Dairy biogas and solar projects in Idaho serve the Magic Valley dairy and farm base, where REAP precedent is deep. An independent USDA feasibility study consultant builds self-consumption economics under the utility's export terms with a no-grant base case; the independent USDA feasibility study company scopes bridge financing under the revised REAP rule.
USAspending records 93 REAP grants to Idaho recipients in FY2024 to FY2026, worth $21,643,985, or $11.77 per resident, seventh among 53 states and territories and almost four times the national $3.11 (computed). That record was built under the old REAP terms. The rule effective 16 October 2026 caps renewable grants at $500,000 and 25 percent of cost, and pays them only after a year of operating data, so the next Idaho dairy project is underwritten on the loan, not the grant.
Program Fit
REAP grants and guaranteed loans under the revised rule (91 FR 62600): grants cover at most 25 percent of project cost, capped at $500,000 for renewable energy systems, and are paid only after 12 months of operation, so bridge or construction financing covers the full system cost.
| Route | Fit for an Idaho dairy, farm or rural business | Deciding condition |
|---|---|---|
| REAP guaranteed loan (7 CFR 5001) | Up-front cost of solar, digesters and efficiency projects | FY2026: 80% guarantee, 1.0% fee, 0.25% annual retention (91 FR 11272) |
| REAP grant | Reimbursement after 12 months of production data | At most 25% of cost; $500,000 renewable and $250,000 efficiency caps; grant plus guaranteed loan at most 75% of cost |
| SBA 7(a) | Larger generation projects | Idaho's two 7(a) loans in this code were $3.5 million and $3.6 million |
| Section 9003 (biorefinery) | Large renewable fuel plants | Outside this page's sources; see the linked guide |
Every guaranteed borrower and owner above 20 percent must clear 7 CFR 5001.127: no federal judgments, delinquent federal tax or debt, or debarment; no more than 15 percent of gross revenue from gambling; no prurient or illegal-product income.
Required by rule or requested by the lender
The independent study in 5001.306(a)(3)(i) is mandatory for guaranteed loans above $1,000,000 to a new business, and part 5001 governs REAP guaranteed loans. A dairy that forms a new entity to own its digester or array, a common structure, can trip the rule; an established dairy borrowing in its own name falls under the Agency's discretion in (a)(3)(ii). The REAP rule adds its own tests that a study must answer whatever the loan size: commensurate historical energy use for ground-mount systems and a simple payback no longer than the system's useful life.
The REAP rule effective 16 October 2026, applied to an Idaho project
| Rule | What it means in Idaho |
|---|---|
| Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible | Irrigated Magic Valley fields are out; arrays go on roofs, corrals, lots or non-cropland |
| 12 months of production and pre-installation data before applying | The grant comes a year or more after the loan funds construction |
| Grant plus guaranteed loan at most 75% of cost | A large loan shrinks the grant a dairy can receive |
| One application per fiscal year per highest-level owner and its affiliates | Multi-entity dairy groups choose one project a year |
| Site owned or leased 12 months before the Project Period | Leased digester sites need the lease in place early |
| Storage limited to 120% of prior annual use; ground-mount sized to historical use | Load data from the dairy's own meters |
| Components from a foreign adversary (15 CFR 791.4) ineligible | Country-of-origin list for panels and inverters |
| Installer licensed in Idaho with three similar installations | Contractor qualifications in the study |
What the Study Covers
Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.
- Market demand and competitive supply analysis
- Technical and site feasibility, including environmental considerations
- Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
- Management and operational capacity assessment
- Economic feasibility and rural community impact
For an energy project, "market demand" is the site's own load: interval meter data, the utility's retail and export rates, and for a digester the gas offtake contract and the manure supply from the herd.
Idaho Market Evidence
A single 2023 REAP round made 27 Idaho awards totaling $7,191,103, mostly dairy and farm solar in the Magic Valley, including $1,000,000 to Skyline Biogas in Burley for a dairy digester and $996,000 to Golden Valley Beef for 1,200 kW of solar. Eight Idaho cities exceeded 50,000 in the 2020 Census, and the excluded urban fringes around Boise, Idaho Falls, Pocatello, Coeur d'Alene and Twin Falls make eligibility parcel-specific at every metro edge; every Idaho study includes a dated, address-level USDA map determination.
Solar and renewable power generation in Idaho: market evidence
| Measure | Idaho | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 4 → 5 (+25.0%) | 405 → 942 |
| Per 100,000 residents (2023) | 0.3 | 0.3 |
| Average employees per establishment | 6.2 | 12.3 |
| Average annual pay per employee | $64,226 | $138,631 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 25.9% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Interpretation. This table counts businesses whose main activity is selling power: five in Idaho in 2023 with 31 employees between them, three of them in a single metropolitan county. It does not count the dairies, feedlots and farms that install solar or a digester to cut their own bills, which are the borrowers REAP is built for. Idaho's pay per employee, $64,226, is less than half the national $138,631, consistent with small operators rather than utility-scale developers. A reviewer will not look to this table for comparables; the evidence for an Idaho REAP project is the site's own meter data, the hub's list of funded dairy and farm systems, and the utility's rates.
Neighbouring states (computed)
REAP dollars are USAspending FY2024 to FY2026 grant obligations per resident (2020 Census population); the Census columns are each state's own pack figures.
| State | REAP grants per resident, FY2024-26 | Power generators 2019 → 2023 | Avg. pay | SBA 7(a) loans FY2020-26 (average) |
|---|---|---|---|---|
| Idaho (this page) | $11.77 | 4 → 5 | $64,226 | 1 ($3,607,000) |
| Oregon | $5.03 | 3 → 9 | $79,276 | 0 |
| Utah | $3.66 | 6 → 25 | $77,556 | 1 ($300,000) |
| Montana | $2.73 | 0 → 0 | 0 | |
| Washington | $2.09 | 0 → 4 | $210,478 | 2 ($1,852,500) |
| United States | $3.11 | 405 → 942 | $138,631 | 138 ($478,591) |
Idaho draws more than twice the REAP dollars per resident of any neighbour, and more than five times Washington's. The difference is the dairy and irrigated-farm base: REAP follows agricultural load, not power-plant counts. It also means Idaho's experience under the old rule is the largest in the region, and the rule change hits it hardest.
The 2023 Idaho awards under the new caps (computed)
Award amounts are from the Idaho hub's precedent file; the two right-hand columns apply the rule effective 16 October 2026.
| Recipient (2023) | Location | System | Award | Project cost needed for this grant at 25% | Above the new $500,000 cap by |
|---|---|---|---|---|---|
| Skyline Biogas LLC | Burley | Dairy digester | $1,000,000 | $4,000,000 | $500,000 |
| Golden Valley Beef LLC | Burley | 1,200 kW solar | $996,000 | $3,984,000 | $496,000 |
| Gehring Agri-Business | American Falls | 1 MW solar | $830,000 | $3,320,000 | $330,000 |
| Agriwest | Iona | 600 kW solar | $480,000 | $1,920,000 | $0 |
| B & H Farming | Rupert | 500 kW solar | $415,000 | $1,660,000 | $0 |
| Grace At Fruitland LLC | Fruitland | 125 kW solar | $95,388 | $381,552 | $0 |
Three of the six named awards could not be made today at their 2023 size. A project like Skyline's would now receive at most $500,000 and would need the balance from the loan and the owner, and the grant would arrive only after a year of operation. The 2023 round averaged $266,337 per award and the FY2024 to FY2026 grants averaged $232,731 (computed), so mid-sized farm arrays are least affected.
Rural footprint and B&I eligibility in Idaho
The pack places no renewable power generator in a non-metro county, but REAP projects sit where the farms are. For guaranteed loans under part 5001, the rural test is 7 CFR 5001.3: outside any city or town of more than 50,000 in the 2020 Census and outside the urbanized area contiguous and adjacent to it. Idaho's eight excluded cities include Twin Falls (51,807), Idaho Falls and Pocatello; the hub screens Burley, Rupert, Jerome, Gooding, Buhl and Blackfoot as eligible and flags Kimberly, Ammon and Chubbuck. Dairy sites outside towns are rarely close to the line, but a processor or business site on the edge of Twin Falls needs the map determination. Whether agricultural producers outside rural areas can use REAP is not covered by this page's sources and should be confirmed with the Boise state office.
Financing benchmarks: USDA REAP next to SBA
Idaho: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 1 | $3.5 million | 0 | $0 |
| FY2020 to FY2023 | 1 | $3.6 million | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $3.6 million. Idaho had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Nationally the charged-off solar-generation loans lost 6.04 percent of dollars lent (computed), the highest dollar-loss rate among the asset classes in this site's data packs (computed), and failures came early, about four years in. That record belongs to merchant power sellers; a dairy array that offsets its own retail bill carries a different risk, and the study should say so with the dairy's load data.
| REAP guaranteed loan term (FY2026) | Rule | Source |
|---|---|---|
| Guarantee | 80% | 91 FR 11272 |
| Upfront guarantee fee | 1.0% of the guaranteed amount | 91 FR 11272 |
| Annual retention fee | 0.25% of the guaranteed share of principal at 31 December | 91 FR 11272 |
| Guarantee issued before construction completion | additional 0.50% fee | 91 FR 11272 |
| Term | useful life, up to 40 years, no balloon | 7 CFR 5001.402 |
| Rate | negotiated; fixed, variable or both | 7 CFR 5001.401 |
| Equity at closing | existing 10%; new 20% balance-sheet equity or 25% of project cost | 7 CFR 5001.105(d) |
| Combined REAP funding | grant plus guaranteed loan at most 75% of project cost | 91 FR 62600 |
Worked example (illustrative)
Inputs: a $2,000,000 rooftop and corral solar project at a Magic Valley dairy, financed with a $1,200,000 REAP guaranteed loan at a fixed 7.00% over 20 years, FY2026 REAP fees, and the rule effective 16 October 2026.
| Item | Amount |
|---|---|
| Project cost (illustrative) | $2,000,000 |
| REAP guaranteed loan | $1,200,000 |
| Guaranteed amount (80%) | $960,000 |
| Unguaranteed amount held by the lender | $240,000 |
| Upfront guarantee fee (1.0%) | $9,600 |
| Balance after 12 monthly payments | $1,171,452.60 |
| First annual retention fee (0.25%) | $2,342.91 |
| Monthly payment | $9,303.59 |
| Annual debt service | $111,643.05 |
| Annual savings and income needed for 1.25x coverage | $139,553.81 |
| Annual debt service at 9.00% | $129,560.54 |
| Coverage at 9.00% on the same savings | 1.08x |
| Combined REAP cap (75% of cost) | $1,500,000 |
| Largest grant allowed with this loan | $300,000 |
| Owner cash before any grant | $800,000 |
| Loan ceiling if the full $500,000 grant is sought | $1,000,000 |
| Simple payback at the coverage-level savings | 14.33 years |
The grant cap and the combined cap interact. A $2,000,000 project could in principle earn a $500,000 grant, but with a $1,200,000 guaranteed loan the 75 percent ceiling leaves room for only $300,000, and that money arrives after a year of meter data. Until then the dairy carries $800,000 of its own cash. To keep the full $500,000 grant, the loan must fall to $1,000,000 and the owner's cash rises. The study's base case therefore assumes no grant: the array must produce $139,553.81 a year of bill savings and export credit for 1.25x coverage, and its 14.33-year simple payback must sit inside the equipment's useful life, which the rule makes an eligibility test.
What a lender-grade renewable energy feasibility study in Idaho must prove
- Load. Twelve months or more of interval data from the dairy's or business's own meters, by month and time of day.
- Self-consumption and export. Savings priced at the utility's actual retail and export terms, as the hub's reviewer test requires, not at a blended average rate.
- Siting. Proof the array is not on Cropland under 7 CFR 718.2, with the farm's field maps.
- Sizing. Ground-mount output commensurate with historical use and any storage at no more than 120 percent of prior annual use.
- Digester supply and offtake. Herd size and manure collection, gas yield assumptions, and a signed gas or power offtake for a biogas project.
- No-grant base case. Coverage without the REAP grant, plus the bridge or construction financing that carries the project through its first year.
- Component origin and installer. A country-of-origin list for major components and an installer licensed in Idaho with three similar systems.
- Payback. Simple payback calculated as the rule defines it and shorter than useful life.
Risks and mitigants in Idaho
| Risk | Idaho signal | Mitigant in the study |
|---|---|---|
| Grant shrinkage | Three 2023 awards above today's $500,000 cap | No-grant base case; loan sized to the 75% combined cap |
| Grant timing | Payment after 12 months of data | Bridge facility and owner cash plan |
| Cropland siting | Irrigated farmland in the Magic Valley | Field maps and non-cropland siting |
| Export value | Utility export terms (hub) | Hourly self-consumption model |
| Merchant risk | 12.9% national loss rate in power generation loans | Load-matched sizing, not export-led |
| Herd change (biogas) | Dairy concentration in the Magic Valley (hub) | Manure supply agreement and herd sensitivity |
Process, documents and what gets an energy study sent back
The sponsor provides 12 months of utility bills and interval data, installer proposals and specifications, the interconnection application, field and site maps, the herd and manure plan for a digester, the gas or power offtake, and statements from owners of 20 percent or more, each of whom guarantees at least their share of the guaranteed loan (5001.204). Studies come back when savings use a flat average rate, when the grant is counted as day-one equity, when the array sits on Cropland, or when the payback exceeds the equipment's life.
Program example, honestly labelled
The Idaho REAP awards in the table above are public program records from the hub's precedent file, made under the rule in force in 2023; none is presented as this firm's engagement. The Pennsylvania rooftop solar case study below is a national program example (outside Idaho) of a REAP solar study.
Hiring a USDA renewable energy feasibility study consultant in Idaho
When it is required. For a new business, often a newly formed energy entity, borrowing more than $1,000,000 under a REAP guarantee (5001.306(a)(3)(i)); otherwise at USDA's or the lender's request, which the REAP rule's sizing and payback tests make likely.
What the engagement includes. The cost page lists the five Part 5001 components, projections with sensitivity tables, demand-driver and supply analysis, operator benchmarks, a management assessment, a PDF and Word report with the Excel workbook, kickoff and midpoint calls, one revision round, and revisions at no cost until USDA or the lender accepts. Engineering and interconnection studies are separate.
What you provide. Utility bills and interval data, installer proposals, maps, herd and offtake documents, and owner statements.
Timing and fee. The cost page lists REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks, and for guaranteed loans over $600,000 at $7,500 to $11,500 over five to seven weeks, including debt service coverage and utility-rate modelling. Most Idaho studies, by the hub's account, take four to eight weeks in all.
How to start. Send the site, the system and a year of utility bills through the Get Your Free Consultation form below; the firm responds within 24 hours. A renewable energy feasibility study consultant can tell from the bills whether the project passes the sizing and payback tests, and an independent USDA feasibility study consultant has no tie to the installer whose proposal it tests.
Last updated 2026-11-08
USDA Feasibility, Inc.