USDA Feasibility Study for Dairy Biogas, Solar and Renewable Energy in Idaho

    NAICS 221114

    Dairy biogas and solar projects in Idaho serve the Magic Valley dairy and farm base, where REAP precedent is deep. An independent USDA feasibility study consultant builds self-consumption economics under the utility's export terms with a no-grant base case; the independent USDA feasibility study company scopes bridge financing under the revised REAP rule.

    USAspending records 93 REAP grants to Idaho recipients in FY2024 to FY2026, worth $21,643,985, or $11.77 per resident, seventh among 53 states and territories and almost four times the national $3.11 (computed). That record was built under the old REAP terms. The rule effective 16 October 2026 caps renewable grants at $500,000 and 25 percent of cost, and pays them only after a year of operating data, so the next Idaho dairy project is underwritten on the loan, not the grant.

    Program Fit

    REAP grants and guaranteed loans under the revised rule (91 FR 62600): grants cover at most 25 percent of project cost, capped at $500,000 for renewable energy systems, and are paid only after 12 months of operation, so bridge or construction financing covers the full system cost.

    RouteFit for an Idaho dairy, farm or rural businessDeciding condition
    REAP guaranteed loan (7 CFR 5001)Up-front cost of solar, digesters and efficiency projectsFY2026: 80% guarantee, 1.0% fee, 0.25% annual retention (91 FR 11272)
    REAP grantReimbursement after 12 months of production dataAt most 25% of cost; $500,000 renewable and $250,000 efficiency caps; grant plus guaranteed loan at most 75% of cost
    SBA 7(a)Larger generation projectsIdaho's two 7(a) loans in this code were $3.5 million and $3.6 million
    Section 9003 (biorefinery)Large renewable fuel plantsOutside this page's sources; see the linked guide

    Every guaranteed borrower and owner above 20 percent must clear 7 CFR 5001.127: no federal judgments, delinquent federal tax or debt, or debarment; no more than 15 percent of gross revenue from gambling; no prurient or illegal-product income.

    Required by rule or requested by the lender

    The independent study in 5001.306(a)(3)(i) is mandatory for guaranteed loans above $1,000,000 to a new business, and part 5001 governs REAP guaranteed loans. A dairy that forms a new entity to own its digester or array, a common structure, can trip the rule; an established dairy borrowing in its own name falls under the Agency's discretion in (a)(3)(ii). The REAP rule adds its own tests that a study must answer whatever the loan size: commensurate historical energy use for ground-mount systems and a simple payback no longer than the system's useful life.

    The REAP rule effective 16 October 2026, applied to an Idaho project

    RuleWhat it means in Idaho
    Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligibleIrrigated Magic Valley fields are out; arrays go on roofs, corrals, lots or non-cropland
    12 months of production and pre-installation data before applyingThe grant comes a year or more after the loan funds construction
    Grant plus guaranteed loan at most 75% of costA large loan shrinks the grant a dairy can receive
    One application per fiscal year per highest-level owner and its affiliatesMulti-entity dairy groups choose one project a year
    Site owned or leased 12 months before the Project PeriodLeased digester sites need the lease in place early
    Storage limited to 120% of prior annual use; ground-mount sized to historical useLoad data from the dairy's own meters
    Components from a foreign adversary (15 CFR 791.4) ineligibleCountry-of-origin list for panels and inverters
    Installer licensed in Idaho with three similar installationsContractor qualifications in the study

    What the Study Covers

    Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.

    • Market demand and competitive supply analysis
    • Technical and site feasibility, including environmental considerations
    • Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
    • Management and operational capacity assessment
    • Economic feasibility and rural community impact

    For an energy project, "market demand" is the site's own load: interval meter data, the utility's retail and export rates, and for a digester the gas offtake contract and the manure supply from the herd.

    Idaho Market Evidence

    A single 2023 REAP round made 27 Idaho awards totaling $7,191,103, mostly dairy and farm solar in the Magic Valley, including $1,000,000 to Skyline Biogas in Burley for a dairy digester and $996,000 to Golden Valley Beef for 1,200 kW of solar. Eight Idaho cities exceeded 50,000 in the 2020 Census, and the excluded urban fringes around Boise, Idaho Falls, Pocatello, Coeur d'Alene and Twin Falls make eligibility parcel-specific at every metro edge; every Idaho study includes a dated, address-level USDA map determination.

