RV park and campground projects in Iowa cluster around the Iowa Great Lakes region, state parks and river corridors. An independent feasibility study consultant models transient versus seasonal site mix, monthly occupancy and amenity capital; the independent USDA feasibility study company frames the projection to the five Part 5001 components.
Iowa added seven staffed RV parks between 2019 and 2023, a 24.1% rise that outpaced the nation, and their payroll nearly doubled. Even so, Iowa has 1.1 parks per 100,000 residents against 9.3 in neighbouring South Dakota and 3.2 in Wisconsin, and SBA lenders have made just two Iowa RV park loans since FY2020. The study's job is to show whether that gap is unmet demand or a sign of a shorter, more local camping market.
Program Fit
B&I within the accommodation and food services sector, the leading national B&I sector across the 2015 through 2024 window.
| Route | Use for an Iowa RV park or campground | Condition |
|---|---|---|
| USDA B&I guarantee | New parks, expansions, purchases, cabins, bathhouses, utilities | Eligible rural parcel (7 CFR 5001.3); FY2026 guarantee 85% below $5 million |
| SBA 7(a) | Purchases and small expansions | Four Iowa loans since FY2010, none since FY2023 |
| SBA 504 | Owner-occupied land and improvements | No Iowa RV park 504 loans in the FOIA data; Minnesota used 61 in FY2020 to FY2026 |
| REAP | Solar or efficient equipment at an operating park | 2026 rule: 12 months of operating data before a grant |
| Community Facilities | Campgrounds owned by a county, city or nonprofit | Not for privately owned parks |
Transient and seasonal camping is a business; sites rented year-round as someone's home look like housing, and 7 CFR 5001.118(a) keeps apartments and other independent housing out of B&I. The study therefore shows the share of seasonal and monthly sites and how long guests stay. The borrower and its owners above 20% must also clear 5001.127: no outstanding federal judgment, delinquent federal tax or debt, or debarment, and no more than 15% of gross revenue from gambling, a point the Iowa hub makes for businesses near the state's 19 licensed casinos. Owners of 20% or more give guarantees in proportion to ownership for the life of the loan (5001.204).
Required by rule or requested by the lender
Once a start-up park company seeks more than $1,000,000 of B&I-guaranteed credit, Part 5001 requires an independent feasibility study from a consultant the Agency accepts (7 CFR 5001.306(a)(3)(i)). Across the country, SBA lenders' RV park loans in FY2020 to FY2026 averaged $1,256,324, comfortably past that threshold; Iowa's own pair of recent loans averaged $567,500. An existing park adding sites, or any loan of $1,000,000 or less, is reviewed under the discretionary rule (5001.306(a)(3)(ii)), and loans of $600,000 or less may use the streamlined path (5001.306(b)). Parks are seasonal, so lenders need quarterly cash flow projections under 5001.202, which a study produces.
What the Study Covers
Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.
- Market demand and competitive supply analysis
- Technical and site feasibility, including environmental considerations
- Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
- Management and operational capacity assessment
- Economic feasibility and rural community impact
An Iowa campground study counts every site that competes for the same camper, including state park, county conservation and municipal campgrounds, then measures occupancy by month and site type. It identifies what brings campers to the location: a lake, a river, a state park, an event or an interstate stop. The technical review covers electrical capacity for modern RVs, water and wastewater, roads and pads, flood exposure near rivers, and storm shelter for guests.
Iowa Market Evidence
Iowa campground demand tracks the Okoboji and Spirit Lake summer season, state-park visitation and river-corridor recreation; seasonality-adjusted occupancy is the core underwriting question in lake markets.
RV parks in Iowa: market evidence
Iowa: RV parks and campgrounds, supply and rural footprint
| Measure | Iowa | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 29 → 36 (+24.1%) | 4,586 → 5,016 |
| Per 100,000 residents (2023) | 1.1 | 1.5 |
| Average employees per establishment | 5.8 | 5.2 |
| Average annual pay per employee | $31,172 | $38,654 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 37.6% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The Iowa count grew from 29 to 36 while the U.S. grew 9.4%, but density is still 75.2% of the national rate, 36th of 51 on a computed ranking. Employment doubled (101.0%, to 209) and payroll rose 98.6%, which suggests existing parks are adding staff and amenities, not just sites. Pay averages $31,172, 19.4% below the U.S. $38,654, consistent with seasonal and part-time work; use it as the labour benchmark, adjusted for the recent rise.
Read the 0.0% rural share in the table with care: it reflects missing county data, not urban parks. Census places only 4 of the 36 parks in a county (all in Polk County); the other 32 are in counties with one or two staffed parks each, which the county file does not publish. Census also misses parks without payroll and every public campground, so it cannot measure supply. What it does show is that Iowa's private, staffed park sector is small and growing, and that a reviewer will want a full inventory before accepting any claim of shortage.
Regional comparables
Computed from each state's pack (Census County Business Patterns 2023; SBA FOIA data as of 30 Sep 2026). Other states' figures are theirs.
| State | RV parks and campgrounds, 2019 → 2023 | Per 100,000 residents | Average pay | SBA 7(a) loans, FY2020 to FY2026 | SBA 504 loans, FY2020 to FY2026 |
|---|---|---|---|---|---|
| Iowa | 29 → 36 | 1.1 | $31,172 | 2 (average $567,500) | 0 |
| South Dakota | 70 → 85 | 9.3 | $57,144 | 9 (average $1,130,044) | 6 |
| Wisconsin | 164 → 187 | 3.2 | $43,046 | 14 (average $667,279) | 25 |
| Minnesota | 135 → 142 | 2.5 | $53,425 | 25 (average $336,744) | 61 |
| Missouri | 91 → 96 | 1.5 | $34,331 | 20 (average $1,190,385) | 2 |
| Nebraska | 18 → 22 | 1.1 | $40,194 | 3 (average $816,433) | 0 |
| Illinois | 70 → 71 | 0.6 | $42,279 | 6 (average $612,667) | 3 |
The neighbours show how different the same product can be. South Dakota, with tourism corridors to the Black Hills and Badlands, has 8.5 times Iowa's density and larger SBA loans; Wisconsin and Minnesota have far more parks and use SBA 504 heavily (25 and 61 loans in FY2020 to FY2026). Nebraska, at the same 1.1 per 100,000, is Iowa's closest match. For an Iowa study, Wisconsin and Minnesota lake-country parks offer the nearest rate and occupancy comparables for the Iowa Great Lakes, labelled as theirs; South Dakota's destination parks do not.
Demand drivers and competition
Demand in Iowa comes from summer lake visitors at Spirit Lake, Okoboji and Clear Lake, state-park campers, river travellers along the Mississippi and Missouri, event traffic (fairs, races, festivals), and workers on construction or plant projects who stay for months. Each behaves differently: lake campers book weekends and seasonal sites, event campers pay peak rates for a few nights, and long-stay workers fill weekdays but raise the housing question. Competition is the full camping supply within the drive time, including the public parks that set a price ceiling.
Revenue model, costs and capital
An Iowa park earns money from four rent periods (nightly, weekly, monthly and full-season), cabins, the camp store, firewood and propane, winter RV storage and special-event packages. Lenders watch June-to-August occupancy, the rate premium for full hookups, income per available site and how many sites are pre-sold for the season. Expense lines run from summer staffing and the electric bill for 50-amp sites to wastewater, upkeep, insurance, property tax, booking software and advertising. Capital covers land, roads and pads, electrical, water and sewer systems, bathhouses, a store and office, cabins, amenities and a storm shelter.
Rural footprint and B&I eligibility in Iowa
Because the county file places only four parks, the rural footprint has to come from the eligibility screen. Under 7 CFR 5001.3, no part of Iowa's 11 cities above 50,000, or their urbanized areas, is eligible; per the Iowa hub that leaves at most 68.4% of Iowans in eligible territory, and non-metro counties hold 37.6% of the population. Spirit Lake, Okoboji, Clear Lake, McGregor, Decorah, Winterset, Indianola and Pella all screen as likely eligible on the hub, covering the lake, river and state-park markets. Parks near Des Moines (Altoona, Polk City, Norwalk), the Quad Cities (Le Claire, Bettendorf) or Council Bluffs (Carter Lake) need a dated map determination.
Financing benchmarks: USDA B&I next to SBA
Iowa: SBA lending to RV parks and campgrounds
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 1 | $40,000 | 0 | $0 |
| FY2017 to FY2019 | 1 | $1.7 million | 0 | $0 |
| FY2020 to FY2023 | 2 | $1.1 million | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $567,500. Iowa had fewer than 30 seasoned 7(a) loans for RV parks and campgrounds; nationally, 3.7% of 349 FY2010 to FY2016 loans were charged off, on average 68 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Four Iowa 7(a) loans in seventeen years, two since FY2020 and none since FY2023, and no 504 loans at all, leave Iowa without a lending benchmark. Nationally, 467 RV park 7(a) loans averaged $1,256,324 in FY2020 to FY2026 and 197 504 loans $848,061, and only 3.7% of 349 seasoned loans were charged off, at an average of 68 months. USAspending records 2 Iowa B&I loans across all industries in FY2024 to FY2026, so a park application will be one of very few at the state office.
| B&I term (FY2026) | Loan under $5 million | Loan of $5 million to $25 million |
|---|---|---|
| Guarantee percentage | 85% | 80% |
| Upfront guarantee fee, on the guaranteed amount | 3.0% | 3.0% |
| Annual retention fee, on the guaranteed share of principal outstanding at 31 December | 0.55% | 0.55% |
| Reduced-fee path, where the 7 CFR 5001.454 criteria are met | 1.0% upfront, 0.50% annual, 80% guarantee | 1.0% upfront, 0.50% annual, 80% guarantee |
| Added fee if the Loan Note Guarantee issues before construction is complete | 0.50% | 0.50% |
| Term (7 CFR 5001.402) | Useful life, 40 years at most, no balloon | Useful life, 40 years at most, no balloon |
| Interest rate (7 CFR 5001.401) | Negotiated; fixed, variable or both; no higher than the lender's similar unguaranteed loans | Same |
| Loan cap (7 CFR 5001.406(c)) | $25 million per borrower | $25 million per borrower |
Fee and guarantee rates: USDA notice for loans obligated in FY2026 (91 FR 11272, effective October 1, 2025). Term, rate and cap: 7 CFR Part 5001.
A new park company needs 20% balance sheet equity or 25% of project cost (5001.105(d)(4)); an owner expanding its own park can meet a 10% test (5001.105(d)(1)). Roads, utilities and bathhouses support a term up to the useful life, within 40 years (5001.402), and an interest-only period can carry the first season if full payments start within three years. The appraisal deducts going-concern value before discounting collateral (5001.203), so the lender relies on land and infrastructure value and on coverage, not on bookings.
Worked example (illustrative)
Iowa's two recent SBA loans are too few to average, so Example A uses $1,260,000, rounded from the national FY2020 to FY2026 average of $1,256,324. Example B is a $2,800,000 new lake-country park with full-hookup sites, cabins and a bathhouse. Both assume a fixed 7.00% over 25 years.
Computed for this page in Python from 91 FR 11272 and 7 CFR Part 5001; the rate, term and loan sizes are assumptions.
| Input or result | Example A | Example B |
|---|---|---|
| Loan amount | $1,260,000 | $2,800,000 |
| FY2026 guarantee percentage for this loan size | 85% | 85% |
| Guaranteed amount | $1,071,000.00 | $2,380,000.00 |
| Lender's unguaranteed exposure | $189,000.00 | $420,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $32,130.00 | $71,400.00 |
| First-year retention fee (0.55% of the guaranteed share, on the full opening principal) | $5,890.50 | $13,090.00 |
| Same fee on the balance left after 12 monthly payments | $5,800.39 | $12,889.75 |
| Illustrative fixed rate and amortization | 7.00%, 25 years, monthly | 7.00%, 25 years, monthly |
| Monthly payment | $8,905.42 | $19,789.82 |
| Annual debt service | $106,865.01 | $237,477.81 |
| Net operating income needed for 1.25x coverage | $133,581.27 | $296,847.26 |
| Cushion between 1.25x and break-even (1.00x) | $26,716.25 | $59,369.45 |
| Coverage if that income falls 10% | 1.125x | 1.125x |
| Coverage if that income falls 20% | 1.000x | 1.000x |
| Coverage if the rate is 2 points higher, same income | 1.05x | 1.05x |
| Interest-only year at the same rate (first full payment due within three years, 5001.402) | $88,200.00 | $196,000.00 |
| New business, 25% of project cost: total project cost | $1,680,000.00 | $3,733,333.33 |
| New business, 25% of project cost: equity | $420,000.00 | $933,333.33 |
| New business, 20% balance sheet equity (debt to equity 4:1), loan as the only debt | $315,000.00 | $700,000.00 |
| Existing business, or new business with qualifying sales contracts: 10% of project cost | $140,000.00 | $311,111.11 |
| Reduced-fee path (80% guarantee, 1.0% upfront, 0.50% annual): year-one fees | $10,080.00 and $5,040.00 | $22,400.00 and $11,200.00 |
| SBA 7(a) comparison: 75% guaranteed share and the 13 CFR 120.220 fee ceiling | $945,000.00; fee up to $33,075.00 | $2,100,000.00; fee up to $76,250.00 |
At 160 sites (an illustrative input, not data), Example B needs $1,855.30 of net operating income per site per year for 1.25x coverage, nearly all of it earned between late May and early September at an Iowa lake. The study converts that into occupied site-nights by month and site type, credits seasonal sites booked in advance, and shows the winter reserve. A season 10% below plan leaves 1.125x; two extra points of interest on the same income leave 1.05x.
Evidence the study must build when local comparables are thin
- A camping inventory within the drive time: private parks with and without payroll, state park, county and municipal campgrounds, with sites, hookups, rates and occupancy where available.
- Reservation data or seasonal-site waiting lists from comparable parks, gathered by interview.
- Visitor evidence for the demand drivers: lake, state park, river or event counts the study can document.
- Signed seasonal-site agreements or deposits for the first year.
- Utility capacity letters, wastewater approvals and road access for the site.
- Flood maps and storm shelter plans for river and open sites.
What a lender-grade RV park feasibility study in Iowa must prove
- Eligibility. A 5001.3 determination, especially near Des Moines, the Quad Cities and Council Bluffs.
- Full supply. Public and private sites competing for the same camper.
- Demand drivers. Documented visitor and camper evidence for the location.
- Monthly occupancy. By site type, with Iowa's short peak.
- Seasonal and long-stay mix. Enough seasonal income to steady cash flow, without becoming housing.
- Site and utilities. Electrical capacity, water, wastewater and flood exposure.
- Operator. A manager with campground experience.
- Coverage and stress. 1.25x, a wet summer, a slower ramp and a rate rise.
Risks and mitigants in Iowa
| Risk | Iowa evidence | Study response |
|---|---|---|
| Short peak season | Okoboji and Spirit Lake summer season (live page) | Monthly occupancy, seasonal-site share, winter reserve |
| Public competition | State parks and county campgrounds not counted by Census | Full inventory of public and private sites |
| Wage growth | Payroll per park nearly doubled from 2019 to 2023 | Staffing model at current wages |
| Thin lending record | Two SBA 7(a) loans since FY2020 | Complete B&I file and conservative ramp |
| Housing use | Long-term residential sites | Keep sites transient or seasonal; 5001.118(a) excludes independent housing |
| Eligibility | Fringe towns near Des Moines, the Quad Cities and Council Bluffs | Parcel determination |
Process, documents and why studies are sent back
The lender files the RV park study in its guaranteed loan application with USDA Rural Development in Iowa, whose area offices the hub lists, among them Le Mars, Humboldt and Iowa Falls. Park studies are returned when occupancy is an annual average, public campgrounds are left out, rates come from destination parks in other states, utility costs at full-hookup sites are understated, or long-stay sites make the park look like housing.
Program examples
The Iowa hub has no RV park in its precedent file. Its visitor-economy precedents are the Mason City ($15,000,000) and Ottumwa ($6,662,000) B&I hotel guarantees, which show the Iowa office financing lodging in regional towns.
National program example (outside Iowa)
The Lake Texoma RV resort expansion study in Texas, linked below, is a B&I feasibility case study at an illustrative $4.0 million, not an Iowa financing. The Iowa case study also linked below is a Community Facilities hospital study, listed as an example of Iowa USDA work rather than a campground precedent.
Hiring a USDA RV park feasibility study consultant in Iowa
An independent RV park feasibility study consultant acceptable to USDA is required when a new park company borrows more than $1,000,000 under B&I; for expansions and smaller loans the lender or Agency decides, and a seasonal park usually gets asked. Engage before buying land or laying out sites, since the camping inventory and utilities can change both. Owners still deciding between campsites, cabins and a marina or lodge often begin with a USDA feasibility study consultant to rank the options on the same market evidence.
The study covers the five Part 5001 components: the full camping market, the site and utilities, a monthly projection over five to ten years with coverage and sensitivity tests, the operator's capacity, and the park's effect on local tourism. The firm's cost page lists a PDF and Word report with the Excel model, a kickoff and a midpoint call, one revision round and a written commitment to revise until the lender or USDA accepts it. Site engineering, environmental assessments, the appraisal and legal work are separate.
The sponsor supplies the site plan and site counts by type, the construction budget, utility information, the rate plan, any operating history by month, résumés, financial statements for each 20% owner and the lender's term sheet.
| Engagement (published schedule) | Typical fee | Typical timeline |
|---|---|---|
| B&I loan guarantee, standard: loans of $1 million to $10 million, established asset class, single site | $6,900 to $12,500 | 6 to 7 weeks |
| B&I loan guarantee, complex: loans over $10 million, unusual asset class, multi-site or phased, limited comparable data | $10,500 to $14,500 | 7 to 9 weeks |
| SBA feasibility study | $4,900 to $9,500 | 9 to 15 business days |
| Rush option, subject to analyst capacity | 20% to 35% above the standard fee | 3 to 4 weeks |
Source: USDA feasibility study cost and timeline.
One park on one site is a standard engagement; a phased resort with cabins, a marina or an event field can be complex. Half the fixed fee is usually due at signing, and the firm's data request follows within 48 hours. Give the location, number and type of sites and the loan amount in the free consultation form at the bottom of this page; the firm replies within 24 hours.
Last updated 2026-11-08
USDA Feasibility, Inc.