USDA REAP Grant Sizing & Eligibility Calculator
This calculator applies the REAP rule effective 16 October 2026. The pre-rule 50% "IRA-enhanced" scenario and the $1,000,000 cap are retired and no longer modelled.
Estimate your USDA Rural Energy for America Program grant under the current rule: the 25% grant share and award caps, the application gates for projects that are already built and operating, rural eligibility, and how a REAP guaranteed loan fits under the 75% combined cap.
No REAP funding notice under the new rule yet (as of 7 November 2026)
Inputs
Live-updating - share by copying the URL.
Uses US Census Geocoder + USDA RD ArcGIS MapServer Layer 2 (RBS). 7 CFR 4280.103.
Under the rule effective 16 October 2026 (91 FR 62600 (1 October 2026)) the grant is at most 25% of project cost, capped at $500,000 for renewable energy systems and $250,000 for energy efficiency, with a $1,500 minimum. The earlier 50% IRA-enhanced share and $1,000,000 cap are not current.
The grant now goes to projects that are already built and operating. Answer for the project as it stands at the planned application date.
Results
Planning estimates - verify with USDA RD state office before applying.
Eligibility
Applicant: Pass
Rural area: Not checked (7 CFR 4280.103)
Application gates: 4 of 8 met
Ready to apply under the rule: Not yet
Grant Sizing
Sizing only: the project does not yet pass every application gate below.
Rule effective 16 October 2026 (91 FR 62600 (1 October 2026)): grant at most 25% of project cost; maximum $500,000 for renewable energy systems and $250,000 for energy efficiency; minimum $1,500.
Application Gates (rule effective 16 Oct 2026)
- Project built and operating: not metThe grant goes to completed projects. Up-front costs are financed through the REAP guaranteed loan under 7 CFR 5001.
- Project Period ended 12 to 24 months before the application: not metApplies once the project is built and operating.
- 12 months of actual production data: not metProduction or savings estimates must be reconciled with actual meter data.
- 12 months of pre-installation data: not metThe baseline the actual data is measured against.
- Not ground-mount solar or wind on Cropland: metGround-mount solar or wind on Cropland (7 CFR 718.2) is ineligible, and so are retrofits of such systems.
- No solar or wind component from a foreign adversary: metSystems with any component from a foreign adversary under 15 CFR 791.4 are ineligible, except projects installed before the rule's publication.
- Project at one location: metProjects at more than one location are ineligible; one site per application.
- Not an excluded project type: metEV chargers, retail energy dispensing, stand-alone storage, storage retrofits and distribution-only projects are excluded.
The rule also requires a load analysis for ground-mount systems (storage limited to 120% of prior annual use), a simple payback no longer than the useful life, installers licensed in the state with at least three similar installations, site control for at least 12 months before the Project Period, and no more than one application per federal fiscal year per highest-level owner.
Combined REAP Funding
The grant no longer finances construction: USDA points to the REAP guaranteed loan under 7 CFR 5001 for up-front costs. Because the grant is competitive and paid later, underwrite the project without it.
Competition and Timing
The rule ends state competitions: one competition for requests of $20,000 or less and one national competition for all others, in annual application windows. Scoring factors are set in the funding notice.
As of 7 November 2026 no funding notice under the rule had appeared, so this calculator no longer previews a score. The earlier 100-point preview modelled the rescinded notice and is retired.