Solar, wind and REAP projects in Iowa must be underwritten under the revised REAP rule: grants cover at most 25 percent of project cost and are paid after 12 months of operation. An independent feasibility study consultant models economics under MidAmerican or Alliant terms, a no-grant base case and bridge financing.
Iowa is the country's largest REAP grant state: 586 grants in FY2024 to FY2026, 8.7% of the national total, and $62,662,488 in grant dollars, about $19.64 per resident, first on both counts. Yet USAspending records no Iowa REAP guaranteed loans in those years. The rule effective 16 October 2026 makes the guaranteed loan the tool that builds a project and the grant a later reimbursement, so Iowa's deep grant pipeline now has to be financed through a loan product Iowa farms have barely used.
Program Fit
REAP grants and guaranteed loans fund renewable energy and efficiency for farms and rural small businesses; ground-mount solar and wind on cropland are excluded under the revised rule.
| Route | Use for an Iowa farm or rural business | Binding limit |
|---|---|---|
| REAP guaranteed loan | Up-front cost of solar, wind or efficiency equipment | Up to 75% of eligible cost and $25 million per borrower; grant plus loan at most 75%; FY2026 80% guarantee, 1.0% fee, 0.25% retention |
| REAP grant | Paid after 12 months of metered production or savings | At most 25% of cost; $500,000 renewable, $250,000 efficiency; national competitions |
| B&I guarantee | Renewable systems not otherwise eligible under REAP (5001.105(b)(21), per the site's national renewable page) | Confirm with the Iowa state office before relying on it |
| SBA 7(a) | Solar as business equipment | Two Iowa 7(a) generator loans since FY2010 |
| Utility and state programmes | Interconnection and export terms under MidAmerican or Alliant (hub) | Tariff decides the value of exported energy |
Under the 2026 rule a grant project must be rural, on one site, built and operating for 12 months with metered data, and free of any component made by a foreign adversary under 15 CFR 791.4; a ground-mount system must be commensurate with the host's historical energy use, storage is limited to 120% of prior annual use, and simple payback may not exceed useful life. Each highest-level owner may file one application per federal fiscal year. The Iowa hub adds that any gambling income now makes a REAP grant applicant ineligible, citing 91 FR 62600; confirm that against the rule text for a convenience store or bar with lottery sales. For the loan, owners above 20% must clear the federal judgment, tax, debt and debarment tests of 5001.127(a), and 20% owners guarantee in proportion to ownership (5001.204).
Does an Iowa solar or wind project need a feasibility study?
For a REAP guaranteed loan, the site's national renewable energy page reports that a technical report is required in every case and a feasibility study when the lender or Agency judges it necessary (7 CFR 5001.307(d) and (e)). The new rule effectively answers that question for larger projects: payback within useful life, sizing to historical load and later reconciliation with a year of meter data are eligibility tests, and a lender financing the full build without the grant will want them proven independently before closing.
What the Study Covers
Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.
- Market demand and competitive supply analysis
- Technical and site feasibility, including environmental considerations
- Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
- Management and operational capacity assessment
- Economic feasibility and rural community impact
For an Iowa farm or rural business the market chapter is the energy bill: 12 months or more of usage by meter, the demand profile of hog barns, grain dryers or shop loads, and the MidAmerican, Alliant or cooperative tariff that will apply after interconnection. The technical chapter covers the site (rooftop, farmstead lot or non-cropland ground), structural loads, wind resource for turbines, interconnection, the installer's Iowa licence and three similar installations, and the country of origin of every component.
Iowa Market Evidence
A November 2024 REAP round sent $18,367,170 to Iowa projects, including wind turbines on Greg Popkes's hog farms ($295,000) and solar at GrowAg Investments' hog sites ($327,109).
Solar generation in Iowa: market evidence
Iowa: solar and other renewable power generation, supply and rural footprint
| Measure | Iowa | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 7 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.2 | 0.3 |
| Average employees per establishment | 21.1 | 12.3 |
| Average annual pay per employee | $152,784 | $138,631 |
| Share of state population in non-metro counties (2025) | 37.6% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Iowa's generator table describes a tiny but well-paid sector. Census found no solar or other renewable generating business with payroll in 2019 and seven in 2023, all classified as solar (NAICS 221114) on a computed reading of the raw file, with 148 employees paid $152,784 on average, 10.2% above the U.S. figure. Density is 0.2 per 100,000 against 0.3 nationally, 27th of 51. These are power producers, not the hog farms and elevators that host REAP systems, so the table cannot measure REAP demand; what it tells a lender is that Iowa has a small base of solar operating companies to benchmark output and maintenance against, and that installer depth must be shown for each project.
Iowa REAP awards under the 2026 rule
Computed from the Iowa hub's precedent file and solar card. The last two columns apply the 2026 caps (25% of cost; $500,000 renewable, $250,000 efficiency) mechanically; they are not the projects' costs or any future award. The hub does not say whether Lincolnway's system counted as renewable generation or efficiency.
| Recipient | Place | Year | Project | Award | Most the 2026 rule allows | Eligible cost needed for that grant at 25% |
|---|---|---|---|---|---|---|
| Lincolnway Energy LLC | Nevada | 2024 | Grain-to-alcohol conversion system | $1,000,000 | $500,000 if a renewable system, $250,000 if efficiency ($500,000 to $750,000 less) | at least $2,000,000 or $1,000,000 |
| GrowAg Investments LLP | Alden | 2024 | Hog-site solar | $327,109 | $327,109 (within the cap) | at least $1,308,436 |
| Greg Popkes | Northwest Iowa | 2024 | Farm wind turbines | $295,000 | $295,000 (within the cap) | at least $1,180,000 |
| Quad J Inc. | Washta | Not stated | Efficient grain dryer | $61,468 | $61,468 (within the cap) | at least $245,872 |
Three of the four named awards already fit the new caps, which shows that much of Iowa's REAP activity is farm-scale. The rule's bigger effect is on timing: GrowAg's hog-site array or a Popkes-style turbine would now be built on the owner's cash and a REAP loan, run for a year, and only then apply for a grant capped at 25% of cost. Lincolnway Energy's $1,000,000 award would be cut by at least half.
Regional context
Computed from USAspending (FY2024 to FY2026, place of performance; grant dollars from the award geography file) and each state's solar pack. Other states' figures are theirs.
| State | REAP grants | REAP grant dollars | REAP guaranteed loans | Solar and renewable generators with payroll, 2023 |
|---|---|---|---|---|
| Iowa | 586 | $62,662,488 | 0 | 7 |
| Minnesota | 544 | $59,174,068 | 0 | 9 |
| Illinois | 459 | $55,148,905 | 6 | 31 |
| Missouri | 309 | $24,373,857 | 4 | 3 |
| Nebraska | 297 | $25,065,600 | 0 | 0 |
| Wisconsin | 248 | $25,106,038 | 2 | 5 |
| South Dakota | 78 | $12,309,780 | 1 | 0 |
Iowa leads its neighbours in REAP grants and dollars, with Minnesota close behind, but Illinois (six) and Missouri (four) used more REAP guaranteed loans than Iowa (none). That is the gap the 2026 rule exposes: the loan product that now finances construction has been more familiar to Illinois and Missouri lenders than to Iowa's.
Demand, competition and the energy model
The value of an Iowa system is the purchases it replaces and the credit for what it exports. The study models output by month, including winter snow cover and summer heat for solar and the wind resource for turbines, matches it to the farm's hourly or monthly load (heat lamps and ventilation in hog barns, drying season at elevators), values self-used energy at the avoided rate and exports under the utility's terms, and stresses the export credit. On price, the rule's own procurement standard does the work: competing bids from qualified Iowa installers set the installed cost the model uses.
Revenue, costs and capital
Value comes from avoided energy and demand charges, export credits and any tax benefits the owner can use. Costs are operations and maintenance, monitoring, insurance, inverter or gearbox replacement, and mowing on ground arrays. Capital covers modules or turbines, racking or towers, inverters, electrical and interconnection work, engineering and permits; per the national renewable page, study, technical report and audit costs financed by a REAP loan are limited to 10% of the loan.
Rural footprint and B&I eligibility in Iowa
REAP loans are made under 7 CFR Part 5001, where 5001.3 excludes cities and towns above 50,000 and their urbanized areas, and the 2026 grant rule requires the project itself to be rural. Census places none of Iowa's seven generators by county. Most REAP hosts are on farms well outside Iowa's 11 excluded cities; per the Iowa hub, at most 68.4% of Iowans live in eligible territory, and farm sites near Ankeny, Waukee, Bettendorf, North Liberty or Carter Lake need a map check. The hub's named awards are in Alden, Nevada, Washta and northwest Iowa, all outside the excluded cities.
Financing benchmarks: USDA B&I next to SBA
Iowa: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 1 | $140,000 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 1 | $302,700 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $302,700. Iowa had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
SBA has made two generator loans in Iowa since FY2010, $140,000 in FY2017 to FY2019 and $302,700 in FY2024 to FY2026, and no 504 loans. Nationally 138 7(a) generator loans averaged $478,591 in FY2020 to FY2026, and 12.9% of 31 seasoned loans failed about 51 months after approval, an early-failure pattern that argues for conservative production and maintenance reserves.
| Term | REAP guaranteed loan, FY2026 | B&I under $5 million, FY2026 (comparison) |
|---|---|---|
| Guarantee | 80% | 85% |
| Upfront fee on the guaranteed portion | 1.0% | 3.0% |
| Annual retention fee | 0.25% | 0.55% |
| Guarantee issued before construction ends | add 0.50% | add 0.50% |
| Loan size | $5,000 up to 75% of eligible cost; $25 million per borrower (national renewable page) | $25 million per borrower |
| Term and rate | Useful life up to 40 years, no balloon; negotiated rate (5001.401, 5001.402) | Same |
Fee and guarantee rates: 91 FR 11272 (FY2026 notice). REAP loan limits: the site's national renewable energy page, citing 7 CFR 5001. Grant limits: 91 FR 62600.
The owner funds at least 25% of eligible cost, and because grant plus loan cannot exceed 75%, each dollar of planned grant comes off the loan and is carried by the owner until the grant is paid. That is the bridge-financing point on the hub's solar card: an Iowa farm that plans a grant needs cash or a bridge loan for the full grant amount through construction and the first year of operation.
Worked example (illustrative)
Iowa's two SBA generator loans give no usable average, so the example uses an illustrative eligible cost of $1,300,000, about the size implied by a $325,000 grant at the 25% limit and close to the GrowAg and Popkes awards. In Structure 1 the farm finances three-quarters of cost with a REAP-guaranteed loan and seeks no grant; Structure 2 trims the loan by the 25% grant it hopes to win a year after start-up. Both assume 7.25% fixed over 15 years.
Computed for this page in Python from 91 FR 62600, 91 FR 11272 and 7 CFR 5001; cost, rate and term are assumptions, not quotes.
| Item | Structure 1: REAP loan only | Structure 2: smaller loan, grant after 12 months | Basis |
|---|---|---|---|
| Eligible project cost (illustrative) | $1,300,000 | $1,300,000 | Assumption |
| REAP guaranteed loan | $975,000.00 | $650,000.00 | At most 75% of cost; grant plus loan at most 75% |
| REAP grant, if awarded | $0 | $325,000.00 | 25% of cost, under the $500,000 ceiling |
| Owner cash through construction and year one | $325,000.00 | $650,000.00 | Cost less loan |
| Owner cash once a grant is paid | $325,000.00 | $325,000.00 | Grant competitive, not assured |
| Guaranteed amount (80%) | $780,000.00 | $520,000.00 | FY2026 REAP terms |
| Upfront guarantee fee (1.0%) | $7,800.00 | $5,200.00 | 91 FR 11272 |
| First-year retention fee (0.25%, opening balance) | $1,950.00 | $1,300.00 | 91 FR 11272 |
| Monthly payment, 7.25%, 15 years | $8,900.41 | $5,933.61 | Illustrative |
| Annual debt service | $106,804.96 | $71,203.30 | Level amortisation |
| Annual energy value needed for 1.25x | $133,506.20 | $89,004.13 | Avoided cost plus export credit, net of operating cost |
| Simple payback at that value | 9.7 years | 14.6 years | Must not exceed useful life |
| Coverage at that value if the rate were 2 points higher | 1.11x | 1.11x | Rate stress |
Structure 1's $975,000.00 loan is below $1,000,000, so even under B&I a study would be discretionary; here the lender's question is whether the farm's load and tariff produce $133,506.20 a year. Structure 2 lowers that target to $89,004.13 but asks the owner to carry $650,000.00 until a competitive grant arrives, and a prudent lender underwrites it as though the grant never comes. A 15-year amortisation shortens the debt well inside a solar array's life, which helps the payback test but raises the annual value needed.
Evidence the study must build when local comparables are thin
- At least 12 months of bills and interval data for each meter the system will serve, with the current tariff and export terms.
- Proof the site is not cropland, or a rooftop or farmstead alternative, and sizing commensurate with historical use for ground-mount systems.
- Installer bids from Iowa-licensed contractors with three similar installations, procured under 2 CFR 200.318 to 200.327.
- A bill of materials with country of origin for every component.
- The utility's interconnection response and any upgrade cost.
