USDA Feasibility Study for Marinas in Arkansas

    NAICS 713930

    Arkansas has 34 marinas with paid staff, 1.1 per 100,000 residents, exactly the national density, and two thirds of the ones Census can place sit in two rural lake counties: Baxter (9) and Cleburne (5). The sector is small and seasonal, and it has almost no lending record: four SBA 7(a) loans since FY2010 and none since FY2023. A USDA marina feasibility study in Arkansas therefore has to build its own evidence for slip demand, rates and the off-season, and show a lender how a business that earns most of its money in summer covers debt service in January.

    Marinas in Arkansas: market evidence

    Arkansas: marinas, supply and rural footprint

    MeasureArkansasUnited States
    Establishments, 2019 → 202331 → 34 (+9.7%)3,757 → 3,734
    Per 100,000 residents (2023)1.11.1
    Average employees per establishment6.28.7
    Average annual pay per employee$41,810$51,262
    Share of establishments in non-metro counties63.6% (14 in 2 counties)
    Share of state population in non-metro counties (2025)38.0%

    Non-metro counties with the most marinas (2023): Baxter County (9); Cleburne County (5).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Small operations, real growth. Arkansas gained three marinas (31 to 34) over four years as the U.S. count slipped 0.6 percent, and employment rose 26.5 percent, from 166 to 210. Most marinas are small: 20 of the 32 with a size class employ fewer than five people, and none employ 20 or more. Average pay rose 20.9 percent, from $34,584 to $41,810, still 81.6 percent of the national figure. Payroll per marina is $258,235, the scale of a manager, dock staff and seasonal help.

    Seasonality in the payroll data (computed). Census reports first-quarter payroll separately. For Arkansas marinas, January to March payroll was 18.9 percent of the year's total, against 25 percent if pay were even, and against 23.5 percent for Arkansas hotels and 25.8 percent for Arkansas manufacturing. Marinas cut staff in winter because revenue falls; a study should show the same pattern in revenue and size a reserve for it.

    What a reviewer will challenge. With so few operators, the reviewer has no public comparables for slip rates, occupancy or fuel and store sales. The study must gather them directly from the marinas on the same lake and others in the region, and show what happens in a low-water or short season.

    Regional comparison

    StateCount, 2023Change since 2019Per 100k residentsAvg employeesAvg payShare outside metro countiesSBA 7(a) loans, 2020-26Avg 7(a) loan, 2020-26
    Arkansas34+9.7%1.16.2$41,81063.6%2$1,728,600
    Missouri65+0.0%1.05.3$50,23378.8%3$3,050,333
    Oklahoma36-10.0%0.97.2$35,808100.0%1$2,020,000
    Tennessee103-8.0%1.46.7$46,98425.4%2$3,529,500
    United States3,7341.18.7$51,262112$1,281,853

    Computed from each state's own pack (Census County Business Patterns 2019 and 2023; SBA 7(a) FOIA data as of 30 Sep 2026); Missouri, Oklahoma and Tennessee figures are theirs.

    Arkansas is the only state of the four where marina numbers grew. Its neighbours share the rural, reservoir-based pattern (Missouri 78.8 percent and Oklahoma 100 percent outside metro counties among placed marinas), and their marinas are similarly small, so their pay and staffing ranges are fair benchmarks when labelled. Lending is thin everywhere: eight 7(a) loans across the four states in FY2020 to FY2026. Nationally, 5.2 percent of 155 seasoned 7(a) marina loans were charged off, on average 91 months after approval, a late pattern that suggests deferred dock maintenance and water-level years catching up with operators.

    Rural footprint and B&I eligibility in Arkansas

    Marinas are among the most rural Arkansas assets: 63.6 percent of placed marinas are outside metro areas against 38.0 percent of residents, or 1.2 per 100,000 non-metro residents against 0.4 in metro counties. Baxter County, with Mountain Home, Lakeview and Norfork, and Cleburne County, with Heber Springs, Greers Ferry and Fairfield Bay, hold 14 of the 22 placed marinas; Garland County, around Hot Springs, holds 5, and Benton County 3. Under 7 CFR 5001.3, which uses the 2020 census, only sites inside or contiguous to the urbanized areas of the nine cities above 50,000 are excluded; a Benton County lake site near Rogers or Bentonville needs an address check, while Baxter and Cleburne sites are far from any excluded city. Baxter falls under the hub's Harrison area office and Cleburne under Jonesboro; see the Arkansas hub.

    Part 5001.127 applies to the marina company and its controlling and 20-percent owners: unpaid federal court judgments, overdue federal taxes or loans and debarment each bar the loan, and so does earning more than 15 percent of gross revenue from gambling.

    Program fit

    B&I guarantees loans for a rural marina's docks, slips, buildings, fuel system, boat rental fleet, store and restaurant, and working capital. Many lake marinas operate on leased shoreline, so the lender will check that the lease or concession outlasts the loan term. SBA 7(a) has been used four times in Arkansas since FY2010 and 504 not at all. REAP can fund efficiency or solar at an operating marina, but under the October 2026 rule retail energy dispensing is excluded, so fuel docks and EV charging are outside it. Hotels or cabins attached to a marina are lodging and fit B&I; apartments do not (5001.118(a)).

    Financing benchmarks: USDA B&I next to SBA

    Arkansas: SBA lending to marinas

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20192$1.6 million0$0
    FY2020 to FY20232$3.5 million0$0
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $1.7 million. Arkansas had fewer than 30 seasoned 7(a) loans for marinas; nationally, 5.2% of 155 FY2010 to FY2016 loans were charged off, on average 91 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    B&I itemFiscal 2026Marina note
    Guarantee85% under $5 millionalmost all marina projects
    Fees3.0% upfront, 0.55% retentionon the guaranteed share
    Termuseful life, 40 years at most, no balloondocks and buildings differ in life
    Equity, new owner25% of cost or 20% balance sheeta buyer forming a new company is a new business
    Equity, operating marina10%5001.105(d)(1)
    Studyrequired above $1,000,000 for a new business5001.306(a)(3)(i)

    Fee and guarantee terms from 91 FR 11272; other rules from Part 5001.

    What it means for an Arkansas marina. Arkansas's only two marina 7(a) loans in FY2020 to FY2026 came to $1,728,600 apiece on average, above the national $1,281,853 and above the study threshold, so a new owner borrowing at that size needs an independent study for B&I. There is no Arkansas loss history at all (no seasoned loans in FY2010 to FY2016), so the lender will rely on the national 5.2 percent and on the study's downside cases.

    Worked example (illustrative)

    Loan A is $1,280,000, the national FY2020 to FY2026 marina 7(a) average ($1,281,853) rounded, used because Arkansas recorded only two such loans. Loan B is $1,730,000, the Arkansas two-loan average ($1,728,600) rounded. Both run 20 years at a hypothetical fixed 7.50 percent.

    Input or resultLoan ALoan B
    Loan amount$1,280,000.00$1,730,000.00
    Program and fee scheduleB&I, fiscal 2026B&I, fiscal 2026
    Guarantee percentage85%85%
    Guaranteed amount$1,088,000.00$1,470,500.00
    Upfront guarantee fee rate3.00%3.00%
    Upfront guarantee fee$32,640.00$44,115.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$38,080.00$51,467.50
    Annual retention fee rate0.55%0.55%
    First annual retention fee (on the guaranteed share of the balance after 12 payments)$5,849.77$7,906.33
    Interest rate (illustrative, fixed)7.50%7.50%
    Amortization in years (no balloon)2020
    Monthly payment$10,311.59$13,936.76
    Annual debt service (NOI for 1.00x)$123,739.11$167,241.15
    NOI for 1.25x coverage$154,673.89$209,051.43
    Quarterly debt service$30,934.78$41,810.29
    Coverage at that NOI if the rate is 2 points higher1.08x1.08x
    Coverage at that NOI if NOI falls 15%1.06x1.06x
    Equity, new business, 25% of total project cost (5001.105(d)(4))$426,666.67$576,666.67
    Total project cost on that basis$1,706,666.67$2,306,666.67
    Equity, new business, 20% balance sheet route if this loan is the only liability$320,000.00$432,500.00
    Equity, existing business, 10% of project cost (5001.105(d)(1))$142,222.22$192,222.22

    Computed in Python from the inputs shown; fee and guarantee rates from 91 FR 11272.

