USDA Feasibility Study for Cold Storage and Warehousing in Alaska

    NAICS 493120

    Cold storage projects in Alaska are seafood throughput businesses, exposed to processor consolidation and to Railbelt power costs. A USDA feasibility study surveys existing freezer capacity in the host port, requires throughput contracts with at least two processors, and models kilowatt-hour cost under current and post-2028 LNG tariffs.

    The Census series for refrigerated warehousing is empty in Alaska: no establishment with paid staff in 2019 or in 2023, and no SBA 7(a) or 504 loan in seventeen years. Freezer capacity exists, inside seafood plants, on tenders and in port facilities, but none of it reports as a stand-alone cold-storage business. A lender asked to finance one has no public comparable at all, so the study must count the capacity itself and show who will pay to use the new space.

    Program Fit

    B&I is the primary program, with the Food Supply Chain guarantee as precedent for seafood logistics assets. (The Food Supply Chain precedent is the Northline Seafoods guarantee on the hub; whether that program is open today is not confirmed in this page's federal sources.)

    RouteFit for an Alaska cold storeDeciding condition
    USDA B&I guaranteeFreezer and cold-storage buildings, blast freezing, docks and equipment in eligible portsOutside the Municipality of Anchorage; 85% under $5 million, 80% from $5 million to $25 million
    B&I off-road tierA store in a high-cost, isolated port not connected to a road system90% guarantee, 1.0% fee, 0.50% retention; documented in the file
    B&I reduced-fee tierA store holding locally produced food, on tribal land, or in a qualifying distressed area80% guarantee, 1.0% fee, 0.50% retention (hub's criteria list)
    SPUR (as described on the hub)Seafood processing capacityHub: 90% guarantee, up to $175 million; read the published notice
    REAPRefrigeration efficiency or heat recovery at an operating storeGrant after 12 months of operating data (rule effective 16 October 2026)

    Every guaranteed borrower is screened under 7 CFR 5001.127 for federal judgments, overdue federal tax or debt, and debarment, covering the company and any owner with more than 20 percent or control, and for gambling income above 15 percent of gross revenue.

    Required by rule or requested by the lender

    A newly formed cold-storage company that asks for a guaranteed loan above $1,000,000 must deliver a study by an independent qualified consultant whom the Agency accepts, with the scope the Agency sets (5001.306(a)(3)(i)); any port freezer building exceeds that. An operating processor adding storage comes under 5001.306(a)(3)(ii), where the Agency may still require a study because the project changes historic cash flow.

    What the Study Covers

    Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.

    • Market demand and competitive supply analysis
    • Technical and site feasibility, including environmental considerations
    • Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
    • Management and operational capacity assessment
    • Economic feasibility and rural community impact

    For an Alaska port the technical chapter covers blast-freezing capacity against peak landings, holding temperature and pallet positions, dock and barge or container access, backup generation, the local utility's capacity and rate, permafrost or shoreline foundations, and freight of panels and refrigeration equipment from the Lower 48.

    Alaska Market Evidence

    Alaska harvested an average of 5.1 billion pounds of seafood a year in 2023–2024, producing about 2.4 billion pounds of product, and Bristol Bay's 2025 sockeye harvest weighed 208.0 million pounds.

    Refrigerated warehousing in Alaska: market evidence

    Alaska: refrigerated warehousing, supply and rural footprint

    MeasureAlaskaUnited States
    Establishments, 2019 → 20230 → 0 (n/a)1,350 → 1,367
    Per 100,000 residents (2023)0.00.4
    Share of state population in non-metro counties (2025)32.2%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Interpretation. Zero is the finding. The national industry has 0.4 stores per 100,000 residents and 1,367 establishments, but Census records none in Alaska in either year, so the state's freezing and holding capacity sits inside other industries, chiefly seafood processing. For underwriting this has three consequences. There is no wage, size or density benchmark from the Census file, so staffing must be priced from processor and port payrolls. There is no stand-alone competitor list, so the supply survey has to be built plant by plant. And demand comes from a small number of processors whose own plants already freeze fish, which makes the reviewer ask why they would pay for outside space.

    Alaska next to Washington and Hawaii (computed)

    Alaska has no land neighbour among the states; Washington, which handles much of Alaska's seafood trade, and Hawaii are the nearest Pacific comparables. Rows are each state's own pack data.

    StateCensus count 2019 → 2023Per 100,000 residentsAvg. employeesAvg. payIn non-metro counties (of those placed)SBA 7(a) loans FY2020-26 (avg.)
    Alaska (this page)0 → 00.0suppressedsuppressednone placed0 (none)
    Washington52 → 520.733.2$62,3897 of 422 ($2,798,800)
    Hawaii4 → 00.0suppressedsuppressednone placed0 (none)
    United States→ 1,3670.448.4$56,90132 ($1,424,256)

    Washington has 52 refrigerated warehouses, 0.7 per 100,000, averaging 33.2 employees and $62,389 in pay, with 7 of 42 placed in non-metro counties and two recent 7(a) loans averaging $2,798,800. Those Washington operators are the nearest benchmark for rates, staffing and pay, and the study should interview them. Hawaii, like Alaska, has none in 2023.

    Seafood throughput and power

    The Alaska hub shows how volatile the volume behind a store can be. Bristol Bay's commercial sockeye harvest was 31.6 million fish in 2024 at an $0.80 base price, 41.2 million fish (208.0 million pounds) in 2025 at $1.03, and 30.1 million fish in 2026 at $1.72, for ex-vessel values of $128.1 million, $215.3 million and $264.0 million. Across the state, seafood's first wholesale value dropped by $0.6 billion between 2023 and 2024, to $3.9 billion. Consolidation followed: Trident sold four Alaska plants in 2024, and Peter Pan Seafoods entered receivership in April 2024. On cost, a Railbelt site faces the utility's own warning, reported on the hub, of electric bills 12 to 24 percent higher once LNG is imported. Its reviewer tests are a primary survey of freezer capacity in the host port, throughput contracts with at least two processors and a processor-exit scenario, kilowatt-hour cost under current and post-2028 LNG tariffs, and June to August throughput concentration.

    Rural footprint and B&I eligibility in Alaska

    With no Census establishments the pack shows no rural share; 32.2% of Alaskans lived in non-metro counties in 2025. For B&I the hub cites USDA Rural Development's Alaska position: Anchorage, the one Alaska city over the 7 CFR 5001.3 population line, is out, and the rest of the state is in, which excludes the Port of Anchorage and admits every fishing port. The more valuable question is the fee tier: the hub's borough table lists Juneau, Bethel, Ketchikan, Kodiak, Nome and Sitka as not connected to the road system, and most Bristol Bay and Aleutian ports are the same. The Alaska hub notes that off-road qualification must be documented in the file.

    Financing benchmarks: USDA B&I next to SBA

    SBA's FY2010 to FY2026 files hold not a single Alaska refrigerated-warehouse loan, under 7(a) or 504, so the national series stands in.

    United States: SBA lending to refrigerated warehousing (computed from the pack's national columns)

    PeriodU.S. 7(a) loansU.S. 7(a) dollarsAvg. 7(a) loanU.S. 504 loansU.S. 504 dollars
    FY2010 to FY201638$46,583,400$1,225,87917$29,572,000
    FY2017 to FY20196$5,581,000$930,16716$36,400,000
    FY2020 to FY202322$27,299,700$1,240,89512$35,206,000
    FY2024 to FY202610$18,276,500$1,827,6504$13,416,000

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded). Computed from the national columns of the Alaska pack.

    Two of the 38 national 7(a) loans approved in FY2010 to FY2016 (5.3%) were charged off, on average 76 months after approval. The 32 national 7(a) loans of FY2020 to FY2026 averaged $1,424,256, a scale far below a port freezer, which is why B&I is the realistic route.

    B&I term (FY2026)RuleSource
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, loans of $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding at 31 December91 FR 11272; 7 CFR 5001.455
    Reduced-fee tier80% guarantee, 1.0% fee, 0.50% retention91 FR 11272; 7 CFR 5001.454
    High-cost, isolated Alaska project not connected to a road system90% guarantee, 1.0% fee, 0.50% retention91 FR 11272
    Guarantee issued before construction is completeadditional 0.50% fee91 FR 11272
    Maximum per borrower$25 million7 CFR 5001.406(c)
    Termuseful life, up to 40 years, no balloon7 CFR 5001.402
    Ratenegotiated; fixed, variable or both; not above the lender's rate on similar unguaranteed loans7 CFR 5001.401
    Equity at closingexisting business 10%; new business 20% balance-sheet equity or 25% of project cost; 25% for construction with an early guarantee7 CFR 5001.105(d)
    Independent feasibility studyrequired above $1,000,000 to a new business; discretionary below7 CFR 5001.306(a)(3)

    What it means for an Alaska cold store. A port freezer often costs more than $5 million, which drops the standard guarantee to 80 percent; the off-road tier restores 90 percent at a 1.0 percent fee. A new company needs 20 percent balance-sheet equity or 25 percent of project cost (5001.105(d)(4)), 25 percent if the guarantee is issued before construction is finished, and the Agency can ask for more under 5001.105(d)(5) where cash flow depends on a few processors. Throughput contracts lower a new store's equity to 10 percent under 5001.105(d)(2) only if they cover debt service and run as long as the loan.

    Worked example (illustrative)

    Inputs: an illustrative $6,000,000 loan for a port cold-storage building with blast freezers (Alaska has no SBA loans to average, and a port freezer is well above the national 7(a) scale), fixed 7.5%, 25-year amortization, FY2026 fees in the standard $5 million to $25 million tier and in the off-road tier if documented, and an illustrative 3,000 pallet positions.

    ItemStandard tier ($5M to $25M)Off-road tier, if documented
    Loan amount$6,000,000$6,000,000
    Program and FY2026 guaranteeB&I, 80% ($5M to $25M)B&I off-road tier, 90%
    Guaranteed amount$4,800,000$5,400,000
    Unguaranteed amount held by the lender$1,200,000$600,000
    Upfront guarantee fee$144,000 (3.0% of guaranteed)$54,000 (1.0% of guaranteed)
    Balance after 12 monthly payments$5,915,045.46$5,915,045.46
    First annual retention fee on that balance$26,026.20 (0.55%)$26,617.70 (0.50%)
    Rate and amortization (illustrative)7.5%, 25 years7.5%, 25 years
    Monthly payment$44,339.47$44,339.47
    Annual debt service$532,073.65$532,073.65
    NOI for 1.25x debt service coverage$665,092.06$665,092.06
    Coverage NOI per pallet position (3,000 pallet positions, illustrative)$221.70$221.70
    Annual debt service if the rate is 2 points higher$629,061.60$629,061.60
    Coverage at that rate on the same NOI1.06x1.06x
    New business, 25% of project cost (5001.105(d)(4)): equity$2,000,000$2,000,000
    New business: implied total project cost$8,000,000$8,000,000
    New business, 20% balance-sheet equity (4:1) if the loan is the only debt$1,500,000$1,500,000
    Existing business or contract-backed new business, 10% of project cost (5001.105(d)(1)-(2))$666,666.67$666,666.67

    Annual debt service is $532,073.65, so 1.25x coverage needs $665,092.06 of NOI, about $221.70 per pallet position a year, and a two-point rate rise lowers coverage to 1.06x. The off-road tier lifts the guarantee from $4,800,000 to $5,400,000 and cuts the closing fee from $144,000 to $54,000, a $90,000 saving; the first retention fee is slightly higher ($26,617.70 against $26,026.20) because 0.50 percent applies to a larger guaranteed share. With most volume arriving between June and August, the store must earn much of that NOI in one quarter, which is why 5001.202 asks seasonal borrowers for quarterly cash flow. SBA 7(a) would guarantee $4,500,000 with a fee capped at $166,250.

    What a lender-grade cold storage feasibility study in Alaska must prove

    1. A port-level capacity survey. Every freezer and holding room in the host port, inside processors and out, with utilisation by month.
    2. Two or more processors under contract. Throughput agreements with volumes, terms and exit clauses, and a scenario in which one processor leaves.
    3. Volume at trough harvests. Throughput and revenue at a weak run and low prices, using the 2024 Bristol Bay season as a reference.
    4. Power cost under LNG scenarios. Kilowatt-hours and demand charges now and at the 12 to 24 percent increase the hub cites, or diesel generation cost off the grid.
    5. Seasonal cash flow. June to August concentration and the winter carrying cost, quarter by quarter.
    6. Freight and construction. Barge or container schedules, the short building season and a contingency for remote construction.
    7. Off-road tier evidence. If claimed, documentation that the port is high-cost, isolated and off the road system.
    8. Lender standing. The originating lender's OneRD status at the study date.

    Primary evidence for a market with no Census comparables

    Because Census lists no Alaska cold-storage business and SBA has no Alaska loans, the study must build its own record: processor interviews and letters of intent, landings and production data for the port, freezer inventories from processors and the harbor, rate quotes from Washington cold stores for comparable product, the utility's load and rate letter, refrigeration bids with freight, and the municipality's harbor and land-lease terms.

    Risks and mitigants in Alaska

    RiskAlaska signalMitigant in the study
    Processor exitTrident plant sales and Peter Pan receivership, 2024 (hub)Two-processor minimum, exit scenario
    Harvest swingsBristol Bay value from $128.1 million (2024) to $264.0 million (2026) (hub)Trough-year case
    Power costLNG could raise bills 12 to 24 percent (hub)Tariff scenario, heat recovery
    SeasonalityJune to August concentration (hub)Quarterly cash flow and reserve
    No comparablesZero Census stores, zero SBA loansPort survey and Washington rates
    ConstructionRemote site, short seasonFixed-price contract, contingency, 25% equity if guarantee issued early

    Process, documents and what gets a study sent back

    The sponsor provides site control or the harbor lease, processor letters or contracts, port landings data, refrigeration and building bids with freight, the utility letter, opening-day balance-sheet projections (5001.306(a)(2) asks for a pro forma at closing), and owner statements, since anyone holding 20 percent or more guarantees at least that slice of the guaranteed loan under 5001.204. Reviewers return cold-storage studies that rely on one processor, assume average harvests in every year, price power at today's rate only, or count capacity inside processors as demand rather than competition.

    Program evidence, honestly labelled

    The Alaska hub records one Alaska cold-chain precedent: a $40,000,000 USDA Food Supply Chain Guaranteed Loan to Sayak Logistics LLC (Northline Seafoods) for a mobile freezing and processing tender serving Bristol Bay (2022 to 2023). That amount exceeds the $25 million per-borrower B&I limit in 5001.406(c), so it shows the scale of seafood logistics rather than a B&I template. The Arkansas protein-chain case study further down is from this site's library, set outside Alaska with a $3M to $20M label; it is not a reported USDA loan. National evidence is on the national cold storage feasibility study page.

    Hiring a USDA cold storage feasibility study consultant in Alaska

    When it is required. For a new cold-storage company above $1,000,000 of guaranteed debt (5001.306(a)(3)(i)); for a processor adding storage, when USDA or the lender asks, which, with no comparables in the state, is to be expected.

    What the engagement includes. The five Part 5001 components: processor demand and a port capacity survey, the refrigeration, power, foundation and freight review, projections with quarterly cash flow and harvest, processor-exit and power sensitivities, and a management assessment. The cost page describes the package: report files in PDF and Word, an Excel model the lender can test, a kickoff and a mid-engagement call, one revision round, and an acceptance guarantee written into the engagement letter.

    What you provide. Leases, processor letters, landings, bids and utility letters listed above.

    Fees and timing. A port freezer with no Census comparables is complex B&I work on the cost page: $10,500 to $14,500 over seven to nine weeks. A contract-backed expansion at an operating processor may fit the $6,900 to $12,500 standard band over six to seven weeks. Rush service shortens the job to three to four weeks at an extra 20 to 35 percent, capacity permitting.

    How to start. Send the port, the processors involved and the capital plan through the Get Your Free Consultation form at the bottom of this page; the firm's reply comes inside 24 hours; its written proposal then sets a fixed fee. Because the processors are also the customers, an independent USDA feasibility study consultant with no tie to any of them gives the Palmer state office a neutral count of capacity, and a cold storage feasibility study consultant can scope the off-road tier documentation on the first call.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a cold storage or warehousing project in Alaska?

    For a new company seeking more than $1,000,000 of guaranteed B&I debt, the rule requires one: 7 CFR 5001.306(a)(3)(i) calls for an independent study whose scope the Agency sets. Expansions and smaller loans fall under 5001.306(a)(3)(ii). Census lists no Alaska cold-storage business and SBA shows no Alaska loans, so Alaska lenders and the Palmer state office have nothing local to compare against and will expect a study.

    What does 7 CFR Part 5001 require the study to contain?

    An independent view of economic, market, technical, financial and management feasibility. For an Alaska port store that means processor demand and a survey of existing freezer capacity in the port, a refrigeration, power, foundation and freight review, projections with quarterly cash flow and harvest and power stress tests, and the operator's record, each at the depth the Agency asks for under Appendix A.

    How is a cold storage or warehousing project evaluated in a USDA feasibility study?

    From contracted and expected throughput by month, priced as freezing, storage and handling charges benchmarked to Washington cold stores and local processor costs. Expenses lead with power, under current and LNG-scenario tariffs, then labour, maintenance and freight. In this page's $6,000,000 example, 1.25x coverage needs $665,092.06 of NOI, about $221.70 per pallet position across 3,000 positions, much of it earned between June and August.

    How long does a USDA feasibility study take in Alaska?

    A port freezer study is complex work on the cost page's schedule, seven to nine weeks, because processor interviews and capacity counts take time; a contract-backed expansion can take six to seven weeks, and a paid rush three to four. Scheduling interviews outside the fishing season helps. The study then goes with the application to the Palmer state office, where the hub notes slower processing after 2025 staffing cuts.

    How does the FY2026 85 percent guarantee affect cold storage or warehousing projects under $5 million?

    Below $5 million, 91 FR 11272 sets an 85 percent guarantee with a 3.0 percent fee and 0.55 percent retention; at $5 million to $25 million the guarantee is 80 percent on the same fees. Alaska adds a third option: a high-cost, isolated project off the road system gets 90 percent with a 1.0 percent fee and 0.50 percent retention, which on this page's $6,000,000 example cuts the closing fee from $144,000 to $54,000.

    Who prepares a cold storage or warehousing feasibility study in Alaska?

    A consultant independent of the store's owners, the processors who will use it, the refrigeration contractor and the lender, whom Rural Development finds acceptable under 5001.306(a)(3)(i). Acceptability is decided in Palmer, file by file, since USDA publishes no roster. Independence matters more than usual here, because the processors supplying demand evidence may also own competing freezer space.

    What does a cold storage feasibility study consultant cost in Alaska?

    Most Alaska port projects fit the cost page's complex B&I band, $10,500 to $14,500, because there is no Census or SBA comparable and the capacity survey is built by interview. An expansion at an operating processor with contracts may fit the $6,900 to $12,500 band. The fee is fixed in writing before work begins and changes only if the scope does, for example by adding a second port.

    How long does an Alaska cold storage study remain current?

    Part 5001 does not date-limit studies. Seafood volumes and prices swing by season, the cost page describes USDA's data norm as about 18 months, and 5001.203 rejects an appraisal more than a year old at closing. A processor sale, a weak run or a tariff change is a reason to refresh the numbers ahead of closing.

    Can the same cold storage study serve an SBA lender and USDA?

    Yes, if it is built to Part 5001, because 13 CFR 120.160(b) lets an SBA lender require a feasibility study without a set format. On $6,000,000, SBA 7(a) would guarantee $4,500,000 at 75 percent with a fee capped at $166,250; B&I would guarantee $4,800,000 in the standard tier or $5,400,000 in the off-road tier. No Alaska cold-storage SBA loan appears in the FY2010 to FY2026 data.

    Can a cold store in an off-road Alaska port get the 90 percent guarantee?

    It may. In the FY2026 fee notice, Alaska projects in high-cost, isolated places with no road connection carry the best B&I terms on offer: 90 percent covered, 1.0 percent up front, 0.50 percent a year. The hub lists Juneau, Bethel, Ketchikan, Kodiak, Nome and Sitka as off the road system. The Agency decides whether a project qualifies, so the study and the lender must document it.

    Does SPUR cover Alaska seafood cold storage?

    The Alaska hub reports that USDA's 23 October 2026 SPUR announcement names seafood processing as eligible, with a 90 percent guarantee and up to $175 million per borrower. Those terms are the hub's, not this page's federal sources, and a stand-alone cold store is not processing, so a sponsor should read the notice before planning around it. B&I, with its Alaska off-road tier, remains the established route.

    Other project types in Alaska

    Hotels and Resorts · RV Parks and Campgrounds · Restaurants and Food Service · Event Venues and Tourism Attractions · Manufacturing and Resource-Sector Support · Food and Seafood Processing · Back to all Alaska project types

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www.census.gov/programs-surveys/cbp.html
    2. U.S. Census Bureau, Vintage 2025 county population estimates: https://www.census.gov/programs-surveys/popest.html
    3. Office of Management and Budget, metropolitan statistical area delineation, July 2023 (Census delineation files): https://www.census.gov/geographies/reference-files/time-series/demo/metro-micro/delineation-files.html
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov award counts, Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), Alaska place of performance, FY2024 to FY2026: https://www.usaspending.gov/search
    10. REAP final rule, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    11. Neighbouring-state data packs (Washington, Hawaii), built from sources 1 to 4
    12. Alaska hub sources reused here (ASMI and McKinley Research Group seafood volumes, ADF&G Bristol Bay summaries, processor sales and receivership, Northline Seafoods guarantee, Chugach LNG estimate, SPUR summary, Anchorage exclusion, borough road-system table, off-road tier, lender standing): /alaska
    13. USDA Feasibility Study Consultants, cost and timeline page: /usda-feasibility-study-cost

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.