- For wind, a resource assessment for the hub height; for efficiency, an energy audit with a pre-installation baseline.
What a lender-grade solar feasibility study in Iowa must prove
- Eligibility: rural site, producer or rural small-business status, single site, one application per owner per year, no barred components, no cropland ground-mount.
- Load: metered history and sizing to it; storage within 120% of prior annual use.
- Production: monthly output with Iowa weather and degradation, or wind resource for turbines.
- Value: self-use and export at the actual MidAmerican, Alliant or cooperative terms.
- Payback within useful life.
- Installer and procurement that meet the rule.
- Debt service with no grant, and a bridge plan if one is sought.
- Operations: monitoring, maintenance and replacement reserves.
Risks and mitigants in Iowa
| Risk | Iowa evidence | Study response |
|---|---|---|
| Cropland | Most Iowa farmland is cropped; ground-mount on cropland is ineligible | Site screen first; rooftops, farmsteads and hog-site lots |
| Grant timing | Grants paid only after 12 months of data | Underwrite on the loan alone; bridge cash plan |
| No REAP loan record | 0 Iowa REAP guaranteed loans in FY2024 to FY2026 | Full loan file, conservative production |
| Early failure nationally | 12.9% of seasoned generator 7(a) loans charged off, about 51 months in | Monitoring, inverter reserve, warranty review |
| Export value | MidAmerican or Alliant terms (hub) | Separate self-use and export, stress export credits |
| Gambling income | The hub says any gambling income bars a REAP grant | Revenue screen for stores with lottery sales |
Review and common reasons for return
The lender's REAP loan file goes to USDA Rural Development in Iowa; the hub names Mike Sexton as State Director and lists seven area offices. Under the rule there are no state grant competitions: one national competition for requests of $20,000 or less and one for all others, in annual windows, with no funding notice published as of 7 November 2026. Iowa studies are returned when ground-mount arrays sit on cropland, when production is not tied to metered load, when the payback counts a grant not yet awarded, or when component origin is missing.
Program examples
The hub's Iowa REAP precedents are Lincolnway Energy's $1,000,000 grant near Nevada (2024), GrowAg Investments' $327,109 for hog-site solar at Alden (2024), Greg Popkes's $295,000 for farm wind turbines in northwest Iowa (2024) and Quad J Inc.'s $61,468 grain dryer in Washta. Each of the four was awarded before the October 2026 rule changed when and how much REAP grants pay.
National program example (outside Iowa)
The Pennsylvania rooftop solar study linked below is a REAP feasibility case study with a $1.37 million modelled loan, not an Iowa financing. The Iowa case study linked below is a Community Facilities hospital study, shown as an example of Iowa USDA work rather than an energy precedent.
Hiring a USDA solar feasibility study consultant in Iowa
Under the 2026 rule the proof comes before the grant: the loan is underwritten on a project that has not yet run, and the grant follows a year of meter data. For an Iowa farm the right time to bring in a solar feasibility study consultant is after a full year of bills from the barns or dryer, once an installer has quoted a system, and before any contract. Hosts still weighing solar against wind, efficiency upgrades or no project at all often first speak with a USDA feasibility study consultant about which a lender will finance.
The study covers the five Part 5001 components with an energy model, coverage and payback tests and, for larger loans, utility rate and interconnection modelling. Per the firm's cost page, the client receives the report in PDF and Word with the Excel model, two calls, a revision round and free revisions until the lender or USDA accepts it. Engineering design, the energy audit, grant application drafting and legal review are separate.
The host provides one to two years of bills and interval data, the tariff, the installer's design, quote, Iowa licence and comparable jobs, the parts list with origins, proof the site is not cropland and is controlled by the owner, three years of financial statements, owner résumés, statements for each 20% owner and the bank's indicative terms.
| Engagement (published schedule) | Typical fee | Typical timeline |
|---|---|---|
| REAP, loan under $600,000 | $4,900 to $8,500 | 4 to 5 weeks |
| REAP, guaranteed loan over $600,000 | $7,500 to $11,500 | 5 to 7 weeks |
| OneRD complex: cross-program structures, combined guaranteed loan and grant packages | $9,500 to $18,000 | 7 to 10 weeks |
| Rush option, subject to analyst capacity | 20% to 35% above the standard fee | 3 to 4 weeks |
Source: USDA feasibility study cost and timeline.
Enter the site, system type and size, annual energy use and planned loan in the free consultation form at the bottom of this page, and the firm will reply within 24 hours.