    Per-slip test. A marina with an illustrative 150 slips needs $1,031.16 of NOI per slip per year on Loan A, or $85.93 per slip per month, from slip rent, fuel, store, rentals and service combined; on Loan B the figure is $1,393.68 a year. The study sets that against surveyed slip rates and occupancy on the same lake.

    Off-season test. Loan A's quarterly debt service is $30,934.78. If the January to March quarter produces only 5 percent of annual NOI, consistent with the low winter payroll share above, it yields $7,733.69 and the $23,201.08 shortfall has to come out of cash banked in the boating season. Annual slip contracts paid in advance and winter storage fees narrow that gap, which is why the study models revenue by month (5001.202 asks for quarterly cash flow for seasonal borrowers).

    Building the evidence for a lake with few comparables

    • A slip survey of every marina on the lake and nearby lakes: slip count by size, covered or open, annual and transient rates, occupancy and waiting lists.
    • Boat registrations or launch counts in the market area, where available, and visitation trends at the lake.
    • Fuel, store, rental and service revenue from comparable operators, by month, gathered by interview.
    • Water-level history and its effect on operations, from the managing agency's records.
    • Lease or concession terms, rent and renewal rights for the shoreline.
    • Dock condition and replacement costs from a marine contractor's inspection.

    What a lender-grade marina feasibility study in Arkansas must prove

    1. Slip demand and rates from named marinas, with occupancy and waiting lists.
    2. Revenue by month and source, and a reserve sized to the winter quarter.
    3. A low-water or short-season case.
    4. Lease or concession terms that outlast the loan, and the lender's position on leasehold collateral.
    5. Dock, fuel system and building condition, with a capital replacement schedule.
    6. Environmental and fuel system compliance.
    7. Staffing at current Arkansas pay ($41,810, up 20.9 percent) with seasonal hires.
    8. Parcel eligibility under 5001.3 for any site near Northwest Arkansas or Hot Springs.

    Risks and mitigants in Arkansas

    Water levels are the defining risk: drought or flood can close ramps and docks for weeks. Mitigants are floating docks, diversified revenue and a reserve. Storms damage docks and boats, so insurance must be priced on current quotes. Fuel price swings affect margin. A leasehold on public shoreline limits collateral value, so equity and guarantees matter more. Demand depends on regional households and visitors, and the hub's tourism data show flat 2025 spending, so the study should not assume visitor growth.

    Documents and the review path

    For a marina, the applicant compiles the lease or concession, slip rent roll, monthly revenue history, dock inspection, capital plan, fuel system records and permits, insurance quotes, with company and personal financial statements, all of which the lender forwards to Little Rock with the B&I request. Marina studies are returned when they annualise summer revenue, ignore the lease term, assume full slip occupancy, or skip water-level history.

    Program example

    No USDA-guaranteed Arkansas marina appears in the inputs. The closest case on the hub is lake hospitality: the 2022 B&I guarantee of $8,080,000 that let Anchor Ventures LLC buy the Beaver Lakefront Resort near Eureka Springs. A resort is not a marina, and the record is USDA's, not a study this firm prepared, but it shows Rural Development lending against Arkansas lake tourism.

    Hiring a USDA marina feasibility study consultant in Arkansas

    A new marina company with a B&I loan over $1,000,000 must commission an independent study the Agency accepts (5001.306(a)(3)(i)); both example loans qualify. For an operating marina rebuilding docks on a smaller loan, USDA decides whether to ask, though the absence of Arkansas marina loss history makes a study likely.

    The site's cost page treats limited comparable data as a mark of a complex B&I study, $10,500 to $14,500 with up to nine weeks for delivery; a marina with good operating history and nearby comparables may be standard, $6,900 to $12,500 over six to seven weeks. The fee is fixed and covers market and slip analysis, monthly projections with sensitivity tables, technical and management sections and the acceptance guarantee; dock engineering and environmental reviews are separate engagements. A marina feasibility study consultant should ask first for the lease and the slip rent roll. To see how a USDA feasibility study consultant handles seasonal assets, visit the homepage.

    Proposals for marina studies start on the contact page: name the lake, slips, lease terms, budget and lender.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does an Arkansas marina need a USDA feasibility study?

    Yes, once a newly organised marina company's B&I loan goes over $1,000,000. Arkansas's two recent marina 7(a) loans averaged $1,728,600, so a buyer at that size crosses the line. An operating marina borrowing less for dock repairs falls under Agency discretion, and lenders with no Arkansas marina loans to compare often ask for one anyway.

    What does a marina feasibility study consultant cost in Arkansas?

    On the cost page, $10,500 to $14,500 for complex B&I studies, the band where thin comparables usually place a marina, or $6,900 to $12,500 if the marina has strong history and nearby comparables. The fee is fixed before signing. USDA's upfront guarantee fee on the $1,280,000 example loan is $32,640.00.

    How long does a marina study take?

    Seven to nine weeks for complex scope and six to seven for standard, per the cost page, or three to four on a rush at extra cost. Surveying slip rates, occupancy and waiting lists at other marinas by phone, and obtaining water-level records and the lease or concession documents, usually decide the schedule, so start gathering them early.

    Who can prepare a marina study for USDA?

    A consultant with marina or outdoor recreation experience who has no stake in the marina, the seller, the dock builder or the lender, acceptable to the Agency; USDA does not certify consultants. A marine contractor's dock inspection and the seller's slip rent roll are inputs that the independent study tests, interprets and builds into the projections.

    How long does a marina feasibility study stay valid?

    Nothing in Part 5001 dates a study. The cost page's rule of thumb is data no more than 18 months old for USDA, and a marina appraisal used at closing must be under twelve months old (5001.203). A drought or flood year, or a change in lease terms, makes an older study unreliable sooner, so update it after any such event.

    Can one marina study serve SBA and USDA lenders?

    It can, once both lenders appear as users and both loans are modelled. Arkansas marinas have used SBA 7(a) four times since FY2010 and 504 never, so sponsors usually weigh 7(a) against B&I. USDA's version also covers the parcel's rural status, the 5001.105(d) equity test and, above all, the lease term, because a leasehold must outlast the loan.

    How seasonal are Arkansas marinas?

    Census payroll shows it: Arkansas marinas paid 18.9 percent of their annual payroll in January to March, below the 25 percent an even year would give and below hotels (23.5 percent) and manufacturing (25.8 percent). Revenue is more seasonal than payroll, so the study models months, not years, and sizes a reserve for winter.

    Where are Arkansas's marinas?

    Census places 22 of the 34: Baxter County 9, Cleburne County 5, Garland County 5 and Benton County 3. Baxter and Cleburne are non-metro lake counties, which gives the sector its 63.6 percent rural share. The other 12 marinas sit in counties with fewer than three, which Census does not publish, so a study builds its own competitor list.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files (NAICS 713930; first-quarter payroll): https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. REAP final rule, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USDA RD New and Better Markets chart, 24 May 2022 (via the Arkansas hub): https://www.rd.usda.gov/sites/default/files/05.24.2022-New-And-Better-Markets-Chart.pdf
    10. Packs for Missouri, Oklahoma and Tennessee (same Census and SBA sources, each state's own figures)
    11. Site pages: /marina-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours