USDA Renewable Energy Feasibility Study

    Last updated 2026-11-08

    Short answer

    A renewable energy feasibility study is the independent report that tells a lender and USDA whether a solar, wind, biomass, anaerobic digester, geothermal or hydro project will produce the energy or savings it promises, at a cost and on a contract structure that repays its debt. The rules changed on 16 October 2026. Under USDA's new Rural Energy for America Program (REAP) rule, a grant project must already be built and operating before the applicant applies, with 12 months of actual production or savings data, and grant awards are capped at $500,000 for renewable systems and 25% of project cost [1]. Up-front financing now runs through REAP guaranteed loans and other lending under 7 CFR part 5001, where a feasibility study is required for a new business borrowing over $1,000,000 under B&I and when the lender or Agency deems one necessary for a REAP renewable system loan [2].

    The business base is small and fast-growing: 942 solar and other renewable power establishments with paid employees in 2023, up from 405 in 2019 (+132.6%), paying $138,631 per employee [3]. REAP grants are the rural signal: 6,722 REAP grant awards and $1,024,856,615 in REAP grant dollars across the states from FY2024 to FY2026 [4]. SBA lending to renewable generation shows real risk: of 68 SBA 7(a) loans approved in FY2020 to FY2023, 9 (13.2%) were already charged off [5]. Data current as of November 2026.

    QuestionAnswer
    What changed on 16 October 2026?REAP grants moved to a post-completion model: build first, run 12 to 24 months, apply with 12 months of data [1]
    REAP grant limits$1,500 minimum; $500,000 for renewable systems, $250,000 for efficiency; at least 75% cost share [1]
    REAP guaranteed loan$5,000 to 75% of eligible project costs, up to $25 million per borrower; FY2026 guarantee 80%, fee 1.0%, retention 0.25% [2][6]
    Grant plus loan capTotal REAP funding may not exceed 75% of project cost [1]
    Study required?REAP loan: when lender or Agency deems it necessary, plus a technical report; B&I: over $1 million to a new business; REAP grant: resource assessment or a study in its place [2][1]
    Newly ineligibleGround-mount solar or wind on Cropland; solar or wind with components from a foreign adversary; multi-location projects; EV chargers [1]

    What a renewable energy feasibility study is, and when USDA requires one

    Both USDA rule sets define the study the same way. Part 5001 calls it a report with an opinion or finding by an independent qualified consultant evaluating economic, market, technical, financial and management feasibility under appendix A [2][7]. The 2026 REAP rule adds that the author must be an independent professional with relevant knowledge, expertise and experience, and that findings must relate to a project at a specific site; it then lists the required content item by item, from minimum inputs and contracts through by-product revenue, construction risk, sensitivity analysis, a recommendation and the consultant's qualifications [1].

    When it is required depends on which money you use.

    Financing routeFeasibility study ruleSource
    B&I loan over $1,000,000 to a new businessRequired, by an independent qualified consultant acceptable to the Agency; Agency sets scope5001.306(a)(3)(i)
    B&I loan of $1,000,000 or lessAgency may require one if the lender's analysis is not sufficient or the project will significantly affect an existing business5001.306(a)(3)(ii)
    B&I loan of $600,000 or lessStreamlined application if the lender's analysis is sufficient5001.306(b)
    REAP guaranteed loan, renewable energy systemWhen the lender or Agency deems it necessary; technical report always required5001.307(d), (e)
    SBA 7(a) or 504SBA may require a feasibility study13 CFR 120.160(b)
    Guarantee issued before construction completionBudget and timetable confirmed by a qualified independent consultant5001.205(e)(2)
    REAP grant document (rule effective 16 Oct 2026)When it appliesSource
    Resource Assessment, or a Feasibility Study in its placeEvery renewable energy system grant application4280.131(b)(3) [1]
    Energy AssessmentEfficiency projects of $80,000 or less4280.131(b)(3) [1]
    Energy AuditEfficiency projects above $80,0004280.131(b)(3) [1]
    All project agreements (PPA, interconnection, lease, feedstock, O&M, financing)Projects above $80,0004280.131(b)(4) [1]
    Two years of pro forma statements for the projectProjects of $200,000 or more4280.131 [1]
    Completion certificate by a state-licensed professional engineerProjects of $200,000 or more, or larger and more complex projects4280.122 [1]
    12 months of actual production or savings plus 12 months pre-installation dataAll grant applications4280.122 [1]

    The REAP rule effective 16 October 2026

    USDA published the final rule with comment period on 1 October 2026 (91 FR 62600), effective 16 October 2026, with comments due 2 November 2026 [1]. It followed the April 2026 rescission of the FY2025 to FY2027 REAP funding notice, which required applicants without an executed financial assistance agreement to reapply under the new rule [8]. The changes below are from the rule text.

    TopicRule effective 16 October 2026Effect on the feasibility study
    TimingProject Period must end 12 to 24 months before the application (12 to 36 months in the first window)The study now often supports the loan that builds the project, not the grant
    Data12 months of actual production or savings and 12 months of pre-installation dataProduction estimates must be reconciled with actual meter data
    Award sizeMinimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiencyGrants cover a smaller share of large projects
    Cost shareAt least 75% of project costGrant at most 25% of cost
    Combined REAP fundingGrant plus guaranteed loan at most 75% of project costCaps the loan when a grant is planned
    CroplandGround-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systemsSite screening first
    Foreign componentsSolar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publicationCountry-of-origin list for every component
    SizingGround-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifePayback calculation is an eligibility test
    LocationsProjects at more than one location ineligibleOne site per application
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsScope these out of the grant budget
    ApplicantNo more than one application per federal fiscal year from each highest-level owner and the entities its owners own; site owned or leased at least 12 months before the Project PeriodOwnership and site control evidence
    InstallersLicensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327Key service provider qualifications
    CompetitionNo state competitions: one competition for requests of $20,000 or less and one national competition for all others, in annual application windowsScoring factors in the notice drive the case

    Two consequences matter most for a borrower. First, the grant no longer finances construction: USDA says plainly that the REAP guaranteed loan under 7 CFR 5001 is available for up-front costs [1]. Second, the grant is competitive and paid later, so a lender should underwrite the project without it. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.

    What a USDA-grade renewable energy feasibility study must prove

    #What the study must proveAppendix A componentEvidence a reviewer expects
    1The project is eligible under current rulesEconomic, TechnicalNot on Cropland, no foreign-adversary components, one location, sized to historical use [1]
    2The resource or baseline supports the production or savings claimedTechnicalResource assessment, shading or wind data, energy audit baseline
    3Production estimates match real performanceTechnical, FinancialDegradation, availability, comparison with metered data once operating
    4The energy has a buyer or offsets real loadMarketTwelve months of utility bills, tariff, PPA or interconnection agreement
    5Tariff and export compensation are modelled correctlyEconomicRate schedule, demand charges, net metering or export terms and their review dates
    6Interconnection is approved or attainableTechnicalUtility interconnection agreement and upgrade costs
    7The installer and equipment are qualifiedTechnicalState licence, at least three similar installations, commercially available equipment [1]
    8Simple payback is within useful lifeFinancialPayback per the 5001.3 and 4280 definitions [2][1]
    9Cash flow covers debt service without the grantFinancialCoverage with and without a later grant; sensitivity to production and price
    10O&M, inverter replacement and insurance are fundedFinancial, ManagementO&M contract, reserve schedule
    11For digesters and biomass, feedstock is securedEconomic, MarketFeedstock agreements, digestate or ash outlets
    12Management can operate and reportManagementMonitoring, data for REAP reporting, owner experience

    Appendix A's elements, applied to a renewable energy project [7][1]:

    Appendix A elementWhat it must cover for solar and other renewable energy projects
    Executive summaryTechnology, rated capacity, site, annual energy production or savings, total project cost
    EconomicMinimum inputs (resource, feedstock, land, interconnection), contracts (PPA, interconnection, feedstock, O&M), environmental risk, cost against benefits
    MarketWho uses or buys the energy (the applicant, a utility, community solar subscribers), competition, by-product revenue such as digestate, industry risk
    TechnicalCommercial availability, record of the technology, installer experience, use, age and reliability of equipment, construction risk
    FinancialUnderwriting, assumptions, source of repayment, equity, peer comparison, sensitivity to production, tariffs and O&M
    ManagementWho runs and maintains the system, O&M contracts, monitoring, owner experience
    RecommendationThe independent professional's opinion on success
    QualificationsRelevant knowledge, expertise and experience of the author, which the 2026 REAP rule now writes into its definition

    Program fit and ineligible uses

    RouteFitKey termsStudy trigger
    REAP grantCompleted, operating renewable systems or efficiency projects of agricultural producers and rural small businessesPaid after completion; up to 25% of cost; $500,000 cap for renewable systems [1]Resource assessment or study in lieu
    REAP guaranteed loanBuilding the system; up-front costUp to 75% of eligible costs; $25 million per borrower; FY2026 80% guarantee, 1.0% fee, 0.25% retention [2][6]Lender or Agency discretion; technical report required
    B&I guaranteed loanRenewable systems not otherwise eligible under REAP, or when REAP funds are unavailable (5001.105(b)(21)); integrated processing systems must show technical meritFY2026 85% under $5 million; Agency may raise equity for new businesses using renewable systems [2][6]Over $1 million to a new business
    Community FacilitiesRenewable systems serving an essential community facility, with no power-sale contractTechnical report as part of the financial feasibility study [2]As for CF
    SBA 7(a) and 504Renewable systems for small businesses anywhere7(a) 75% guarantee over $150,000; 504 equity 10% to 20% [9]SBA may require one
    Conventional, equipment finance or third-party ownershipLarger or tax-driven projectsLender or investor termsLender or investor policy

    Ineligible uses and projects cut across programs. REAP loan funds cannot buy agricultural tillage equipment, used equipment or vehicles, and money for studies, technical reports, audits and business plans is limited to 10% of the loan in total [2]. Lease payments are ineligible, though a REAP borrower may lease financed equipment to a third party that uses it for REAP purposes if the borrower keeps ownership and control for the useful life [2]. Residential systems are ineligible, except community solar subscriptions, licensed nursing and assisted living facilities, and hotels with stays of 30 days or less; owner-occupied bed and breakfasts are ineligible for REAP [1][2].

    Eligibility: who and where

    REAP serves agricultural producers, defined as earning at least 50% of gross income from agricultural operations averaged over five years, and rural small businesses [2]. Under the 2026 grant rule, the project must be located in a rural area, the small business definition follows SBA's, and only the highest-level owner may apply, once per federal fiscal year [1]. B&I requires a rural area: outside cities or towns over 50,000 and their contiguous urbanized areas [2]. This site's state pages also report an August 2025 USDA policy that bars wind and solar from B&I and limits REAP for large ground-mounted arrays on farmland; the 2026 CFR text of 5001.105(b)(21) still lists renewable systems as an eligible B&I purpose, so the policy should be confirmed with the State Office for any B&I solar or wind request.

    National market evidence: establishments, density, pay and rural footprint

    County Business Patterns counts solar (NAICS 221114), biomass (221117) and other (221118) electric power generation establishments with paid employees [3]. Most solar arrays have no on-site employees, so they appear where their operating company has staff, not where the panels are. These figures describe the business base that develops and operates generation, not the location of generation.

    MeasureUnited States
    Establishments with paid employees, 2019405
    Establishments with paid employees, 2023942
    Change, 2019 to 2023+537 (+132.6%)
    States (incl. DC) with at least one establishment, 202341
    Establishments per 100,000 residents, 20230.3
    Paid employees, 2023 (mid-March)11,596
    Annual payroll, 2023$1.61 billion
    Average employees per establishment12.3
    Average annual pay per employee$138,631
    Establishments the county file places in a county525 (55.7% of the national total)
    Of those, in non-metro counties5 (1.0%) in 1 counties
    Share of U.S. population living in non-metro counties, 202513.6%
    Rural concentration index (non-metro share of establishments / non-metro share of population)0.07

    Only 5 of the 525 establishments in the 2023 county file are in non-metro counties, all in Georgia, so a top-10 ranking by non-metro share is not meaningful for this industry; REAP award geography below is the better rural indicator [3][10].

    The base more than doubled in four years (+132.6%), led by California, Florida, Texas. Average pay of $138,631 and 12.3 employees per establishment describe a professional, capital-intensive industry. For a rural feasibility study the useful national facts are therefore not establishment counts but program activity: where REAP grants and guaranteed loans actually went.

    Top 10 states by establishments, 2023

    RankState20192023ChangePer 100k residentsAvg employeesAvg payNon-metro share*
    1California94240+155.3%0.616.4$147,2250.0%
    2Florida1493+564.3%0.42.5$125,1920.0%
    3Texas2975+158.6%0.218.0$122,9410.0%
    4New York1645+181.2%0.212.7$200,4100.0%
    5North Carolina3335+6.1%0.324.7$126,5270.0%
    6Colorado732+357.1%0.510.4$164,1920.0%
    7Illinois1131+181.8%0.24.3$141,1670.0%
    8Michigan2530+20.0%0.38.8$117,0610.0%
    9Virginia2427+12.5%0.38.4$129,6100.0%
    10Georgia626+333.3%0.22.8$213,23062.5%
    • Non-metro share of establishments placed in a county. The top 10 states hold 67.3% of all establishments [3].

    Where REAP money went, FY2024 to FY2026

    RankState, ranked by REAP grant dollarsREAP grant dollars, FY2024 to FY2026Dollars per residentState, ranked by dollars per residentDollars per resident (ranked)
    1Iowa$62,662,488$19.64Iowa$19.64
    2Michigan$61,851,826$6.14Vermont$16.47
    3Pennsylvania$60,772,255$4.67North Dakota$14.45
    4Minnesota$59,174,068$10.37South Dakota$13.88
    5Illinois$55,148,905$4.30Nebraska$12.78
    6Ohio$45,916,364$3.89Idaho$11.77
    7Texas$40,481,643$1.39New Hampshire$11.76
    8New York$39,996,318$1.98Minnesota$10.37
    9Georgia$36,934,061$3.45Maine$9.99
    10Indiana$29,441,059$4.34Delaware$7.39

    REAP grant obligations by place of performance, 1 October 2023 to 30 September 2026, in the 50 states with REAP grant dollars (territories excluded); per-resident figures use the population reported by USAspending. The top 10 states took 48.0% of $1,024,856,615; the national average was $3.10 per resident [4].

    StateREAP grantsREAP guaranteed loansB&I guaranteed loan awards
    Iowa58602
    Minnesota54405
    Illinois459621
    Pennsylvania340111
    Missouri309474
    Nebraska29707
    Ohio268021
    Wisconsin24826
    Michigan225120
    Georgia221013
    All 51 states with data6,72275643

    Award counts by state for REAP (10.868) and B&I (10.768), FY2024 to FY2026; top 10 states by REAP grants [4]. These awards were made under the pre-2026 rules.

    Demand drivers and competition analysis

    For a behind-the-meter system, demand is the applicant's own load: twelve months or more of interval or monthly utility data, the tariff, demand charges and how much production can be used on site. For a system that sells power, demand is the buyer: a utility, a community solar program or a PPA counterparty, plus the interconnection queue. For an anaerobic digester or biomass system, it is also the feedstock supply and the market for digestate, heat or gas. Competition analysis means the alternatives the energy competes with: utility retail rates and their trend, other generation on the same feeder, and competing feedstock buyers.

    • Load: historical consumption by month and time of day.
    • Tariff: energy, demand and fixed charges, and the export or net metering terms.
    • Resource: solar irradiance and shading, wind data, water flow, or feedstock tonnage.
    • Offtake: PPA term and price, or the share of production used on site.
    • Policy: utility tariff reviews and incentive rules that can change the value of output.

    Revenue model and key metrics

    Revenue is either avoided cost (energy and demand charges the applicant no longer pays), export credits, power sales under a PPA, renewable energy credits, or energy savings for efficiency projects, net of operation and maintenance. Part 5001 defines simple payback as total project costs divided by the annual dollar value of energy produced or saved, excluding one-time benefits and tax credits that do not provide annual income [2].

    MetricWhat it measuresHow the study supports it
    Annual energy production or savings (kWh or MMBtu)OutputResource assessment or audit; actual meter data once operating
    Capacity factor and degradationProduction over timeSite data and equipment warranties
    Share of production used on siteAvoided-cost versus export valueLoad and production by hour or month
    Value per kWh (avoided, exported, contracted)Revenue rateTariff and contracts
    O&M cost per year and inverter or major-component reserveNet incomeO&M contract and equipment life
    Simple payback (years)REAP grant eligibility and valueProject cost / annual energy value
    Debt service coverage with and without grantRepayment capacityFinancing structure

    Cost structure, wages and capital items

    Operating costs are small but long-lived: O&M, monitoring, insurance, property tax where it applies, site lease, inverter or component replacement reserves, and for digesters and biomass, feedstock, labour and maintenance. Wages in the generation industry averaged $138,631 in 2023 [3], though most rural projects contract O&M rather than hire. Capital items are the generation equipment (modules, inverters, racking, turbines, digesters, boilers), balance of system, interconnection and utility upgrades, storage where eligible, engineering, permits, and the feasibility, technical report and audit costs that REAP loans can finance within the 10% limit [2].

    Financing evidence: SBA lending history and seasoned losses

    SBA loan records for solar, wind, geothermal, biomass and other generation (NAICS 221114 to 221118) show how lenders have financed small renewable businesses [5]. The SBA set includes wind and geothermal, which the County Business Patterns figures above do not.

    Approval years7(a) loans7(a) dollarsAverage 7(a)504 loans504 dollarsAverage 504Jobs reported (both)
    FY2010 to FY201631$15.3 million$492,09010$9.5 million$945,700255
    FY2017 to FY201929$12.4 million$426,2974$1.8 million$460,500142
    FY2020 to FY202368$35.2 million$517,11014$9.2 million$656,000933
    FY2024 to FY202670$30.9 million$441,1733$1.7 million$557,333961
    FY2010 to FY2026198$93.7 million$473,04531$22.2 million$714,6772,291

    From FY2020 to FY2026, lenders made 138 7(a) loans averaging $478,591 and 17 504 loans averaging $638,588.

    ProgramApproval yearsCohort ageLoansCharged offCharge-off rate (count)Charged-off dollars / approved dollarsAverage months to charge-off
    7(a)FY2010 to FY2016seasoned (10 to 16 years)31412.9%6.0%51
    7(a)FY2017 to FY2019maturing (7 to 9 years)29310.3%4.4%47
    7(a)FY2020 to FY2023young (3 to 6 years)68913.2%6.5%37
    7(a)FY2024 to FY2026new (under 3 years)7011.4%0.0%23
    504FY2010 to FY2016seasoned (10 to 16 years)1000.0%0.0%n/a
    504FY2017 to FY2019maturing (7 to 9 years)400.0%0.0%n/a
    504FY2020 to FY2023young (3 to 6 years)1400.0%0.0%n/a
    504FY2024 to FY2026new (under 3 years)300.0%0.0%n/a

    The loss record is the warning on this page. 4 of 31 7(a) loans approved in FY2010 to FY2016 were charged off (12.9%), and the younger FY2020 to FY2023 cohort already shows 9 charge-offs among 68 loans (13.2%) after an average of 37 months. Samples are small, but the pattern says renewable generation businesses can fail quickly when production, prices or incentives fall short, which is why the study's sensitivity analysis carries more weight than in most asset classes.

    Financing structure: REAP and B&I terms, equity, collateral

    FY2026 loan typeGuarantee feeAnnual retention feeGuaranteeExtra fee if guarantee issued before construction completion
    B&I under $5 million3.0%0.55%85%0.50%
    B&I $5 million to $25 million3.0%0.55%80%0.50%
    B&I reduced fee1.0%0.50%80%0.50%
    B&I Alaska high-cost isolated area not on road system1.0%0.50%90%0.50%
    Community Facilities guaranteed1.25%0.50%80%0.50%
    REAP guaranteed1.0%0.25%80%0.50%

    For REAP guaranteed loans, the borrower must contribute at least 25% of total eligible project costs, the loan runs from $5,000 to 75% of those costs, and total REAP guaranteed loans to one borrower may not exceed $25 million [2]. B&I applies the equity tests below and may raise them for new businesses using renewable energy systems [2]. Fees are on the guaranteed portion: REAP's FY2026 guarantee fee is 1.0% and its retention fee 0.25% [6]. Rates are negotiated and terms follow useful life up to 40 years with no balloon [2].

    Borrower situation at closingMinimum capital or equity (any one test)Rule
    Existing business10% balance-sheet equity (or debt to equity no more than 9 to 1); or 10% of total eligible project costs invested; or owner capital of at least 10% of net fixed assets plus depreciation5001.105(d)(1)
    New business with sales contracts covering debt service for at least the loan term10% balance-sheet equity (or 9 to 1); or 10% of project cost5001.105(d)(2)
    New business, construction, guarantee requested before completion25% balance-sheet equity (or 3 to 1); or 25% of project cost5001.105(d)(3)
    All other new businesses20% balance-sheet equity (or 4 to 1); or 25% of project cost5001.105(d)(4)
    Higher-risk loansAgency may raise the requirement (industry status, concentration, collateral, guarantees, cash flow, contracts, credit rating, strength of the feasibility study, management)5001.105(d)(5)

    Collateral follows 5001.203: chattel appraisals for existing equipment over $250,000, real estate appraisals over $250,000, going concern value deducted before discounting, appraisals no older than one year [2]. New equipment can be supported with a bill of sale. Owners of 20% or more give guarantees [2].

    B&I compared with SBA for the same loan

    FeatureUSDA B&I (FY2026)SBA 7(a)SBA 504
    Guarantee on $500,00085% ($425,000)75% ($375,000)Debenture 100% SBA-guaranteed; bank first lien not guaranteed
    Up-front fee3.0% of guaranteed amount ($12,750)Ceiling $11,250 under 120.2200.5% of debenture plus CDC fees
    Annual fee0.55% of guaranteed balanceUp to 0.55%, paid by lenderUp to 0.9375% of debenture balance plus CDC servicing fee
    Borrower equity10% existing; 20% to 25% newLender credit judgment10%; 15% new or single-purpose; 20% both
    LocationRural area only (5001.3)Anywhere in the U.S.Anywhere in the U.S.
    Feasibility studyRequired over $1 million for a new businessMay be requiredMay be required

    Worked financing examples (illustrative)

    Illustrative only. The loan is near the national average SBA loan to renewable generation businesses, with an assumed 7.50% fixed rate and 15-year term. The first table is the REAP guaranteed loan most rural projects will now use; the second is the same loan under B&I terms.

    REAP guaranteed loan, with and without a later grant

    ItemStructure A: loan onlyStructure B: loan + later grantBasis
    Total eligible project cost$666,667$666,667Loan capped at 75% of eligible project costs; borrower at least 25% (5001.406(d))
    REAP guaranteed loan$500,000$333,333Rate 7.50% fixed, 15 years (assumption)
    REAP grant (applied for 12 to 24 months after completion)$0 (no room under the 75% cap)$166,667Grant at most 25% of project cost and $500,000 for a renewable system; grant plus loan at most 75% (4280.122)
    Owner cash at construction$166,667$333,333Structure B: owner bridges the future grant
    Owner cash net of grant, if awarded$166,667$166,667Grant is competitive and not assured
    Guarantee (FY2026 REAP)80% ($400,000)80% ($266,667)91 FR 11272
    Guarantee fee (1.0%)$4,000$2,667Loan x 80% x 1.0%
    Retention fee, year 1 (0.25%)$962$642Guaranteed principal outstanding x 0.25%
    Annual debt service$55,621$37,080Level amortisation
    Annual energy value for 1.25x coverage$69,526$46,351Savings plus sales net of O&M, before tax credits
    Simple payback at that energy value9.6 years14.4 yearsProject cost / annual energy value (5001.3 definition); must not exceed useful life for a REAP grant

    Structure A borrows the maximum 75% and leaves no room for a grant under the 75% combined cap. Structure B borrows $333,333, plans a $166,667 grant after 12 to 24 months of operation, and asks the owner to fund $333,333 at construction, falling to $166,667 only if the grant is awarded. A lender should underwrite Structure B on its debt service alone.

    The same loan as a B&I guarantee

    ItemIllustrative valueBasis
    Loan amount$500,000National average SBA loan for solar and other renewable energy projects, FY2020 to FY2026 ($496,139), rounded
    Rate and term7.50% fixed, 15 years, monthlyAssumption; 5001.401 and 5001.402
    FY2026 guarantee85%: $425,000 guaranteed, $75,000 notB&I under $5 million
    Guarantee fee$12,750 (3.00%); $14,875 if issued before construction completionLoan x guarantee % x fee rate
    Monthly payment / annual debt service$4,635 / $55,621Level amortisation, no balloon
    Retention fee, year 1 / year 10$2,250 / $1,0810.55% x guaranteed principal outstanding
    NOI for 1.00x / 1.25x$55,621 / $69,526Debt service x coverage
    NOI for 1.25x with retention fee$72,338(Debt service + year-1 retention fee) x 1.25
    New business: 25% of cost testCost $666,667; equity $166,6675001.105(d)(3), (4)
    New business: 20% balance-sheet testAssets $625,000; equity $125,0005001.105(d)(4)
    Existing business: 10% of cost testCost $555,556; equity $55,5565001.105(d)(1)

    How B&I numbers scale

    B&I loanApplication trackFeasibility studyFY2026 guaranteeGuarantee fee (3.0%)Annual debt serviceNOI for 1.25xNew-business equity at 25% of cost
    $500,000streamlined, 5001.306(b)Agency or lender may require85%$12,750$55,621$69,526$166,667
    $1,000,000full application, 5001.306(a)Agency or lender may require85%$25,500$111,241$139,052$333,333
    $1,500,000full application, 5001.306(a)required (new business)85%$38,250$166,862$208,578$500,000
    $3,000,000full application, 5001.306(a)required (new business)85%$76,500$333,724$417,156$1,000,000
    $5,000,000full application, 5001.306(a)required (new business)80%$120,000$556,207$695,259$1,666,667
    $10,000,000full application, 5001.306(a)required (new business)80%$240,000$1,112,415$1,390,519$3,333,333

    Net operating income needed at different rates and terms

    TermNOI for 1.25x at 6.5%NOI for 1.25x at 7.5%NOI for 1.25x at 8.5%
    10 years$85,161$89,026$92,989
    15 years$65,333$69,526$73,855
    20 years$55,918$60,419$65,087

    Stress test and break-even

    ScenarioNet operating incomeDebt service coverage
    Base case at 1.25x$69,5261.25x
    NOI down 10%$62,5731.12x
    NOI down 20% (break-even)$55,6211.00x
    NOI down 30%$48,6680.88x
    Variable rate 1 point higher, re-amortised$69,5261.18x (debt service $59,084)
    Variable rate 2 points higher, re-amortised$69,5261.11x (debt service $62,653)
    Variable rate 3 points higher, re-amortised$69,5261.05x (debt service $66,324)

    Energy output needed to carry the debt

    The first column is an assumed net value per kWh after O&M, for illustration only; the study uses the project's tariff and contracts.

    Assumed net value of energy per kWh (illustrative)kWh per year for 1.00xkWh per year for 1.25x
    $0.08695,259869,074
    $0.10556,207695,259
    $0.12463,506579,383
    $0.15370,805463,506

    A 20% shortfall in net energy value takes the project from 1.25 times to break-even. Production shortfalls, a tariff change to export credits and inverter failures are the usual causes, so the study should test each and show the effect on payback as well as coverage.

    Renewable energy risks, regulators and how the study tests them

    RiskRegulator or ruleHow the study tests it
    REAP ineligibilityCropland, foreign-adversary components, sizing and location rules [1]Eligibility screen before design
    Grant not awardedNational competition under an annual notice [1]Underwrite without the grant
    Production shortfallNone; technical riskResource data, degradation, availability, P90-style downside
    Export compensation changeState utility commissionTariff sensitivity
    Interconnection delay or upgrade costUtility and state commissionInterconnection agreement, upgrade budget
    Installer or equipment failureInstaller licence and experience requirements [1]Key service provider review, warranties
    Feedstock (digesters, biomass)None; market riskSupply agreements, alternative feedstock
    Environmental review7 CFR part 1b for REAP grants [1]Review documentation in the schedule
    Tax credit assumptionsInternal Revenue CodeModel without credits; credits only as upside
    B&I policy on wind and solarUSDA policy reported on this site's state pagesConfirm with the State Office

    Process, timeline, documents and acceptance

    Under the 2026 rule the sequence is: screen eligibility, finance and build the project (REAP guaranteed loan, B&I, SBA or bank), operate and collect 12 to 24 months of data, then apply for the grant when the annual notice opens. For a REAP or B&I loan, the lender files the application with the technical report and any feasibility study the lender or Agency requires, and must evaluate the study and technical report in writing [2].

    PhaseTimingWhat happens
    Scoping and proposalBefore engagementFifteen-minute call; written proposal with scope, timeline and firm fixed fee within one business day
    Kickoff and data requestWeek 1Engagement letter, data request within 48 hours, kickoff with borrower and lender
    Market analysisWeeks 2 to 4Market area, demand drivers, competitive supply, comparable operators
    Modeling and draftWeeks 4 to 6Five to ten year projection, sensitivity tables, management and technical sections
    Delivery and reviewWeeks 6 to 8Draft, one round of revisions, final PDF and Word report with Excel workbook
    AcceptanceAfter deliveryRevisions at no added cost until USDA or the lender accepts the report

    Schedule and acceptance terms as stated on this site's cost, contact and about pages [11][12][13].

    Documents the lender and Agency will look for

    • Business-level income statement, balance sheet and cash flow statement for the most recent fiscal year; project-level statements are not accepted for REAP grants [1].
    • Twelve or more months of utility bills and, for grants, 12 months of post-installation data [1].
    • Technical report or resource assessment; energy audit for efficiency projects [2][1].
    • Agreements: interconnection, PPA, site lease, feedstock, O&M and financing [1].
    • Country of origin for every solar or wind component [1].
    • Installer licence and experience; procurement records.
    • Pro forma statements and, for loans, a pro forma closing balance sheet [2].

    Common review failures in renewable energy studies

    • Production at nameplate rather than site-specific output.
    • A system sized beyond historical use, now an eligibility failure for ground-mount projects.
    • No country-of-origin documentation for components.
    • Export credits valued at retail rates without tariff support.
    • No O&M or inverter reserve.
    • Debt service that depends on a grant that has not been awarded.
    • Technical report and study that disagree on cost or output.

    Hiring a renewable energy feasibility study consultant for a USDA loan

    An independent qualified consultant acceptable to the Agency is required for a B&I loan over $1,000,000 to a new business [2]; for REAP renewable system loans, the study is required when the lender or Agency deems it necessary, and for REAP grants the study can replace the resource assessment if it is prepared by an independent professional with relevant knowledge, expertise and experience [2][1]. The consultant should be independent of the installer and equipment seller, which the REAP conflict-of-interest rules also require of key service providers [1].

    On this site, the engagement includes all five Part 5001 components, a five to ten year projection with sensitivity analysis, market and demand analysis, a management assessment, PDF and Word reports with an Excel workbook, kickoff and midpoint calls, one round of revisions and a written acceptance guarantee; engineering, environmental assessments, legal work, appraisals and grant or lender package drafting are separate [11]. The site's REAP and renewable pages describe the feasibility study as reconciling with, not replacing, the engineer's technical report. You provide utility bills, the system design and quotes, interconnection and site documents, any feedstock or offtake agreements, and financial statements; a structured data request follows within one to two business days [13].

    Timeline: the cost page lists 4 to 5 weeks for REAP studies under a $600,000 loan and 5 to 7 weeks above it, 6 to 7 weeks for standard B&I studies, and a 3 to 4 week rush option [11]. To start, use the contact page or email info@usda-feasibility-study.com; the site states a senior analyst responds within one business day with a scoped proposal or follow-up questions, and that every proposal quotes a firm fixed fee [12].

    Request a scoped proposal for your renewable energy or REAP feasibility study at usda-feasibility-study.com/contact.

    Precedents

    REAP's recent record is the main precedent: 6,722 REAP grant awards and 75 REAP guaranteed loan awards in FY2024 to FY2026, led by Iowa (586); Minnesota (544); Illinois (459) [4]. SBA lent $115.8 million across 229 loans to renewable generation businesses from FY2010 to FY2026 [5]. This site's state pages cite publicly announced REAP awards as program evidence, such as a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California, and its case study library includes an illustrative REAP rooftop solar study in Pennsylvania [14]. Those awards were made under the earlier rules; some ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule.

    Solar and renewable energy feasibility study pages by state

    The site has 33 state pages for solar and renewable energy, each with state-level data.

    State pageEstablishments, 2023Non-metro shareSBA 7(a) and 504 loans, FY2020 to FY2026
    Alabama4n/a0
    Alaska0n/a0
    Arizona250.0%4
    California2400.0%33
    Colorado320.0%4
    Connecticut90.0%2
    Delaware90.0%0
    Florida930.0%9
    Georgia2662.5%4
    Illinois310.0%3
    Indiana3n/a2
    Iowa7n/a1
    Kansas0n/a1
    Kentucky6n/a0
    Louisiana7n/a0
    Maryland180.0%4
    Massachusetts220.0%7
    Michigan300.0%2
    Missouri3n/a1
    Nebraska0n/a0
    Nevada110.0%3
    New Jersey260.0%2
    New Mexico70.0%1
    New York450.0%2
    North Carolina350.0%2
    Ohio18n/a4
    Oklahoma0n/a1
    Oregon9n/a0
    Pennsylvania7n/a0
    South Carolina100.0%0
    Texas750.0%20
    Utah250.0%1
    Virginia270.0%3

    Establishments and non-metro share from County Business Patterns 2023; SBA loans by project state [3][5].

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    How much does a renewable energy or REAP feasibility study cost?

    This site quotes a firm fixed fee in a written proposal. Its cost page lists $4,900 to $8,500 for REAP studies under a $600,000 guaranteed loan, $7,500 to $11,500 above $600,000, and $6,900 to $12,500 for standard B&I studies, with a 20% to 35% rush premium [11].

    How long does a REAP feasibility study take?

    On this site's schedule, 4 to 5 weeks for REAP studies under $600,000, 5 to 7 weeks above it, and 3 to 4 weeks on a rush basis [11]. Under the 2026 rule the grant application itself comes 12 to 24 months after the project is finished [1].

    Do I need a feasibility study for a REAP grant?

    Not always. A renewable system grant application needs a resource assessment, and a feasibility study can be submitted in its place [1]. A REAP guaranteed loan needs a technical report and a study when the lender or Agency deems it necessary; a B&I loan over $1,000,000 to a new business requires one [2].

    Who can prepare a REAP feasibility study?

    An independent professional with relevant knowledge, expertise and experience, whose findings relate to the project at its specific site [1]; for B&I, an independent qualified consultant acceptable to the Agency [2]. Installers with a conflict of interest are not qualified key service providers [1].

    How long is a renewable energy feasibility study valid?

    Neither rule prints an expiry date. Appraisals under part 5001 may be no more than one year old [2], and this site works to an 18-month data recency standard [11]. Under the 2026 REAP rule, the grant application relies on actual operating data, so a study written before construction will need updating with metered results.

    Can one study serve SBA and USDA?

    Usually yes if it meets the Part 5001 and REAP content lists, which are more detailed than SBA's. SBA may require a feasibility study [9]; model both structures.

    Can I apply for a REAP grant before I build?

    No. Under the rule effective 16 October 2026, the project must be completed 12 to 24 months before the application (12 to 36 months in the first window), with 12 months of production or savings data [1].

    What happened to REAP applications filed before 2026?

    USDA rescinded the FY2025 to FY2027 funding notice on 15 April 2026; applicants without a fully executed financial assistance agreement must submit a new application under the new rule [8].

    Can REAP fund ground-mounted solar on farmland or panels made abroad?

    Ground-mount solar or wind on Cropland is ineligible, and solar or wind systems with any component from a country named as a foreign adversary in 15 CFR 791.4 are ineligible unless installed before the rule was published [1].

    What is the difference between a technical report and a feasibility study?

    The technical report shows technical merit: design, performance, payback and reliability. It can sit in the technical section of a feasibility study or stand alone [2]. The feasibility study adds the market, financial, economic and management findings and the consultant's recommendation [7].

    What should a renewable energy feasibility study consultant ask for first?

    Twelve months or more of utility bills, the site and whether it is Cropland, the system design with component origins, the installer, interconnection status and your financial statements. These settle eligibility, structure and whether a study is required.

    Can B&I finance a solar project?

    The 2026 CFR lists renewable systems not otherwise eligible under REAP, or when REAP funds are unavailable, as an eligible B&I purpose [2], but this site's state pages report an August 2025 USDA policy barring wind and solar from B&I. Confirm with the State Office before relying on B&I.

    Sources

    [1] USDA RBCS, Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026. https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm (accessed 7 Nov 2026)

    [2] 7 CFR part 5001, OneRD Guaranteed Loans (CFR 2026 edition, title 7 vol. 15, revised 1 Jan 2026), govinfo. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 7 Nov 2026)

    [3] U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files. https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23st.zip ; https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23co.zip ; https://www2.census.gov/programs-surveys/cbp/datasets/2019/cbp19st.zip (accessed 7 Nov 2026)

    [4] USAspending.gov, award counts by place of performance for Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), 1 Oct 2023 to 30 Sep 2026, API v2 spending_by_award_count. https://api.usaspending.gov/api/v2/search/spending_by_award_count/ (accessed 7 Nov 2026)

    [5] U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: FOIA_7a_FY2010_FY2019, FOIA_7a_FY2020_Present, FOIA_504_FY2010_Present. https://data.sba.gov/sites/default/files/uploaded_resources/FOIA_7a_FY2020_Present_asof_260930.csv (and companion files) (accessed 7 Nov 2026)

    [6] USDA, OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026, 91 FR 11272 (9 Mar 2026). https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 6 Nov 2026)

    [7] OneRD Guaranteed Loan Regulation, 85 FR 42494 (14 Jul 2020), appendix A to subpart D of part 5001, Elements of an Acceptable Feasibility Study, pp. 42556-42557. https://www.govinfo.gov/content/pkg/FR-2020-07-14/pdf/2020-13991.pdf (accessed 7 Nov 2026)

    [8] USDA RBCS, Notice of Rescission of Funding Opportunity for the Rural Energy for America Program, 91 FR 20090 (15 Apr 2026). https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm (accessed 7 Nov 2026)

    [9] 13 CFR part 120, Business Loans (CFR 2026 edition), govinfo; sections 120.101, 120.150, 120.160, 120.210, 120.220, 120.801, 120.900 to 120.971. https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-160.xml (accessed 7 Nov 2026; other sections accessed 6 Nov 2026)

    [10] OMB metropolitan and micropolitan statistical area delineation file, July 2023 (list1_2023). https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx (accessed 7 Nov 2026)

    [11] usda-feasibility-study.com, USDA Feasibility Study Cost & Timeline (site page). https://usda-feasibility-study.com/usda-feasibility-study-cost (read 7 Nov 2026)

    [12] usda-feasibility-study.com, Contact & Request a Proposal (site page). https://usda-feasibility-study.com/contact (read 7 Nov 2026)

    [13] usda-feasibility-study.com, About (site page). https://usda-feasibility-study.com/about (read 7 Nov 2026)

    [14] usda-feasibility-study.com, Case Studies and Engagements (site pages). https://usda-feasibility-study.com/case-studies ; https://usda-feasibility-study.com/engagements (read 7 Nov 2026)

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.