    Solar and renewable power generation in Idaho: market evidence

    MeasureIdahoUnited States
    Establishments, 2019 → 20234 → 5 (+25.0%)405 → 942
    Per 100,000 residents (2023)0.30.3
    Average employees per establishment6.212.3
    Average annual pay per employee$64,226$138,631
    Share of establishments in non-metro counties0.0% (0 in 0 counties)
    Share of state population in non-metro counties (2025)25.9%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Interpretation. This table counts businesses whose main activity is selling power: five in Idaho in 2023 with 31 employees between them, three of them in a single metropolitan county. It does not count the dairies, feedlots and farms that install solar or a digester to cut their own bills, which are the borrowers REAP is built for. Idaho's pay per employee, $64,226, is less than half the national $138,631, consistent with small operators rather than utility-scale developers. A reviewer will not look to this table for comparables; the evidence for an Idaho REAP project is the site's own meter data, the hub's list of funded dairy and farm systems, and the utility's rates.

    Neighbouring states (computed)

    REAP dollars are USAspending FY2024 to FY2026 grant obligations per resident (2020 Census population); the Census columns are each state's own pack figures.

    StateREAP grants per resident, FY2024-26Power generators 2019 → 2023Avg. paySBA 7(a) loans FY2020-26 (average)
    Idaho (this page)$11.774 → 5$64,2261 ($3,607,000)
    Oregon$5.033 → 9$79,2760
    Utah$3.666 → 25$77,5561 ($300,000)
    Montana$2.730 → 00
    Washington$2.090 → 4$210,4782 ($1,852,500)
    United States$3.11405 → 942$138,631138 ($478,591)

    Idaho draws more than twice the REAP dollars per resident of any neighbour, and more than five times Washington's. The difference is the dairy and irrigated-farm base: REAP follows agricultural load, not power-plant counts. It also means Idaho's experience under the old rule is the largest in the region, and the rule change hits it hardest.

    The 2023 Idaho awards under the new caps (computed)

    Award amounts are from the Idaho hub's precedent file; the two right-hand columns apply the rule effective 16 October 2026.

    Recipient (2023)LocationSystemAwardProject cost needed for this grant at 25%Above the new $500,000 cap by
    Skyline Biogas LLCBurleyDairy digester$1,000,000$4,000,000$500,000
    Golden Valley Beef LLCBurley1,200 kW solar$996,000$3,984,000$496,000
    Gehring Agri-BusinessAmerican Falls1 MW solar$830,000$3,320,000$330,000
    AgriwestIona600 kW solar$480,000$1,920,000$0
    B & H FarmingRupert500 kW solar$415,000$1,660,000$0
    Grace At Fruitland LLCFruitland125 kW solar$95,388$381,552$0

    Three of the six named awards could not be made today at their 2023 size. A project like Skyline's would now receive at most $500,000 and would need the balance from the loan and the owner, and the grant would arrive only after a year of operation. The 2023 round averaged $266,337 per award and the FY2024 to FY2026 grants averaged $232,731 (computed), so mid-sized farm arrays are least affected.

    Rural footprint and B&I eligibility in Idaho

    The pack places no renewable power generator in a non-metro county, but REAP projects sit where the farms are. For guaranteed loans under part 5001, the rural test is 7 CFR 5001.3: outside any city or town of more than 50,000 in the 2020 Census and outside the urbanized area contiguous and adjacent to it. Idaho's eight excluded cities include Twin Falls (51,807), Idaho Falls and Pocatello; the hub screens Burley, Rupert, Jerome, Gooding, Buhl and Blackfoot as eligible and flags Kimberly, Ammon and Chubbuck. Dairy sites outside towns are rarely close to the line, but a processor or business site on the edge of Twin Falls needs the map determination. Whether agricultural producers outside rural areas can use REAP is not covered by this page's sources and should be confirmed with the Boise state office.

    Financing benchmarks: USDA REAP next to SBA

    Idaho: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20191$3.5 million0$0
    FY2020 to FY20231$3.6 million0$0
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $3.6 million. Idaho had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Nationally the charged-off solar-generation loans lost 6.04 percent of dollars lent (computed), the highest dollar-loss rate among the asset classes in this site's data packs (computed), and failures came early, about four years in. That record belongs to merchant power sellers; a dairy array that offsets its own retail bill carries a different risk, and the study should say so with the dairy's load data.

    REAP guaranteed loan term (FY2026)RuleSource
    Guarantee80%91 FR 11272
    Upfront guarantee fee1.0% of the guaranteed amount91 FR 11272
    Annual retention fee0.25% of the guaranteed share of principal at 31 December91 FR 11272
    Guarantee issued before construction completionadditional 0.50% fee91 FR 11272
    Termuseful life, up to 40 years, no balloon7 CFR 5001.402
    Ratenegotiated; fixed, variable or both7 CFR 5001.401
    Equity at closingexisting 10%; new 20% balance-sheet equity or 25% of project cost7 CFR 5001.105(d)
    Combined REAP fundinggrant plus guaranteed loan at most 75% of project cost91 FR 62600

    Worked example (illustrative)

    Inputs: a $2,000,000 rooftop and corral solar project at a Magic Valley dairy, financed with a $1,200,000 REAP guaranteed loan at a fixed 7.00% over 20 years, FY2026 REAP fees, and the rule effective 16 October 2026.

    ItemAmount
    Project cost (illustrative)$2,000,000
    REAP guaranteed loan$1,200,000
    Guaranteed amount (80%)$960,000
    Unguaranteed amount held by the lender$240,000
    Upfront guarantee fee (1.0%)$9,600
    Balance after 12 monthly payments$1,171,452.60
    First annual retention fee (0.25%)$2,342.91
    Monthly payment$9,303.59
    Annual debt service$111,643.05
    Annual savings and income needed for 1.25x coverage$139,553.81
    Annual debt service at 9.00%$129,560.54
    Coverage at 9.00% on the same savings1.08x
    Combined REAP cap (75% of cost)$1,500,000
    Largest grant allowed with this loan$300,000
    Owner cash before any grant$800,000
    Loan ceiling if the full $500,000 grant is sought$1,000,000
    Simple payback at the coverage-level savings14.33 years

    The grant cap and the combined cap interact. A $2,000,000 project could in principle earn a $500,000 grant, but with a $1,200,000 guaranteed loan the 75 percent ceiling leaves room for only $300,000, and that money arrives after a year of meter data. Until then the dairy carries $800,000 of its own cash. To keep the full $500,000 grant, the loan must fall to $1,000,000 and the owner's cash rises. The study's base case therefore assumes no grant: the array must produce $139,553.81 a year of bill savings and export credit for 1.25x coverage, and its 14.33-year simple payback must sit inside the equipment's useful life, which the rule makes an eligibility test.

    What a lender-grade renewable energy feasibility study in Idaho must prove

    1. Load. Twelve months or more of interval data from the dairy's or business's own meters, by month and time of day.
    2. Self-consumption and export. Savings priced at the utility's actual retail and export terms, as the hub's reviewer test requires, not at a blended average rate.
    3. Siting. Proof the array is not on Cropland under 7 CFR 718.2, with the farm's field maps.
    4. Sizing. Ground-mount output commensurate with historical use and any storage at no more than 120 percent of prior annual use.
    5. Digester supply and offtake. Herd size and manure collection, gas yield assumptions, and a signed gas or power offtake for a biogas project.
    6. No-grant base case. Coverage without the REAP grant, plus the bridge or construction financing that carries the project through its first year.
    7. Component origin and installer. A country-of-origin list for major components and an installer licensed in Idaho with three similar systems.
    8. Payback. Simple payback calculated as the rule defines it and shorter than useful life.

    Risks and mitigants in Idaho

    RiskIdaho signalMitigant in the study
    Grant shrinkageThree 2023 awards above today's $500,000 capNo-grant base case; loan sized to the 75% combined cap
    Grant timingPayment after 12 months of dataBridge facility and owner cash plan
    Cropland sitingIrrigated farmland in the Magic ValleyField maps and non-cropland siting
    Export valueUtility export terms (hub)Hourly self-consumption model
    Merchant risk12.9% national loss rate in power generation loansLoad-matched sizing, not export-led
    Herd change (biogas)Dairy concentration in the Magic Valley (hub)Manure supply agreement and herd sensitivity

    Process, documents and what gets an energy study sent back

    The sponsor provides 12 months of utility bills and interval data, installer proposals and specifications, the interconnection application, field and site maps, the herd and manure plan for a digester, the gas or power offtake, and statements from owners of 20 percent or more, each of whom guarantees at least their share of the guaranteed loan (5001.204). Studies come back when savings use a flat average rate, when the grant is counted as day-one equity, when the array sits on Cropland, or when the payback exceeds the equipment's life.

    Program example, honestly labelled

    The Idaho REAP awards in the table above are public program records from the hub's precedent file, made under the rule in force in 2023; none is presented as this firm's engagement. The Pennsylvania rooftop solar case study below is a national program example (outside Idaho) of a REAP solar study.

    Hiring a USDA renewable energy feasibility study consultant in Idaho

    When it is required. For a new business, often a newly formed energy entity, borrowing more than $1,000,000 under a REAP guarantee (5001.306(a)(3)(i)); otherwise at USDA's or the lender's request, which the REAP rule's sizing and payback tests make likely.

    What the engagement includes. The cost page lists the five Part 5001 components, projections with sensitivity tables, demand-driver and supply analysis, operator benchmarks, a management assessment, a PDF and Word report with the Excel workbook, kickoff and midpoint calls, one revision round, and revisions at no cost until USDA or the lender accepts. Engineering and interconnection studies are separate.

    What you provide. Utility bills and interval data, installer proposals, maps, herd and offtake documents, and owner statements.

    Timing and fee. The cost page lists REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks, and for guaranteed loans over $600,000 at $7,500 to $11,500 over five to seven weeks, including debt service coverage and utility-rate modelling. Most Idaho studies, by the hub's account, take four to eight weeks in all.

    How to start. Send the site, the system and a year of utility bills through the Get Your Free Consultation form below; the firm responds within 24 hours. A renewable energy feasibility study consultant can tell from the bills whether the project passes the sizing and payback tests, and an independent USDA feasibility study consultant has no tie to the installer whose proposal it tests.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a solar, biogas or renewable energy project in Idaho?

    For a REAP guaranteed loan above $1,000,000 to a new business, 7 CFR 5001.306(a)(3)(i) requires an independent study; dairies that put a digester or array into a new entity often meet that test. Otherwise USDA may require one. Separately, the REAP rule effective 16 October 2026 makes sizing to historical use and a payback shorter than useful life eligibility tests, which a study is the usual way to document.

    What does 7 CFR Part 5001 require the study to contain?

    An independent, qualified consultant acceptable to the Agency prepares it and USDA sets the scope; Appendix A frames the components, covered here as economic, market, technical, financial and management feasibility. For an Idaho dairy or farm, the market chapter is the site's own load and the utility's rates, and the technical chapter covers siting off Cropland, component origin, installer qualifications and, for a digester, manure supply and gas offtake.

    How is a solar, biogas or renewable energy project evaluated in a USDA feasibility study?

    The study models production hour by hour against the site's metered load, prices self-consumed energy at retail rates and exports at the utility's export terms, then subtracts operations, insurance and inverter replacement. Savings are set against debt service. In this page's example, a $1,200,000 REAP loan at 7.00% over 20 years needs $139,553.81 a year for 1.25x coverage, with a 14.33-year simple payback.

    How long does a USDA feasibility study take in Idaho?

    The site's cost page gives four to five weeks for REAP work under $600,000 and five to seven weeks for guaranteed loans above that; the Idaho hub's range is four to eight weeks. The pace is set by the data: 12 months of interval data and an interconnection response from the utility. Because the grant now needs a year of operating data, plan the study around the loan, not the grant window.

