USDA Feasibility Study Consultant in Colorado
Independent USDA feasibility study consultant for Business & Industry, SPUR, REAP and Community Facilities projects across rural Colorado, prepared to 7 CFR Part 5001 standards for lenders and for review by USDA Rural Development's Colorado state office in Denver.
Data as of October 2026.
On this page
When a Colorado Project Needs a USDA Feasibility Study
Under the OneRD guaranteed loan rule, an independent feasibility study is mandatory for Business & Industry guarantees above $1,000,000 to a new business. Section 5001.306(a)(3)(i) requires a study "prepared by an independent qualified consultant acceptable to the Agency," with its scope set by the Agency according to the complexity of the project and the borrower.
For loans of $1,000,000 or less, and for existing businesses, the study is discretionary. USDA may require one when the lender's analysis does not establish technical feasibility or economic viability, or when the project will significantly affect an existing borrower's operations and historic cash flow (§5001.306(a)(3)(ii)). Across OneRD programs, §5001.303(c)(4) allows the Agency to require an independent study whenever it cannot determine a basis for repayment from the five feasibility components: economic, market, technical, financial and management feasibility.
Community Facilities runs on a parallel standard. Every CF guarantee requires a financial feasibility report "prepared by a qualified firm or individual acceptable to the Agency," and an independent study is required above $1,000,000 to a new entity or an entity conducting a new activity (§5001.304). Projections for assisted living, skilled nursing and similar residential facilities must be based on no more than 90 percent occupancy.
| Situation | Study status | Rule |
|---|---|---|
| B&I guarantee above $1M to a new business | Required | 7 CFR 5001.306(a)(3)(i) |
| B&I guarantee of $1M or less, or an existing business | At Agency discretion | 7 CFR 5001.306(a)(3)(ii) |
| Any OneRD program where the basis for repayment is unclear | At Agency discretion | 7 CFR 5001.303(c)(4) |
| Community Facilities guarantee, any size | Financial feasibility report required | 7 CFR 5001.304 |
| Community Facilities guarantee above $1M to a new entity or new activity | Independent feasibility study required | 7 CFR 5001.304(a)(4)(i) |
In Colorado, studies are reviewed by USDA Rural Development's state office at the Denver Federal Center as part of the Conditional Commitment process.
What USDA Means by an Independent Feasibility Study Consultant
Part 5001 defines the role directly. A qualified consultant is "an independent third-party person possessing the knowledge, expertise, and experience to perform the specific task required," and a feasibility study is a report "conducted by an independent qualified consultant(s) evaluating the economic, market, technical, financial, and management feasibility of the proposed project" (7 CFR 5001.3). For B&I guarantees, the consultant must also be "acceptable to the Agency" (§5001.306(a)(3)(i)). In practice, that sets three tests for a Colorado project:
Independence
No ownership or financial interest in the borrower, the project or the loan.
Qualification
Demonstrated experience with the asset class, with Colorado's snow-year, water-rights and resort-labor conditions, and with USDA Rural Development review.
Acceptability
The Agency, not the borrower, decides whether the consultant and the study scope are sufficient. Engaging the consultant before the lender submits the application avoids scope rework during Conditional Commitment review.
For Community Facilities financial feasibility studies issued with an examination opinion, §5001.304(b) requires preparation under AICPA attestation standards and professional liability insurance. USDA does not publish a list of approved feasibility study consultants. The Colorado state office assesses acceptability application by application.
Colorado's USDA Record: Mid-Tier B&I, Deep REAP, Active CF
Colorado does not appear among the ten largest B&I states for 2015–2024 in the national assessment commissioned by the National Rural Lenders Association. Its documented USDA record is broad, though. A $6.5 million B&I guarantee refinanced a hotel in Alamosa and a $3.0 million guarantee funded working capital for a gold mine in Gunnison and Saguache counties, both in FY2022. In September 2026, USDA broke ground on nearly $24 million of Community Facilities direct and guaranteed financing for the Wray Community District Hospital. Colorado REAP grants totaled $18.83 million in 2023 alone, across dairies, manufacturers, a bank and an electric cooperative. Those REAP precedents were awarded under rules that ended in October 2026, so they no longer predict future awards. Nationally, accommodation and food services took 32.06 percent of FY2024 B&I obligations, which makes Colorado's lodging sector the natural B&I fit.
Colorado's 2025–26 Snow Shock Is the New Underwriting Benchmark
Colorado resort demand fell further in 2025–26 than in any season in 35 years. Skier visits dropped 23.9 percent to 10.5 million, resorts averaged 129 days open against a 20-year average of 144, and every month's snowfall was below its 20-year average. Summer park demand is capped by reservations rather than open-ended: Rocky Mountain National Park requires timed entry from May 22 to mid-October, from 5 a.m. to 6 p.m. on the Bear Lake Road corridor. Every Colorado resort study we prepare runs a downside case built on the 2025–26 season, and shows how timed entry pushes park demand into overnight stays.
| Season | Visits | Change |
|---|---|---|
| 2022–23 | 14.8M (record) | — |
| 2023–24 | 14.0M | −5.4% |
| 2024–25 | 13.8M | −1.4% |
| 2025–26 | 10.5M | −23.9% |
Source: Colorado Ski Country USA (changes calculated).
| Unit | Visits | Gateway |
|---|---|---|
| Rocky Mountain NP | 4,171,431 | Estes Park, Grand Lake |
| Curecanti NRA | 807,117 (−17%) | Gunnison, Montrose |
| Mesa Verde NP | 463,130 (−3.5%) | Cortez |
| Great Sand Dunes NP | 432,498 | Alamosa |
| Black Canyon of the Gunnison NP | 250,086 | Montrose |
Source: NPS, as reported by the Denver Gazette and Axios (March 2026).
Where B&I Financing Can Go in Colorado
B&I eligibility excludes any city or town above 50,000 population, measured by the latest decennial census, together with its contiguous and adjacent urbanized area (7 CFR 5001.3). Twenty Colorado places exceeded 50,000 in 2020. Together they held 3,338,930 of the state's 5,773,714 residents, or 57.8 percent, so at most about 42 percent of Coloradans live in B&I-eligible territory (calculated). The real share is lower once residents of contiguous urbanized areas are removed.
Excluded places (2020 Census): Denver, Colorado Springs, Aurora, Fort Collins, Lakewood, Thornton, Arvada, Westminster, Pueblo, Greeley, Centennial, Boulder, Highlands Ranch, Longmont, Loveland, Broomfield, Castle Rock, Grand Junction, Commerce City and Parker.
Eligibility Screen for Buyer-Intent Markets
The verdicts below are a desk screen under the 5001.3 rule, not USDA map determinations. Every study confirms eligibility at the address level.
| Market | Screen | Reason |
|---|---|---|
| Vail, Avon, Edwards, Eagle, Breckenridge, Frisco, Silverthorne, Aspen, Snowmass Village, Basalt, Carbondale, Glenwood Springs, Steamboat Springs, Telluride, Crested Butte, Gunnison, Salida, Buena Vista, Durango, Pagosa Springs, Estes Park, Winter Park, Granby, Montrose, Ouray | Screens eligible | Far below 50,000 and isolated from excluded urbanized areas |
| Cañon City, Trinidad, Alamosa, Sterling, Fort Morgan, La Junta, Cortez, Craig, Rifle | Screens eligible | Far below 50,000 and not contiguous to excluded places |
| Woodland Park, Elizabeth, Bailey, Idaho Springs, Conifer | Screens eligible | Mountain or exurban, separated from the Denver and Colorado Springs cores |
| Fruita, Palisade | Split risk | Adjacent to Grand Junction |
| Monument, Evergreen | Split risk | Edges of the Colorado Springs and Denver urbanized areas |
| Firestone, Frederick, Johnstown, Windsor, Wellington | Split risk | Between Longmont, Fort Collins, Loveland and Greeley |
| Erie | Likely ineligible | Contiguous to the Boulder–Broomfield urbanized area |
Cannabis, Hemp and USDA Eligibility in Colorado
Colorado legalized cannabis, but federal law still governs USDA lending. Under 7 CFR 5001.127(d), an entity is ineligible if it derives income from any product or activity that is illegal under federal statute, and a borrower that leases space to a marijuana dispensary is not eligible. USDA Rural Development's Administrative Notice 4857 applies the same principle to REAP: a landlord leasing space to a marijuana business "would be receiving rental proceeds from the tenant's marijuana operation" and is not allowed. Hemp with no more than 0.3 percent delta-9 THC is a lawful agricultural commodity under the 2018 Farm Bill, and USDA agencies treat it as program-eligible. Projects that process intoxicating hemp-derived products need a current legal review before a lender relies on them. Every Colorado study we prepare screens the rent roll and any power-purchase agreements for cannabis income.
2026–2027 Program Terms Monitor
As of late October 2026, USDA has not published a FY2027 OneRD guarantee fee notice. A continuing resolution (P.L. 119-103) funds USDA at FY2026 levels through December 11, 2026. The President's FY2027 budget proposes terminating B&I, while the House-passed bill (H.R. 8646, 213–210 on June 4, 2026) raises B&I loan authority to $2.0 billion with $38.6 million in subsidy. The Senate had not acted at publication. B&I credits are underwritten on the current schedule: an 85 percent guarantee under $5 million and 80 percent at $5 million or more, a 3 percent upfront fee and a 0.55 percent annual retention fee. Given the funding uncertainty, applications should aim for obligation early in the fiscal year.
| Program | Guarantee | Upfront fee | Retention fee | Notes |
|---|---|---|---|---|
| B&I, under $5M | 85% | 3.0% | 0.55% | Maximum $25M per borrower |
| B&I, $5M to $25M | 80% | 3.0% | 0.55% | — |
| B&I, reduced-fee tier | 80% | 1.0% | 0.50% | Subject to annual cap |
| SPUR (meat, poultry, seafood processing) | 90% | 3.0% | 0.55% | Lender holds at least 10%; no rural-area restriction |
| Pre-completion loan note guarantee | — | +0.50% | — | All programs |
SPUR for Colorado Processors
Federal Register Doc. 2026-21858, published October 27, 2026, makes at least $5 billion in loan level available for facilities that establish, reopen, retrofit, expand or improve meat, poultry or seafood processing "in America's rural or urban areas, as there are no geographic restrictions." The guarantee is 90 percent, at a 3 percent fee and 0.55 percent retention, with the lender holding at least 10 percent. USDA announced a maximum of $175 million per borrower. Packing and processing plants in Weld and Morgan counties qualify even inside excluded cities such as Greeley.
REAP After the October 2026 Rule
Under USDA's revised REAP rule (91 FR 62600), effective October 16, 2026, REAP becomes a post-completion, performance-validated program. Applicants submit 12 months of actual production or savings data with 12 months of pre-installation data, through a single national competition. Grants are capped at 25 percent of project cost, with maximums of $500,000 for renewable energy systems and $250,000 for efficiency improvements. A REAP guaranteed loan may still be paired with the grant.
Outdated Claims to Ignore
Several web sources still describe REAP grants as covering up to 50 percent of project cost, and B&I guarantees as 60 to 80 percent. Under current rules, REAP grants are capped at 25 percent and B&I guarantees are 85 percent under $5 million and 80 percent above. SPUR guarantees 90 percent.
Capital Stacking in Colorado
| Program | Terms | Status |
|---|---|---|
| Rural Jump-Start | Operating grants of $15,000 ($25,000 in coal-transition communities); new businesses receive relief from state income, sales and use, and business personal property taxes; qualified new hires receive state income-tax relief | Active in 31 zones |
| Advanced Industry Investment Tax Credit | 25% of qualified investment, or 35% in an Enterprise Zone or rural county; $100,000 maximum credit; $10,000 minimum investment | Active; 54 of 64 counties qualify as rural |
Rural Jump-Start Zones
Active zones: Alamosa, Archuleta, Clear Creek, Conejos, Costilla, Delta, Dolores, Fremont, Garfield, Huerfano, Kiowa, Kit Carson, Lake, Las Animas, Lincoln, Logan, Mesa, Moffat, Montezuma, Montrose, Morgan, Otero, Phillips, Prowers, Pueblo, Rio Blanco, Rio Grande, Routt, San Juan, Sedgwick and Yuma. Moffat, Montrose, Morgan, Pueblo, Rio Blanco and Routt carry Tier 1 Just Transition status. Published lists differ for Clear Creek, Routt and La Plata, so each study confirms zone status with OEDIT.
Ten counties carry none of Colorado's rural designations: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer and Weld.
Reduced-Fee Eligibility (7 CFR 5001.454(d))
A lender may request the reduced fee when the project meets any one of these criteria, subject to USDA's annual cap on reduced-fee authority:
- It is located in a rural community that is distressed under the Economic Innovation Group index, has experienced long-term population decline across three decennial censuses, is in a persistent poverty county, is in a presidentially declared disaster area declared within the prior 24 months, has unemployment at or above 125 percent of the national rate, or is on tribal lands.
- It processes, distributes, aggregates, stores or markets locally or regionally produced agricultural food products and promotes access to healthy foods.
- It is locally owned and managed, and either supports value-added agriculture or produces a natural-resource value-added product.
- It is part of a multi-jurisdictional strategic plan under Section 6401 of the 2018 Farm Bill.
- It provides an additional market for existing local businesses.
Each study confirms the designation against the current USDA ERS persistent poverty edition.
Colorado USDA Feasibility Study Consultant by Project Type
Each module sets out the Colorado-specific evidence a lender or USDA reviewer will expect, and the test the study must pass.
Hotel and Mountain Lodging Feasibility Study Consultant in Colorado (USDA B&I)
Colorado lodging is a two-season business whose winter half just had its worst year in 35 years, so resort studies must prove debt service in a weak-snow season.
- Skier visits fell 23.9 percent to 10.5 million in 2025–26, with resorts open 129 days on average against a 20-year average of 144.Colorado Ski Country USA
- Rocky Mountain National Park drew 4,171,431 visits in 2025 under a timed-entry system that limits day-trip growth.NPS
- USDA guaranteed $6,530,812 to refinance a hotel in Alamosa, gateway to Great Sand Dunes (FY2022).USDA RD
What the reviewer will test
A downside case built on 2025–26; the summer and winter revenue split; evidence that park capacity limits shift demand into overnight stays; local lodging-tax trends; short-term rental supply and local caps; and address-level eligibility.
RV Park and Campground Feasibility Study Consultant in Colorado
Colorado camping demand follows the parks and lakes, and fire seasons set the downside.
- Curecanti National Recreation Area, home to Blue Mesa Reservoir camping, recorded 807,117 visits in 2025, down 17 percent, a decline reported as partly tied to fire impacts.NPS
What the reviewer will test
Occupancy by month; fire-ban and closure history; water and wastewater capacity; a comparison set that includes federal campgrounds; and seasonal road closures such as Trail Ridge Road.
Meat and Food Processing Feasibility Study Consultant in Colorado
SPUR gives Colorado protein processors the strongest USDA terms of any asset class, inside or outside excluded cities.
- SPUR guarantees 90 percent of loans for meat, poultry and seafood processing, up to $175 million per borrower, with a possible two-year deferral and no geographic restriction.FR Doc. 2026-21858; USDA
- Miraflora Wagyu in Boulder County shared a $280,470 Value-Added Producer Grant award with two other Colorado producers.USDA RD
- Bella Holsteins in Platteville, a Weld County dairy, received a $1,000,000 REAP grant for a 1,260 kW solar array.USDA RD, 2024
What the reviewer will test
Livestock supply-shed analysis; kill-floor utilization ramp; FSIS inspection pathway; offtake or co-pack contracts; wastewater permits; and water rights.
Solar and REAP Feasibility Study Consultant in Colorado
Colorado has one of the deepest REAP records in the West, but the 2026 rule pays grants only after projects run for a year.
- Colorado REAP awards totaled $18.83 million in 2023.Sen. Hickenlooper release
- Highline Electric Association in Holyoke received $1,000,000 for a 1 MW single-axis tracking solar array producing 2,358,034 kWh a year.USDA RD, 2024
- Under the revised rule, ground-mount solar on cropland is excluded and each owner may receive one award per fiscal year.91 FR 62600
What the reviewer will test
Self-consumption economics under the utility tariff; a no-grant base case; and construction or bridge financing for the full system cost.
Rural Hospital and Clinic Feasibility Study Consultant in Colorado
Community Facilities lending is active in rural Colorado health care, with Wray as the current showcase.
- USDA provided nearly $24 million in Community Facilities direct and guaranteed financing for a roughly 13,500-square-foot expansion of the Wray Community District Hospital for surgery, imaging and women's care.USDA RD, September 2, 2026
What the reviewer will test
Service-area need and payer mix; grant funds kept out of debt service; provider recruitment; and Community Facilities scoring for communities under 20,000.
Mining and Manufacturing Feasibility Study Consultant in Colorado
USDA has guaranteed Colorado mining working capital and funded rural manufacturers' energy upgrades.
- Fossil Creek Mines received a $3,000,000 B&I guarantee for gold-mining working capital in Gunnison and Saguache counties (FY2022).USDA RD
- Estes Industries in Penrose received a $520,000 REAP grant for a 480.15 kW solar array.USDA RD
What the reviewer will test
Commodity price stress; customer concentration; permits; and site eligibility for Front Range locations.
Workforce Housing Feasibility Study Consultant in Colorado
Staff housing limits how many rooms and covers Colorado resorts can operate, so it belongs in every resort study.
- BHV Adventures, a tiny-home manufacturer in Arriba, became the first Rural Jump-Start participant in Lincoln County in January 2026, with a $15,000 grant.Colorado Governor's Office
What the reviewer will test
Employer master leases or anchor demand; absorption in thin markets; and B&I limits on residential uses.
Restaurant Feasibility Study Consultant in Colorado
Colorado restaurant pro formas carry a rising statutory wage floor and resort seasonality.
- Colorado's 2026 minimum wage is $15.16 ($12.14 tipped), rising to $15.71 on January 1, 2027; Denver's is $19.29.Colorado Department of Labor and Employment, as reported
What the reviewer will test
The 2027 wage step; seasonal revenue; and staff housing.
Car Wash Feasibility Study Consultant in Colorado
Under Colorado's prior-appropriation water law, new commercial water use is a title-like diligence item.
What the reviewer will test
Tap fees and a water-court or augmentation opinion; reclaim-system specifications; competitor tunnels; and address-level eligibility on the I-25 corridor.
Gas Station and Truck Stop Feasibility Study Consultant in Colorado
Colorado corridor stops depend on mountain-highway access, and EV charging no longer qualifies for REAP.
What the reviewer will test
Site-specific CDOT traffic counts and a capture-rate model; I-70 closure exposure; Phase I environmental review; and EV charging excluded from any REAP request.
Cold Storage Feasibility Study Consultant in Colorado
Cold storage upgrades in Colorado's producing counties now sequence around the post-completion REAP rule.
- HoneyRock LLC in Delta County received a $72,104 REAP grant for a cold-storage upgrade.USDA RD
What the reviewer will test
Throughput contracts; energy cost; and the post-completion REAP sequence.
Brewery, Winery and Distillery Feasibility Study Consultant in Colorado
Colorado's craft beverage businesses depend on the same visitor flows that weakened in 2025–26.
What the reviewer will test
Taproom versus distribution revenue split; closure rates among comparable producers; water rights; and tourism sensitivity.
Assisted Living Feasibility Study Consultant in Colorado
Colorado assisted living projects financed through Community Facilities face a hard occupancy ceiling in underwriting.
- Community Facilities projections for assisted living must be based on no more than 90 percent occupancy.7 CFR 5001.304
What the reviewer will test
Licensed-bed penetration among residents aged 75+ by county; Medicaid share; staffing in resort labor markets; and the 2027 wage step.
Self-Storage Feasibility Study Consultant in Colorado
Colorado storage demand follows growth in the eligible gaps between Front Range metros.
What the reviewer will test
Supply pipeline and square feet per capita against eligible-area population; and eligibility for I-25 edge towns, where oversupply and ineligibility risks overlap.
Colorado USDA Precedent File
| Program | Recipient | Location | Year | Amount | Purpose |
|---|---|---|---|---|---|
| CF direct and guaranteed | Wray Community District Hospital | Wray | 2026 | Nearly $24M | Hospital expansion |
| B&I | Diamond Hospitality LLC | Alamosa | FY2022 | $6,530,812 | Hotel refinancing |
| B&I | Fossil Creek Mines LLC | Gunnison and Saguache counties | FY2022 | $3,000,000 | Mining working capital |
| B&I | Huberd Services Company LLC | Bennett | FY2022 | $216,000 | Real property purchase |
| REAP | Highline Electric Association | Holyoke | 2024 | $1,000,000 | 1 MW solar |
| REAP | Bella Holsteins LLC | Platteville | 2024 | $1,000,000 | Dairy solar |
| REAP | Estes Industries LLC | Penrose | 2024 | $520,000 | Manufacturing solar |
| REAP | Gilcrest II LLC | Weld County | — | $250,000 | 2 MW solar |
| REAP | HoneyRock LLC | Delta | 2024 | $72,104 | Cold-storage upgrade |
| REAP | First Southwest Bank | Alamosa | — | $25,558 | Solar |
| REAP | Good Vibes River Gear | Craig | 2024 | $20,000 | Solar |
| VAPG | Miraflora Wagyu and two other producers | Boulder and Larimer counties | — | $280,470 | Value-added agriculture |
| Grants and microloan | Grand Junction Business Incubator Center | Grand Junction | 2026 | $692,075 | Business support |
| RBDG | Northwest Colorado Innovation Center | Moffat, Routt, Rio Blanco | — | $99,500 | Microloan fund |
Source: USDA Rural Development releases and charts; Kiowa County Press; Sen. Hickenlooper release; Grand Junction Daily Sentinel.
USDA Rural Development in Colorado
USDA Rural Development's Colorado State Office is at the Denver Federal Center, Building 56, Room E-2300, PO Box 25426, Denver, CO 80225 ((720) 544-2903). State Director Sallie Clark was appointed in May 2025, having also served in the role previously. Susan Beckman was named Deputy State Director in August 2026, and Robert McElroy directs Rural Business and Cooperative Services.
Lender Landscape
In May 2026, USDA revoked or declined to renew OneRD approved-lender status for ten lenders holding about 47 percent of Rural Development's delinquent loans; revoked lenders cannot obtain new guarantees. Every Colorado study we prepare records the originating lender's OneRD standing as of the study date.
How Our Colorado USDA Feasibility Study Consultants Scope a Study
Every Colorado engagement is built around the tests the Denver state office and lender credit committees apply.
Eligibility at the address level
Dated determinations, with priority on I-25 corridor and Grand Junction edge towns.
Snow-year downside case
Debt service tested against the 2025–26 season, with summer demand shown separately.
Cannabis and hemp screens
Rent-roll, power-purchase and business-activity review under 5001.127(d) and AN 4857.
Water rights and augmentation
Prior-appropriation diligence for any new commercial water use.
Stacking
Rural Jump-Start, the Advanced Industry credit and reduced-fee criteria.
Program fit
B&I vs. SPUR, REAP under the new rule, and the originating lender's OneRD standing.
Colorado USDA feasibility studies by project type
Related Case Studies
Lake Texoma RV Resort Expansion: USDA B&I Feasibility Case Study
Great Lakes Marina with Lodging, Ludington, Michigan: USDA B&I Feasibility Case Study
Colorado USDA Feasibility Study FAQ
Does USDA approve feasibility study consultants in Colorado?
USDA does not maintain a public list of approved consultants. Part 5001 defines a qualified consultant as an independent third-party person with the knowledge, expertise and experience to perform the task, and for B&I the consultant must be acceptable to the Agency. The Colorado state office makes that determination for each application.
Can the borrower, developer or lender prepare the feasibility study instead of a consultant?
Not when USDA requires an independent study for B&I. The rule calls for an independent, qualified third party with no financial interest in the borrower, the project or the loan. For Community Facilities, a lender may prepare a financial feasibility analysis in some cases, but a CF guarantee above $1 million to a new entity or activity requires an independent qualified consultant.
How do I choose a USDA feasibility study consultant for a Colorado project?
Look for independence, experience with your asset class, and command of Colorado-specific evidence: decennial-census eligibility on the Front Range; the 2025–26 snow-year downside; cannabis and hemp; water rights; Rural Jump-Start stacking; and SPUR for processors. The study should address all five Part 5001 components (economic, market, technical, financial and management feasibility) in the form the state office reviews.
Does USDA require a feasibility study for a B&I loan in Colorado?
Yes, for B&I guarantees above $1,000,000 to a new business. For smaller loans and existing businesses, USDA may require one when the lender's analysis does not establish technical feasibility or economic viability, or when the project significantly affects an existing borrower's operations.
Are Colorado ski towns such as Breckenridge, Vail or Estes Park eligible for B&I?
Colorado's resort towns are far below 50,000 and separated from the excluded Front Range urbanized areas, so they screen as eligible. USDA's map controls, so every study includes a dated, address-level determination.
How should a Colorado resort study handle a bad snow year?
The 2025–26 season is now the benchmark: skier visits fell 23.9 percent to 10.5 million and resorts averaged 129 days open. Lenders should see debt service tested against that season, with summer demand shown separately.
Can a Colorado property with a cannabis tenant use a USDA guarantee?
No. Under 7 CFR 5001.127(d) and USDA's REAP guidance, a borrower receiving rental or power-purchase income from a marijuana business is ineligible. Hemp under 0.3 percent delta-9 THC is a lawful agricultural commodity.
Can a Weld or Morgan County meat processor use SPUR?
Yes. SPUR guarantees 90 percent of loans for meat, poultry and seafood processing up to $175 million per borrower, with no geographic restriction, so plants inside excluded cities such as Greeley qualify.
Can Rural Jump-Start benefits be combined with a USDA loan?
Yes. Businesses in Colorado's 31 Rural Jump-Start Zones can receive $15,000 operating grants ($25,000 in coal-transition communities) and state tax relief alongside USDA financing; zone status should be confirmed with OEDIT.
Is B&I funded in FY2027?
A continuing resolution funds USDA at FY2026 levels through December 11, 2026. The President's budget proposes ending B&I, while the House-passed bill raises loan authority to $2.0 billion.
How long does a USDA feasibility study take in Colorado?
Preparation typically runs several weeks depending on data availability and site complexity, and the completed study then enters the lender's underwriting package for USDA review during the Conditional Commitment process. USDA Rural Development staffing reductions in 2025 have extended agency processing timelines, so commissioning the study early protects the overall closing schedule.
What does 7 CFR Part 5001 require the study to contain?
The regulation requires an independent analysis covering economic, market, technical, financial, and management feasibility. In practice that means market demand and competitive supply analysis, site and technical assessment, five-to-ten-year financial projections with debt service coverage and sensitivity testing, and an evaluation of the management team, prepared by a qualified consultant with no financial interest in the project.
Related Analysis and Guides
How 7 CFR Part 5001 decides your file
Every USDA guaranteed loan passes through nine regulatory gates, and the feasibility study decides most of them. Our full framework sets out each gate, the current fiscal year fees and guarantee levels, and what the Agency looks for in the report.
Read the USDA Feasibility Study FrameworkFlagship research · 2026 editionUSDA Rural Capital Atlas 38 asset classes, program comparisons, capital stacks, lender performance and credit forensics.
Ready to Start Your USDA Project?
Get your free consultation today and take the first step toward securing USDA funding for your rural development project.
Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.
Sources and Methodology
Figures on this page are drawn from primary federal and state sources and verified as of October 2026. Industry, advocacy and sponsor sources are labeled as such. Where sources conflict, we use the controlling legal document (Federal Register or eCFR) or the most recent official release. Eligibility determinations require an address-level check on the USDA eligibility map.
Full source list (20 references)
- 7 CFR Part 5001
- SPUR notice, FR Doc. 2026-21858
- USDA SPUR announcement
- REAP final rule
- USDA RD Administrative Notice 4857
- CRS R49343 (FY2027 agriculture appropriations)
- CRS R49353 (FY2027 continuing appropriations)
- USDA FY2027 Explanatory Notes, RBCS
- Summit/NRLA Economic Assessment 2025
- USDA RD New and Better Markets chart (May 2022)
- USDA RD Wray hospital release
- USDA RD Colorado contacts
- Colorado Ski Country USA, 2025–26 skier visits
- NPS, Rocky Mountain timed entry 2026
- Denver Gazette, 2025 Colorado park visitation
- Advance Colorado, Rural Jump-Start
- OEDIT, Advanced Industry Investment Tax Credit
- Sen. Hickenlooper, Colorado REAP awards
- Kiowa County Press, Colorado REAP awards
- U.S. Census Bureau, 2020 Census and V2025 estimates