USDA Feasibility Study for Cold Storage in Iowa

    NAICS 493120

    Cold storage projects in Iowa serve the state's protein, egg and food-processing base. An independent feasibility study consultant documents anchor tenants, throughput contracts and utility capacity, and tests commodity-cycle exposure.

    Iowa already runs one of the densest cold chains in the country: 26 refrigerated warehouses with payroll in 2023, 0.8 per 100,000 residents, twice the national rate and third among the 50 states and the District of Columbia on a computed ranking. A new Iowa cold store therefore enters a market with competitors, not a gap, and the study has to show who will move product into it and why.

    Program Fit

    B&I and Food Supply Chain guarantees both apply, as this page has stated; SPUR covers processing-adjacent scopes for meat, poultry and seafood. Before relying on Food Supply Chain or SPUR, confirm with the lender and the Iowa state office that each is accepting applications on the terms described.

    RouteFit for an Iowa cold storage projectWhat decides it
    USDA B&I guaranteePublic refrigerated warehouses, freezer additions to processing sites, distribution cold storesRural parcel under 7 CFR 5001.3; FY2026 guarantee 85% below $5 million, 80% from $5 million to $25 million
    SPUR (per the Iowa hub's summary)Storage that is part of a meat, poultry or seafood processing projectThe hub reports a 90% guarantee, 3% fee, 0.55% retention and no rural-area limit; confirm scope against the notice
    Food Supply Chain guarantee (named on the live page)Food-chain storage and aggregationThe hub's Nutriom guarantee was made in 2022; confirm the program is taking applications now
    REAPEfficient refrigeration, controls or rooftop solar at an operating warehouse2026 rule: grant after 12 months of data, at most 25% of cost
    SBA 504Owner-occupied warehouseOne Iowa refrigerated warehousing 504 loan in seventeen years
    Conventional or processor-fundedStorage built inside a processor's own expansionThe processor's balance sheet, not the warehouse, carries the credit

    A cold store that sells space and handling to processors is commercial, so Community Facilities is out unless a public body or nonprofit owns a food-bank facility. The borrower's owners of more than 20% are checked for federal judgments, delinquent federal tax or debt, and debarment, and the business may not take more than 15% of gross revenue from gambling (7 CFR 5001.127); in a state with 19 licensed casinos, the Iowa hub stresses that the gambling test applies to the borrower's own income, so a warehouse that merely stores food for a casino operator is not affected. Guarantees from each 20% owner, sized to ownership, run for the full term (5001.204).

    Required by rule or requested by the lender

    For a start-up warehouse operator, a B&I-guaranteed loan above $1,000,000 triggers a mandatory feasibility study by an independent consultant the Agency accepts, scoped by USDA (7 CFR 5001.306(a)(3)(i)). Iowa has no recent SBA loans to size against, and the national 7(a) average for the industry, $1,424,256, sits above the trigger. A processor adding cold space to an existing business, or a loan of $1,000,000 or less, faces the study at USDA's discretion under 5001.306(a)(3)(ii), and loans up to $600,000 can take the streamlined route of 5001.306(b). A new facility with more than 50 jobs and a loan over $1,000,000 also needs Department of Labor concurrence (5001.306(a)(1)); Iowa's warehouses averaged 43.4 workers in 2023, so only the larger projects reach that line.

    What the Study Covers

    Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.

    • Market demand and competitive supply analysis
    • Technical and site feasibility, including environmental considerations
    • Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
    • Management and operational capacity assessment
    • Economic feasibility and rural community impact

    In Iowa the market chapter is mostly a contract chapter. It lists the processors, egg packers and distributors that would use the space, the pallets each would commit by month, and the terms; then it surveys the competing public and private cold space those customers use today. The technical chapter covers refrigeration design, power service and backup, insulated envelope, dock count and truck access, and the financial chapter turns committed and probable pallets into storage and handling income.

    Iowa Market Evidence

    Iowa's protein and egg concentration, including the $11,100,000 Nutriom freeze-dried egg expansion in Panora, supports cold-chain demand; the study must show contracted throughput rather than speculative capacity.

    Cold storage in Iowa: market evidence

    Iowa: refrigerated warehousing, supply and rural footprint

    MeasureIowaUnited States
    Establishments, 2019 → 202320 → 26 (+30.0%)1,350 → 1,367
    Per 100,000 residents (2023)0.80.4
    Average employees per establishment43.448.4
    Average annual pay per employee$53,030$56,901
    Share of establishments in non-metro counties23.1% (3 in 1 counties)
    Share of state population in non-metro counties (2025)37.6%

    Non-metro counties with the most refrigerated warehousing (2023): Plymouth County (3).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Iowa added six refrigerated warehouses between 2019 and 2023, a 30.0% rise while the national count barely moved, and its density is 199.2% of the U.S. figure. Employment stayed almost flat (1,136 to 1,129), so the new facilities are small or highly automated; average size, 43.4 employees, is now below the national 48.4. Pay per worker jumped 33.9% to $53,030 and total payroll 33.1%, closing much of the gap with the U.S. average of $56,901. For a pro forma, the Iowa wage is the floor and the trend is upward.

    The reviewer's challenge follows from the density. With more cold space per resident than all but two states, Iowa does not lack generic storage; it may lack the right kind (blast freezing, egg-product cooler space, space near a particular processor). A study that argues demand from statewide protein output will be returned. One that names the customers and shows their current space is full, too far away or the wrong temperature will not.

    Computed from the Census County Business Patterns 2023 state file. Census leaves the under-5 and 100-plus classes blank for Iowa (2 of 26 establishments).

    Employees per establishmentIowa refrigerated warehouses
    5 to 93
    10 to 196
    20 to 4911
    50 to 994
    Fewer than 5, or 100 and moreNot published

    Eleven of the 24 Iowa warehouses with a published size class (45.8%) employ 20 to 49 people, the band a regional public cold store usually falls in. That makes a mid-sized project easier to benchmark in Iowa than in most states.

    Regional comparables

    Computed from each state's pack (Census County Business Patterns 2023; SBA FOIA data as of 30 Sep 2026). Other states' figures are theirs.

    StateRefrigerated warehouses, 2019 → 2023Per 100,000 residentsAverage employeesAverage paySBA loans, FY2020 to FY2026
    Iowa20 → 260.843.4$53,030None
    Wisconsin67 → 751.342.0$55,5726 SBA 504 (average $2,494,500)
    Nebraska19 → 180.934.5$50,796None
    Minnesota28 → 300.521.2$54,874None
    Illinois48 → 500.492.3$57,093None
    Missouri22 → 180.351.5$79,3771 SBA 504 ($2,429,000)
    South Dakota4 → 30.348.3$56,386None

    Wisconsin is the only neighbour denser than Iowa, with 75 warehouses, and its six SBA 504 loans since FY2020, averaging $2,494,500, are the closest regional evidence of how cold storage is financed in the upper Midwest. Nebraska's density (0.9) is close to Iowa's, while Minnesota, Illinois and Missouri sit well below it. None of the neighbours has an SBA 7(a) cold storage loan since FY2020. These are the other states' figures, useful for loan structure and wage checks; Iowa's own customers remain the demand test.

    Demand drivers and competition

    The hub's food-system record points to where demand comes from: freeze-dried egg manufacturing in Panora, meat lockers such as Jordan's Meat Market in Marcus, pork, egg and poultry processors in the northwest, and aquaculture at Eagle's Catch in Ellsworth. Iowa's 149 meat and poultry plants, 4.6 per 100,000 residents (fourth in the nation on a computed basis), and 11 of them in Sioux County alone, mark the northwest as the densest protein cluster. Competition is the existing public warehouses in the Des Moines and Sioux City areas, the three in Plymouth County, and space inside processors' own plants.

    Revenue model, costs and capital

    Income comes from monthly storage per pallet, in-and-out handling per pallet, blast freezing, and services such as labelling, repacking and order picking. The cost side is led by power and labour, then maintenance of refrigeration equipment, insurance and property tax. The capital budget covers site work, the insulated structure, the refrigeration plant, racking, dock doors, backup generation, material-handling equipment and start-up working capital.

    Rural footprint and B&I eligibility in Iowa

    Census can place 13 of Iowa's 26 warehouses by county: five in Polk, five in Woodbury and three in Plymouth, the only non-metro county among them (about 11.7 per 100,000 residents there, computed from Vintage 2025 estimates). Iowa's remaining 13 refrigerated warehouses are scattered in ones and twos, below the three-establishment threshold Census needs before it prints a county figure. Non-metro counties hold 37.6% of Iowans, so the 23.1% non-metro share is a floor on rural supply, not a measure of it.

    The eligibility rule is 7 CFR 5001.3, which excludes Iowa's 11 cities above 50,000 at the 2020 Census and their urbanized areas; per the Iowa hub, at most 68.4% of Iowans live in eligible territory. Polk County's warehouses sit in or around Des Moines, West Des Moines and Ankeny, and Woodbury's in the Sioux City area, which the hub notes extends into Nebraska and South Dakota. Le Mars, Plymouth County's seat, is on the hub's likely-eligible list, as are Storm Lake, Sioux Center, Orange City, Denison and Carroll in the protein belt. Fringe towns such as Altoona, Waukee, Grimes, Bondurant and Carter Lake need a dated map determination.

    Financing benchmarks: USDA B&I next to SBA

    Iowa: SBA lending to refrigerated warehousing

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20161$3.5 million0$0
    FY2017 to FY20190$01$1.5 million
    FY2020 to FY20230$00$0
    FY2024 to FY20260$00$0

    Iowa had fewer than 30 seasoned 7(a) loans for refrigerated warehousing; nationally, 5.3% of 38 FY2010 to FY2016 loans were charged off, on average 76 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Two SBA loans in seventeen years, a $3.5 million 7(a) loan in FY2010 to FY2016 and a $1.5 million 504 loan in FY2017 to FY2019, are Iowa's entire SBA cold storage record; nothing since FY2020. Nationally, 32 7(a) loans averaged $1,424,256 and 16 504 loans averaged $3,038,875 over FY2020 to FY2026, which places Iowa projects in B&I territory. USAspending shows just 2 Iowa B&I loans across every industry in FY2024 to FY2026 (41st of 51, tied with three states), so the state office has seen few B&I files recently, and the study carries more of the explanatory load.

    B&I term (FY2026)Loan under $5 millionLoan of $5 million to $25 million
    Guarantee percentage85%80%
    Upfront guarantee fee, on the guaranteed amount3.0%3.0%
    Annual retention fee, on the guaranteed share of principal outstanding at 31 December0.55%0.55%
    Reduced-fee path, where the 7 CFR 5001.454 criteria are met1.0% upfront, 0.50% annual, 80% guarantee1.0% upfront, 0.50% annual, 80% guarantee
    Added fee if the Loan Note Guarantee issues before construction is complete0.50%0.50%
    Term (7 CFR 5001.402)Useful life, 40 years at most, no balloonUseful life, 40 years at most, no balloon
    Interest rate (7 CFR 5001.401)Negotiated; fixed, variable or both; no higher than the lender's similar unguaranteed loansSame
    Loan cap (7 CFR 5001.406(c))$25 million per borrower$25 million per borrower

    Fee and guarantee rates: USDA notice for loans obligated in FY2026 (91 FR 11272, effective October 1, 2025). Term, rate and cap: 7 CFR Part 5001.

    Equity depends on the contract book. A start-up with qualifying sales contracts, adequate to service the debt and running at least as long as the loan, can close with 10% (5001.105(d)(2)); without them the test is 20% balance sheet equity or 25% of cost (5001.105(d)(4)), and 25% if the guarantee issues before construction ends (5001.105(d)(3)). A warehouse the borrower already runs needs 10% under 5001.105(d)(1). Insulated buildings have limited alternative use, so the appraisal's going-concern deduction (5001.203) can leave collateral short, which pushes the lender toward coverage and contracts.

    Worked example (illustrative)

    With no Iowa SBA cold storage lending after FY2019 to size against, Example A borrows $1,420,000, the national 7(a) mean of $1,424,256 rounded to the nearest $10,000. Example B is a $4,600,000 regional freezer warehouse, sized to stay just under the $5 million tier line. Each is modelled at an assumed 7.00% fixed rate, amortised monthly over 25 years.

    Computed for this page in Python from 91 FR 11272 and 7 CFR Part 5001; the rate, term and loan sizes are assumptions, not quotes.

    Input or resultExample AExample B
    Loan amount$1,420,000$4,600,000
    FY2026 guarantee percentage for this loan size85%85%
    Guaranteed amount$1,207,000.00$3,910,000.00
    Lender's unguaranteed exposure$213,000.00$690,000.00
    Upfront guarantee fee (3.0% of the guaranteed amount)$36,210.00$117,300.00
    First-year retention fee (0.55% of the guaranteed share, on the full opening principal)$6,638.50$21,505.00
    Same fee on the balance left after 12 monthly payments$6,536.94$21,176.01
    Illustrative fixed rate and amortization7.00%, 25 years, monthly7.00%, 25 years, monthly
    Monthly payment$10,036.26$32,511.84
    Annual debt service$120,435.18$390,142.12
    Net operating income needed for 1.25x coverage$150,543.97$487,677.65
    Cushion between 1.25x and break-even (1.00x)$30,108.79$97,535.53
    Coverage if that income falls 10%1.125x1.125x
    Coverage if that income falls 20%1.000x1.000x
    Coverage if the rate is 2 points higher, same income1.05x1.05x
    New business, 25% of project cost: total project cost$1,893,333.33$6,133,333.33
    New business, 25% of project cost: equity$473,333.33$1,533,333.33
    New business, 20% balance sheet equity (debt to equity 4:1), loan as the only debt$355,000.00$1,150,000.00
    Existing business, or new business with qualifying sales contracts: 10% of project cost$157,777.78$511,111.11
    Extra 0.50% if the guarantee issues before construction ends$6,035.00$19,550.00
    Reduced-fee path (80% guarantee, 1.0% upfront, 0.50% annual): year-one fees$11,360.00 and $5,680.00$36,800.00 and $18,400.00
    SBA 7(a) comparison: 75% guaranteed share and the 13 CFR 120.220 fee ceiling$1,065,000.00; fee up to $37,437.50$3,450,000.00; fee up to $126,875.00

    The tier line matters for a project of Example B's size. At $4,600,000 the 85% guarantee covers $3,910,000.00 and leaves the bank $690,000.00; push the loan to $5,000,000 and the 80% tier guarantees $4,000,000.00 while the bank's unguaranteed share rises to $1,000,000.00. If Example B held 12,000 pallet positions (an illustrative input), 1.25x coverage would require $40.64 of net operating income per position a year. With a qualifying storage contract, equity for B falls from $1,533,333.33 to $511,111.11.

    Evidence the study must build when local comparables are thin

    • Storage agreements or letters of intent from named processors, packers or distributors, with pallets by month, temperature range, term and rates.
    • An inventory of public and private refrigerated space within the haul radius, with occupancy where operators share it.
    • Customer interviews on current space, turnover and plans, including whether their own expansions would add in-house freezers.
    • The utility's written service capacity and rate schedule for the site.
    • Truck access from the site to the customers and the interstate or state highway network.
    • Wage and staffing evidence for warehouse and refrigeration technicians within commuting range.

    What a lender-grade cold storage feasibility study in Iowa must prove

    1. Eligibility. A 5001.3 determination, with the distance to Des Moines, Sioux City or another excluded city.
    2. Contracted demand. The share of space under agreement, and whether it meets the 5001.105(d)(2) test.
    3. Competition. Why customers will move from existing space in a state with dense cold storage.
    4. Customer credit and concentration. The financial strength of each anchor.
    5. Seasonal fill. Monthly pallets in and out by customer.
    6. Disease and closure scenarios. Avian influenza and a lost processor, with reserves.
    7. Energy and construction. Load, tariff, backup, fixed-price contract and schedule.
    8. Labour. Wages at or above $53,030 and staffing by shift.
    9. Coverage. 1.25x on contracted income, then without the largest customer.

    Risks and mitigants in Iowa

    RiskIowa evidenceStudy response
    Dense competing supplyThird-highest warehouse density of 51Capacity and occupancy survey within the haul radius
    Anchor lossTyson's Perry pork plant closed in June 2024 with 1,276 jobs (hub)Contract term, termination clauses, re-letting time
    Layer and turkey outbreaksSioux County layer flocks and Palo Alto, Sac and Buena Vista turkey flocks hit by avian influenza (hub)Throughput gap months and a reserve
    Power costRefrigeration load runs year-roundTariff, demand charges, backup generation
    Wage catch-upPay per worker up 33.9% from 2019 to 2023Wages at $53,030 or higher
    Fringe eligibilityPolk and Woodbury counties hold 10 of 13 county-coded warehousesParcel determination against Des Moines and Sioux City urbanized areas

    Process, documents and why studies are sent back

    The lender submits the study inside its guaranteed loan application to USDA Rural Development in Iowa, where the hub names Mike Sexton as State Director and lists area offices including Le Mars, Humboldt and Iowa Falls. Iowa cold storage studies are sent back when they cite statewide protein output instead of named customers, ignore the existing public warehouses, model power as a fixed percentage, or rely on contracts shorter than the loan to meet the equity test.

    Program examples

    The hub's closest precedents are food-chain guarantees, not warehouses: an $11,100,000 Food Supply Chain guarantee in 2022 for Crystal Freeze Dry LLC (Nutriom) in Panora to expand freeze-dried egg manufacturing, and an $800,000 Food Supply Chain guarantee in 2023 for Jordan's Meat Market in Marcus. Both show the program financing Iowa food processing with storage needs; neither is a stand-alone cold store.

    National program example (outside Iowa)

    The Arkansas protein-chain cold storage study linked below is a B&I feasibility case study ($3M to $20M range), not an Iowa financing. The Iowa case study also linked below concerns Community Facilities financing for a replacement critical access hospital; it shows how an Iowa study is built for USDA, not how a warehouse is underwritten.

    Hiring a USDA cold storage feasibility study consultant in Iowa

    A start-up warehouse company borrowing more than $1,000,000 under B&I must engage an independent cold storage feasibility study consultant acceptable to USDA; expansions and smaller loans are at the lender's or Agency's discretion. Engage once an anchor customer has agreed terms in principle and before the refrigeration contract is let, since the contract volumes set the building. Processors weighing whether to build their own freezer or contract with a public warehouse can first speak with a USDA feasibility study consultant about which structure a lender will finance.

    The study covers the five Part 5001 components, with a contract and capacity analysis, site and refrigeration review, a monthly projection over five to ten years with coverage and sensitivity tables, and a management review. The firm's cost page says the report comes in PDF and Word with an Excel workbook, after a kickoff and a midpoint call, includes one round of revisions, and carries a written acceptance guarantee. Refrigeration design, environmental assessments, appraisal and legal work are commissioned separately.

    From the sponsor the study needs the site plan, refrigeration concept and budget, customer letters or agreements, the utility's service letter, any operating results, résumés, financial statements for each 20% owner and the lender's term sheet.

    Engagement (published schedule)Typical feeTypical timeline
    B&I loan guarantee, standard: loans of $1 million to $10 million, established asset class, single site$6,900 to $12,5006 to 7 weeks
    B&I loan guarantee, complex: loans over $10 million, unusual asset class, multi-site or phased, limited comparable data$10,500 to $14,5007 to 9 weeks
    REAP, guaranteed loan over $600,000$7,500 to $11,5005 to 7 weeks
    SBA feasibility study$4,900 to $9,5009 to 15 business days
    Rush option, subject to analyst capacity20% to 35% above the standard fee3 to 4 weeks

    Source: USDA feasibility study cost and timeline.

    A single warehouse with an anchor is a standard engagement; multi-tenant speculative space or a loan above $10 million is complex. Half the fee is typically invoiced when the engagement letter is signed, and the data request follows within 48 hours. Send the location, pallet capacity, customers and loan amount through the free consultation form at the bottom of this page, and the firm will respond within 24 hours.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a cold storage or warehousing project in Iowa?

    It does when the borrower is a new business and the B&I-guaranteed loan is above $1,000,000 (7 CFR 5001.306(a)(3)(i)); the national SBA cold storage average of $1,424,256 already clears that bar. Below it, or for an existing processor adding space, the study is discretionary. Iowa's dense competing supply makes lenders likely to ask anyway.

    What does 7 CFR Part 5001 require the study to contain?

    USDA decides how deep each of the five parts goes: market, technical, financial, management and economic. In an Iowa cold storage study that means named customers and their volumes, an inventory of competing refrigerated space, the refrigeration and power design, a monthly projection with coverage tests, the operator's record, and local economic effects. The lender's own credit memo under 5001.202 then assesses the study.

    How is a cold storage or warehousing project evaluated in a USDA feasibility study?

    Committed and probable pallets by month are priced at storage and handling rates, power and labour are modelled, and the result is tested against debt service with and without the largest customer. Example B here, $4,600,000 at 7.00% over 25 years, needs $487,677.65 of net operating income for 1.25x, about $40.64 per pallet position at 12,000 positions.

    How long does a USDA feasibility study take in Iowa?

    On the firm's published schedule, six to seven weeks for a standard single-site B&I study and seven to nine for a complex one, from signed engagement letter to final report. A rush service at a 20% to 35% premium can deliver in three to four weeks if analysts are available. Collecting customer volumes usually takes the longest.

    How does the FY2026 85 percent guarantee affect cold storage or warehousing projects under $5 million?

    FY2026 loans under $5,000,000 carry 85%. Example A's $1,420,000 gets $1,207,000.00 guaranteed for a $36,210.00 fee. The line matters for mid-sized warehouses: at $4,600,000 the bank holds $690,000.00, but at $5,000,000 the 80% tier leaves it $1,000,000.00. FY2027 percentages will be set by a new notice, so a borrower whose closing may slip into the next fiscal year should test coverage and the bank's exposure at that year's tier as well.

    Who prepares a cold storage or warehousing feasibility study in Iowa?

    An independent, qualified consultant acceptable to USDA, with no interest in the warehouse, its builder, its refrigeration contractor, its customers or its lender. A processor's internal capital request or a contractor's energy model is not a substitute. USDA Feasibility Study Consultants prepares cold storage studies to the five Part 5001 components for lenders working with USDA Rural Development in Iowa.

    What does a cold storage feasibility study consultant cost in Iowa?

    An Iowa warehouse study with one site and an anchor customer falls in the firm's $6,900 to $12,500 standard B&I band; speculative multi-tenant space or a loan over $10 million moves it to $10,500 to $14,500, and an SBA-only study is $4,900 to $9,500. Half of the fixed quote is normally paid when the engagement letter is signed. Example B's USDA upfront guarantee fee would be $117,300.00, several times the study's cost.

    How long is an Iowa cold storage feasibility study valid?

    Nothing in Part 5001 dates an Iowa warehouse study out. In practice the firm treats Iowa market data as current for USDA purposes for roughly 18 months, and 5001.203 separately requires the closing appraisal to be less than a year old. If an anchor customer changes its volumes, or a processor in the market closes or expands, the contract and coverage chapters need updating before closing.

    Can the same cold storage study serve SBA and USDA lenders?

    In most cases. SBA lenders may require a study under 13 CFR 120.160(b), and a Part 5001 report covers what they read; the firm refreshes SBA data older than about 12 months. Iowa's only SBA cold storage loans were a 7(a) loan before FY2017 and a 504 loan in FY2017 to FY2019, so comparing B&I with 504 is usually part of the job.

    Is Iowa already oversupplied with cold storage?

    Not necessarily, but it is well supplied: 0.8 refrigerated warehouses per 100,000 residents, twice the national rate and third of 51. That makes generic speculative space hard to finance. A study can still support a project that serves a named processor, offers a temperature or service the market lacks, or sits closer to customers than existing warehouses, and it shows that with contracts and a capacity survey.

    Can a cold store near Des Moines or Sioux City get a B&I guarantee?

    Not inside those cities or their urbanized areas, which hold 10 of Iowa's 13 county-coded warehouses. Fringe towns such as Altoona, Waukee, Grimes and Bondurant near Des Moines, and Carter Lake by Omaha, need a dated USDA map determination. Le Mars, Storm Lake, Sioux Center and Orange City in the northwest screen as likely eligible on the Iowa hub.

    Other project types in Iowa

    Hotels and Resorts · RV Parks and Campgrounds · Restaurants and Food Service · Event Venues and Banquet Facilities · Manufacturing · Food Processing · Back to all Iowa project types

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www.census.gov/programs-surveys/cbp.html
    2. U.S. Census Bureau, Vintage 2025 county population estimates: https://www.census.gov/programs-surveys/popest.html
    3. Office of Management and Budget, metropolitan statistical area delineation, July 2023 (Census delineation files): https://www.census.gov/geographies/reference-files/time-series/demo/metro-micro/delineation-files.html
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD guarantee fee, retention fee and guarantee percentage notice for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loans (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov award counts, Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), FY2024 to FY2026: https://www.usaspending.gov/search
    10. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    11. Iowa hub sources reused here (USDA RD Iowa releases and precedent file; SPUR notice FR Doc. 2026-21858 as summarised by the hub; USDA APHIS avian influenza detections; Food Dive / DTN on the Tyson Perry closure; Iowa Racing and Gaming Commission; U.S. Census Bureau 2020 Census and V2025 estimates for the 50,000 test): /iowa
    12. USDA Feasibility Study Consultants, fee and timeline schedule: /usda-feasibility-study-cost

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours