Cold Storage and Refrigerated Warehouse Feasibility Study for USDA Loans

    Last updated 2026-11-08

    Short answer

    A cold storage feasibility study is the independent report that tells a lender and USDA whether a refrigerated warehouse will fill enough pallet positions, at high enough storage and handling rates, to cover an energy-heavy cost base and its debt. For a USDA Business and Industry (B&I) guaranteed loan over $1,000,000 to a new business a study by an independent qualified consultant is required, and USDA or the lender may require one on smaller loans [1]. Where the cold storage is part of a meat, poultry or seafood processing facility, the new SPUR guaranteed loan, administered under the same rules with a 90% guarantee, may also apply [2].

    The national market is concentrated. County Business Patterns counted 1,367 refrigerated warehousing establishments with paid employees in 2023 (+1.3% since 2019), with 48.4 employees and $56,901 in pay per employee on average [3]. Only 5.0% of those placed in a county were in non-metro counties, against 13.6% of the population [3][4][5], so rural producer regions are thinly served. SBA lenders made 125 loans worth $212.3 million to the industry since FY2010, averaging $1,962,462 from FY2020 to FY2026 [6]. Data current as of November 2026.

    QuestionAnswer
    Is a study required?Yes for a B&I loan over $1,000,000 to a new business; otherwise at USDA or lender discretion [1]
    Average SBA loan, FY2020 to FY2026$1,424,256 for 7(a); $3,038,875 for 504 [6]
    FY2026 B&I guarantee85% under $5 million, 80% from $5 million to $25 million; 3.0% fee; 0.55% retention fee [7]
    Refrigerant rulesAmmonia above 10,000 pounds triggers EPA risk management and OSHA process safety rules; new HFC systems face GWP limits from 1 January 2026 [8][9][10]
    Key eligibility trapBuildings leased to tenants the borrower does not control can be ineligible [1]
    Typical study timeline on this site4 to 8 weeks; 3 to 4 weeks on a rush basis [11]

    What a cold storage feasibility study is, and when USDA requires one

    Part 5001 defines a feasibility study as a report with an opinion or finding by an independent qualified consultant on the economic, market, technical, financial and management feasibility of the project, organised under appendix A to subpart D [1][12]. For a refrigerated warehouse, the core questions are who will store product, how full the building will be in the slow months, what the power bill will be, and whether the refrigeration system can be permitted and run safely.

    A business is new if it has operated less than a full year, or longer without stable operations, including an operator moving into a new market [1]. A processor building its first public cold store, or a warehouse operator entering a new region, is usually a new business.

    Financing routeFeasibility study ruleSource
    B&I loan over $1,000,000 to a new businessRequired, by an independent qualified consultant acceptable to the Agency; Agency sets scope5001.306(a)(3)(i)
    B&I loan of $1,000,000 or lessAgency may require one if the lender's analysis is not sufficient or the project will significantly affect an existing business5001.306(a)(3)(ii)
    B&I loan of $600,000 or lessStreamlined application if the lender's analysis is sufficient5001.306(b)
    REAP guaranteed loan, renewable energy systemWhen the lender or Agency deems it necessary; technical report always required5001.307(d), (e)
    SBA 7(a) or 504SBA may require a feasibility study13 CFR 120.160(b)
    Guarantee issued before construction completionBudget and timetable confirmed by a qualified independent consultant5001.205(e)(2)
    SPUR guaranteed loan, where cold storage is part of a meat, poultry or seafood processing facilityAdministered under 7 CFR 5001 as amended or supplemented by the funding notice91 FR 67540

    The national average SBA loan in this industry, $1,962,462, is above $1,000,000, and the 504 average of $3,038,875 shows how capital-intensive buildings are. Most new cold storage B&I projects will therefore need a full independent study.

    What a USDA-grade cold storage feasibility study must prove

    #What the study must proveAppendix A componentEvidence a reviewer expects
    1Producers, processors and distributors need the spaceMarketVolumes by commodity and season in the service area; letters of intent or storage contracts
    2Utilisation reaches the level the debt needs, in every monthFinancialMonthly occupancy curve tied to harvest and production cycles
    3Rates hold against competing warehousesMarketStorage and handling rate survey, competitor capacity and occupancy
    4Anchor-customer risk is understoodMarket, FinancialShare of revenue from the largest customers, contract terms, credit quality
    5Energy cost is modelled from the real tariffEconomic, FinancialUtility rate schedule, demand charges, load profile, efficiency measures
    6The refrigeration system is safe, permitted and lawful to installTechnicalRefrigerant choice against ammonia thresholds and HFC limits [8][9][10]
    7The building and racking fit the productTechnicalTemperature zones, clear height, pallet positions, dock doors, blast capacity
    8Power supply and backup are adequateTechnicalUtility capacity letter, generator plan
    9Labour is available at local wagesTechnical, FinancialStaffing plan against $56,901 national average pay
    10The borrower operates the business, not just the buildingManagement, EligibilityServices and tenants under the borrower's control [1]
    11Cash flow survives ramp-up and seasonalityFinancialQuarterly cash flow through start-up and for seasonal borrowers [1]

    Appendix A's elements, applied to a cold storage warehouse [12]:

    Appendix A elementWhat it must cover for cold storage warehouses
    Executive summaryCubic feet and pallet positions by temperature zone, services (blast freezing, handling, cross-dock), site, total project cost
    EconomicPower, water and refrigerant inputs, storage and anchor contracts, environmental and process-safety risk, regional food-chain effect
    MarketProducer, processor and distributor demand in the service area, competing public and private warehouses, end users, industry risk
    TechnicalBuilding envelope, refrigeration system and refrigerant, racking, docks, backup power, construction risk, labour
    FinancialUtilisation by month, storage and handling rates, energy cost per pallet, contracted versus spot revenue, sensitivity
    ManagementWarehouse operating record, refrigeration operators, food safety programs, ownership and guarantees
    RecommendationA finding on whether the warehouse, at this size and debt, is feasible
    QualificationsIndependent consultant acceptable to the Agency

    Program fit and ineligible uses

    RouteFit for cold storageKey termsStudy trigger
    USDA B&I guaranteed loanConstruction, expansion, acquisition and equipment for rural refrigerated warehousesUp to $25 million; FY2026 guarantee 85% under $5 million, 80% above [1][7]Over $1 million to a new business
    USDA SPUR guaranteed loanCold storage that is part of a meat, poultry or seafood processing facility; no geographic restriction90% guarantee; under 7 CFR 5001 [2]Part 5001 rules unless the notice changes them
    SBA 504Owner-occupied buildings and long-life refrigeration equipmentBorrower 10%; 15% new or single-purpose; 20% if both [13]SBA may require one
    SBA 7(a)Equipment, acquisitions, working capital75% guarantee over $150,000 [13]SBA may require one
    REAPRefrigeration efficiency or rooftop solar at an operating rural warehouseGrants after completion with 12 months of data; solar or wind with foreign-adversary components ineligible [14]Technical report; study at lender or Agency discretion
    Conventional bank loanStrong sponsors with anchor contractsLender policyLender policy

    The most important cold storage eligibility rule is the bar on properties used primarily for commercial rental when the borrower has no control over tenants and services offered [1]. A public refrigerated warehouse that stores, handles and freezes customers' product is operating a business. A building developed to lease in full to one tenant on a net lease looks more like a rental property, and should be tested with the State Office before the study is scoped. Community Facilities does not fund inherently commercial enterprises [1]. The usual ineligible uses apply: no broker fees, no above-cost payments to related contractors, no rental of equipment the borrower owns, no distributions to owners [1].

    Eligibility: rural area, borrower and project

    B&I applies only in rural areas: outside cities or towns over 50,000 and their contiguous urbanized areas under the latest census, and approval cannot depend on meeting the test later [1]. That is a real constraint for cold storage, which clusters near metro distribution hubs. The borrower can be a company, cooperative, tribe, public body or an individual who is a U.S. citizen or lawful permanent resident; agricultural cooperatives are a natural borrower for shared cold storage [1]. SPUR has no geographic restriction for processing facilities [2]. Non-metro county figures here are a proxy only.

    National market evidence: establishments, density, pay and rural footprint

    NAICS 493120 counts refrigerated warehousing and storage establishments with paid employees [3]. Cold rooms inside processing plants, grocery distribution centers and farms are counted under those businesses, not here, so the figures measure the public and third-party cold storage market.

    MeasureUnited States
    Establishments with paid employees, 20191,350
    Establishments with paid employees, 20231,367
    Change, 2019 to 2023+17 (+1.3%)
    States (incl. DC) with at least one establishment, 202344
    Establishments per 100,000 residents, 20230.4
    Paid employees, 2023 (mid-March)66,143
    Annual payroll, 2023$3.76 billion
    Average employees per establishment48.4
    Average annual pay per employee$56,901
    Establishments the county file places in a county886 (64.8% of the national total)
    Of those, in non-metro counties44 (5.0%) in 11 counties
    Share of U.S. population living in non-metro counties, 202513.6%
    Rural concentration index (non-metro share of establishments / non-metro share of population)0.37

    Non-metro share is computed on the 886 establishments the 2023 county file places in a county (64.8% of the total), using OMB's July 2023 delineation [5].

    Three findings matter. Supply is flat: +17 establishments over four years, with 18 states adding and 22 losing warehouses. Warehouses are large, 48.4 employees and $2,753,160 of payroll per establishment. And they are metropolitan: a rural concentration index of 0.37 means non-metro counties hold about a third of the share of cold storage they hold of population. For rural producers that gap is the market opportunity, and for the study it is the burden of proof, because thin rural demand is also why operators stay near cities.

    Top 10 states by establishments, 2023

    RankState20192023ChangePer 100k residentsAvg employeesAvg payNon-metro share*
    1California203211+3.9%0.538.3$59,3450.0%
    2Texas120139+15.8%0.548.0$55,7010.0%
    3Wisconsin6775+11.9%1.342.0$55,57221.7%
    4Florida8274-9.8%0.369.2$49,3800.0%
    5Georgia5872+24.1%0.793.2$57,9040.0%
    6New Jersey5172+41.2%0.843.8$58,9220.0%
    7Washington5252+0.0%0.733.2$62,38916.7%
    8Illinois4850+4.2%0.492.3$57,09310.8%
    9Pennsylvania4650+8.7%0.472.0$54,0190.0%
    10New York4439-11.4%0.228.0$51,8820.0%
    • Non-metro share of establishments placed in a county. The top 10 states hold 61.0% of all refrigerated warehouses [3].

    Top 10 states by non-metro share

    RankStateNon-metro establishmentsEstablishments in county fileNon-metro shareState population in non-metro countiesLeading non-metro counties
    1Ohio41428.6%17.9%Henry County (4)
    2Arizona62227.3%4.5%Santa Cruz County (6)
    3Arkansas31323.1%38.0%Pope County (3)
    4Iowa31323.1%37.6%Plymouth County (3)
    5Wisconsin104621.7%25.4%Wood County (4); Monroe County (3); Walworth County (3)
    6Michigan31421.4%16.6%Oceana County (3)
    7Washington74216.7%10.2%Grant County (7)
    8Illinois43710.8%12.5%Ogle County (4)
    9Alabama0110.0%21.7%none
    10California01910.0%2.1%none

    States with at least 10 establishments in the county file (20 qualify). By count, the most non-metro refrigerated warehouses are in Wisconsin (10); Washington (7); Arizona (6); Idaho (4); Illinois (4) [3][5].

    States that added the most refrigerated warehouses, 2019 to 2023

    RankState20192023AddedChange
    1New Jersey5172+21+41.2%
    2Texas120139+19+15.8%
    3Georgia5872+14+24.1%
    4California203211+8+3.9%
    5Wisconsin6775+8+11.9%
    6Iowa2026+6+30.0%
    7Maryland1620+4+25.0%
    8Nevada59+4+80.0%
    9Pennsylvania4650+4+8.7%
    10Colorado1417+3+21.4%

    Demand drivers and competition analysis

    • Production volumes of fruit, vegetables, nuts, dairy, meat, poultry and seafood in the service area, by month.
    • Processors that need frozen or chilled storage and blast freezing capacity.
    • Distribution: grocery, food service and export flows that need staging near producers.
    • Shelf-life and quality requirements that limit how far product can travel before storage.
    • Existing cold storage capacity, its occupancy and its age.
    • Transport links: highway, rail and port access for inbound and outbound loads.

    The competition method inventories every public and private refrigerated warehouse within the economic haul distance, with temperature zones, pallet positions, services, rates and occupancy, plus cold rooms at processors that could be expanded. The consultant then estimates unmet demand by temperature zone and month, because a warehouse that is full at harvest and half empty in spring needs a different debt structure than one with year-round contracts. The study should show the share of capacity under signed contracts and the share that depends on spot storage.

    Revenue model and key metrics

    Public cold storage earns storage fees per pallet per month, handling fees for each pallet in and out, and charges for blast freezing, tempering, case picking, repacking, labelling, cross-docking and transport coordination. Some warehouses lease dedicated rooms to anchor customers. The model must separate contracted from spot revenue and show both by month.

    MetricWhat it measuresHow the study supports it
    Pallet positions by temperature zoneCapacityRacking plan and building design
    Utilisation (occupied positions / capacity) by monthDemand and seasonalityCommodity calendars and customer commitments
    Storage rate per pallet per monthPriceRate survey of competing warehouses
    Handling revenue per pallet and inventory turnsActivity-based incomeCustomer order patterns
    Energy cost per pallet positionLargest variable costTariff, load profile, refrigeration design
    Contracted share of revenue and top-customer shareConcentration riskContracts and credit of anchors
    Labour hours per pallet handledProductivityStaffing plan

    Cost structure, wages and capital items

    Refrigerated warehouses averaged 48.4 employees at $56,901 per employee in 2023, and $2,753,160 of payroll per establishment [3]. Energy for refrigeration is the cost line that most often breaks a pro forma; the study should model it from the utility's actual tariff, including demand charges, rather than an average cents-per-kWh. Other costs are maintenance of refrigeration and doors, lift trucks, insurance including product liability, property tax, food safety and sanitation programs, and refrigerant management. Capital items are land and site work, insulated panel building and floors with heave protection for freezers, the refrigeration system, racking, dock doors and levelers, blast freezers, backup power, offices, and a ramp-up reserve.

    Financing evidence: SBA lending history and seasoned losses

    SBA loan records for NAICS 493120 show how lenders have financed refrigerated warehousing nationally [6].

    Approval years7(a) loans7(a) dollarsAverage 7(a)504 loans504 dollarsAverage 504Jobs reported (both)
    FY2010 to FY201638$46.6 million$1,225,87917$29.6 million$1,739,529987
    FY2017 to FY20196$5.6 million$930,16716$36.4 million$2,275,000194
    FY2020 to FY202322$27.3 million$1,240,89512$35.2 million$2,933,833407
    FY2024 to FY202610$18.3 million$1,827,6504$13.4 million$3,354,000461
    FY2010 to FY202676$97.7 million$1,286,06149$114.6 million$2,338,6532,049

    From FY2020 to FY2026, lenders made 32 7(a) loans averaging $1,424,256 and 16 504 loans averaging $3,038,875. At 3.5 SBA loans per 100 establishments, SBA plays a smaller role in cold storage than in the other assets on these pages.

    ProgramApproval yearsCohort ageLoansCharged offCharge-off rate (count)Charged-off dollars / approved dollarsAverage months to charge-off
    7(a)FY2010 to FY2016seasoned (10 to 16 years)3825.3%1.6%76
    7(a)FY2017 to FY2019maturing (7 to 9 years)600.0%0.0%n/a
    7(a)FY2020 to FY2023young (3 to 6 years)2200.0%0.0%n/a
    7(a)FY2024 to FY2026new (under 3 years)10110.0%3.4%20
    504FY2010 to FY2016seasoned (10 to 16 years)1700.0%0.0%n/a
    504FY2017 to FY2019maturing (7 to 9 years)1600.0%0.0%n/a
    504FY2020 to FY2023young (3 to 6 years)1200.0%0.0%n/a
    504FY2024 to FY2026new (under 3 years)400.0%0.0%n/a

    The seasoned FY2010 to FY2016 cohort is small: 2 of 38 7(a) loans were charged off (5.3%), after 76 months on average, and none of 17 504 loans. Small samples like this cannot set a reliable loss rate, so the study's stress tests matter more than the historical average.

    USDA activity, all states

    USAspending counts awards by program, not industry: 643 B&I guaranteed loan awards nationwide from 1 October 2023 to 30 September 2026, shown for the ten states with the most [15].

    StateB&I guaranteed loan awardsREAP grantsREAP guaranteed loansCommunity Facilities awards
    Missouri74309432
    Texas72134340
    Oklahoma37103047
    California3593551
    North Carolina331021287
    Louisiana2872022
    New York281861393
    Florida2467121
    Illinois21459637
    Ohio21268075
    All 51 states with data6436,722751,717

    Financing structure: B&I and SPUR terms, equity, collateral and going concern

    B&I terms are set each fiscal year. The FY2026 notice governs loans obligated in FY2026; as of 7 November 2026 no FY2027 B&I fee notice had appeared in the Federal Register, while the SPUR notice of 27 October 2026 set FY2027 SPUR terms [7][2].

    FY2026 loan typeGuarantee feeAnnual retention feeGuaranteeExtra fee if guarantee issued before construction completion
    B&I under $5 million3.0%0.55%85%0.50%
    B&I $5 million to $25 million3.0%0.55%80%0.50%
    B&I reduced fee1.0%0.50%80%0.50%
    B&I Alaska high-cost isolated area not on road system1.0%0.50%90%0.50%
    Community Facilities guaranteed1.25%0.50%80%0.50%
    REAP guaranteed1.0%0.25%80%0.50%
    SPUR guaranteed (meat, poultry and seafood processing facilities), FY2027 notice3%0.55%90%0.5%

    The guarantee fee is loan times guaranteed percentage times rate; the retention fee is charged yearly on the guaranteed share of principal outstanding [1][7]. Rates are negotiated, fixed or variable, no higher than the lender's rate on similar unguaranteed loans; terms follow the useful life of the collateral up to 40 years, fully amortising, with first full principal and interest within three years [1]. A loan of $5 million or more drops to an 80% B&I guarantee in FY2026 [7], which matters for large warehouses.

    Borrower situation at closingMinimum capital or equity (any one test)Rule
    Existing business10% balance-sheet equity (or debt to equity no more than 9 to 1); or 10% of total eligible project costs invested; or owner capital of at least 10% of net fixed assets plus depreciation5001.105(d)(1)
    New business with sales contracts covering debt service for at least the loan term10% balance-sheet equity (or 9 to 1); or 10% of project cost5001.105(d)(2)
    New business, construction, guarantee requested before completion25% balance-sheet equity (or 3 to 1); or 25% of project cost5001.105(d)(3)
    All other new businesses20% balance-sheet equity (or 4 to 1); or 25% of project cost5001.105(d)(4)
    Higher-risk loansAgency may raise the requirement (industry status, concentration, collateral, guarantees, cash flow, contracts, credit rating, strength of the feasibility study, management)5001.105(d)(5)

    Equity must be cash or earning assets, not appraisal surplus; for construction with an early guarantee the borrower must inject equity before guaranteed funds are drawn [1]. Real estate over $250,000 needs a USPAP appraisal with as-is and prospective values, going concern value is deducted before discounting, and appraisals can be no more than a year old [1]. Refrigerated buildings are special-purpose, so the appraised value can sit well below cost. Owners of 20% or more give guarantees [1].

    B&I compared with SBA for the same loan

    FeatureUSDA B&I (FY2026)SBA 7(a)SBA 504
    Guarantee on $1,950,00085% ($1,657,500)75% ($1,462,500)Debenture 100% SBA-guaranteed; bank first lien not guaranteed
    Up-front fee3.0% of guaranteed amount ($49,725)Ceiling $52,344 under 120.2200.5% of debenture plus CDC fees
    Annual fee0.55% of guaranteed balanceUp to 0.55%, paid by lenderUp to 0.9375% of debenture balance plus CDC servicing fee
    Borrower equity10% existing; 20% to 25% newLender credit judgment10%; 15% new or single-purpose; 20% both
    LocationRural area only (5001.3)Anywhere in the U.S.Anywhere in the U.S.
    Feasibility studyRequired over $1 million for a new businessMay be requiredMay be required

    Worked B&I example (illustrative)

    Illustrative only: a loan near the national average SBA refrigerated warehousing loan, with an assumed rate and a 25-year term.

    ItemIllustrative valueBasis
    Loan amount$1,950,000National average SBA loan for cold storage warehouses, FY2020 to FY2026 ($1,962,462), rounded
    Rate and term7.50% fixed, 25 years, monthlyAssumption; 5001.401 and 5001.402
    FY2026 guarantee85%: $1,657,500 guaranteed, $292,500 notB&I under $5 million
    Guarantee fee$49,725 (3.00%); $58,012 if issued before construction completionLoan x guarantee % x fee rate
    Monthly payment / annual debt service$14,410 / $172,924Level amortisation, no balloon
    Retention fee, year 1 / year 10$8,987 / $7,2670.55% x guaranteed principal outstanding
    NOI for 1.00x / 1.25x$172,924 / $216,155Debt service x coverage
    NOI for 1.25x with retention fee$227,389(Debt service + year-1 retention fee) x 1.25
    New business: 25% of cost testCost $2,600,000; equity $650,0005001.105(d)(3), (4)
    New business: 20% balance-sheet testAssets $2,437,500; equity $487,5005001.105(d)(4)
    Existing business: 10% of cost testCost $2,166,667; equity $216,6675001.105(d)(1)

    At $1,950,000, the loan is above $1,000,000, so a new business needs an independent study [1]. The warehouse needs about $216,155 of net operating income for 1.25 times coverage, $227,389 with the retention fee passed through, and a new business would put in about $650,000 under the 25% of project cost test.

    How the numbers scale

    B&I loanApplication trackFeasibility studyFY2026 guaranteeGuarantee fee (3.0%)Annual debt serviceNOI for 1.25xNew-business equity at 25% of cost
    $1,000,000full application, 5001.306(a)Agency or lender may require85%$25,500$88,679$110,849$333,333
    $1,950,000full application, 5001.306(a)required (new business)85%$49,725$172,924$216,155$650,000
    $3,000,000full application, 5001.306(a)required (new business)85%$76,500$266,037$332,546$1,000,000
    $5,000,000full application, 5001.306(a)required (new business)80%$120,000$443,395$554,243$1,666,667
    $10,000,000full application, 5001.306(a)required (new business)80%$240,000$886,789$1,108,487$3,333,333
    $20,000,000full application, 5001.306(a)required (new business)80%$480,000$1,773,579$2,216,974$6,666,667

    Net operating income needed at different rates and terms

    TermNOI for 1.25x at 6.5%NOI for 1.25x at 7.5%NOI for 1.25x at 8.5%
    15 years$254,799$271,151$288,036
    20 years$218,080$235,636$253,838
    25 years$197,498$216,155$235,529

    Stress test and break-even

    ScenarioNet operating incomeDebt service coverage
    Base case at 1.25x$216,1551.25x
    NOI down 10%$194,5391.12x
    NOI down 20% (break-even)$172,9241.00x
    NOI down 30%$151,3080.88x
    Variable rate 1 point higher, re-amortised$216,1551.15x (debt service $188,423)
    Variable rate 2 points higher, re-amortised$216,1551.06x (debt service $204,445)
    Variable rate 3 points higher, re-amortised$216,1550.98x (debt service $220,939)

    Occupied pallet positions needed to carry the debt

    The first column is an assumed net operating income per occupied pallet position per year, for illustration only; the study derives it from rates, handling and energy cost.

    Assumed NOI per occupied pallet position per year (illustrative)Occupied pallet positions per year for 1.00xOccupied pallet positions per year for 1.25x
    $404,3235,404
    $602,8823,603
    $802,1622,702
    $1001,7292,162

    A 20% fall in net operating income takes the warehouse from 1.25 times to break-even. Energy is the usual trigger: a tariff change or a hot summer can move the power bill faster than rates can be raised, so the study should show coverage under an energy-cost shock alongside lower utilisation.

    Cold storage risks, regulators and how the study tests them

    RiskRegulator or ruleHow the study tests it
    Low or seasonal utilisationNone; market riskMonthly occupancy, contracted share
    Anchor customer lossNoneConcentration analysis, contract terms
    Energy costState utility commission tariffsTariff-based model, energy shock
    Ammonia releaseEPA risk management program above 10,000 pounds of anhydrous ammonia [8]; OSHA process safety management at the same threshold [9]System charge, compliance cost, trained operators
    HFC refrigerant restrictionsFrom 1 January 2026, new cold storage warehouse systems of 200 pounds or more may not use refrigerants with GWP of 150 or more; smaller systems 300 [10]Refrigerant choice and equipment cost
    Rental-property ineligibility5001.115(g)Operating model and tenant control [1]
    Power outage and product lossInsurersBackup generation, insurance
    Construction overrun5001.205(e)(2) early-guarantee conditionsFixed-price contract, contingency [1]
    LabourState wage lawStaffing plan and wage stress
    Appraisal below cost5001.203Equity plan [1]

    Process, timeline, documents and acceptance

    The B&I path runs from eligibility check to lender engagement, study and appraisal, lender credit analysis, State Office application, conditional commitment, closing and loan note guarantee. The lender must evaluate the study in writing and substantiate projections that depart from history; for construction with an early guarantee it needs quarterly cash flow through start-up [1].

    PhaseTimingWhat happens
    Scoping and proposalBefore engagementFifteen-minute call; written proposal with scope, timeline and firm fixed fee within one business day
    Kickoff and data requestWeek 1Engagement letter, data request within 48 hours, kickoff with borrower and lender
    Market analysisWeeks 2 to 4Market area, demand drivers, competitive supply, comparable operators
    Modeling and draftWeeks 4 to 6Five to ten year projection, sensitivity tables, management and technical sections
    Delivery and reviewWeeks 6 to 8Draft, one round of revisions, final PDF and Word report with Excel workbook
    AcceptanceAfter deliveryRevisions at no added cost until USDA or the lender accepts the report

    Schedule and acceptance terms as stated on this site's cost, contact and about pages [11][16][17].

    Documents the lender and Agency will look for

    • Business and affiliate financial statements to Agency-acceptable standards; a tax return alone is not acceptable [1].
    • Pro forma closing balance sheet and projections showing the equity test [1].
    • Customer letters of intent or storage contracts with volumes and terms.
    • Building and refrigeration design, refrigerant choice and compliance plan.
    • Utility capacity letter and tariff; backup power plan.
    • Budget, construction contract and schedule.
    • Operator resumes, food safety programs and owners of 20% or more.

    Common review failures in cold storage studies

    • Annual average occupancy used where monthly occupancy swings with harvest.
    • Energy cost from an average rate, ignoring demand charges.
    • A refrigerant system that cannot lawfully be installed after 1 January 2026.
    • One anchor customer treated as permanent without a contract.
    • A net-leased building presented as an operating business.
    • No backup power or product-loss insurance in the budget.
    • Projections without support from the operator's own history [1].

    Hiring a cold storage feasibility study consultant for a USDA loan

    An independent qualified consultant acceptable to the Agency is required for a B&I or SPUR loan over $1,000,000 to a new business, with scope set by the Agency [1]. Below that size, USDA or the lender may still ask for one. The consultant should be independent of the builder, refrigeration contractor and anchor tenant.

    On this site, the engagement includes all five Part 5001 components, a five to ten year projection with sensitivity analysis, market area and demand analysis, a competitive supply inventory, comparable operator benchmarks, a management assessment, PDF and Word reports with an Excel workbook, kickoff and midpoint calls, one round of revisions and a written acceptance guarantee; environmental assessments, engineering, legal work, appraisals and lender package drafting are separate [11]. You provide customer commitments, building and refrigeration plans, the utility tariff and capacity letter, the budget and the operator's history and financials; a structured data request follows within one to two business days [17].

    Timeline: most engagements take 4 to 8 weeks, standard B&I studies 6 to 7 weeks and complex ones 7 to 9 weeks, with a 3 to 4 week rush option [11]. To start, use the contact page or email info@usda-feasibility-study.com; the site states a senior analyst responds within one business day with a scoped proposal or follow-up questions, and that every proposal quotes a firm fixed fee [16].

    Request a scoped proposal for your cold storage feasibility study at usda-feasibility-study.com/contact.

    Precedents

    SBA records show 125 refrigerated warehousing loans worth $212.3 million from FY2010 to FY2026 [6]. This site's state pages cite Origo Cold Storage in Madera County, California, as national program evidence: a $35 million USDA guaranteed loan paired with $17 million of C-PACE financing for a 254,000 square foot temperature-controlled facility, made under the since-discontinued Food Supply Chain program. Its case study library includes a protein-chain cold storage B&I study in Arkansas, and its engagement index lists cold storage work in Washington and a cold storage rooftop solar REAP study in Georgia [18]. These are reported as the site states them.

    Cold storage feasibility study pages by state

    The site has 35 state pages for cold storage, each with state-level establishment, rural and SBA data.

    State pageEstablishments, 2023Non-metro shareSBA 7(a) and 504 loans, FY2020 to FY2026
    Alabama200.0%0
    Alaska0n/a0
    Arizona2727.3%0
    California2110.0%13
    Colorado170.0%0
    Connecticut3n/a0
    Delaware60.0%0
    Florida740.0%4
    Georgia720.0%0
    Hawaii0n/a0
    Idaho1357.1%0
    Illinois5010.8%0
    Indiana260.0%0
    Iowa2623.1%0
    Kansas110.0%0
    Kentucky130.0%0
    Louisiana9n/a0
    Maryland200.0%0
    Massachusetts260.0%0
    Michigan3021.4%1
    Missouri180.0%1
    Nebraska180.0%0
    Nevada90.0%0
    New Jersey720.0%1
    New Mexico60.0%0
    New York390.0%0
    North Carolina21n/a0
    Ohio2928.6%4
    Oklahoma70.0%1
    Oregon250.0%0
    Pennsylvania500.0%1
    South Carolina130.0%0
    Texas1390.0%4
    Utah120.0%2
    Virginia290.0%3

    Establishments and non-metro share from County Business Patterns 2023; SBA loans by project state [3][6].

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    How much does a cold storage feasibility study cost?

    This site quotes a firm fixed fee in a written proposal; its cost page lists $6,900 to $12,500 for standard B&I studies and $10,500 to $14,500 for complex ones (loans over $10 million, phased or limited comparable data), plus 20% to 35% for a rush [11].

    How long does a cold storage feasibility study take?

    Most engagements take 4 to 8 weeks on this site's schedule, standard B&I studies 6 to 7 weeks and complex ones 7 to 9 weeks; a rush delivers in 3 to 4 weeks [11].

    Do I need a feasibility study for a USDA cold storage loan?

    Yes for a B&I loan over $1,000,000 to a new business [1]; most cold storage loans are above that size. Smaller loans may still need one at the Agency's or lender's discretion.

    Who prepares a cold storage feasibility study?

    An independent qualified consultant acceptable to the Agency [1], with refrigeration design and engineering by separate licensed professionals. Appendix A asks for the author's qualifications [12].

    How long is a cold storage feasibility study valid?

    Part 5001 sets no expiry for studies; appraisals may be no more than a year old [1], and this site works to an 18-month data recency standard [11]. Losing or adding an anchor customer calls for an update.

    Can one study serve SBA and USDA?

    Usually yes if built to the Part 5001 standard. SBA may require a feasibility study [13]; model both structures, since SBA 504 treats a refrigerated building as single-purpose for equity.

    Can USDA finance a cold storage building leased to one tenant?

    Possibly not: part 5001 makes properties used primarily for commercial rental ineligible when the borrower has no control over tenants and services [1]. An operating public warehouse is different. Test the structure with the State Office first.

    Does SPUR cover cold storage?

    SPUR supports establishing, expanding or improving meat, poultry and seafood processing facilities [2]. Cold storage that is part of such a facility may fit; check the full funding notice before relying on it for a stand-alone warehouse.

    Which refrigerant rules affect a new cold storage warehouse?

    From 1 January 2026, EPA bars installing new cold storage warehouse systems of 200 pounds or more using refrigerants with a GWP of 150 or more (300 for smaller systems) [10]. Ammonia systems above 10,000 pounds fall under EPA risk management and OSHA process safety rules [8][9].

    What utilisation does a cold storage warehouse need?

    There is no rule; it depends on rates, energy cost and debt. The page's break-even table shows occupied pallet positions needed at a range of assumed income per position, and the study replaces those assumptions with the project's own figures.

    What should a cold storage feasibility study consultant ask for first?

    Customer commitments, the commodity calendar, building and refrigeration plans, the utility tariff, the budget and the operator's record. These decide eligibility, program fit and the scope of the market work.

    Can REAP pay for refrigeration upgrades?

    For an operating rural warehouse, yes: under the rule effective 16 October 2026 REAP grants go to completed projects with 12 months of energy data, up to $250,000 for efficiency improvements [14].

    Sources

    [1] 7 CFR part 5001, OneRD Guaranteed Loans (CFR 2026 edition, title 7 vol. 15, revised 1 Jan 2026), govinfo. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 7 Nov 2026)

    [2] USDA RBCS, Notice of Funding Opportunity for the Strengthening Processing for US Ranchers (SPUR) Guaranteed Loan Program for Fiscal Year 2027, 91 FR 67540 (27 Oct 2026). https://www.govinfo.gov/content/pkg/FR-2026-10-27/html/2026-21858.htm (accessed 7 Nov 2026)

    [3] U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files. https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23st.zip ; https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23co.zip ; https://www2.census.gov/programs-surveys/cbp/datasets/2019/cbp19st.zip (accessed 7 Nov 2026)

    [4] U.S. Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata). https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/totals/co-est2025-alldata.csv (accessed 7 Nov 2026)

    [5] OMB metropolitan and micropolitan statistical area delineation file, July 2023 (list1_2023). https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx (accessed 7 Nov 2026)

    [6] U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: FOIA_7a_FY2010_FY2019, FOIA_7a_FY2020_Present, FOIA_504_FY2010_Present. https://data.sba.gov/sites/default/files/uploaded_resources/FOIA_7a_FY2020_Present_asof_260930.csv (and companion files) (accessed 7 Nov 2026)

    [7] USDA, OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026, 91 FR 11272 (9 Mar 2026). https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 6 Nov 2026)

    [8] 40 CFR 68.130, List of substances (Clean Air Act section 112(r) risk management program) (CFR 2025 edition). https://www.govinfo.gov/content/pkg/CFR-2025-title40-vol17/xml/CFR-2025-title40-vol17-sec68-130.xml (accessed 7 Nov 2026)

    [9] 29 CFR 1910.119, Process safety management of highly hazardous chemicals, appendix A (CFR 2025 edition). https://www.govinfo.gov/content/pkg/CFR-2025-title29-vol5/xml/CFR-2025-title29-vol5-sec1910-119.xml (accessed 7 Nov 2026)

    [10] 40 CFR 84.54, Restrictions on the use of hydrofluorocarbons (CFR 2025 edition). https://www.govinfo.gov/content/pkg/CFR-2025-title40-vol21/xml/CFR-2025-title40-vol21-sec84-54.xml (accessed 7 Nov 2026)

    [11] usda-feasibility-study.com, USDA Feasibility Study Cost & Timeline (site page). https://usda-feasibility-study.com/usda-feasibility-study-cost (read 7 Nov 2026)

    [12] OneRD Guaranteed Loan Regulation, 85 FR 42494 (14 Jul 2020), appendix A to subpart D of part 5001, Elements of an Acceptable Feasibility Study, pp. 42556-42557. https://www.govinfo.gov/content/pkg/FR-2020-07-14/pdf/2020-13991.pdf (accessed 7 Nov 2026)

    [13] 13 CFR part 120, Business Loans (CFR 2026 edition), govinfo; sections 120.101, 120.150, 120.160, 120.210, 120.220, 120.801, 120.900 to 120.971. https://www.govinfo.gov/content/pkg/CFR-2026-title13-vol1/xml/CFR-2026-title13-vol1-sec120-160.xml (accessed 7 Nov 2026; other sections accessed 6 Nov 2026)

    [14] USDA RBCS, Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026. https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm (accessed 7 Nov 2026)

    [15] USAspending.gov, award counts by place of performance for Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), 1 Oct 2023 to 30 Sep 2026, API v2 spending_by_award_count. https://api.usaspending.gov/api/v2/search/spending_by_award_count/ (accessed 7 Nov 2026)

    [16] usda-feasibility-study.com, Contact & Request a Proposal (site page). https://usda-feasibility-study.com/contact (read 7 Nov 2026)

    [17] usda-feasibility-study.com, About (site page). https://usda-feasibility-study.com/about (read 7 Nov 2026)

    [18] usda-feasibility-study.com, Case Studies and Engagements (site pages). https://usda-feasibility-study.com/case-studies ; https://usda-feasibility-study.com/engagements (read 7 Nov 2026)

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.