USDA Feasibility Study Consultant in Colorado

    Independent USDA feasibility study consultant for Business & Industry, SPUR, REAP and Community Facilities projects across rural Colorado, prepared to 7 CFR Part 5001 standards for lenders and for review by USDA Rural Development's Colorado state office in Denver.

    Data as of October 2026.

    On this page
    $1M
    B&I guarantee to a new business above which USDA requires an independent feasibility study
    7 CFR 5001.306
    10.5M
    Colorado skier visits in 2025–26, down 23.9% and the lowest since 1991–92
    Colorado Ski Country USA
    129
    Average days resorts were open in 2025–26, against a 20-year average of 144
    Colorado Ski Country USA
    4,171,431
    Rocky Mountain National Park recreation visits, 2025
    NPS
    90%
    SPUR guarantee for meat, poultry and seafood processing, with no geographic restriction
    FR Doc. 2026-21858
    31
    Active Rural Jump-Start Zones, with $15,000 operating grants ($25,000 in coal-transition communities)
    OEDIT
    57.8%
    Share of Coloradans living in the 20 places above 50,000, which are excluded from B&I
    2020 Census (calculated)
    ~$24M
    USDA Community Facilities direct and guaranteed financing for the Wray Community District Hospital expansion
    USDA RD, September 2026

    When a Colorado Project Needs a USDA Feasibility Study

    Under the OneRD guaranteed loan rule, an independent feasibility study is mandatory for Business & Industry guarantees above $1,000,000 to a new business. Section 5001.306(a)(3)(i) requires a study "prepared by an independent qualified consultant acceptable to the Agency," with its scope set by the Agency according to the complexity of the project and the borrower.

    For loans of $1,000,000 or less, and for existing businesses, the study is discretionary. USDA may require one when the lender's analysis does not establish technical feasibility or economic viability, or when the project will significantly affect an existing borrower's operations and historic cash flow (§5001.306(a)(3)(ii)). Across OneRD programs, §5001.303(c)(4) allows the Agency to require an independent study whenever it cannot determine a basis for repayment from the five feasibility components: economic, market, technical, financial and management feasibility.

    Community Facilities runs on a parallel standard. Every CF guarantee requires a financial feasibility report "prepared by a qualified firm or individual acceptable to the Agency," and an independent study is required above $1,000,000 to a new entity or an entity conducting a new activity (§5001.304). Projections for assisted living, skilled nursing and similar residential facilities must be based on no more than 90 percent occupancy.

    When USDA requires a feasibility study
    SituationStudy statusRule
    B&I guarantee above $1M to a new businessRequired7 CFR 5001.306(a)(3)(i)
    B&I guarantee of $1M or less, or an existing businessAt Agency discretion7 CFR 5001.306(a)(3)(ii)
    Any OneRD program where the basis for repayment is unclearAt Agency discretion7 CFR 5001.303(c)(4)
    Community Facilities guarantee, any sizeFinancial feasibility report required7 CFR 5001.304
    Community Facilities guarantee above $1M to a new entity or new activityIndependent feasibility study required7 CFR 5001.304(a)(4)(i)

    In Colorado, studies are reviewed by USDA Rural Development's state office at the Denver Federal Center as part of the Conditional Commitment process.

    What USDA Means by an Independent Feasibility Study Consultant

    Part 5001 defines the role directly. A qualified consultant is "an independent third-party person possessing the knowledge, expertise, and experience to perform the specific task required," and a feasibility study is a report "conducted by an independent qualified consultant(s) evaluating the economic, market, technical, financial, and management feasibility of the proposed project" (7 CFR 5001.3). For B&I guarantees, the consultant must also be "acceptable to the Agency" (§5001.306(a)(3)(i)). In practice, that sets three tests for a Colorado project:

    • Independence

      No ownership or financial interest in the borrower, the project or the loan.

    • Qualification

      Demonstrated experience with the asset class, with Colorado's snow-year, water-rights and resort-labor conditions, and with USDA Rural Development review.

    • Acceptability

      The Agency, not the borrower, decides whether the consultant and the study scope are sufficient. Engaging the consultant before the lender submits the application avoids scope rework during Conditional Commitment review.

    For Community Facilities financial feasibility studies issued with an examination opinion, §5001.304(b) requires preparation under AICPA attestation standards and professional liability insurance. USDA does not publish a list of approved feasibility study consultants. The Colorado state office assesses acceptability application by application.

    Colorado's USDA Record: Mid-Tier B&I, Deep REAP, Active CF

    Colorado does not appear among the ten largest B&I states for 2015–2024 in the national assessment commissioned by the National Rural Lenders Association. Its documented USDA record is broad, though. A $6.5 million B&I guarantee refinanced a hotel in Alamosa and a $3.0 million guarantee funded working capital for a gold mine in Gunnison and Saguache counties, both in FY2022. In September 2026, USDA broke ground on nearly $24 million of Community Facilities direct and guaranteed financing for the Wray Community District Hospital. Colorado REAP grants totaled $18.83 million in 2023 alone, across dairies, manufacturers, a bank and an electric cooperative. Those REAP precedents were awarded under rules that ended in October 2026, so they no longer predict future awards. Nationally, accommodation and food services took 32.06 percent of FY2024 B&I obligations, which makes Colorado's lodging sector the natural B&I fit.

    Colorado's 2025–26 Snow Shock Is the New Underwriting Benchmark

    Colorado resort demand fell further in 2025–26 than in any season in 35 years. Skier visits dropped 23.9 percent to 10.5 million, resorts averaged 129 days open against a 20-year average of 144, and every month's snowfall was below its 20-year average. Summer park demand is capped by reservations rather than open-ended: Rocky Mountain National Park requires timed entry from May 22 to mid-October, from 5 a.m. to 6 p.m. on the Bear Lake Road corridor. Every Colorado resort study we prepare runs a downside case built on the 2025–26 season, and shows how timed entry pushes park demand into overnight stays.

    Colorado skier visits
    SeasonVisitsChange
    2022–2314.8M (record)—
    2023–2414.0M−5.4%
    2024–2513.8M−1.4%
    2025–2610.5M−23.9%

    Source: Colorado Ski Country USA (changes calculated).

    Colorado national park units, 2025 recreation visits
    UnitVisitsGateway
    Rocky Mountain NP4,171,431Estes Park, Grand Lake
    Curecanti NRA807,117 (−17%)Gunnison, Montrose
    Mesa Verde NP463,130 (−3.5%)Cortez
    Great Sand Dunes NP432,498Alamosa
    Black Canyon of the Gunnison NP250,086Montrose

    Source: NPS, as reported by the Denver Gazette and Axios (March 2026).

    Where B&I Financing Can Go in Colorado

    B&I eligibility excludes any city or town above 50,000 population, measured by the latest decennial census, together with its contiguous and adjacent urbanized area (7 CFR 5001.3). Twenty Colorado places exceeded 50,000 in 2020. Together they held 3,338,930 of the state's 5,773,714 residents, or 57.8 percent, so at most about 42 percent of Coloradans live in B&I-eligible territory (calculated). The real share is lower once residents of contiguous urbanized areas are removed.

    Excluded places (2020 Census): Denver, Colorado Springs, Aurora, Fort Collins, Lakewood, Thornton, Arvada, Westminster, Pueblo, Greeley, Centennial, Boulder, Highlands Ranch, Longmont, Loveland, Broomfield, Castle Rock, Grand Junction, Commerce City and Parker.

    Eligibility Screen for Buyer-Intent Markets

    The verdicts below are a desk screen under the 5001.3 rule, not USDA map determinations. Every study confirms eligibility at the address level.

    Colorado market eligibility screen
    MarketScreenReason
    Vail, Avon, Edwards, Eagle, Breckenridge, Frisco, Silverthorne, Aspen, Snowmass Village, Basalt, Carbondale, Glenwood Springs, Steamboat Springs, Telluride, Crested Butte, Gunnison, Salida, Buena Vista, Durango, Pagosa Springs, Estes Park, Winter Park, Granby, Montrose, OurayScreens eligibleFar below 50,000 and isolated from excluded urbanized areas
    Cañon City, Trinidad, Alamosa, Sterling, Fort Morgan, La Junta, Cortez, Craig, RifleScreens eligibleFar below 50,000 and not contiguous to excluded places
    Woodland Park, Elizabeth, Bailey, Idaho Springs, ConiferScreens eligibleMountain or exurban, separated from the Denver and Colorado Springs cores
    Fruita, PalisadeSplit riskAdjacent to Grand Junction
    Monument, EvergreenSplit riskEdges of the Colorado Springs and Denver urbanized areas
    Firestone, Frederick, Johnstown, Windsor, WellingtonSplit riskBetween Longmont, Fort Collins, Loveland and Greeley
    ErieLikely ineligibleContiguous to the Boulder–Broomfield urbanized area

    Cannabis, Hemp and USDA Eligibility in Colorado

    Colorado legalized cannabis, but federal law still governs USDA lending. Under 7 CFR 5001.127(d), an entity is ineligible if it derives income from any product or activity that is illegal under federal statute, and a borrower that leases space to a marijuana dispensary is not eligible. USDA Rural Development's Administrative Notice 4857 applies the same principle to REAP: a landlord leasing space to a marijuana business "would be receiving rental proceeds from the tenant's marijuana operation" and is not allowed. Hemp with no more than 0.3 percent delta-9 THC is a lawful agricultural commodity under the 2018 Farm Bill, and USDA agencies treat it as program-eligible. Projects that process intoxicating hemp-derived products need a current legal review before a lender relies on them. Every Colorado study we prepare screens the rent roll and any power-purchase agreements for cannabis income.

    2026–2027 Program Terms Monitor

    As of late October 2026, USDA has not published a FY2027 OneRD guarantee fee notice. A continuing resolution (P.L. 119-103) funds USDA at FY2026 levels through December 11, 2026. The President's FY2027 budget proposes terminating B&I, while the House-passed bill (H.R. 8646, 213–210 on June 4, 2026) raises B&I loan authority to $2.0 billion with $38.6 million in subsidy. The Senate had not acted at publication. B&I credits are underwritten on the current schedule: an 85 percent guarantee under $5 million and 80 percent at $5 million or more, a 3 percent upfront fee and a 0.55 percent annual retention fee. Given the funding uncertainty, applications should aim for obligation early in the fiscal year.

    USDA guaranteed loan terms relevant to Colorado
    ProgramGuaranteeUpfront feeRetention feeNotes
    B&I, under $5M85%3.0%0.55%Maximum $25M per borrower
    B&I, $5M to $25M80%3.0%0.55%—
    B&I, reduced-fee tier80%1.0%0.50%Subject to annual cap
    SPUR (meat, poultry, seafood processing)90%3.0%0.55%Lender holds at least 10%; no rural-area restriction
    Pre-completion loan note guarantee—+0.50%—All programs

    SPUR for Colorado Processors

    Federal Register Doc. 2026-21858, published October 27, 2026, makes at least $5 billion in loan level available for facilities that establish, reopen, retrofit, expand or improve meat, poultry or seafood processing "in America's rural or urban areas, as there are no geographic restrictions." The guarantee is 90 percent, at a 3 percent fee and 0.55 percent retention, with the lender holding at least 10 percent. USDA announced a maximum of $175 million per borrower. Packing and processing plants in Weld and Morgan counties qualify even inside excluded cities such as Greeley.

    REAP After the October 2026 Rule

    Under USDA's revised REAP rule (91 FR 62600), effective October 16, 2026, REAP becomes a post-completion, performance-validated program. Applicants submit 12 months of actual production or savings data with 12 months of pre-installation data, through a single national competition. Grants are capped at 25 percent of project cost, with maximums of $500,000 for renewable energy systems and $250,000 for efficiency improvements. A REAP guaranteed loan may still be paired with the grant.

    Outdated Claims to Ignore

    Several web sources still describe REAP grants as covering up to 50 percent of project cost, and B&I guarantees as 60 to 80 percent. Under current rules, REAP grants are capped at 25 percent and B&I guarantees are 85 percent under $5 million and 80 percent above. SPUR guarantees 90 percent.

    Capital Stacking in Colorado

    Colorado incentives that stack with USDA financing
    ProgramTermsStatus
    Rural Jump-StartOperating grants of $15,000 ($25,000 in coal-transition communities); new businesses receive relief from state income, sales and use, and business personal property taxes; qualified new hires receive state income-tax reliefActive in 31 zones
    Advanced Industry Investment Tax Credit25% of qualified investment, or 35% in an Enterprise Zone or rural county; $100,000 maximum credit; $10,000 minimum investmentActive; 54 of 64 counties qualify as rural

    Rural Jump-Start Zones

    Active zones: Alamosa, Archuleta, Clear Creek, Conejos, Costilla, Delta, Dolores, Fremont, Garfield, Huerfano, Kiowa, Kit Carson, Lake, Las Animas, Lincoln, Logan, Mesa, Moffat, Montezuma, Montrose, Morgan, Otero, Phillips, Prowers, Pueblo, Rio Blanco, Rio Grande, Routt, San Juan, Sedgwick and Yuma. Moffat, Montrose, Morgan, Pueblo, Rio Blanco and Routt carry Tier 1 Just Transition status. Published lists differ for Clear Creek, Routt and La Plata, so each study confirms zone status with OEDIT.

    Ten counties carry none of Colorado's rural designations: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer and Weld.

    Reduced-Fee Eligibility (7 CFR 5001.454(d))

    A lender may request the reduced fee when the project meets any one of these criteria, subject to USDA's annual cap on reduced-fee authority:

    1. It is located in a rural community that is distressed under the Economic Innovation Group index, has experienced long-term population decline across three decennial censuses, is in a persistent poverty county, is in a presidentially declared disaster area declared within the prior 24 months, has unemployment at or above 125 percent of the national rate, or is on tribal lands.
    2. It processes, distributes, aggregates, stores or markets locally or regionally produced agricultural food products and promotes access to healthy foods.
    3. It is locally owned and managed, and either supports value-added agriculture or produces a natural-resource value-added product.
    4. It is part of a multi-jurisdictional strategic plan under Section 6401 of the 2018 Farm Bill.
    5. It provides an additional market for existing local businesses.

    Each study confirms the designation against the current USDA ERS persistent poverty edition.

    Colorado USDA Feasibility Study Consultant by Project Type

    Each module sets out the Colorado-specific evidence a lender or USDA reviewer will expect, and the test the study must pass.

    Hotel and Mountain Lodging Feasibility Study Consultant in Colorado (USDA B&I)

    Colorado lodging is a two-season business whose winter half just had its worst year in 35 years, so resort studies must prove debt service in a weak-snow season.

    • Skier visits fell 23.9 percent to 10.5 million in 2025–26, with resorts open 129 days on average against a 20-year average of 144.Colorado Ski Country USA
    • Rocky Mountain National Park drew 4,171,431 visits in 2025 under a timed-entry system that limits day-trip growth.NPS
    • USDA guaranteed $6,530,812 to refinance a hotel in Alamosa, gateway to Great Sand Dunes (FY2022).USDA RD

    What the reviewer will test

    A downside case built on 2025–26; the summer and winter revenue split; evidence that park capacity limits shift demand into overnight stays; local lodging-tax trends; short-term rental supply and local caps; and address-level eligibility.

    View our hotel feasibility study services

    RV Park and Campground Feasibility Study Consultant in Colorado

    Colorado camping demand follows the parks and lakes, and fire seasons set the downside.

    • Curecanti National Recreation Area, home to Blue Mesa Reservoir camping, recorded 807,117 visits in 2025, down 17 percent, a decline reported as partly tied to fire impacts.NPS

    What the reviewer will test

    Occupancy by month; fire-ban and closure history; water and wastewater capacity; a comparison set that includes federal campgrounds; and seasonal road closures such as Trail Ridge Road.

    View our RV park feasibility study services

    Meat and Food Processing Feasibility Study Consultant in Colorado

    SPUR gives Colorado protein processors the strongest USDA terms of any asset class, inside or outside excluded cities.

    • SPUR guarantees 90 percent of loans for meat, poultry and seafood processing, up to $175 million per borrower, with a possible two-year deferral and no geographic restriction.FR Doc. 2026-21858; USDA
    • Miraflora Wagyu in Boulder County shared a $280,470 Value-Added Producer Grant award with two other Colorado producers.USDA RD
    • Bella Holsteins in Platteville, a Weld County dairy, received a $1,000,000 REAP grant for a 1,260 kW solar array.USDA RD, 2024

    What the reviewer will test

    Livestock supply-shed analysis; kill-floor utilization ramp; FSIS inspection pathway; offtake or co-pack contracts; wastewater permits; and water rights.

    View our meat processing feasibility study services

    Solar and REAP Feasibility Study Consultant in Colorado

    Colorado has one of the deepest REAP records in the West, but the 2026 rule pays grants only after projects run for a year.

    • Colorado REAP awards totaled $18.83 million in 2023.Sen. Hickenlooper release
    • Highline Electric Association in Holyoke received $1,000,000 for a 1 MW single-axis tracking solar array producing 2,358,034 kWh a year.USDA RD, 2024
    • Under the revised rule, ground-mount solar on cropland is excluded and each owner may receive one award per fiscal year.91 FR 62600

    What the reviewer will test

    Self-consumption economics under the utility tariff; a no-grant base case; and construction or bridge financing for the full system cost.

    View our solar and renewable energy feasibility study services

    Rural Hospital and Clinic Feasibility Study Consultant in Colorado

    Community Facilities lending is active in rural Colorado health care, with Wray as the current showcase.

    • USDA provided nearly $24 million in Community Facilities direct and guaranteed financing for a roughly 13,500-square-foot expansion of the Wray Community District Hospital for surgery, imaging and women's care.USDA RD, September 2, 2026

    What the reviewer will test

    Service-area need and payer mix; grant funds kept out of debt service; provider recruitment; and Community Facilities scoring for communities under 20,000.

    View our rural clinic feasibility study services

    Mining and Manufacturing Feasibility Study Consultant in Colorado

    USDA has guaranteed Colorado mining working capital and funded rural manufacturers' energy upgrades.

    • Fossil Creek Mines received a $3,000,000 B&I guarantee for gold-mining working capital in Gunnison and Saguache counties (FY2022).USDA RD
    • Estes Industries in Penrose received a $520,000 REAP grant for a 480.15 kW solar array.USDA RD

    What the reviewer will test

    Commodity price stress; customer concentration; permits; and site eligibility for Front Range locations.

    View our manufacturing feasibility study services

    Workforce Housing Feasibility Study Consultant in Colorado

    Staff housing limits how many rooms and covers Colorado resorts can operate, so it belongs in every resort study.

    • BHV Adventures, a tiny-home manufacturer in Arriba, became the first Rural Jump-Start participant in Lincoln County in January 2026, with a $15,000 grant.Colorado Governor's Office

    What the reviewer will test

    Employer master leases or anchor demand; absorption in thin markets; and B&I limits on residential uses.

    Restaurant Feasibility Study Consultant in Colorado

    Colorado restaurant pro formas carry a rising statutory wage floor and resort seasonality.

    • Colorado's 2026 minimum wage is $15.16 ($12.14 tipped), rising to $15.71 on January 1, 2027; Denver's is $19.29.Colorado Department of Labor and Employment, as reported

    What the reviewer will test

    The 2027 wage step; seasonal revenue; and staff housing.

    View our restaurant feasibility study services

    Car Wash Feasibility Study Consultant in Colorado

    Under Colorado's prior-appropriation water law, new commercial water use is a title-like diligence item.

      What the reviewer will test

      Tap fees and a water-court or augmentation opinion; reclaim-system specifications; competitor tunnels; and address-level eligibility on the I-25 corridor.

      View our car wash feasibility study services

      Gas Station and Truck Stop Feasibility Study Consultant in Colorado

      Colorado corridor stops depend on mountain-highway access, and EV charging no longer qualifies for REAP.

        What the reviewer will test

        Site-specific CDOT traffic counts and a capture-rate model; I-70 closure exposure; Phase I environmental review; and EV charging excluded from any REAP request.

        View our gas station feasibility study services

        Cold Storage Feasibility Study Consultant in Colorado

        Cold storage upgrades in Colorado's producing counties now sequence around the post-completion REAP rule.

        • HoneyRock LLC in Delta County received a $72,104 REAP grant for a cold-storage upgrade.USDA RD

        What the reviewer will test

        Throughput contracts; energy cost; and the post-completion REAP sequence.

        View our cold storage feasibility study services

        Brewery, Winery and Distillery Feasibility Study Consultant in Colorado

        Colorado's craft beverage businesses depend on the same visitor flows that weakened in 2025–26.

          What the reviewer will test

          Taproom versus distribution revenue split; closure rates among comparable producers; water rights; and tourism sensitivity.

          View our brewery, winery and distillery feasibility study services

          Assisted Living Feasibility Study Consultant in Colorado

          Colorado assisted living projects financed through Community Facilities face a hard occupancy ceiling in underwriting.

          • Community Facilities projections for assisted living must be based on no more than 90 percent occupancy.7 CFR 5001.304

          What the reviewer will test

          Licensed-bed penetration among residents aged 75+ by county; Medicaid share; staffing in resort labor markets; and the 2027 wage step.

          View our assisted living feasibility study services

          Self-Storage Feasibility Study Consultant in Colorado

          Colorado storage demand follows growth in the eligible gaps between Front Range metros.

            What the reviewer will test

            Supply pipeline and square feet per capita against eligible-area population; and eligibility for I-25 edge towns, where oversupply and ineligibility risks overlap.

            View our self-storage feasibility study services

            Colorado USDA Precedent File

            Publicly identified USDA financings in Colorado
            ProgramRecipientLocationYearAmountPurpose
            CF direct and guaranteedWray Community District HospitalWray2026Nearly $24MHospital expansion
            B&IDiamond Hospitality LLCAlamosaFY2022$6,530,812Hotel refinancing
            B&IFossil Creek Mines LLCGunnison and Saguache countiesFY2022$3,000,000Mining working capital
            B&IHuberd Services Company LLCBennettFY2022$216,000Real property purchase
            REAPHighline Electric AssociationHolyoke2024$1,000,0001 MW solar
            REAPBella Holsteins LLCPlatteville2024$1,000,000Dairy solar
            REAPEstes Industries LLCPenrose2024$520,000Manufacturing solar
            REAPGilcrest II LLCWeld County—$250,0002 MW solar
            REAPHoneyRock LLCDelta2024$72,104Cold-storage upgrade
            REAPFirst Southwest BankAlamosa—$25,558Solar
            REAPGood Vibes River GearCraig2024$20,000Solar
            VAPGMiraflora Wagyu and two other producersBoulder and Larimer counties—$280,470Value-added agriculture
            Grants and microloanGrand Junction Business Incubator CenterGrand Junction2026$692,075Business support
            RBDGNorthwest Colorado Innovation CenterMoffat, Routt, Rio Blanco—$99,500Microloan fund

            Source: USDA Rural Development releases and charts; Kiowa County Press; Sen. Hickenlooper release; Grand Junction Daily Sentinel.

            USDA Rural Development in Colorado

            USDA Rural Development's Colorado State Office is at the Denver Federal Center, Building 56, Room E-2300, PO Box 25426, Denver, CO 80225 ((720) 544-2903). State Director Sallie Clark was appointed in May 2025, having also served in the role previously. Susan Beckman was named Deputy State Director in August 2026, and Robert McElroy directs Rural Business and Cooperative Services.

            Lender Landscape

            In May 2026, USDA revoked or declined to renew OneRD approved-lender status for ten lenders holding about 47 percent of Rural Development's delinquent loans; revoked lenders cannot obtain new guarantees. Every Colorado study we prepare records the originating lender's OneRD standing as of the study date.

            How Our Colorado USDA Feasibility Study Consultants Scope a Study

            Every Colorado engagement is built around the tests the Denver state office and lender credit committees apply.

            Eligibility at the address level

            Dated determinations, with priority on I-25 corridor and Grand Junction edge towns.

            Snow-year downside case

            Debt service tested against the 2025–26 season, with summer demand shown separately.

            Cannabis and hemp screens

            Rent-roll, power-purchase and business-activity review under 5001.127(d) and AN 4857.

            Water rights and augmentation

            Prior-appropriation diligence for any new commercial water use.

            Stacking

            Rural Jump-Start, the Advanced Industry credit and reduced-fee criteria.

            Program fit

            B&I vs. SPUR, REAP under the new rule, and the originating lender's OneRD standing.

            Colorado USDA Feasibility Study FAQ

            Does USDA approve feasibility study consultants in Colorado?

            USDA does not maintain a public list of approved consultants. Part 5001 defines a qualified consultant as an independent third-party person with the knowledge, expertise and experience to perform the task, and for B&I the consultant must be acceptable to the Agency. The Colorado state office makes that determination for each application.

            Can the borrower, developer or lender prepare the feasibility study instead of a consultant?

            Not when USDA requires an independent study for B&I. The rule calls for an independent, qualified third party with no financial interest in the borrower, the project or the loan. For Community Facilities, a lender may prepare a financial feasibility analysis in some cases, but a CF guarantee above $1 million to a new entity or activity requires an independent qualified consultant.

            How do I choose a USDA feasibility study consultant for a Colorado project?

            Look for independence, experience with your asset class, and command of Colorado-specific evidence: decennial-census eligibility on the Front Range; the 2025–26 snow-year downside; cannabis and hemp; water rights; Rural Jump-Start stacking; and SPUR for processors. The study should address all five Part 5001 components (economic, market, technical, financial and management feasibility) in the form the state office reviews.

            Does USDA require a feasibility study for a B&I loan in Colorado?

            Yes, for B&I guarantees above $1,000,000 to a new business. For smaller loans and existing businesses, USDA may require one when the lender's analysis does not establish technical feasibility or economic viability, or when the project significantly affects an existing borrower's operations.

            Are Colorado ski towns such as Breckenridge, Vail or Estes Park eligible for B&I?

            Colorado's resort towns are far below 50,000 and separated from the excluded Front Range urbanized areas, so they screen as eligible. USDA's map controls, so every study includes a dated, address-level determination.

            How should a Colorado resort study handle a bad snow year?

            The 2025–26 season is now the benchmark: skier visits fell 23.9 percent to 10.5 million and resorts averaged 129 days open. Lenders should see debt service tested against that season, with summer demand shown separately.

            Can a Colorado property with a cannabis tenant use a USDA guarantee?

            No. Under 7 CFR 5001.127(d) and USDA's REAP guidance, a borrower receiving rental or power-purchase income from a marijuana business is ineligible. Hemp under 0.3 percent delta-9 THC is a lawful agricultural commodity.

            Can a Weld or Morgan County meat processor use SPUR?

            Yes. SPUR guarantees 90 percent of loans for meat, poultry and seafood processing up to $175 million per borrower, with no geographic restriction, so plants inside excluded cities such as Greeley qualify.

            Can Rural Jump-Start benefits be combined with a USDA loan?

            Yes. Businesses in Colorado's 31 Rural Jump-Start Zones can receive $15,000 operating grants ($25,000 in coal-transition communities) and state tax relief alongside USDA financing; zone status should be confirmed with OEDIT.

            Is B&I funded in FY2027?

            A continuing resolution funds USDA at FY2026 levels through December 11, 2026. The President's budget proposes ending B&I, while the House-passed bill raises loan authority to $2.0 billion.

            How long does a USDA feasibility study take in Colorado?

            Preparation typically runs several weeks depending on data availability and site complexity, and the completed study then enters the lender's underwriting package for USDA review during the Conditional Commitment process. USDA Rural Development staffing reductions in 2025 have extended agency processing timelines, so commissioning the study early protects the overall closing schedule.

            What does 7 CFR Part 5001 require the study to contain?

            The regulation requires an independent analysis covering economic, market, technical, financial, and management feasibility. In practice that means market demand and competitive supply analysis, site and technical assessment, five-to-ten-year financial projections with debt service coverage and sensitivity testing, and an evaluation of the management team, prepared by a qualified consultant with no financial interest in the project.

            Regulatory framework

            How 7 CFR Part 5001 decides your file

            Every USDA guaranteed loan passes through nine regulatory gates, and the feasibility study decides most of them. Our full framework sets out each gate, the current fiscal year fees and guarantee levels, and what the Agency looks for in the report.

            Read the USDA Feasibility Study Framework

            Flagship research · 2026 editionUSDA Rural Capital Atlas 38 asset classes, program comparisons, capital stacks, lender performance and credit forensics.

            Ready to Start Your USDA Project?

            Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

            Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

            Get Your Free Consultation

            Fill out the form below and we'll contact you within 24 hours to discuss your project.

            We'll respond within 24 hours

            Sources and Methodology

            Figures on this page are drawn from primary federal and state sources and verified as of October 2026. Industry, advocacy and sponsor sources are labeled as such. Where sources conflict, we use the controlling legal document (Federal Register or eCFR) or the most recent official release. Eligibility determinations require an address-level check on the USDA eligibility map.

            Full source list (20 references)