Short answer
A renewable energy feasibility study is the independent report that tells a lender and USDA whether a solar, wind, biomass, anaerobic digester, geothermal or hydro project will produce the energy or savings it promises, at a cost and on a contract structure that repays its debt. The rules changed on 16 October 2026. Under USDA's new Rural Energy for America Program (REAP) rule, a grant project must already be built and operating before the applicant applies, with 12 months of actual production or savings data, and grant awards are capped at $500,000 for renewable systems and 25% of project cost [1]. Up-front financing now runs through REAP guaranteed loans and other lending under 7 CFR part 5001, where a feasibility study is required for a new business borrowing over $1,000,000 under B&I and when the lender or Agency deems one necessary for a REAP renewable system loan [2].
The business base is small and fast-growing: 942 solar and other renewable power establishments with paid employees in 2023, up from 405 in 2019 (+132.6%), paying $138,631 per employee [3]. REAP grants are the rural signal: 6,722 REAP grant awards and $1,024,856,615 in REAP grant dollars across the states from FY2024 to FY2026 [4]. SBA lending to renewable generation shows real risk: of 68 SBA 7(a) loans approved in FY2020 to FY2023, 9 (13.2%) were already charged off [5]. Data current as of November 2026.
| Question | Answer |
|---|---|
| What changed on 16 October 2026? | REAP grants moved to a post-completion model: build first, run 12 to 24 months, apply with 12 months of data [1] |
| REAP grant limits | $1,500 minimum; $500,000 for renewable systems, $250,000 for efficiency; at least 75% cost share [1] |
| REAP guaranteed loan | $5,000 to 75% of eligible project costs, up to $25 million per borrower; FY2026 guarantee 80%, fee 1.0%, retention 0.25% [2][6] |
| Grant plus loan cap | Total REAP funding may not exceed 75% of project cost [1] |
| Study required? | REAP loan: when lender or Agency deems it necessary, plus a technical report; B&I: over $1 million to a new business; REAP grant: resource assessment or a study in its place [2][1] |
| Newly ineligible | Ground-mount solar or wind on Cropland; solar or wind with components from a foreign adversary; multi-location projects; EV chargers [1] |
What a renewable energy feasibility study is, and when USDA requires one
Both USDA rule sets define the study the same way. Part 5001 calls it a report with an opinion or finding by an independent qualified consultant evaluating economic, market, technical, financial and management feasibility under appendix A [2][7]. The 2026 REAP rule adds that the author must be an independent professional with relevant knowledge, expertise and experience, and that findings must relate to a project at a specific site; it then lists the required content item by item, from minimum inputs and contracts through by-product revenue, construction risk, sensitivity analysis, a recommendation and the consultant's qualifications [1].
When it is required depends on which money you use.
| Financing route | Feasibility study rule | Source |
|---|---|---|
| B&I loan over $1,000,000 to a new business | Required, by an independent qualified consultant acceptable to the Agency; Agency sets scope | 5001.306(a)(3)(i) |
| B&I loan of $1,000,000 or less | Agency may require one if the lender's analysis is not sufficient or the project will significantly affect an existing business | 5001.306(a)(3)(ii) |
| B&I loan of $600,000 or less | Streamlined application if the lender's analysis is sufficient | 5001.306(b) |
| REAP guaranteed loan, renewable energy system | When the lender or Agency deems it necessary; technical report always required | 5001.307(d), (e) |
| SBA 7(a) or 504 | SBA may require a feasibility study | 13 CFR 120.160(b) |
| Guarantee issued before construction completion | Budget and timetable confirmed by a qualified independent consultant | 5001.205(e)(2) |
| REAP grant document (rule effective 16 Oct 2026) | When it applies | Source |
|---|---|---|
| Resource Assessment, or a Feasibility Study in its place | Every renewable energy system grant application | 4280.131(b)(3) [1] |
| Energy Assessment | Efficiency projects of $80,000 or less | 4280.131(b)(3) [1] |
| Energy Audit | Efficiency projects above $80,000 | 4280.131(b)(3) [1] |
| All project agreements (PPA, interconnection, lease, feedstock, O&M, financing) | Projects above $80,000 | 4280.131(b)(4) [1] |
| Two years of pro forma statements for the project | Projects of $200,000 or more | 4280.131 [1] |
| Completion certificate by a state-licensed professional engineer | Projects of $200,000 or more, or larger and more complex projects | 4280.122 [1] |
| 12 months of actual production or savings plus 12 months pre-installation data | All grant applications | 4280.122 [1] |
The REAP rule effective 16 October 2026
USDA published the final rule with comment period on 1 October 2026 (91 FR 62600), effective 16 October 2026, with comments due 2 November 2026 [1]. It followed the April 2026 rescission of the FY2025 to FY2027 REAP funding notice, which required applicants without an executed financial assistance agreement to reapply under the new rule [8]. The changes below are from the rule text.
| Topic | Rule effective 16 October 2026 | Effect on the feasibility study |
|---|---|---|
| Timing | Project Period must end 12 to 24 months before the application (12 to 36 months in the first window) | The study now often supports the loan that builds the project, not the grant |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Production estimates must be reconciled with actual meter data |
| Award size | Minimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiency | Grants cover a smaller share of large projects |
| Cost share | At least 75% of project cost | Grant at most 25% of cost |
| Combined REAP funding | Grant plus guaranteed loan at most 75% of project cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systems | Site screening first |
| Foreign components | Solar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publication | Country-of-origin list for every component |
| Sizing | Ground-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual use | Load analysis is mandatory |
| Economics | Simple payback must not exceed useful life | Payback calculation is an eligibility test |
| Locations | Projects at more than one location ineligible | One site per application |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Scope these out of the grant budget |
| Applicant | No more than one application per federal fiscal year from each highest-level owner and the entities its owners own; site owned or leased at least 12 months before the Project Period | Ownership and site control evidence |
| Installers | Licensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Key service provider qualifications |
| Competition | No state competitions: one competition for requests of $20,000 or less and one national competition for all others, in annual application windows | Scoring factors in the notice drive the case |
Two consequences matter most for a borrower. First, the grant no longer finances construction: USDA says plainly that the REAP guaranteed loan under 7 CFR 5001 is available for up-front costs [1]. Second, the grant is competitive and paid later, so a lender should underwrite the project without it. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.
What a USDA-grade renewable energy feasibility study must prove
| # | What the study must prove | Appendix A component | Evidence a reviewer expects |
|---|---|---|---|
| 1 | The project is eligible under current rules | Economic, Technical | Not on Cropland, no foreign-adversary components, one location, sized to historical use [1] |
| 2 | The resource or baseline supports the production or savings claimed | Technical | Resource assessment, shading or wind data, energy audit baseline |
| 3 | Production estimates match real performance | Technical, Financial | Degradation, availability, comparison with metered data once operating |
| 4 | The energy has a buyer or offsets real load | Market | Twelve months of utility bills, tariff, PPA or interconnection agreement |
| 5 | Tariff and export compensation are modelled correctly | Economic | Rate schedule, demand charges, net metering or export terms and their review dates |
| 6 | Interconnection is approved or attainable | Technical | Utility interconnection agreement and upgrade costs |
| 7 | The installer and equipment are qualified | Technical | State licence, at least three similar installations, commercially available equipment [1] |
| 8 | Simple payback is within useful life | Financial | Payback per the 5001.3 and 4280 definitions [2][1] |
| 9 | Cash flow covers debt service without the grant | Financial | Coverage with and without a later grant; sensitivity to production and price |
| 10 | O&M, inverter replacement and insurance are funded | Financial, Management | O&M contract, reserve schedule |
| 11 | For digesters and biomass, feedstock is secured | Economic, Market | Feedstock agreements, digestate or ash outlets |
| 12 | Management can operate and report | Management | Monitoring, data for REAP reporting, owner experience |
Appendix A's elements, applied to a renewable energy project [7][1]:
| Appendix A element | What it must cover for solar and other renewable energy projects |
|---|---|
| Executive summary | Technology, rated capacity, site, annual energy production or savings, total project cost |
| Economic | Minimum inputs (resource, feedstock, land, interconnection), contracts (PPA, interconnection, feedstock, O&M), environmental risk, cost against benefits |
| Market | Who uses or buys the energy (the applicant, a utility, community solar subscribers), competition, by-product revenue such as digestate, industry risk |
| Technical | Commercial availability, record of the technology, installer experience, use, age and reliability of equipment, construction risk |
| Financial | Underwriting, assumptions, source of repayment, equity, peer comparison, sensitivity to production, tariffs and O&M |
| Management | Who runs and maintains the system, O&M contracts, monitoring, owner experience |
| Recommendation | The independent professional's opinion on success |
| Qualifications | Relevant knowledge, expertise and experience of the author, which the 2026 REAP rule now writes into its definition |
Program fit and ineligible uses
| Route | Fit | Key terms | Study trigger |
|---|---|---|---|
| REAP grant | Completed, operating renewable systems or efficiency projects of agricultural producers and rural small businesses | Paid after completion; up to 25% of cost; $500,000 cap for renewable systems [1] | Resource assessment or study in lieu |
| REAP guaranteed loan | Building the system; up-front cost | Up to 75% of eligible costs; $25 million per borrower; FY2026 80% guarantee, 1.0% fee, 0.25% retention [2][6] | Lender or Agency discretion; technical report required |
| B&I guaranteed loan | Renewable systems not otherwise eligible under REAP, or when REAP funds are unavailable (5001.105(b)(21)); integrated processing systems must show technical merit | FY2026 85% under $5 million; Agency may raise equity for new businesses using renewable systems [2][6] | Over $1 million to a new business |
| Community Facilities | Renewable systems serving an essential community facility, with no power-sale contract | Technical report as part of the financial feasibility study [2] | As for CF |
| SBA 7(a) and 504 | Renewable systems for small businesses anywhere | 7(a) 75% guarantee over $150,000; 504 equity 10% to 20% [9] | SBA may require one |
| Conventional, equipment finance or third-party ownership | Larger or tax-driven projects | Lender or investor terms | Lender or investor policy |
Ineligible uses and projects cut across programs. REAP loan funds cannot buy agricultural tillage equipment, used equipment or vehicles, and money for studies, technical reports, audits and business plans is limited to 10% of the loan in total [2]. Lease payments are ineligible, though a REAP borrower may lease financed equipment to a third party that uses it for REAP purposes if the borrower keeps ownership and control for the useful life [2]. Residential systems are ineligible, except community solar subscriptions, licensed nursing and assisted living facilities, and hotels with stays of 30 days or less; owner-occupied bed and breakfasts are ineligible for REAP [1][2].
Eligibility: who and where
REAP serves agricultural producers, defined as earning at least 50% of gross income from agricultural operations averaged over five years, and rural small businesses [2]. Under the 2026 grant rule, the project must be located in a rural area, the small business definition follows SBA's, and only the highest-level owner may apply, once per federal fiscal year [1]. B&I requires a rural area: outside cities or towns over 50,000 and their contiguous urbanized areas [2]. This site's state pages also report an August 2025 USDA policy that bars wind and solar from B&I and limits REAP for large ground-mounted arrays on farmland; the 2026 CFR text of 5001.105(b)(21) still lists renewable systems as an eligible B&I purpose, so the policy should be confirmed with the State Office for any B&I solar or wind request.
National market evidence: establishments, density, pay and rural footprint
County Business Patterns counts solar (NAICS 221114), biomass (221117) and other (221118) electric power generation establishments with paid employees [3]. Most solar arrays have no on-site employees, so they appear where their operating company has staff, not where the panels are. These figures describe the business base that develops and operates generation, not the location of generation.
| Measure | United States |
|---|---|
| Establishments with paid employees, 2019 | 405 |
| Establishments with paid employees, 2023 | 942 |
| Change, 2019 to 2023 | +537 (+132.6%) |
| States (incl. DC) with at least one establishment, 2023 | 41 |
| Establishments per 100,000 residents, 2023 | 0.3 |
| Paid employees, 2023 (mid-March) | 11,596 |
| Annual payroll, 2023 | $1.61 billion |
| Average employees per establishment | 12.3 |
| Average annual pay per employee | $138,631 |
| Establishments the county file places in a county | 525 (55.7% of the national total) |
| Of those, in non-metro counties | 5 (1.0%) in 1 counties |
| Share of U.S. population living in non-metro counties, 2025 | 13.6% |
| Rural concentration index (non-metro share of establishments / non-metro share of population) | 0.07 |
Only 5 of the 525 establishments in the 2023 county file are in non-metro counties, all in Georgia, so a top-10 ranking by non-metro share is not meaningful for this industry; REAP award geography below is the better rural indicator [3][10].
The base more than doubled in four years (+132.6%), led by California, Florida, Texas. Average pay of $138,631 and 12.3 employees per establishment describe a professional, capital-intensive industry. For a rural feasibility study the useful national facts are therefore not establishment counts but program activity: where REAP grants and guaranteed loans actually went.
Top 10 states by establishments, 2023
| Rank | State | 2019 | 2023 | Change | Per 100k residents | Avg employees | Avg pay | Non-metro share* |
|---|---|---|---|---|---|---|---|---|
| 1 | California | 94 | 240 | +155.3% | 0.6 | 16.4 | $147,225 | 0.0% |
| 2 | Florida | 14 | 93 | +564.3% | 0.4 | 2.5 | $125,192 | 0.0% |
| 3 | Texas | 29 | 75 | +158.6% | 0.2 | 18.0 | $122,941 | 0.0% |
| 4 | New York | 16 | 45 | +181.2% | 0.2 | 12.7 | $200,410 | 0.0% |
| 5 | North Carolina | 33 | 35 | +6.1% | 0.3 | 24.7 | $126,527 | 0.0% |
| 6 | Colorado | 7 | 32 | +357.1% | 0.5 | 10.4 | $164,192 | 0.0% |
| 7 | Illinois | 11 | 31 | +181.8% | 0.2 | 4.3 | $141,167 | 0.0% |
| 8 | Michigan | 25 | 30 | +20.0% | 0.3 | 8.8 | $117,061 | 0.0% |
| 9 | Virginia | 24 | 27 | +12.5% | 0.3 | 8.4 | $129,610 | 0.0% |
| 10 | Georgia | 6 | 26 | +333.3% | 0.2 | 2.8 | $213,230 | 62.5% |
- Non-metro share of establishments placed in a county. The top 10 states hold 67.3% of all establishments [3].
Where REAP money went, FY2024 to FY2026
| Rank | State, ranked by REAP grant dollars | REAP grant dollars, FY2024 to FY2026 | Dollars per resident | State, ranked by dollars per resident | Dollars per resident (ranked) |
|---|---|---|---|---|---|
| 1 | Iowa | $62,662,488 | $19.64 | Iowa | $19.64 |
| 2 | Michigan | $61,851,826 | $6.14 | Vermont | $16.47 |
| 3 | Pennsylvania | $60,772,255 | $4.67 | North Dakota | $14.45 |
| 4 | Minnesota | $59,174,068 | $10.37 | South Dakota | $13.88 |
| 5 | Illinois | $55,148,905 | $4.30 | Nebraska | $12.78 |
| 6 | Ohio | $45,916,364 | $3.89 | Idaho | $11.77 |
| 7 | Texas | $40,481,643 | $1.39 | New Hampshire | $11.76 |
| 8 | New York | $39,996,318 | $1.98 | Minnesota | $10.37 |
| 9 | Georgia | $36,934,061 | $3.45 | Maine | $9.99 |
| 10 | Indiana | $29,441,059 | $4.34 | Delaware | $7.39 |
REAP grant obligations by place of performance, 1 October 2023 to 30 September 2026, in the 50 states with REAP grant dollars (territories excluded); per-resident figures use the population reported by USAspending. The top 10 states took 48.0% of $1,024,856,615; the national average was $3.10 per resident [4].
| State | REAP grants | REAP guaranteed loans | B&I guaranteed loan awards |
|---|---|---|---|
| Iowa | 586 | 0 | 2 |
| Minnesota | 544 | 0 | 5 |
| Illinois | 459 | 6 | 21 |
| Pennsylvania | 340 | 1 | 11 |
| Missouri | 309 | 4 | 74 |
| Nebraska | 297 | 0 | 7 |
| Ohio | 268 | 0 | 21 |
| Wisconsin | 248 | 2 | 6 |
| Michigan | 225 | 1 | 20 |
| Georgia | 221 | 0 | 13 |
| All 51 states with data | 6,722 | 75 | 643 |
Award counts by state for REAP (10.868) and B&I (10.768), FY2024 to FY2026; top 10 states by REAP grants [4]. These awards were made under the pre-2026 rules.
Demand drivers and competition analysis
For a behind-the-meter system, demand is the applicant's own load: twelve months or more of interval or monthly utility data, the tariff, demand charges and how much production can be used on site. For a system that sells power, demand is the buyer: a utility, a community solar program or a PPA counterparty, plus the interconnection queue. For an anaerobic digester or biomass system, it is also the feedstock supply and the market for digestate, heat or gas. Competition analysis means the alternatives the energy competes with: utility retail rates and their trend, other generation on the same feeder, and competing feedstock buyers.
- Load: historical consumption by month and time of day.
- Tariff: energy, demand and fixed charges, and the export or net metering terms.
- Resource: solar irradiance and shading, wind data, water flow, or feedstock tonnage.
- Offtake: PPA term and price, or the share of production used on site.
- Policy: utility tariff reviews and incentive rules that can change the value of output.
Revenue model and key metrics
Revenue is either avoided cost (energy and demand charges the applicant no longer pays), export credits, power sales under a PPA, renewable energy credits, or energy savings for efficiency projects, net of operation and maintenance. Part 5001 defines simple payback as total project costs divided by the annual dollar value of energy produced or saved, excluding one-time benefits and tax credits that do not provide annual income [2].
| Metric | What it measures | How the study supports it |
|---|---|---|
| Annual energy production or savings (kWh or MMBtu) | Output | Resource assessment or audit; actual meter data once operating |
| Capacity factor and degradation | Production over time | Site data and equipment warranties |
| Share of production used on site | Avoided-cost versus export value | Load and production by hour or month |
| Value per kWh (avoided, exported, contracted) | Revenue rate | Tariff and contracts |
| O&M cost per year and inverter or major-component reserve | Net income | O&M contract and equipment life |
| Simple payback (years) | REAP grant eligibility and value | Project cost / annual energy value |
| Debt service coverage with and without grant | Repayment capacity | Financing structure |
Cost structure, wages and capital items
Operating costs are small but long-lived: O&M, monitoring, insurance, property tax where it applies, site lease, inverter or component replacement reserves, and for digesters and biomass, feedstock, labour and maintenance. Wages in the generation industry averaged $138,631 in 2023 [3], though most rural projects contract O&M rather than hire. Capital items are the generation equipment (modules, inverters, racking, turbines, digesters, boilers), balance of system, interconnection and utility upgrades, storage where eligible, engineering, permits, and the feasibility, technical report and audit costs that REAP loans can finance within the 10% limit [2].
Financing evidence: SBA lending history and seasoned losses
SBA loan records for solar, wind, geothermal, biomass and other generation (NAICS 221114 to 221118) show how lenders have financed small renewable businesses [5]. The SBA set includes wind and geothermal, which the County Business Patterns figures above do not.
| Approval years | 7(a) loans | 7(a) dollars | Average 7(a) | 504 loans | 504 dollars | Average 504 | Jobs reported (both) |
|---|---|---|---|---|---|---|---|
| FY2010 to FY2016 | 31 | $15.3 million | $492,090 | 10 | $9.5 million | $945,700 | 255 |
| FY2017 to FY2019 | 29 | $12.4 million | $426,297 | 4 | $1.8 million | $460,500 | 142 |
| FY2020 to FY2023 | 68 | $35.2 million | $517,110 | 14 | $9.2 million | $656,000 | 933 |
| FY2024 to FY2026 | 70 | $30.9 million | $441,173 | 3 | $1.7 million | $557,333 | 961 |
| FY2010 to FY2026 | 198 | $93.7 million | $473,045 | 31 | $22.2 million | $714,677 | 2,291 |
From FY2020 to FY2026, lenders made 138 7(a) loans averaging $478,591 and 17 504 loans averaging $638,588.
| Program | Approval years | Cohort age | Loans | Charged off | Charge-off rate (count) | Charged-off dollars / approved dollars | Average months to charge-off |
|---|---|---|---|---|---|---|---|
| 7(a) | FY2010 to FY2016 | seasoned (10 to 16 years) | 31 | 4 | 12.9% | 6.0% | 51 |
| 7(a) | FY2017 to FY2019 | maturing (7 to 9 years) | 29 | 3 | 10.3% | 4.4% | 47 |
| 7(a) | FY2020 to FY2023 | young (3 to 6 years) | 68 | 9 | 13.2% | 6.5% | 37 |
| 7(a) | FY2024 to FY2026 | new (under 3 years) | 70 | 1 | 1.4% | 0.0% | 23 |
| 504 | FY2010 to FY2016 | seasoned (10 to 16 years) | 10 | 0 | 0.0% | 0.0% | n/a |
| 504 | FY2017 to FY2019 | maturing (7 to 9 years) | 4 | 0 | 0.0% | 0.0% | n/a |
| 504 | FY2020 to FY2023 | young (3 to 6 years) | 14 | 0 | 0.0% | 0.0% | n/a |
| 504 | FY2024 to FY2026 | new (under 3 years) | 3 | 0 | 0.0% | 0.0% | n/a |
The loss record is the warning on this page. 4 of 31 7(a) loans approved in FY2010 to FY2016 were charged off (12.9%), and the younger FY2020 to FY2023 cohort already shows 9 charge-offs among 68 loans (13.2%) after an average of 37 months. Samples are small, but the pattern says renewable generation businesses can fail quickly when production, prices or incentives fall short, which is why the study's sensitivity analysis carries more weight than in most asset classes.
Financing structure: REAP and B&I terms, equity, collateral
| FY2026 loan type | Guarantee fee | Annual retention fee | Guarantee | Extra fee if guarantee issued before construction completion |
|---|---|---|---|---|
| B&I under $5 million | 3.0% | 0.55% | 85% | 0.50% |
| B&I $5 million to $25 million | 3.0% | 0.55% | 80% | 0.50% |
| B&I reduced fee | 1.0% | 0.50% | 80% | 0.50% |
| B&I Alaska high-cost isolated area not on road system | 1.0% | 0.50% | 90% | 0.50% |
| Community Facilities guaranteed | 1.25% | 0.50% | 80% | 0.50% |
| REAP guaranteed | 1.0% | 0.25% | 80% | 0.50% |
For REAP guaranteed loans, the borrower must contribute at least 25% of total eligible project costs, the loan runs from $5,000 to 75% of those costs, and total REAP guaranteed loans to one borrower may not exceed $25 million [2]. B&I applies the equity tests below and may raise them for new businesses using renewable energy systems [2]. Fees are on the guaranteed portion: REAP's FY2026 guarantee fee is 1.0% and its retention fee 0.25% [6]. Rates are negotiated and terms follow useful life up to 40 years with no balloon [2].
| Borrower situation at closing | Minimum capital or equity (any one test) | Rule |
|---|---|---|
| Existing business | 10% balance-sheet equity (or debt to equity no more than 9 to 1); or 10% of total eligible project costs invested; or owner capital of at least 10% of net fixed assets plus depreciation | 5001.105(d)(1) |
| New business with sales contracts covering debt service for at least the loan term | 10% balance-sheet equity (or 9 to 1); or 10% of project cost | 5001.105(d)(2) |
| New business, construction, guarantee requested before completion | 25% balance-sheet equity (or 3 to 1); or 25% of project cost | 5001.105(d)(3) |
| All other new businesses | 20% balance-sheet equity (or 4 to 1); or 25% of project cost | 5001.105(d)(4) |
| Higher-risk loans | Agency may raise the requirement (industry status, concentration, collateral, guarantees, cash flow, contracts, credit rating, strength of the feasibility study, management) | 5001.105(d)(5) |
Collateral follows 5001.203: chattel appraisals for existing equipment over $250,000, real estate appraisals over $250,000, going concern value deducted before discounting, appraisals no older than one year [2]. New equipment can be supported with a bill of sale. Owners of 20% or more give guarantees [2].
B&I compared with SBA for the same loan
| Feature | USDA B&I (FY2026) | SBA 7(a) | SBA 504 |
|---|---|---|---|
| Guarantee on $500,000 | 85% ($425,000) | 75% ($375,000) | Debenture 100% SBA-guaranteed; bank first lien not guaranteed |
| Up-front fee | 3.0% of guaranteed amount ($12,750) | Ceiling $11,250 under 120.220 | 0.5% of debenture plus CDC fees |
| Annual fee | 0.55% of guaranteed balance | Up to 0.55%, paid by lender | Up to 0.9375% of debenture balance plus CDC servicing fee |
| Borrower equity | 10% existing; 20% to 25% new | Lender credit judgment | 10%; 15% new or single-purpose; 20% both |
| Location | Rural area only (5001.3) | Anywhere in the U.S. | Anywhere in the U.S. |
| Feasibility study | Required over $1 million for a new business | May be required | May be required |
Worked financing examples (illustrative)
Illustrative only. The loan is near the national average SBA loan to renewable generation businesses, with an assumed 7.50% fixed rate and 15-year term. The first table is the REAP guaranteed loan most rural projects will now use; the second is the same loan under B&I terms.
REAP guaranteed loan, with and without a later grant
| Item | Structure A: loan only | Structure B: loan + later grant | Basis |
|---|---|---|---|
| Total eligible project cost | $666,667 | $666,667 | Loan capped at 75% of eligible project costs; borrower at least 25% (5001.406(d)) |
| REAP guaranteed loan | $500,000 | $333,333 | Rate 7.50% fixed, 15 years (assumption) |
| REAP grant (applied for 12 to 24 months after completion) | $0 (no room under the 75% cap) | $166,667 | Grant at most 25% of project cost and $500,000 for a renewable system; grant plus loan at most 75% (4280.122) |
| Owner cash at construction | $166,667 | $333,333 | Structure B: owner bridges the future grant |
| Owner cash net of grant, if awarded | $166,667 | $166,667 | Grant is competitive and not assured |
| Guarantee (FY2026 REAP) | 80% ($400,000) | 80% ($266,667) | 91 FR 11272 |
| Guarantee fee (1.0%) | $4,000 | $2,667 | Loan x 80% x 1.0% |
| Retention fee, year 1 (0.25%) | $962 | $642 | Guaranteed principal outstanding x 0.25% |
| Annual debt service | $55,621 | $37,080 | Level amortisation |
| Annual energy value for 1.25x coverage | $69,526 | $46,351 | Savings plus sales net of O&M, before tax credits |
| Simple payback at that energy value | 9.6 years | 14.4 years | Project cost / annual energy value (5001.3 definition); must not exceed useful life for a REAP grant |
Structure A borrows the maximum 75% and leaves no room for a grant under the 75% combined cap. Structure B borrows $333,333, plans a $166,667 grant after 12 to 24 months of operation, and asks the owner to fund $333,333 at construction, falling to $166,667 only if the grant is awarded. A lender should underwrite Structure B on its debt service alone.
The same loan as a B&I guarantee
| Item | Illustrative value | Basis |
|---|---|---|
| Loan amount | $500,000 | National average SBA loan for solar and other renewable energy projects, FY2020 to FY2026 ($496,139), rounded |
| Rate and term | 7.50% fixed, 15 years, monthly | Assumption; 5001.401 and 5001.402 |
| FY2026 guarantee | 85%: $425,000 guaranteed, $75,000 not | B&I under $5 million |
| Guarantee fee | $12,750 (3.00%); $14,875 if issued before construction completion | Loan x guarantee % x fee rate |
| Monthly payment / annual debt service | $4,635 / $55,621 | Level amortisation, no balloon |
| Retention fee, year 1 / year 10 | $2,250 / $1,081 | 0.55% x guaranteed principal outstanding |
| NOI for 1.00x / 1.25x | $55,621 / $69,526 | Debt service x coverage |
| NOI for 1.25x with retention fee | $72,338 | (Debt service + year-1 retention fee) x 1.25 |
| New business: 25% of cost test | Cost $666,667; equity $166,667 | 5001.105(d)(3), (4) |
| New business: 20% balance-sheet test | Assets $625,000; equity $125,000 | 5001.105(d)(4) |
| Existing business: 10% of cost test | Cost $555,556; equity $55,556 | 5001.105(d)(1) |
How B&I numbers scale
| B&I loan | Application track | Feasibility study | FY2026 guarantee | Guarantee fee (3.0%) | Annual debt service | NOI for 1.25x | New-business equity at 25% of cost |
|---|---|---|---|---|---|---|---|
| $500,000 | streamlined, 5001.306(b) | Agency or lender may require | 85% | $12,750 | $55,621 | $69,526 | $166,667 |
| $1,000,000 | full application, 5001.306(a) | Agency or lender may require | 85% | $25,500 | $111,241 | $139,052 | $333,333 |
| $1,500,000 | full application, 5001.306(a) | required (new business) | 85% | $38,250 | $166,862 | $208,578 | $500,000 |
| $3,000,000 | full application, 5001.306(a) | required (new business) | 85% | $76,500 | $333,724 | $417,156 | $1,000,000 |
| $5,000,000 | full application, 5001.306(a) | required (new business) | 80% | $120,000 | $556,207 | $695,259 | $1,666,667 |
| $10,000,000 | full application, 5001.306(a) | required (new business) | 80% | $240,000 | $1,112,415 | $1,390,519 | $3,333,333 |
Net operating income needed at different rates and terms
| Term | NOI for 1.25x at 6.5% | NOI for 1.25x at 7.5% | NOI for 1.25x at 8.5% |
|---|---|---|---|
| 10 years | $85,161 | $89,026 | $92,989 |
| 15 years | $65,333 | $69,526 | $73,855 |
| 20 years | $55,918 | $60,419 | $65,087 |
Stress test and break-even
| Scenario | Net operating income | Debt service coverage |
|---|---|---|
| Base case at 1.25x | $69,526 | 1.25x |
| NOI down 10% | $62,573 | 1.12x |
| NOI down 20% (break-even) | $55,621 | 1.00x |
| NOI down 30% | $48,668 | 0.88x |
| Variable rate 1 point higher, re-amortised | $69,526 | 1.18x (debt service $59,084) |
| Variable rate 2 points higher, re-amortised | $69,526 | 1.11x (debt service $62,653) |
| Variable rate 3 points higher, re-amortised | $69,526 | 1.05x (debt service $66,324) |
Energy output needed to carry the debt
The first column is an assumed net value per kWh after O&M, for illustration only; the study uses the project's tariff and contracts.
| Assumed net value of energy per kWh (illustrative) | kWh per year for 1.00x | kWh per year for 1.25x |
|---|---|---|
| $0.08 | 695,259 | 869,074 |
| $0.10 | 556,207 | 695,259 |
| $0.12 | 463,506 | 579,383 |
| $0.15 | 370,805 | 463,506 |
A 20% shortfall in net energy value takes the project from 1.25 times to break-even. Production shortfalls, a tariff change to export credits and inverter failures are the usual causes, so the study should test each and show the effect on payback as well as coverage.
Renewable energy risks, regulators and how the study tests them
| Risk | Regulator or rule | How the study tests it |
|---|---|---|
| REAP ineligibility | Cropland, foreign-adversary components, sizing and location rules [1] | Eligibility screen before design |
| Grant not awarded | National competition under an annual notice [1] | Underwrite without the grant |
| Production shortfall | None; technical risk | Resource data, degradation, availability, P90-style downside |
| Export compensation change | State utility commission | Tariff sensitivity |
| Interconnection delay or upgrade cost | Utility and state commission | Interconnection agreement, upgrade budget |
| Installer or equipment failure | Installer licence and experience requirements [1] | Key service provider review, warranties |
| Feedstock (digesters, biomass) | None; market risk | Supply agreements, alternative feedstock |
| Environmental review | 7 CFR part 1b for REAP grants [1] | Review documentation in the schedule |
| Tax credit assumptions | Internal Revenue Code | Model without credits; credits only as upside |
| B&I policy on wind and solar | USDA policy reported on this site's state pages | Confirm with the State Office |
Process, timeline, documents and acceptance
Under the 2026 rule the sequence is: screen eligibility, finance and build the project (REAP guaranteed loan, B&I, SBA or bank), operate and collect 12 to 24 months of data, then apply for the grant when the annual notice opens. For a REAP or B&I loan, the lender files the application with the technical report and any feasibility study the lender or Agency requires, and must evaluate the study and technical report in writing [2].
| Phase | Timing | What happens |
|---|---|---|
| Scoping and proposal | Before engagement | Fifteen-minute call; written proposal with scope, timeline and firm fixed fee within one business day |
| Kickoff and data request | Week 1 | Engagement letter, data request within 48 hours, kickoff with borrower and lender |
| Market analysis | Weeks 2 to 4 | Market area, demand drivers, competitive supply, comparable operators |
| Modeling and draft | Weeks 4 to 6 | Five to ten year projection, sensitivity tables, management and technical sections |
| Delivery and review | Weeks 6 to 8 | Draft, one round of revisions, final PDF and Word report with Excel workbook |
| Acceptance | After delivery | Revisions at no added cost until USDA or the lender accepts the report |
Schedule and acceptance terms as stated on this site's cost, contact and about pages [11][12][13].
Documents the lender and Agency will look for
- Business-level income statement, balance sheet and cash flow statement for the most recent fiscal year; project-level statements are not accepted for REAP grants [1].
- Twelve or more months of utility bills and, for grants, 12 months of post-installation data [1].
- Technical report or resource assessment; energy audit for efficiency projects [2][1].
- Agreements: interconnection, PPA, site lease, feedstock, O&M and financing [1].
- Country of origin for every solar or wind component [1].
- Installer licence and experience; procurement records.
- Pro forma statements and, for loans, a pro forma closing balance sheet [2].
Common review failures in renewable energy studies
- Production at nameplate rather than site-specific output.
- A system sized beyond historical use, now an eligibility failure for ground-mount projects.
- No country-of-origin documentation for components.
- Export credits valued at retail rates without tariff support.
- No O&M or inverter reserve.
- Debt service that depends on a grant that has not been awarded.
- Technical report and study that disagree on cost or output.
Hiring a renewable energy feasibility study consultant for a USDA loan
An independent qualified consultant acceptable to the Agency is required for a B&I loan over $1,000,000 to a new business [2]; for REAP renewable system loans, the study is required when the lender or Agency deems it necessary, and for REAP grants the study can replace the resource assessment if it is prepared by an independent professional with relevant knowledge, expertise and experience [2][1]. The consultant should be independent of the installer and equipment seller, which the REAP conflict-of-interest rules also require of key service providers [1].
On this site, the engagement includes all five Part 5001 components, a five to ten year projection with sensitivity analysis, market and demand analysis, a management assessment, PDF and Word reports with an Excel workbook, kickoff and midpoint calls, one round of revisions and a written acceptance guarantee; engineering, environmental assessments, legal work, appraisals and grant or lender package drafting are separate [11]. The site's REAP and renewable pages describe the feasibility study as reconciling with, not replacing, the engineer's technical report. You provide utility bills, the system design and quotes, interconnection and site documents, any feedstock or offtake agreements, and financial statements; a structured data request follows within one to two business days [13].
Timeline: the cost page lists 4 to 5 weeks for REAP studies under a $600,000 loan and 5 to 7 weeks above it, 6 to 7 weeks for standard B&I studies, and a 3 to 4 week rush option [11]. To start, use the contact page or email info@usda-feasibility-study.com; the site states a senior analyst responds within one business day with a scoped proposal or follow-up questions, and that every proposal quotes a firm fixed fee [12].
Request a scoped proposal for your renewable energy or REAP feasibility study at usda-feasibility-study.com/contact.
Precedents
REAP's recent record is the main precedent: 6,722 REAP grant awards and 75 REAP guaranteed loan awards in FY2024 to FY2026, led by Iowa (586); Minnesota (544); Illinois (459) [4]. SBA lent $115.8 million across 229 loans to renewable generation businesses from FY2010 to FY2026 [5]. This site's state pages cite publicly announced REAP awards as program evidence, such as a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California, and its case study library includes an illustrative REAP rooftop solar study in Pennsylvania [14]. Those awards were made under the earlier rules; some ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule.
Solar and renewable energy feasibility study pages by state
The site has 33 state pages for solar and renewable energy, each with state-level data.
| State page | Establishments, 2023 | Non-metro share | SBA 7(a) and 504 loans, FY2020 to FY2026 |
|---|---|---|---|
| Alabama | 4 | n/a | 0 |
| Alaska | 0 | n/a | 0 |
| Arizona | 25 | 0.0% | 4 |
| California | 240 | 0.0% | 33 |
| Colorado | 32 | 0.0% | 4 |
| Connecticut | 9 | 0.0% | 2 |
| Delaware | 9 | 0.0% | 0 |
| Florida | 93 | 0.0% | 9 |
| Georgia | 26 | 62.5% | 4 |
| Illinois | 31 | 0.0% | 3 |
| Indiana | 3 | n/a | 2 |
| Iowa | 7 | n/a | 1 |
| Kansas | 0 | n/a | 1 |
| Kentucky | 6 | n/a | 0 |
| Louisiana | 7 | n/a | 0 |
| Maryland | 18 | 0.0% | 4 |
| Massachusetts | 22 | 0.0% | 7 |
| Michigan | 30 | 0.0% | 2 |
| Missouri | 3 | n/a | 1 |
| Nebraska | 0 | n/a | 0 |
| Nevada | 11 | 0.0% | 3 |
| New Jersey | 26 | 0.0% | 2 |
| New Mexico | 7 | 0.0% | 1 |
| New York | 45 | 0.0% | 2 |
| North Carolina | 35 | 0.0% | 2 |
| Ohio | 18 | n/a | 4 |
| Oklahoma | 0 | n/a | 1 |
| Oregon | 9 | n/a | 0 |
| Pennsylvania | 7 | n/a | 0 |
| South Carolina | 10 | 0.0% | 0 |
| Texas | 75 | 0.0% | 20 |
| Utah | 25 | 0.0% | 1 |
| Virginia | 27 | 0.0% | 3 |
Establishments and non-metro share from County Business Patterns 2023; SBA loans by project state [3][5].
USDA Feasibility, Inc.