties by FY2027 economic status
    Status (federal/local match)Counties
    Distressed (80/20)Chattooga
    At-Risk (70/30)Elbert, Franklin
    Transitional (50/50)Banks, Barrow, Bartow, Carroll, Catoosa, Dade, Douglas, Fannin, Floyd, Gilmer, Gordon, Gwinnett, Habersham, Haralson, Hart, Heard, Lumpkin, Madison, Murray, Pickens, Polk, Rabun, Stephens, Towns, Union, Walker, White, Whitfield
    Competitive (30/70)Dawson, Hall, Jackson, Paulding
    Attainment (ineligible)Cherokee, Forsyth

    Source: Georgia DCA, August 17, 2026.

    Chattooga is both ARC-Distressed and a Tier 1 Job Tax Credit county.

    Reduced-Fee Eligibility (7 CFR 5001.454(d))

    A lender may request the reduced fee when the project meets any one of these criteria, subject to USDA's annual cap on reduced-fee authority:

    1. It is located in a rural community that is distressed under the Economic Innovation Group index, has experienced long-term population decline across three decennial censuses, is in a persistent poverty county, is in a presidentially declared disaster area declared within the prior 24 months, has unemployment at or above 125 percent of the national rate, or is on tribal lands.
    2. It processes, distributes, aggregates, stores or markets locally or regionally produced agricultural food products and promotes access to healthy foods.
    3. It is locally owned and managed, and either supports value-added agriculture or produces a natural-resource value-added product.
    4. It is part of a multi-jurisdictional strategic plan under Section 6401 of the 2018 Farm Bill.
    5. It provides an additional market for existing local businesses.

    Each study confirms the designation against the current USDA ERS persistent poverty edition.

    Georgia USDA Feasibility Study Consultant by Project Type

    Each module sets out the Georgia-specific evidence a lender or USDA reviewer will expect, and the test the study must pass.

    Assisted Living Feasibility Study Consultant in Georgia

    Georgia's largest named B&I guarantee financed senior care, and retiree markets from Lake Oconee to the Golden Isles drive further demand.

    • USDA guaranteed $25,000,000 to Spalding Assisted Living LLC for a 107-unit, 127-bed assisted living and memory care community operated by Integral Senior Living, creating 42 jobs.USDA RD, December 2022
    • Community Facilities projections for assisted living must be based on no more than 90 percent occupancy.7 CFR 5001.304

    What the reviewer will test

    Age- and income-qualified demand penetration; a competitive bed inventory; a lease-up curve; private-pay depth in rural counties; and staffing.

    View our assisted living feasibility study services

    Poultry and Food Processing Feasibility Study Consultant in Georgia

    Georgia leads the nation in broilers by head, and SPUR now guarantees 90 percent of processing loans with no rural test.

    • Georgia produced 1.317 billion broilers in 2025, first by head but second by weight and value: $5.848 billion against North Carolina's $5.922 billion. Head count fell 3.5 percent and value 4.0 percent from 2024 (calculated).USDA NASS, April 2026
    • Hardee Fresh in Americus combined a $25,000,000 B&I guarantee, a $25,000,000 REAP award and a $40,000,000 Food Supply Chain guarantee for a roughly 350,000-square-foot indoor agricultural facility with 100+ jobs.Rep. Bishop, January 2024
    • Hurricane Helene cost Georgia's economy at least $5.5 billion in 2024 present value, affecting every crop.UGA Extension

    What the reviewer will test

    Grower supply contracts; processing capacity gap analysis; avian influenza and hurricane damage to poultry houses and orchards; and a labor plan.

    View our meat and poultry processing feasibility study services

    Hotel Feasibility Study Consultant in Georgia (USDA B&I)

    USDA has financed Georgia hotels in secondary markets, and new industrial anchors are creating demand that statewide tourism totals do not capture.

    • Visitors spent a record $45.2 billion in Georgia in 2024, generating $5.1 billion in state and local taxes.Tourism Economics for the Georgia Department of Economic Development
    • USDA guaranteed $5,552,000 to buy a 68-room hotel in Milledgeville, saving 25 jobs, and $1,400,000 to Linked Hospitality Management Group in Kingsland.USDA RD; Sen. Warnock release
    • Laurens County visitor spending rose 11.1 percent to $121.4 million in 2024.Visit Dublin, citing GDEcD

    What the reviewer will test

    Anchor-specific room-night demand rather than statewide tourism totals; STR competitive sets; hurricane exposure on the coast; and dated anchor milestones.

    View our hotel feasibility study services

    Manufacturing and EV Supplier Feasibility Study Consultant in Georgia

    Hyundai and Rivian anchor Georgia's eligible-county supplier demand, and both have already slipped.

    • Hyundai Motor Group Metaplant America in Ellabell represents $7.6 billion and began full production in October 2024. A September 4, 2025 immigration enforcement action at the adjacent Hyundai–LG Energy Solution battery plant detained 475 people. Hyundai's CEO estimated a minimum two-to-three-month delay, and the company said the plant would open in the first half of 2026.AP; Bloomberg; CBS News
    • Rivian's Department of Energy loan for its Social Circle plant was amended on April 30, 2026 to $4.5 billion, with Phase 1 capacity raised to 300,000 vehicles a year. Production is planned for 2028, with commitments of $5 billion and 7,500 jobs by the end of 2030.DOE; Rivian

    What the reviewer will test

    Supplier contracts or letters of intent; sensitivity to anchor delays; a workforce sourcing plan that addresses visa risk; and eligibility, since Chatham, Richmond, Bibb, Clarke and Muscogee counties are excluded.

    View our manufacturing feasibility study services

    Truck Stop and Logistics Feasibility Study Consultant in Georgia

    The Port of Savannah's growth is pushing truck freight onto the I-16 and I-95 corridors through eligible counties.

    • Savannah handled 5.67 million TEU in FY2026 and a record 504,015 TEU in September 2026. With 17 percent of containers moving by rail, about 4.7 million TEU moved by truck (calculated).Georgia Ports Authority
    • The $2.3 billion Savannah Container Terminal won Corps approval on October 14, 2026, and the port is building toward 12 million TEU of capacity.Georgia Ports Authority

    What the reviewer will test

    Interchange-level traffic counts and truck percentages; competing sites; and eligibility near Richmond Hill and Rincon.

    View our truck stop and c-store feasibility study services

    Cold Storage and Inland Port Feasibility Study Consultant in Georgia

    • The $134 million Gainesville Inland Port opened in May 2026, and the Appalachian Regional Port handled 49,319 containers in FY2026, up 20 percent.Georgia Ports Authority
    • Genuine Georgia Farms received a $1.5 million REDLG pass-through for cold storage and packing in Crawford County, and Georgia Cold Storage used REAP for a 330 kW solar array.USDA RD

    What the reviewer will test

    Throughput contracts; energy cost; and Savannah urbanized-area eligibility for Effingham and Bryan sites.

    View our cold storage feasibility study services

    Winery and Agritourism Feasibility Study Consultant in Georgia

    • Value-Added Producer Grants have funded Crane Creek Vineyards ($224,000), Muscadine Products Corp. ($250,000), Habersham Vintners ($250,000), Yonah Mountain Vineyards and Horse Creek Winery.USDA RD
    • White Oak Pastures, Pecan Nation and Mill Creek Farms each received $250,000 Value-Added Producer Grants in 2023.USDA RD

    What the reviewer will test

    Visitation and tasting-room conversion; distribution channels; and freeze and weather risk.

    View our winery and beverage feasibility study services

    Rural Hospital and Clinic Feasibility Study Consultant in Georgia

    Georgia rural health projects have the deepest capital stack in the state.

    • USDA awarded the Hospital Authority of Randolph County a $4,000,000 Community Facilities grant to restore full operations, and lent Clinch County Hospital Authority $4,789,000.USDA RD
    • $57,331,502 of the 2026 Rural Hospital Tax Credit cap remained available as of July 22, 2026.Georgia DOR

    What the reviewer will test

    Payer mix without full Medicaid expansion; grant and tax-credit funds kept out of debt service; and Community Facilities scoring.

    View our rural clinic feasibility study services

    Irrigation, Solar and REAP Feasibility Study Consultant in Georgia

    • REAP grants funded diesel-to-electric irrigation conversions at 2 J Farms ($499,690) and Ryan Ireland Farms ($485,069), and a 1.32 MW solar array at HSH Eva LLC ($877,232).USDA RD, 2024
    • Under the revised rule, grants cover at most 25 percent of project cost and are paid after 12 months of operating data.91 FR 62600

    What the reviewer will test

    Metered savings; a no-grant base case; and utility and EMC interconnection terms.

    View our solar and REAP feasibility study services

    Sawmill and Forest Products Feasibility Study Consultant in Georgia

    • Of 8,931,000 forest acres in Hurricane Helene's path, 1,470,000 acres took the majority of timber damage, a $1.28 billion timber impact.State assessment by UGA, the Governor's office, GDA and GFC
    • Georgia Crate & Basket Co. in Thomas County used REAP for energy upgrades.USDA RD

    What the reviewer will test

    Salvage-timber supply followed by a supply gap; mill offtake; and fire and storm insurance.

    View our sawmill and wood products feasibility study services

    Data Center and Energy Infrastructure Feasibility Study Consultant in Georgia

    • Georgia's 41 electric membership corporations serve more than 5 million Georgians and 73 percent of the state's land area. USDA has made electric loans of $240 million to Georgia Transmission (December 2025) and $486 million (July 2026).USDA RD

    What the reviewer will test

    Power availability and interconnection timing; anchor tenant contracts; and eligibility.

    Self-Storage and Car Wash Feasibility Study Consultant in Georgia

    • Exit Six Mini Storage in Glynn County used REAP for solar.USDA RD

    What the reviewer will test

    Supply per capita within 3–5 miles; absorption tied to new households near anchor sites; and coastal flood zones.

    View our self-storage feasibility study services

    RV Park and Campground Feasibility Study Consultant in Georgia

      What the reviewer will test

      Seasonal occupancy comparables; the split between transient and workforce stays near Ellabell and Social Circle; and hurricane evacuation and closures on the I-95 corridor.

      View our RV park feasibility study services

      Restaurant Feasibility Study Consultant in Georgia

      • Laurens County visitors spent $34.9 million on food and beverage in 2024, up 13.4 percent.Visit Dublin, citing GDEcD

      What the reviewer will test

      Margins; labor; and anchor-driven demand.

      View our restaurant feasibility study services

      Georgia USDA Precedent File

      Publicly identified USDA financings in Georgia
      ProgramRecipientLocationYearAmountPurpose
      B&I + REAP + Food Supply ChainHardee FreshAmericus2024$90,000,000 totalIndoor agricultural facility
      B&ISpalding Assisted Living LLCSpalding County2022$25,000,000Assisted living and memory care
      B&IBhugesh Investments, LLCMadison2022$23,725,000Not disclosed
      B&INirvana Hotels LLCMilledgeville2022$5,552,00068-room hotel purchase
      B&IFoodie J., Inc.Kingsland2022$5,000,000Not disclosed
      B&ILinked Hospitality Management Group, LLCKingsland2022$1,400,000Hospitality
      CF loanClinch County Hospital AuthorityClinch County2022$4,789,000Health care
      CF loanGeorgia Mountains Health ServicesGilmer County2022$4,200,000Health care
      CF grantHospital Authority of Randolph CountyRandolph County2025$4,000,000Restore full operations
      REDLGGenuine Georgia Farms (via Flint EMC)Crawford County2022$1,500,000Cold storage and packing
      REAPHSH Eva LLCGeorgia2024$877,2321.32 MW solar
      REAP2 J Farms LLCGeorgia2024$499,690Irrigation conversion
      REAPRyan Ireland Farms LLCGeorgia2024$485,069Irrigation conversion
      CF grantFlint River Fresh, Inc.Dougherty County2023$299,000Equipment
      VAPGWhite Oak PasturesClay County2023$250,000Beef and chicken
      VAPGPecan NationPeach County2023$250,000Pecans
      VAPGHunter Cattle CompanyBulloch County2025$250,000Value-added products
      VAPGCrane Creek VineyardsTowns County2023$224,000Wine

      Source: USDA Rural Development charts and releases; congressional releases (2015–2025).

      USDA Rural Development in Georgia

      USDA Rural Development's Georgia State Office is in Athens. State Director Joyce White was appointed in September 2025, and Jared Hooper is Deputy State Director. Area offices operate in Barnesville, Dawson, Blackshear, Thomson, Clarkesville, Camilla and Sandersville.

      Lender Landscape

      In May 2026, USDA revoked or declined to renew OneRD approved-lender status for ten lenders holding about 47 percent of Rural Development's delinquent loans; revoked lenders cannot obtain new guarantees. Every Georgia study we prepare records the originating lender's OneRD standing as of the study date.

      How Our Georgia USDA Feasibility Study Consultants Scope a Study

      Every Georgia engagement is built around the tests the Athens state office and lender credit committees apply.

      Address-level eligibility

      Including the consolidated counties and the Savannah and Atlanta urbanized-area edges.

      Capital stacking

      ARC status, Job Tax Credit tier and Rural Hospital Tax Credit availability.

      Anchor-delay sensitivity

      For Hyundai, Rivian and battery suppliers.

      Hurricane and timber exposure

      Storm and timber damage analysis after Helene.

      Program fit

      B&I vs. SPUR, Community Facilities, and REAP under the new rule.

      Lender standing and precedent

      Lender OneRD standing and Georgia precedent.

      Georgia USDA Feasibility Study FAQ

      Does USDA approve feasibility study consultants in Georgia?

      USDA does not maintain a public list of approved consultants. Part 5001 defines a qualified consultant as an independent third-party person with the knowledge, expertise and experience to perform the task, and for B&I the consultant must be acceptable to the Agency. The Georgia state office makes that determination for each application.

      Can the borrower, developer or lender prepare the feasibility study?

      Not when USDA requires an independent study for B&I. The rule calls for an independent, qualified third party with no financial interest in the borrower, the project or the loan. For Community Facilities, a lender may prepare a financial feasibility analysis in some cases, but a CF guarantee above $1 million to a new entity or activity requires an independent qualified consultant.

      How do I choose a USDA feasibility study consultant for a Georgia project?

      Look for independence, experience with your asset class, and command of Georgia-specific evidence: consolidated-county eligibility; urbanized-area edges; ARC and Job Tax Credit stacking; anchor delays; hurricane exposure; and SPUR for processors. The study should address all five Part 5001 components (economic, market, technical, financial and management feasibility) in the form the state office reviews.

      Does USDA require a feasibility study for a B&I loan in Georgia?

      Yes, for B&I guarantees above $1,000,000 to a new business. For smaller loans and existing businesses, USDA may require one when the lender's analysis does not establish technical feasibility or economic viability, or when the project significantly affects an existing borrower's operations.

      Are Augusta, Columbus, Macon or Athens-area sites eligible for B&I?

      Each is a consolidated city-county above 50,000, so on our analysis essentially all of Richmond, Muscogee, Bibb and Clarke counties is ineligible. Independent towns such as Blythe and Hephzibah still need a map check.

      Is Mableton eligible, since it incorporated after 2020?

      Mableton is not measured as a city until the 2030 Census, but it sits within the Atlanta urbanized area and is likely ineligible on that basis.

      Can a Hyundai or Rivian supplier use a USDA guarantee?

      Ellabell, Social Circle and nearby counties screen as eligible, while Chatham County is excluded. Lenders will expect supplier contracts, anchor-delay sensitivity and a workforce plan.

      Can a Georgia poultry processor use SPUR?

      Yes. SPUR guarantees 90 percent of loans for meat, poultry and seafood processing with no geographic restriction, at a 3 percent fee and 0.55 percent retention.

      How can a rural hospital use Georgia's tax credit with USDA financing?

      Donors receive a 100 percent state income tax credit, up to $4 million per hospital within a $100 million annual cap. As of July 22, 2026, $57.3 million of the 2026 cap remained, which can sit alongside Community Facilities lending.

      Is B&I funded in FY2027?

      A continuing resolution funds USDA at FY2026 levels through December 11, 2026. The President's budget proposes ending B&I, while the House-passed bill raises loan authority to $2.0 billion.

      How long does a USDA feasibility study take in Georgia?

      Preparation typically runs several weeks depending on data availability and site complexity, and the completed study then enters the lender's underwriting package for USDA review during the Conditional Commitment process. USDA Rural Development staffing reductions in 2025 have extended agency processing timelines, so commissioning the study early protects the overall closing schedule.

      What does 7 CFR Part 5001 require the study to contain?

      The regulation requires an independent analysis covering economic, market, technical, financial, and management feasibility. In practice that means market demand and competitive supply analysis, site and technical assessment, five-to-ten-year financial projections with debt service coverage and sensitivity testing, and an evaluation of the management team, prepared by a qualified consultant with no financial interest in the project.

      Regulatory framework

      How 7 CFR Part 5001 decides your file

      Every USDA guaranteed loan passes through nine regulatory gates, and the feasibility study decides most of them. Our full framework sets out each gate, the current fiscal year fees and guarantee levels, and what the Agency looks for in the report.

      Read the USDA Feasibility Study Framework

      Flagship research · 2026 editionUSDA Rural Capital Atlas 38 asset classes, program comparisons, capital stacks, lender performance and credit forensics.

      Ready to Start Your USDA Project?

      Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

      Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

      Get Your Free Consultation

      Fill out the form below and we'll contact you within 24 hours to discuss your project.

      We'll respond within 24 hours

      Sources and Methodology

      Figures on this page are drawn from primary federal and state sources and verified as of October 2026. Industry, advocacy and sponsor sources are labeled as such. Where sources conflict, we use the controlling legal document (Federal Register or eCFR) or the most recent official release. Eligibility determinations require an address-level check on the USDA eligibility map.

      Full source list (17 references)