USDA Feasibility Study for Event Venues and Agritourism in Hawaii

    NAICS 711310

    Event venue and agritourism projects in rural Hawaii combine farm venues on the neighbor islands with destination wedding and corporate retreat demand. An independent USDA feasibility study consultant models bookable dates, per-event revenue and utilization ramp against regional comparables; the independent USDA feasibility study company grounds each assumption in verifiable evidence.

    Census publishes no count of wedding and event venues, so the nearest statewide record is lending. SBA's two closest codes, promoters with facilities and caterers, show 11 Hawaii 7(a) loans from FY2020 to FY2026 averaging $117,273, and the seven most recent averaged $170,000 (computed). Those are small, mostly catering-scale loans. A farm venue with a pavilion, kitchen and parking will cost many times more, which is why the study has to supply the evidence the lending record cannot.

    Program Fit

    B&I within the accommodation and food services sector leading national obligations. Agritourism ventures with a production component can also intersect Value-Added Producer Grant eligibility.

    RouteFit for a Hawaii venueDeciding condition
    USDA B&I guaranteePavilions, barns, kitchens, restrooms, parking, guest cottages for a for-profit venueEligible site; event revenue that covers debt; 85% guarantee under $5 million
    Value-Added Producer GrantFarms selling their own value-added products at the venueVAPG terms are outside this page's sources
    SBA 7(a) and 504Caterers, small venues and acquisitions11 Hawaii 7(a) loans in the proxy codes since FY2020
    REAPSolar or efficiency at an operating venueGrant only after 12 months of operating data (rule effective 16 October 2026)
    Conventional bankVenues on fee-simple land with a booking historyLender's own policy

    Two lines of 7 CFR 5001.127 matter for venues: a borrower is ineligible if more than 15 percent of gross revenue, including space or machine lease income, comes from gambling (5001.127(b)), or if it earns income of a prurient sexual nature (5001.127(c)). The company and anyone owning over 20 percent must also be free of federal judgments, delinquent federal tax or debt, and debarment.

    Required by rule or requested by the lender

    Under 5001.306(a)(3)(i), a new venue company asking for more than $1,000,000 of B&I-guaranteed debt must commission an independent study from a qualified consultant the Agency accepts. An operating venue, or a loan of $1,000,000 or less, falls under 5001.306(a)(3)(ii), where the Agency decides. Venue loans in Hawaii's SBA record are far below the mandatory line, but a purpose-built venue usually crosses it.

    What the Study Covers

    Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.

    • Market demand and competitive supply analysis
    • Technical and site feasibility, including environmental considerations
    • Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
    • Management and operational capacity assessment
    • Economic feasibility and rural community impact

    For a Hawaii venue the site chapter reviews the county's permits for events on agricultural land, parking and shuttle plans, wastewater for peak crowds, the kitchen and liquor licensing, and how guests reach the site from the airport and hotels.

    Hawaii Market Evidence

    Hawaii venue demand follows island visitor flows and permit systems at major sites; storm-driven cancellations and seasonality must be modeled explicitly, and county permitting timelines shape the opening ramp. USDA's Honolulu determination treats only the Urban Honolulu and East Honolulu census-designated places as urban, so most of Oahu and all neighbor-island territory is B&I-eligible; every Hawaii study includes a dated, address-level USDA map determination.

    Event venues in Hawaii: market evidence

    Census has no single industry code for event and wedding venues; they report under several codes.

    Hawaii: SBA lending to promoters with facilities and caterers (NAICS 711310 and 722320, the nearest SBA codes to event venues)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201614$890,0004$1.9 million
    FY2017 to FY20199$666,0000$0
    FY2020 to FY20234$100,0001$266,000
    FY2024 to FY20267$1.2 million0$0

    Average 7(a) loan, FY2020 to FY2026: $117,273. Average 504 loan: $266,000. Hawaii had fewer than 30 seasoned 7(a) loans for promoters with facilities and caterers (NAICS 711310 and 722320, the nearest SBA codes to event venues); nationally, 7.6% of 1,311 FY2010 to FY2016 loans were charged off, on average 64 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Hawaii proxy-code lending by period (computed)

    PeriodHawaii 7(a) loansHawaii average 7(a) loanUS average 7(a) loan
    FY2010 to FY201614$63,571$318,473
    FY2017 to FY20199$74,000$426,363
    FY2020 to FY20234$25,000$542,555
    FY2024 to FY20267$170,000$507,860

    Computed from the pack JSON.

    Interpretation. Hawaii's 34 proxy-code 7(a) loans since FY2010 never averaged more than $170,000 in any period, against national averages between $318,473 and $542,555. The loans are mostly to caterers and small promoters, not to venue owners building facilities. Nationally, 7.6 percent of seasoned proxy-code loans were charged off and 3.37 percent of the dollars were lost (computed), higher than most hospitality classes on this site, and failures came early, 64 months after approval on average. A reviewer will treat a Hawaii venue as a start-up in a category with a weak national record and no local loan history.

    The proxy codes on the ground (computed)

    Census does count the two proxy industries. They are not venue counts, but they show where event services cluster.

    Census code (2019 → 2023)HawaiiHonoluluMauiHawaii CountyKauai
    711310 promoters with facilities3 → 7fewer than 33fewer than 3fewer than 3
    722320 caterers62 → 744513106
    Caterers per 100,000 residents (2023)5.24.68.14.88.2

    Computed from Census CBP 2019 and 2023 state and county files and Vintage 2025 county populations; the county file omits counties with fewer than three establishments in a code.

    Maui and Kauai have about 1.8 times Honolulu's density of caterers (computed), which fits destination weddings concentrated on those islands. A venue there competes with resort ballrooms, beach permits and private estates, most of which no Census series captures.

    Regional comparison (computed)

    Rows are Alaska's and California's own pack figures for the same proxy codes.

    StateCensus venue countSBA 7(a) loans FY2020-26 (average)
    Hawaii (this page)no Census code11 ($117,273)
    Alaskano Census code2 ($12,500)
    Californiano Census code189 ($615,583)
    United States1,366 ($523,963)

    California's 189 proxy-code loans averaged $615,583, five times Hawaii's figure, and are the better guide to the loan size a facility-based venue needs. Alaska's two loans averaged $12,500, which says remote markets fund event businesses with very little debt.

    Island visitor flows

    The Hawaii hub supplies the demand anchors. Visitor arrivals from January to August 2026 reached 6,693,107 (+1.8 percent), with Maui at 1,819,840 (+6.0 percent) and Kauai at 989,084 (+0.9 percent). Maui's average daily visitor census was still 20.2 percent below normal in August 2026, three years after the Lahaina fire, and Kauai hotel room revenue fell 40.7 percent in September 2026 after Hurricane Lowell. A wedding venue sells dates months ahead, so a storm in the booking season moves deposits and cancellations into the cash flow, not just the occupancy rate.

    Rural footprint and B&I eligibility in Hawaii

    Because venues have no Census code, the pack cannot show their rural share; 19.8 percent of Hawaii residents live in the non-metro counties of Hawaii and Kauai. That proxy understates eligibility. Under 7 CFR 5001.3, B&I excludes cities and towns above 50,000 and their contiguous urbanized areas, and USDA treats only the Urban Honolulu and East Honolulu census-designated places as urban in Honolulu County, so North Shore and Windward Oahu farm venues screen eligible. On the hub's calculation 72.4 percent of residents live in B&I-eligible areas. The Kahului–Wailuku urban area on Maui (57,905) needs a map check; Upcountry Maui, the Kohala Coast, Hilo and all of Kauai screen eligible.

    Financing benchmarks: USDA B&I next to SBA

    The proxy table above is the only Hawaii lending benchmark. FY2026 B&I terms:

    B&I term (FY2026)RuleSource
    Guarantee85% under $5 million; 80% from $5 million to $25 million91 FR 11272
    Upfront fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed balance at 31 December91 FR 11272; 7 CFR 5001.455
    Guarantee issued before construction is completeadditional 0.50%91 FR 11272
    Term and rateuseful life up to 40 years, no balloon; rate negotiated7 CFR 5001.401, 5001.402
    Equity at closingexisting business 10%; new business 20% balance-sheet equity or 25% of project cost7 CFR 5001.105(d)

    What it means for a Hawaii venue. A caterer borrowing near the Hawaii average of $117,273 is better served by SBA, where a loan of $150,000 or less carries an 85 percent guarantee and a fee capped at 2 percent (13 CFR 120.210, 120.220). A purpose-built venue near $1.5 million sits in the 85 percent B&I tier, and a new company at that size needs 20 percent balance-sheet equity or 25 percent of project cost under 5001.105(d)(4). The Agency may raise that under 5001.105(d)(5) for higher-risk industries, and a 7.6 percent national proxy loss rate invites the question.

    Worked example (illustrative)

    Inputs: a loan near the Hawaii proxy average ($120,000, fixed 7.75%, 10 years, 40 events a year), and an illustrative $1,500,000 farm venue with pavilion, kitchen and restrooms (fixed 7.75%, 25 and 20 years, 80 events a year). FY2026 B&I fees throughout.

    Item$120,000, 10 years$1,500,000, 25 years$1,500,000, 20 years
    Guaranteed amount (85%)$102,000$1,275,000$1,275,000
    Unguaranteed amount$18,000$225,000$225,000
    Upfront guarantee fee$3,060$38,250$38,250
    Balance after 12 payments$111,728.77$1,479,575.44$1,467,335.16
    First annual retention fee$522.33$6,917.02$6,859.79
    Monthly payment$1,440.13$11,329.93$12,314.23
    Annual debt service$17,281.53$135,959.18$147,770.74
    NOI for 1.25x coverage$21,601.91$169,948.97$184,713.43
    NOI per event$540.05 (40 events)$2,124.36 (80 events)$2,308.92 (80 events)
    Debt service 2 points higher$18,830.91$160,404.74$170,733.03
    Coverage at that rate, same NOI1.15x1.06x1.08x
    New business equity, 25% of cost$40,000$500,000 on $2,000,000same
    SBA 7(a) alternative: guarantee and fee cap$102,000; $2,040$1,125,000; $39,687.50same

    Computed in Python from the stated inputs.

    The larger venue needs $2,124.36 of net operating income from each of 80 events on a 25-year schedule. If a storm season or a slow permit cuts the calendar to 60 events and NOI per event holds, coverage falls to 0.94x (computed), below break-even. Each lost weekend matters more than any change in the rate: the 2-point rate shock still leaves coverage at 1.06x.

    What a lender-grade event venue feasibility study in Hawaii must prove

    1. Bookable dates by island. A monthly calendar showing weddings, corporate retreats and community events, with the wet season and storm months shown separately.
    2. Who books, and from where. The share of mainland and Japan destination couples, island residents and corporate groups, tied to the hub's island arrival figures.
    3. Revenue per event. Site fee, catering, bar where licensed, rentals and any lodging, priced from surveyed competitors including resort ballrooms.
    4. Permits on agricultural land. The county permit path and timing, since the opening ramp depends on it.
    5. A competitor census. Every venue, estate and resort space within reach, built by hand because no Census count exists.
    6. Cancellation economics. Deposit policy, refund exposure and insurance after a named storm.
    7. Transport and parking. Shuttle or parking capacity for the largest event the permit allows.
    8. Any farm product revenue. Value-added sales that might support a VAPG application, kept separate from venue revenue.

    Evidence the study must build when local comparables are thin

    The study collects primary evidence: the sponsor's inquiry log and signed contracts, rate cards and booked dates of competing venues, interviews with planners, caterers and resort sales teams, county permit records for comparable agricultural event sites, and the island's visitor and hotel data from DBEDT. Letters from wedding planners committing to a minimum number of dates are worth more to a reviewer than any survey of intent.