    How does the FY2026 85 percent guarantee affect solar, biogas or renewable energy projects under $5 million?

    The 85 percent FY2026 figure applies to B&I loans under $5 million, not to REAP. REAP guaranteed loans have their own FY2026 terms in 91 FR 11272: an 80 percent guarantee, a 1.0 percent upfront fee and a 0.25 percent annual retention fee. On $1,200,000 that is $960,000 guaranteed, $240,000 held by the lender and a $9,600 fee, and the grant plus loan cannot exceed 75 percent of project cost.

    Who prepares a solar, biogas or renewable energy feasibility study in Idaho?

    A consultant independent of the installer, the equipment supplier, the gas buyer and the lender, with energy and USDA experience, whom the Agency accepts as qualified. An installer's production estimate is an input to be tested, not a substitute, since the installer is paid if the project goes ahead. Technical engineering reports remain separate documents.

    What does a renewable energy feasibility study consultant cost in Idaho?

    On the cost page, REAP studies tied to loans under $600,000 cost $4,900 to $8,500, and those for guaranteed loans above $600,000 cost $7,500 to $11,500 because they add full projections, coverage analysis and utility-rate modelling. A dairy digester with a gas offtake can be more complex. Every fee is fixed in a written proposal before work starts.

    How long is an Idaho renewable energy study valid?

    Part 5001 sets no expiry; the cost page treats data inside about 18 months as current. An Idaho energy study can date faster if the utility changes its export terms, the dairy's herd or load changes, or component prices move. Because the REAP grant now follows 12 months of operation, the lender will usually want the study refreshed with actual production before the grant application.

    Can the same renewable energy study serve an SBA lender and USDA?

    Yes, if written to Part 5001. SBA rules permit a lender to call for a feasibility study (13 CFR 120.160(b)) and leave the content open. Idaho's two SBA loans in this code were $3.5 million and $3.6 million, generation-scale deals; a dairy's self-consumption array financed through REAP is a different credit, and the study should explain that difference to either lender.

    Can a Magic Valley dairy put a ground-mount array on its fields?

    Not on Cropland. The REAP rule effective 16 October 2026 makes ground-mount solar or wind on Cropland, as defined in 7 CFR 718.2, ineligible, and bars retrofits of such systems. Rooftops, corrals, lots, lagoon banks or other non-cropland can qualify, and ground-mount systems must still be sized to the dairy's historical energy use. The study should include field maps showing the array's footprint.

    What happens to a dairy digester like Skyline Biogas's under the new rule?

    The hub's 2023 record shows a $1,000,000 grant for the Burley digester. Under the rule effective 16 October 2026 the renewable grant cap is $500,000 and 25 percent of cost, paid after 12 months of data, so a similar project today would need more loan or owner capital up front. Whether an RNG digester that sells gas off-site meets the new sizing and use tests should be confirmed with the state office.

    Other project types in Idaho

    Hotels and Resorts · RV Parks and Campgrounds · Restaurants and Food Service · Event Venues and Agritourism · Laundromats and Laundry Services · Childcare and Early Learning · Back to all Idaho project types

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www.census.gov/programs-surveys/cbp.html
    2. U.S. Census Bureau, Vintage 2025 county population estimates: https://www.census.gov/programs-surveys/popest.html
    3. Office of Management and Budget, metropolitan statistical area delineation, July 2023 (Census delineation files): https://www.census.gov/geographies/reference-files/time-series/demo/metro-micro/delineation-files.html
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    8. USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026) (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    9. USAspending.gov, Assistance Listing 10.868 (REAP) grant obligations by state, FY2024 to FY2026: https://www.usaspending.gov/search
    10. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    11. Neighbouring-state data packs (Montana, Utah, Oregon, Washington), built from sources 1 to 4
    12. Idaho hub sources reused here (2023 REAP awards and recipients, dairy concentration, excluded cities, eligibility screen, reviewer tests): /idaho
    13. USDA Feasibility Study Consultants, cost and timeline page: /usda-feasibility-study-cost

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours