USDA Feasibility Study for Marinas in Delaware

    NAICS 713930

    Marina projects on Delaware's Inland Bays, the Delaware Bay shore, and the Nanticoke and Broadkill rivers combine recurring slip revenue, fuel and service margins, and ancillary food and beverage income. An independent USDA feasibility study consultant quantifies registered boat populations within a defined service area, benchmarks slip rates and ancillary revenue, and projects financials with sensitivity to weather, fuel margin, and occupancy.

    Delaware's marina count rose from 14 to 22 between 2019 and 2023, and at 2.1 per 100,000 residents the state now has about twice the national density.

    Program Fit

    B&I is the primary program for marina projects in eligible areas.

    At 85 percent below $5 million (FY2026, 91 FR 11272), B&I is the strongest guarantee available to a marina buyer or builder, and its term can follow the useful life of bulkheads, docks and buildings up to 40 years (5001.402). SBA 7(a) has financed four Delaware marinas since FY2010; 504 has not been used. REAP can fund solar or efficiency on a marina store or service building once 12 months of data exist. A marina with gaming machines must keep gambling under 15 percent of gross revenue to remain B&I-eligible (5001.127(b)). Community Facilities applies only to a public boat ramp or municipal harbor, and SPUR, linked in other Delaware pages, is for seafood processors, not marinas.

    Rule or discretion

    Only one case forces an independent study under 5001.306(a)(3)(i): a newly formed borrower whose B&I guarantee exceeds $1,000,000. The national average SBA marina loan from FY2020 to FY2026 was $1,281,853, so a typical acquisition by a new owner crosses the line; Delaware's two recent loans averaged $206,050, the size of working capital or equipment rather than a marina purchase.

    What the Study Covers

    Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.

    • Market demand and competitive supply analysis
    • Technical and site feasibility, including environmental considerations
    • Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
    • Management and operational capacity assessment
    • Economic feasibility and rural community impact

    Delaware Market Evidence

    Sussex County's coastal recreation economy and growing resident base support multi-revenue marina operations; coastal flood exposure and storm insurance are first-order diligence items. Because the Philadelphia urbanized area reaches into New Castle County, eligibility in Delaware is parcel-specific north of the C&D Canal, while Kent and Sussex counties are broadly eligible; USDA sets rural determinations at the census level, so sponsors should confirm the exact project parcel against USDA's rural-area determination before relying on eligibility.

    Marinas in Delaware: market evidence

    Delaware: marinas, supply and rural footprint

    MeasureDelawareUnited States
    Establishments, 2019 → 202314 → 22 (+57.1%)3,757 → 3,734
    Per 100,000 residents (2023)2.11.1
    Average employees per establishment7.38.7
    Average annual pay per employee$43,882$51,262
    Share of establishments in non-metro counties72.7% (16 in 1 counties)
    Share of state population in non-metro counties (2025)26.1%

    Non-metro counties with the most marinas (2023): Sussex County (16).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Eight marinas were added in four years while the national count slipped from 3,757 to 3,734, and Sussex holds 16 of the 22, or 5.8 per 100,000 residents on its 2025 population (computed). Delaware marinas are small: 7.3 employees on average and 161 workers statewide in 2023, with payroll averaging about $321,136 per marina. Sussex's 16 averaged about 8 workers each and New Castle's 6 about 6 (Census county file). Average pay of $43,882 is 14.4 percent below the national $51,262, about $21.10 an hour.

    The growth signals demand from Sussex's expanding resident base, up 16.8 percent from 2020 to 2025, but it also means the new marina's competitors may be recent entrants with modern docks. A reviewer will ask whether the eight new establishments added slips or simply changed owners, how many slips are vacant in winter and in a weak boating season, and what a coastal storm does to the docks, the fuel dock and the insurance premium.

    Regional comparison

    State (each state's own pack)Establishments 2019 → 2023Per 100,000 residentsAvg employeesAvg annual payNon-metro share of county-placed establishmentsSBA 7(a) loans FY2020–FY2026Average 7(a) loan
    Delaware14 → 22 (+57.1%)2.17.3$43,88272.7% (16 of 22)2$206,050
    Maryland164 → 166 (+1.2%)2.78.9$53,72221.1% (34 of 161)3$1.5 million
    New Jersey186 → 180 (-3.2%)1.95.5$57,2130.0% (0 of 174)5$1.7 million
    United States3,734 (2023)1.18.7$51,262112$1.3 million

    Compiled from the Delaware, Maryland and New Jersey packs (Census CBP 2023; SBA FOIA as of 30 Sep 2026); the United States row uses the national columns. Computed table.

    Maryland's marinas on the Eastern Shore are the natural comparables: the Maryland pack places 14 in Kent County, 9 in Talbot and 4 each in Dorchester and Worcester, all non-metro, and Maryland's three recent SBA marina loans averaged $1,495,667. New Jersey's recent loans averaged $1,745,600. Both are close to the national average and far above Delaware's, which tells a lender that a Delaware marina purchase will be financed at regional, not local, scale.

    Revenue model, costs and capital

    Revenue comes from annual and seasonal slip leases, transient dockage, dry or rack storage, winter storage, fuel sales, service and repair labour, parts, ship's store, and any restaurant or lease income. The metrics that matter are slip occupancy by length class, revenue per linear foot, fuel gallons and margin, storage turns and service hours billed. Costs are labour, fuel cost of goods, utilities, insurance (including windstorm and flood), dredging and dock maintenance, property tax, and lease payments for any state submerged-land authorisation. Capital items include docks, piles and bulkheads, fuel system and tanks, lifts or forklifts for dry storage, the service building, dredging and upland improvements. Delaware has no sales tax but levies a gross receipts tax on business revenue, which the pro forma treats as an operating cost.

    Rural footprint and B&I eligibility in Delaware

    Sixteen of 22 marinas (72.7 percent) are in Sussex, Delaware's only non-metro county, against 26.1 percent of residents; marinas are among the most rural assets in the state. The six in New Castle County need care, because B&I's 5001.3 test excludes Wilmington (70,898 in 2020) and the urbanized area joined to it, which runs south through Newark, Bear and Glasgow. A Delaware River or C&D Canal marina in that area is likely ineligible; one south of the canal near Odessa or Townsend needs a parcel check. Sussex sites on Rehoboth Bay, Indian River Bay, Little Assawoman Bay, the Broadkill and the Nanticoke screen as eligible, and Kent's Delaware Bay shore towns screen in too. See the Delaware USDA feasibility study hub for the town list.

    Financing benchmarks: USDA B&I next to SBA

    Delaware: SBA lending to marinas

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20192$2.5 million0$0
    FY2020 to FY20232$412,1000$0
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $206,050. Delaware had fewer than 30 seasoned 7(a) loans for marinas; nationally, 5.2% of 155 FY2010 to FY2016 loans were charged off, on average 91 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Four loans in 17 years: two in FY2017 to FY2019 totalling $2.5 million, consistent with marina purchases, and two in FY2020 to FY2023 totalling $412,100. There is no seasoned Delaware record to rate. Nationally 5.2 percent of 155 seasoned marina loans were charged off, on average 91 months after approval, a late-loss pattern: marinas usually fail slowly, through deferred dock maintenance and a storm or two, rather than in the first years. Delaware has no B&I award on USAspending for FY2024 to FY2026, so the lender cannot point to a recent state precedent.

    B&I term (FY2026)Rule
    Guarantee, loans under $5 million85 percent; 3.0 percent upfront fee; 0.55 percent annual retention fee
    Guarantee, $5 million to $25 million80 percent; 3.0 percent fee; 0.55 percent retention
    Reduced-fee tier80 percent; 1.0 percent fee; 0.50 percent retention
    Loan note guarantee before construction completionAdditional 0.50 percent fee
    Maximum loan$25 million per borrower (7 CFR 5001.406(c))
    TermUseful life, up to 40 years, no balloon; interest-only must end within 3 years (5001.402)
    RateNegotiated, fixed or variable, no higher than the lender's similar unguaranteed loans (5001.401)
    Equity at closingExisting business 10 percent; new business 20 percent balance sheet equity or 25 percent of project cost; new construction with an early guarantee 25 percent (5001.105(d))
    Feasibility studyRequired from an independent qualified consultant for a guarantee above $1,000,000 to a new business (5001.306(a)(3)(i))

    Source: 91 FR 11272 (FY2026 fee notice); 7 CFR Part 5001, CFR 2026 edition.

    Buyers forming a new company to acquire a Sussex marina meet 5001.105(d)(4) with 20 percent balance sheet equity or a 25 percent cash contribution; an operator already running a marina and adding slips needs 10 percent. Docks and bulkheads in a flood zone are collateral the lender will discount heavily, and the appraisal removes going-concern value first (5001.203), so equity often needs to be above the minimum.

    Worked example (illustrative)

    Delaware's own loans are too few and small, so the example uses the national average SBA marina loan of $1,281,853, rounded to $1,280,000, for a new company buying and upgrading a 120-slip Sussex marina. Rate and term are assumptions.

    Worked example inputs: $1.28 million Sussex marina (illustrative)

    InputValue
    Loan amount$1,280,000.00
    Guarantee (B&I, FY2026 notice, under $5 million)85 percent
    Upfront guarantee fee3.00 percent of the guaranteed amount
    Annual retention fee0.55 percent of the outstanding balance times the guaranteed share
    Interest rate (illustrative, fixed)7.75 percent
    Term (illustrative)25 years, monthly payments, fully amortizing; docks, bulkheads and buildings
    Coverage target1.25x

    Worked example results: $1.28 million Sussex marina (computed)

    ResultAmount
    Guaranteed amount$1,088,000.00
    Lender's unguaranteed share$192,000.00
    Upfront guarantee fee$32,640.00
    Monthly payment$9,668.21
    Annual debt service$116,018.52
    Balance after payment 12$1,262,571.05
    First-year retention fee (on the balance after payment 12)$5,902.52
    NOI or cash flow needed for 1.25x coverage$145,023.15
    Equity, new business, 20 percent balance sheet test (loan as the only liability)$320,000.00 on a $1,600,000.00 project
    Equity, new business, 25 percent of project cost$426,666.67 on a $1,706,666.67 project
    Equity, existing business, 10 percent of project cost$142,222.22 on a $1,422,222.22 project

    Reading the result. The marina needs $145,023.15 of NOI for 1.25x coverage, or $1,208.53 per slip per year across 120 slips, after fuel margin, service income, labour and insurance. Debt service of $116,018.52 equals 36.1 percent of the average Delaware marina's 2023 payroll. The guarantee exceeds $1,000,000 and the borrower is new, so the independent study is mandatory. A major storm year is the right stress test: if the marina loses a season of transient and fuel income and insurance deductibles fall on the owner, coverage must still clear 1.0x with reserves.

    What a lender-grade marina feasibility study in Delaware must prove

    1. Slip demand by length. Registered boats in the service area by length, current waiting lists, and occupancy at competing marinas, since Delaware added eight marinas from 2019 to 2023.
    2. Rate support. Annual, seasonal and transient rates per foot from comparable Inland Bays, Delaware Bay and Eastern Shore marinas, labelled by state.
    3. Ancillary revenue. Fuel gallons and margin, service hours and storage turns, each supported by records or comparables.
    4. Seasonality. Monthly revenue and quarterly cash flow (5001.202 asks for this in seasonal businesses), with winter storage as the off-season anchor.
    5. Coastal exposure. Flood zone, storm history, dock elevation and an actual insurance quote for wind and flood.
    6. Site rights and permits. Riparian rights or submerged-land authorisation, dredging permits and the next dredging cycle's cost.
    7. Physical condition. A dock and bulkhead inspection with a capital plan and reserve.
    8. Address-level eligibility. A dated USDA map determination, especially for any New Castle County site.

    Risks and mitigants

    Storm damage is mitigated by insurance, elevation and a reserve; dredging risk by permits and a sinking fund; fuel price risk by margin rather than volume assumptions; competition by a slip-demand study. Appropriations run only to 11 December 2026 under the stopgap, and the administration's FY2027 request would wind B&I down. The study records the lender's OneRD standing given the May 2026 revocations.

    Three years of operating statements for an existing marina, the slip roll by length and term, fuel and service records, site rights and permits, an engineering inspection, insurance quotes, statements from each owner of 20 percent or more and the closing sources and uses, all sent by the lender to the Dover state office. Marina studies are returned for occupancy assumptions without a waiting list or comparables, missing dredging costs, generic insurance figures, and revenue that ignores the off-season.

    Hiring a USDA marina feasibility study consultant in Delaware

    If a new owner's B&I guarantee exceeds $1,000,000, Part 5001 requires the independent study, and a typical Delaware marina purchase at the national average loan size does. Smaller refinancings and equipment loans are discretionary. A USDA feasibility study consultant who works with waterfront assets helps the lender separate durable slip income from a good summer.

    Scope: slip demand and competition, rate and ancillary benchmarks, a coastal-risk and site review, monthly and annual projections with storm and occupancy cases, and an assessment of the operator, with the working model supplied. The site's cost page explains the fixed-fee bands; the fee is confirmed in writing before any work starts. Engineering inspections and appraisals are separate. The national marina feasibility study page explains the method more fully. Tell the team the marina's location, slips, services and loan size in the Get Your Free Consultation form below; they answer within 24 hours.

    Program example (none in Delaware)

    The Delaware hub's precedent file has no marina financing. The nearest documented USDA marina example on this site is a REAP grant in Florida: Shields Marina in Wakulla County received $135,828 for a 194.4 kW solar system, as the Florida hub reports. The Michigan case study below shows the site's B&I method for a marina with lodging.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a marina project in Delaware?

    Yes, if the buyer is a new company and the B&I guarantee will exceed $1,000,000. Otherwise the Agency or lender decides. Because the national average SBA marina loan from FY2020 to FY2026 was $1,281,853 and Delaware has no recent purchase-scale marina loans, a new owner buying a Sussex marina should expect the requirement to apply.

    What does 7 CFR Part 5001 require the study to contain?

    Independence and five feasibility headings: economic, market, technical, financial and management. For a Delaware marina they come down to slip demand by boat length, competitor occupancy and rates around the Inland Bays and Delaware Bay, the condition of docks, bulkheads and the channel, flood and wind exposure with a real insurance quote, monthly projections with coverage and storm cases, and the operator's waterfront record.

    How is a marina project evaluated in a USDA feasibility study?

    Revenue is built slip by slip and service by service: occupancy and rate per foot for each length class, transient nights, storage, fuel margin and service hours. Costs include labour priced against the $43,882 Delaware average, insurance from an actual quote, dredging and maintenance. The study tests 1.25x coverage and a storm year. Nationally, marina losses arrived about 91 months after approval, so the capital plan for years five to ten matters.

    How long does a USDA feasibility study take in Delaware?

    Usually inside this site's six-to-nine-week schedule, or three to four weeks on a rush, but marinas depend on a dock and bulkhead inspection the buyer arranges, which can set the pace. Once finished, the study goes into the lender's package for the Dover office; with reviews slower since the 2025 staffing cuts, a buyer who wants the keys before the boating season should start in the autumn.

    How does the FY2026 85 percent guarantee affect marina projects under $5 million?

    Loans under $5 million get an 85 percent B&I guarantee in FY2026, priced at 3.0 percent of the guaranteed amount upfront and 0.55 percent a year. On the illustrative $1,280,000 Sussex marina, that is $1,088,000 guaranteed, a $32,640 fee and about $5,903 of first-year retention, and the lender carries $192,000. For an asset exposed to coastal storms, that cover is often what brings a community bank in.

    Who prepares a marina feasibility study in Delaware?

    A waterfront specialist with no stake in the marina, the seller, the buyer or the lender, whom the Agency accepts. The Dover office rules on acceptability for each loan; there is no USDA list. The skills that matter for Delaware are slip-demand analysis by length class, dredging and permit cost estimation, and pricing wind and flood exposure from quotes rather than rules of thumb.

    Is a New Castle County marina eligible for B&I?

    It depends on the parcel. Marinas on the Delaware River or C&D Canal inside the Philadelphia urbanized area, around Newark, Bear and Glasgow, are likely ineligible. Sites south of the canal near Odessa or Townsend need a parcel-level check. Every Sussex and Kent bayshore site on the hub's list screens as eligible, but each study includes a dated USDA map determination.

    What does a marina feasibility study consultant cost in Delaware?

    A clean single-marina purchase in Sussex usually prices in the cost page's standard band, $6,900 to $12,500; one with a restaurant, lodging or a major rebuild and dredging programme may fall into the complex band, $10,500 to $14,500. The figure is fixed in a written proposal. Dock engineering, environmental review and the appraisal are separate.

    Can one study support both SBA and USDA financing for a Delaware marina?

    Yes. When an SBA lender exercises its right to require a study (13 CFR 120.160(b)), a Part 5001 report satisfies it, since SBA sets no format. Maryland and New Jersey marina loans averaged $1.5 million to $1.7 million, and a Delaware buyer may well talk to lenders across the region under either program; one study supports every application.

    How long is a marina feasibility study valid?

    The regulation sets no end date for a study; it does cap appraisals at one year (5001.203), and the site aims to keep its own data within roughly 18 months. For a Delaware marina, a storm season can change both the physical condition and the insurance market in a year, so a study older than twelve months should be updated with a new inspection note and fresh wind and flood quotes before closing.

    Other project types in Delaware

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www.census.gov/programs-surveys/cbp.html
    2. U.S. Census Bureau, Vintage 2025 county and state population estimates: https://www.census.gov/programs-surveys/popest.html
    3. Office of Management and Budget, metropolitan and micropolitan statistical area delineation, July 2023 (Census delineation files): https://www.census.gov/geographies/reference-files/time-series/demo/metro-micro/delineation-files.html
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentage for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov award counts for Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), Delaware, FY2024 to FY2026: https://www.usaspending.gov/search
    10. Delaware hub sources reused here (Census V2025 for Sussex growth; 2020 Census and Delaware Census State Data Center urbanized areas; Delaware Division of Revenue on gross receipts tax; FY2027 appropriations status; USDA lender actions of May 2026): /delaware
    11. Florida hub, Shields Marina REAP grant: /florida
    12. Site cost page (fees, timelines, scope): /usda-feasibility-study-cost

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.