    Risks and mitigants

    RiskHawaii signalMitigant in the study
    Unproven demandNo Census venue code; SBA loans average $117,273Booked calendar and planner letters
    StormsKauai room revenue down 40.7% in September 2026 (hub)Cancellation and deposit scenarios
    Maui recoveryDaily visitor census down 20.2% in August 2026 (hub)Separate Maui scenario with slower ramp
    PermitsCounty approval for events on agricultural landPermit in hand or a timeline with float
    Weak national record7.6% of 1,311 seasoned proxy loans charged offEquity above minimum; reserves

    Process, documents and what gets a study sent back

    The sponsor provides the site plan, land documents and permits, the booking log and contracts, rate card, catering and liquor arrangements, construction bids, and statements from each owner of 20 percent or more, who must personally guarantee at least their share of the guaranteed loan (5001.204). Studies come back when event counts are projected from visitor arrivals alone, when resort competition is ignored, when no storm scenario appears, or when the permit timeline is assumed rather than documented.

    Program evidence, honestly labelled

    No Hawaii event venue appears among the USDA financings on the Hawaii hub. The nearest visitor-facing farm precedent is the hub's largest named B&I deal: a $10,000,000 guarantee to Hawaiʻi Sea Spirits for a distillery, retail and café expansion on 80 acres on Maui (2023), a public program record. The hub also lists 2022 Value-Added Producer Grants to Hawaiʻi ʻUlu Producers Cooperative ($250,000) and Island Harvest in North Kohala ($214,379). Venue evidence from other states is on the national wedding venue and agritourism feasibility study pages.

    Hiring a USDA event venue feasibility study consultant in Hawaii

    When it is required. For a new venue company above $1,000,000 of B&I-guaranteed debt (5001.306(a)(3)(i)), and whenever the Hilo office or the lender asks, which a thin local record and a 7.6 percent national loss rate make likely.

    What the engagement includes. The cost page sets out the five Part 5001 components, a five- to ten-year projection with sensitivity tests, the market area, a competitive supply inventory, operator benchmarks, a management review, the report in PDF and Word with an Excel model, kickoff and midpoint calls, one revision round and free revisions until USDA or the lender accepts.

    What you provide. Permits and site plans, bookings and contracts, the rate card, bids, and owner financial statements.

    Fees and timing. The cost page names agritourism among the asset classes that need primary research and places that work in the complex B&I band, $10,500 to $14,500 over seven to nine weeks; an operating venue with a booking history may fit the standard band, $6,900 to $12,500 over six to seven weeks. The Hawaii hub's range is four to eight weeks.

    How to start. Describe the island, the site and the event mix in the Get Your Free Consultation form below; the firm replies within 24 hours and sends a fixed-fee proposal. An event venue feasibility study consultant who has no stake in your bookings is what makes the calendar credible in Hilo, and the home page explains how this independent USDA feasibility study consultant works with lenders.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for an event venue or agritourism project in Hawaii?

    Yes, for a new venue company borrowing more than $1,000,000 under a B&I guarantee: 5001.306(a)(3)(i) requires an independent study. Smaller loans and operating venues are at the Agency's discretion under 5001.306(a)(3)(ii). Hawaii's venue-type SBA loans averaged $117,273 since FY2020 and the code carries a 7.6 percent national loss rate, so a lender will usually ask for a study for any purpose-built venue.

    What does 7 CFR Part 5001 require the study to contain?

    USDA sets the scope case by case and requires an independent, qualified author for new businesses over $1,000,000. This site structures the study around the five areas it reads from Appendix A: economic, market, technical, financial and management feasibility. For a Hawaii venue that means island visitor demand and a hand-built competitor census, permits and site capacity, a booking-based projection with storm scenarios, and the operator's record.

    How is an event venue or agritourism project evaluated in a USDA feasibility study?

    Each revenue line is built from booked and projected events, priced from surveyed competitors, and set against operating costs and debt. In this page's $1,500,000 example the venue needs $2,124.36 of NOI from each of 80 events for 1.25x coverage on 25 years. If storms or permits cut the year to 60 events, coverage drops to 0.94x even with the same margin per event.

    How long does a USDA feasibility study take in Hawaii?

    The Hawaii hub expects four to eight weeks for island work. The cost page schedules agritourism and other primary-research work at seven to nine weeks, with a three- to four-week rush at a 20 to 35 percent premium. Planner and competitor interviews take the most time, and a county permit review can add more where the venue sits on agricultural land.

    How does the FY2026 85 percent guarantee affect event venue or agritourism projects under $5 million?

    FY2026 B&I loans under $5 million carry an 85 percent guarantee, a 3.0 percent upfront fee on the guaranteed share and 0.55 percent a year (91 FR 11272). On $1,500,000 that is $1,275,000 guaranteed, $225,000 held by the lender and a $38,250 fee. A loan near the Hawaii proxy average, $120,000, would carry a $3,060 fee, though SBA is usually the better fit at that size.

    Who prepares an event venue or agritourism feasibility study in Hawaii?

    An independent consultant who understands venue economics and USDA review, acceptable to Rural Development's Hilo office, with no interest in the venue, its builder, caterer or lender. A Hawaii office is not required. Planners and caterers supply useful evidence, but their own revenue forecasts cannot stand in for the study because each gains if the venue opens.

    What does an event venue feasibility study consultant cost in Hawaii?

    The cost page lists agritourism among the classes that need direct research and prices complex B&I work at $10,500 to $14,500. An operating venue with two or more seasons of bookings may fall in the standard band of $6,900 to $12,500. Adding cottages or a VAPG element can change the scope. Every engagement is quoted as a fixed fee in writing, usually half at signing.

    Can the same venue study serve an SBA lender and USDA?

    Yes, if it is written to the Part 5001 standard; SBA allows a lender to require a feasibility study (13 CFR 120.160(b)) without prescribing a format. On $1,500,000, SBA 7(a) would guarantee $1,125,000 with a fee capped at $39,687.50, while B&I would guarantee $1,275,000 for a $38,250 fee. Every Hawaii proxy-code loan since FY2020 used 7(a) except one 504 loan of $266,000.

    How should a Kauai or Maui venue plan for storms and the Maui recovery?

    With separate scenarios rather than an averaged year. The hub reports Kauai room revenue down 40.7 percent in September 2026 after Hurricane Lowell and Maui's daily visitor census 20.2 percent below normal in August 2026. The study should show deposits refunded or moved, a season with fewer dates, insurance proceeds and the reserve that carries debt service through it, and should not assume a quick return to pre-fire Maui demand.

    Other project types in Hawaii

    Hotels and Resorts · RV Parks and Campgrounds · Restaurants and Food Service · Laundromats and Laundry Services · Childcare and Early Learning · Assisted Living and Elder Care · Back to all Hawaii project types

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www.census.gov/programs-surveys/cbp.html
    2. U.S. Census Bureau, Vintage 2025 county population estimates: https://www.census.gov/programs-surveys/popest.html
    3. Office of Management and Budget, metropolitan statistical area delineation, July 2023: https://www.census.gov/geographies/reference-files/time-series/demo/metro-micro/delineation-files.html
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD guarantee fee, retention fee and guarantee percentages for FY2026: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments (11 Dec 2025): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. REAP final rule, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. Alaska and California data packs, built from sources 1 to 4
    11. Hawaii hub sources reused here (DBEDT visitor statistics to 30 September 2026, STR via Honolulu Star-Advertiser, Honolulu determination, Kahului–Wailuku urban area, Hawaiʻi Sea Spirits and VAPG records): /hawaii
    12. USDA Feasibility Study Consultants, cost and timeline page: /usda-feasibility-study-cost

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.