How to read this case study. The engagement summary reflects the published record. Client names, actual costs, loan terms and proprietary data are confidential, so the project budget, market sizing and financial projections below are a modeled example built from public data for this project type and location. They show the analysis a lender-grade study performs, not the client's figures.
In 2024 a community bank lending with a USDA guarantee needed a feasibility study for an assisted living expansion in Dodge City, Kansas, financed under the Community Facilities (CF) guaranteed loan program in the $5 million to $25 million loan tier. The study was prepared with a market and demand study. This page works through the questions such a study has to answer, using a modeled 40-unit expansion (24 assisted living apartments and 16 memory care suites added to an existing 40-unit nonprofit campus) and public data for Ford County and the six counties around it.
The short version: Dodge City is too large for CF direct money but squarely inside the CF guaranteed rural area; the 90% occupancy ceiling in the CF rule leaves a thin margin above break-even; and the lease-up year, not the stabilized year, decides whether the sponsor's cash is enough. Data current as of November 2026.
Engagement summary
| Published record | Detail |
|---|---|
| Program | USDA Community Facilities guaranteed loan |
| Asset | Assisted living (expansion of an existing community) |
| Location | Dodge City, Kansas (Ford County, Great Plains region) |
| Loan size tier | $5 million to $25 million |
| Year | 2024 |
| Lender | Community bank with a USDA guarantee |
| Outcome | Prepared with market and demand study |
Source: this site's engagement index [16]. Everything else on this page (scope, budget, demand, rates, staffing and projections) is a model.
The engagement card on the index also carried a longer summary. Several of its statements can be checked against the regulations and data this site holds; others cannot, and some need correcting. The table sets out what this page keeps and on what basis.
| Statement in the engagement card | Status on this page |
|---|---|
| CF guaranteed loans: up to $100 million per borrower, terms up to 40 years | Kept; matches 7 CFR part 5001 [1] |
| Initial fee 1.25% of the guaranteed amount, 80% guarantee | Kept for FY2026 (91 FR 11272) [5]; the card's "FY2025" label could not be checked against a FY2025 notice and is not used |
| Kansas does not require a certificate of need for assisted living | Kept; this site's Kansas page records it, citing NCSL [13] |
| Study delivered at a "CF Financial Feasibility Study with Review Report standard", the "appropriate tier" for $5M to $25M | Corrected. Part 5001 names a financial feasibility analysis (appendix B), a financial feasibility study with a CPA examination opinion, and an independent feasibility study for a new entity or activity; it has no "review report" tier, and loan size alone does not pick the type (5001.304) [1][2] |
| Kansas assisted living averages $5,149 to $6,026 a month and memory care $5,587 (2024) | Kept only as the card's figures; no source in this site's data. The model's rates are its own assumptions |
| Kansas Frail Elderly waiver income threshold $2,829 a month and asset limit $2,000 | Kept only as the card's figures; to be confirmed against the state's current waiver rules |
| National occupancy of 85.7% (Q4 2024) and 88.1% (Q2 2025), record occupied units, 1.3% inventory growth, 80+ population growth to 2030 | Not used; national trend figures with no source in this site's data |
| West North Central assisted living occupancy below the national average | Not used; no source in this site's data |
| A 40-bed community in Salem, Wisconsin filled within a year | Not used; an out-of-state anecdote with no source |
| Form HUD-935.2A (Affirmative Fair Housing Marketing Plan) required for five or more residential units | Kept as the card's statement; the requirement is not in the rules this site has read and should be confirmed with the lender |
The question the lender and USDA needed answered
A CF guaranteed loan is made by an approved lender; USDA guarantees part of it. Before the State Office issues a conditional commitment, the lender has to show the borrower is eligible, the project is in an eligible rural area, and the facility will generate enough cash to operate, fund reserves and repay the debt. Part 5001 makes the paperwork explicit for Community Facilities: a financial feasibility report is always required, and its form depends on the borrower and the loan [1][2].
| Borrower situation (CF guaranteed, 7 CFR 5001.304) | Report the lender submits |
|---|---|
| Existing facility, loan of $25 million or less | Financial feasibility analysis under appendix B; the lender's credit evaluation can serve |
| Debt backed by general obligation bonds or tax revenue | Financial feasibility analysis |
| Three years of audited statements showing capacity to pay | Financial feasibility analysis |
| All other loans | Financial feasibility study with an examination opinion by a CPA under AICPA attestation standards |
| Loan over $1,000,000 to a new entity or an entity starting a new activity | Independent feasibility study by a qualified consultant acceptable to the Agency, scope set by the Agency |
Source: 5001.304 and appendices A and B to subpart D [1][2].
An expansion by an established operator usually starts in the first row. Two features of this kind of project can move it down the table. Memory care is the first: an operator that has never run a secure memory care unit is, for many reviewers, starting a new activity, and at this loan size that brings the independent study requirement. The second is the debt itself: if the existing campus cannot show three audited years of capacity to pay, the lender may not be able to rely on a simpler analysis. The published record states the study was prepared with a market and demand study; the work the State Office needed in either case was the same. It had to prove that the service area holds enough income-qualified seniors for 40 more units, that the campus fills them under a 90% occupancy ceiling, and that the combined campus covers the new debt service through lease-up.
The occupancy rule is specific to senior care. Under 5001.304, CF projections for assisted living, skilled nursing and similar residential facilities may assume no more than 90% occupancy [1]. That ceiling governs every number in the projections below; it is not a target the model is free to exceed even if the market study finds a waiting list.
Eligibility: why a guarantee and not CF direct
| Test | Rule | Dodge City result |
|---|---|---|
| CF direct loan population limit | City or town of 20,000 or less (7 CFR 1942.17) [3] | Not eligible: 27,793 residents in the Census Bureau's April 2020 estimates base, 27,653 in July 2025 [8] |
| CF grant population limit | 20,000 or less, plus a service-area income test (7 CFR 3570.53) [4] | Not eligible on population |
| CF guaranteed rural area | Outside any city or town of more than 50,000 and the urbanized area contiguous to it (7 CFR 5001.3) [1] | Eligible on population; Ford County is a non-metro county in the OMB July 2023 delineation [9]; the parcel is confirmed on the USDA eligibility map |
| CF guaranteed funding priority | Funds reserved first for places of 20,000 or less, released on 1 July for places up to 50,000 (5001.103(c), 5001.316(e)) [1] | Outside the reserved pool; timing matters |
| Borrower type | Public body, nonprofit with significant community ties, tribe, or a corporation operated on a not-for-profit basis for the life of the loan [1] | Modeled as a local nonprofit with a board drawn from the service area |
| Credit elsewhere | Borrower certifies it cannot finance the project without the guarantee at reasonable terms [1] | Lender documents it in the credit memo |
| Local support | Certification of support from each affected local government [1] | City and county letters |
Dodge City sits in a gap that shapes the whole financing plan. It is too large for CF direct loans and grants, which stop at 20,000, but it is far below the 50,000 line in the OneRD rural definition. A CF guarantee is therefore the main USDA route for a nonprofit borrower here. The same population count also costs the project the 15 priority points CF guaranteed scoring gives communities under 20,000, and it puts the application outside the pool reserved for small places until that reservation lapses each July [1]. A study that knows this sets its schedule around the State Office's funding calendar rather than the construction calendar.
B&I is the other OneRD route, but it finances assisted living only where constant medical care is provided and available on site, and it carries a 3.0% fee against 1.25% for a CF guarantee [1][5]. For a nonprofit campus, CF is the natural fit.
Project description (modeled)
The model assumes an established nonprofit operating 40 assisted living apartments on an owned, debt-free campus, at 88% occupancy before the expansion. The expansion adds a 29,500 square foot wing and renovates the shared dining, kitchen and common areas so that one kitchen and one administrative team serve 80 units.
| Modeled scope | Before | After |
|---|---|---|
| Assisted living apartments | 40 | 64 |
| Memory care suites (secure) | 0 | 16 |
| Total units | 40 | 80 |
| Staff (full-time equivalents) | 24.0 | 41.3 |
| Building area added | 29,500 sq ft new wing; 4,500 sq ft renovated |
| Modeled timeline | Months from engagement | Notes |
|---|---|---|
| Feasibility study and appraisal | 0 to 2 | This site's schedule lists 6 to 8 weeks for a Community Facilities study [15] |
| Lender credit evaluation and State Office application | 2 to 5 | Conditional commitment depends on CF guaranteed funding in the fiscal year |
| Design completion, bids, closing | 5 to 8 | Fixed-price contract before closing |
| Construction | 8 to 22 | 14 months; existing building stays open |
| Pre-opening hiring and marketing | 19 to 22 | Funded by the sponsor |
| Lease-up to 90% | 22 to 32 | About 10 months in the model |
Project cost and sources and uses
There is no construction-cost database behind this page, so every line below is an assumption, stated with a range and with the document a real study would rely on. A real budget comes from the architect's estimate, contractor bids, equipment quotes and the lender's term sheet.
| Use of funds (modeled) | Amount | Share | Assumption range and how a real study sources it |
|---|---|---|---|
| Site work, paving and utility extensions | $620,000 | 4.1% | $450,000 to $900,000; civil engineer's estimate |
| New wing, 29,500 gross sq ft at $300/sq ft | $8,850,000 | 59.1% | $265 to $360 per sq ft; contractor bids |
| Renovation of existing dining, kitchen and commons, 4,500 sq ft at $180/sq ft | $810,000 | 5.4% | $140 to $230 per sq ft; contractor bids |
| Secure memory care entry, wander management and campus nurse call | $295,000 | 2.0% | $220,000 to $380,000; vendor quotes |
| Generator and life safety upgrades to the existing building | $240,000 | 1.6% | $150,000 to $350,000; engineer's estimate |
| Hard cost subtotal | $10,815,000 | 72.3% | |
| Construction contingency, 7% of hard cost | $757,000 | 5.1% | 5% to 10%; higher for renovation |
| Furniture, fixtures and equipment (40 units at $9,500 plus $160,000 commons) | $540,000 | 3.6% | Vendor quotes |
| Architecture and engineering, 7.5% of hard cost | $811,000 | 5.4% | 6% to 9%; design contract |
| Permits, survey, geotechnical, environmental and testing | $135,000 | 0.9% | Local fee schedules and quotes |
| Builder's risk and construction-period insurance | $70,000 | 0.5% | Broker quote |
| Feasibility study, appraisal and review, legal, lender closing costs | $210,000 | 1.4% | Engagement letters and lender term sheet |
| CF guarantee fee, 1.25% of the 80% guaranteed share | $114,600 | 0.8% | 91 FR 11272 (FY2026) |
| Interest during construction, 14 months, average draw 55% at 7.50% | $551,513 | 3.7% | Draw schedule |
| Pre-opening staffing, training and marketing (sponsor funds) | $260,000 | 1.7% | Operator budget |
| Lease-up and working capital reserve (sponsor funds) | $700,000 | 4.7% | Sized from the monthly lease-up model |
| Total project cost | $14,964,112 | 100.0% |
At $14,964,112 the expansion costs $374,103 per new unit, because the budget also carries the renovation, campus-wide life safety and nurse call work, the reserves and the financing costs. Three items follow the CF guaranteed rules. The 1.25% guarantee fee and interest during construction may be paid from loan funds, and Part 5001 allows interest for up to three years until the facility is self-supporting [1]. Initial operating expenses and working capital may not be paid with CF guaranteed loan funds (5001.122(m)) [1], so the pre-opening budget and the lease-up reserve sit with the sponsor.
| Source of funds (modeled) | Amount | Share | Note |
|---|---|---|---|
| CF guaranteed loan from the community bank | $11,460,000 | 76.6% | 80% guaranteed ($9,168,000); $2,292,000 at the bank's own risk |
| Sponsor cash reserves | $1,904,112 | 12.7% | Unrestricted cash on the closing balance sheet |
| Capital campaign and foundation gifts collected before closing | $1,600,000 | 10.7% | Pledges count only when collected or firmly scheduled |
| Total | $14,964,112 | 100.0% |
The modeled loan of $11,460,000 sits inside the published $5 million to $25 million tier. At 80%, USDA guarantees $9,168,000 and the bank keeps $2,292,000 at its own risk. Part 5001 sets no fixed equity percentage for CF guaranteed loans; instead, committed other funds earn priority points, and the lender sets its own expectation in the credit evaluation [1]. The model's $3,504,112 of sponsor cash and gifts is 23.4% of cost.
| CF guaranteed priority factor (7 CFR 5001.316) | Points available | This modeled project | Why |
|---|---|---|---|
| Community of under 20,000 people | 15 | 0 | Dodge City had 27,793 residents in the Census Bureau's April 2020 base |
| Health clinic, public safety, early education or primary/secondary education facility | 10 | 0 | An assisted living community is not one of the listed facility types |
| Other funds committed: 5% to 19% / 20% to 49% / 50% or more | 5 / 10 / 15 | 10 | Sponsor cash and gifts are 23.4% of project cost |
| Administrator points from a National Office reserve | up to 15 | not modeled | Discretionary |
The fee would be higher if the lender asked USDA to issue the loan note guarantee before construction is finished: the FY2026 notice adds 0.50% of the guaranteed amount for that [5].
Market analysis
Kansas supply and the statewide picture
The state data module for Kansas shows a state that is already well supplied with senior care buildings [6][7][9]:
Kansas: assisted living and nursing facilities, supply and rural footprint
| Measure | Kansas | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 575 → 593 (+3.1%) | 43,506 → 44,649 |
| Per 100,000 residents (2023) | 20.1 | 13.3 |
| Average employees per establishment | 51.0 | 53.5 |
| Average annual pay per employee | $36,435 | $41,324 |
| Share of establishments in non-metro counties | 26.1% (114 in 22 counties) | |
| Share of state population in non-metro counties (2025) | 28.8% |
Non-metro counties with the most assisted living and nursing facilities (2023): Crawford County (13); Reno County (13); Montgomery County (9); Saline County (8); McPherson County (7); Brown County (6).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Kansas has 20.1 senior care establishments per 100,000 residents against 13.3 nationally, half again the national density. A reviewer reading that figure will ask why another 40 units are needed. The answer has to come from the local market, not the state average, and from the mix of buildings. Splitting the state total by industry shows where growth has been:
| Kansas industry | NAICS | Establishments, 2019 | Establishments, 2023 | Change | Employees, 2023 | Average pay, 2023 |
|---|---|---|---|---|---|---|
| Nursing care facilities (skilled nursing) | 623110 | 276 | 279 | 1.1% | 14,387 | $39,936 |
| Continuing care retirement communities | 623311 | 124 | 121 | -2.4% | 9,696 | $35,754 |
| Assisted living facilities for the elderly | 623312 | 175 | 193 | 10.3% | 6,131 | $29,295 |
Source: County Business Patterns, state files [6]. Assisted living for the elderly grew 10.3% in four years while skilled nursing was flat and continuing care communities shrank. Average pay in Kansas assisted living, $29,295 per employee, is the lowest of the three and includes part-time staff; it is the floor, not the budget, for the wage assumptions below.
Regional comparison
| State | Establishments, 2019 | Establishments, 2023 | Change | Per 100,000 residents | Employees per establishment | Average pay | Share of establishments in non-metro counties | Share of population in non-metro counties |
|---|---|---|---|---|---|---|---|---|
| Kansas | 575 | 593 | 3.1% | 20.1 | 51.0 | $36,435 | 26.1% | 28.8% |
| Nebraska | 367 | 335 | -8.7% | 16.8 | 61.3 | $35,461 | 21.2% | 33.6% |
| Oklahoma | 499 | 466 | -6.6% | 11.5 | 54.2 | $35,513 | 34.5% | 31.8% |
| Colorado | 707 | 739 | 4.5% | 12.5 | 50.7 | $42,889 | 7.0% | 12.0% |
| Missouri | 1,088 | 1,088 | 0.0% | 17.5 | 49.9 | $38,294 | 26.7% | 24.4% |
| Iowa | 611 | 559 | -8.5% | 17.4 | 64.4 | $37,074 | 40.9% | 37.6% |
| United States | 43,506 | 44,649 | 2.6% | 13.3 | 53.5 | $41,324 |
Source: this site's state data modules, built from County Business Patterns and Vintage 2025 estimates [6][7][9]. Kansas has the highest density in the region and, with Colorado, one of only two states that added establishments between 2019 and 2023. Nebraska, Oklahoma and Iowa all lost buildings. A lender reads the pattern two ways: Kansas operators have been willing to build, and competing supply can enter freely, because Kansas has no certificate of need for assisted living [13]. That second point is why the study inventories approved but unbuilt projects as well as operating ones.
The service area: Ford County and six neighbors
The modeled primary service area is Ford County and the six counties that border it. A real study draws it from the sponsor's own admissions history (prior addresses of residents and of the adult children who chose the community) and a drive-time analysis.
| County | Population, April 2020 base | Population, July 2025 | Change | Births, 2025 | Deaths, 2025 | Net migration, 2025 | Nursing homes (623110) | CCRC and assisted living (623311) | Assisted living for the elderly (623312) |
|---|---|---|---|---|---|---|---|---|---|
| Ford County | 34,287 | 33,993 | -0.9% | 610 | 257 | -639 | fewer than 3 | 4 | fewer than 3 |
| Gray County | 5,652 | 5,652 | 0.0% | 103 | 74 | -65 | 3 | fewer than 3 | fewer than 3 |
| Hodgeman County | 1,725 | 1,619 | -6.1% | 16 | 34 | -27 | fewer than 3 | fewer than 3 | fewer than 3 |
| Edwards County | 2,907 | 2,640 | -9.2% | 34 | 55 | -60 | fewer than 3 | fewer than 3 | fewer than 3 |
| Kiowa County | 2,463 | 2,432 | -1.3% | 29 | 32 | 19 | fewer than 3 | fewer than 3 | fewer than 3 |
| Clark County | 1,990 | 1,900 | -4.5% | 20 | 22 | 12 | fewer than 3 | fewer than 3 | fewer than 3 |
| Meade County | 4,060 | 3,852 | -5.1% | 55 | 45 | -51 | fewer than 3 | fewer than 3 | fewer than 3 |
| Seven-county area | 53,084 | 52,088 | -1.9% | 867 | 519 | -811 |
Sources: Vintage 2025 county estimates [7]; County Business Patterns 2023, county file [6]; OMB July 2023 delineation [9]. The county extract used for this page lists industry cells with at least three establishments; "fewer than 3" means two, one or none. All seven counties are non-metro.
The table explains the shape of demand. Ford County holds 65.3% of the area's 52,088 residents and is young: 610 births against 257 deaths in 2025. The six surrounding counties hold 18,095 people, and their 257 births fell just short of 262 deaths; in four of them (Hodgeman, Edwards, Kiowa and Clark) deaths outnumbered births. Both parts of the area lost people to migration, 811 in total in 2025, and the seven counties together shrank 1.9% from the April 2020 base. The senior market for a Dodge City community is therefore older and thinner in the outlying counties than the Ford County totals suggest, and the outlying counties are where the adult children who move a parent closer are least likely to live. A study that treated the whole area as Ford County would overstate demand.
Supply in the county file is thin and hard to read. Ford County shows four establishments classed as continuing care retirement communities and assisted living with 164 employees, and Gray County three nursing homes with 174 employees; every other cell has fewer than three establishments. County Business Patterns counts establishments with payroll, not licensed units, and a small residential home may not appear at all. That is why the census count is a starting point only. The study's real supply inventory comes from the state licensing roster: every licensed assisted living, residential health care, home plus and nursing facility within the drive time, with units, occupancy, rates by care level and any project with plans approved.
Demand model (assumptions)
The data modules carry no age detail, so the demand model below runs on stated assumptions with a range. A real study replaces each assumption with Census age-by-income estimates for the area, the share of seniors who own homes they could sell, and penetration rates measured at comparable rural communities.
| Scenario (assumptions) | Share of area population aged 75+ | Residents aged 75+ | Income- and asset-qualified | Qualified residents | Assisted living penetration | Added demand from outside the area | Supportable assisted living units |
|---|---|---|---|---|---|---|---|
| Low | 6.0% | 3,125 | 35% | 1,094 | 8% | 10% | 96 |
| Base | 7.0% | 3,646 | 40% | 1,458 | 10% | 15% | 168 |
| High | 8.5% | 4,427 | 45% | 1,992 | 12% | 20% | 287 |
The base case supports about 168 assisted living units in the area, inside a range of 96 to 287. The range is wide because three uncertain shares multiply together, which is exactly why a reviewer will not accept a single-point demand figure. Net demand then depends on what already operates:
| Competing assisted living units in the area, including the sponsor's 40 (placeholder) | Unmet units, low | Unmet units, base | Unmet units, high |
|---|---|---|---|
| 110 | -14 | 58 | 177 |
| 130 | -34 | 38 | 157 |
| 150 | -54 | 18 | 137 |
The competing-supply column is a placeholder, not a count; it shows how the conclusion moves with the inventory the study must build. In the base case the area has room for the 24 new assisted living apartments only if competing supply, including the sponsor's existing 40, is below about 145 units. In the low case there is no unmet demand at any of the supply levels shown, and the expansion would fill by taking residents from other communities. That is the finding the lender most needs to see tested, and it is why this kind of study is prepared with a market and demand study rather than a pro forma alone.
Memory care is a separate market with a separate test. Residents living with dementia who cannot safely live in an open building need a secure setting, and in a rural area the alternative is often a nursing home bed or a move to a larger town.
| Scenario (assumptions) | Residents aged 75+ | Share living with dementia | Residents with dementia | Share needing a secure residential setting | Memory care units supportable |
|---|---|---|---|---|---|
| Low | 3,125 | 11% | 344 | 12% | 41 |
| Base | 3,646 | 14% | 510 | 15% | 77 |
| High | 4,427 | 17% | 753 | 18% | 135 |
Even the low case supports about 41 memory care units across the area against 16 proposed, before counting existing secure units. The constraint on memory care is less likely to be demand than staffing and price: memory care suites in the model are priced at $6,700 a month and need around-the-clock aides on a secure unit.
Rates and payer mix (assumptions)
| Revenue assumption (Year 1, modeled) | Value | Range tested or how a real study sets it |
|---|---|---|
| Assisted living monthly rate, private pay (rent and base care) | $5,150 | Rate survey of every licensed competitor; 5% lower in stress |
| Average level-of-care add-on, private assisted living | $425 | Operator's care-level assessments |
| Memory care monthly rate, private pay | $6,700 | Rate survey; memory care competitors within the drive time |
| Combined monthly receipts for a Frail Elderly waiver resident, assisted living | $3,500 | State waiver rate schedule plus the resident's room-and-board payment |
| Combined monthly receipts for a waiver resident, memory care | $4,100 | Same |
| Waiver share of occupied assisted living units | 20% | Operator history; 35% in stress |
| Waiver share of occupied memory care suites | 12% | Operator history |
| Ancillary and second-person fees per occupied unit per month | $55 | Operator history |
| Annual increase: private rates / waiver rates | 3.0% / 2.0% | Rate history; waiver increases held below private |
| Annual increase: wages / other expenses | 3.5% / 3.0% | Local wage survey; vendor contracts |
| Stabilized occupancy, all units | 90% | Capped at 90% for CF projections (7 CFR 5001.304) |
The Frail Elderly waiver line matters because it sets the low end of the market. A waiver resident brings combined receipts well below the private rate, and the model holds waiver rates to 2.0% annual increases against 3.0% for private rates, so a campus that takes more waiver residents loses margin over time. The sensitivity table tests a 35% waiver share.
Financial feasibility
Staffing plan (modeled)
| Role (stabilized, 80 units) | FTE | Year 1 wage per FTE | Year 1 wages |
|---|---|---|---|
| Executive director | 1.0 | $98,000 | $98,000 |
| Director of nursing (RN) | 1.0 | $95,000 | $95,000 |
| Charge nurses (LPN), one per shift around the clock | 4.2 | $60,000 | $252,000 |
| Medication aides and resident assistants, assisted living | 12.6 | $36,000 | $453,600 |
| Resident assistants, memory care | 8.4 | $37,500 | $315,000 |
| Life enrichment | 1.5 | $34,000 | $51,000 |
| Dietary | 5.6 | $33,500 | $187,600 |
| Housekeeping and laundry | 3.5 | $31,000 | $108,500 |
| Maintenance | 1.5 | $46,000 | $69,000 |
| Business office, admissions and HR | 2.0 | $44,000 | $88,000 |
| Total | 41.3 | $1,717,700 | |
| Benefits and payroll taxes at 24% of wages | $412,248 |
Labor is the largest cost: in the model, salaries, benefits and agency labor are 46.4% of Year 3 revenue. The plan covers one licensed practical nurse on every shift, a secure memory care unit staffed around the clock, and one kitchen for the whole campus. The expansion adds 17.3 full-time equivalents to an existing 24.0. A study tests the plan against the state's licensing minimums and the local wage market, and it shows what happens if the campus has to fill shifts with agency staff; the model carries agency labor at 3% of wages in Year 1 and 2% after that.
Lease-up
| Month after opening | Occupied new assisted living units | Occupied memory care suites | Campus occupancy |
|---|---|---|---|
| Month 1 | 4.0 of 24 | 2.0 of 16 | 51.5% |
| Month 2 | 6.0 of 24 | 3.5 of 16 | 55.9% |
| Month 3 | 8.0 of 24 | 5.0 of 16 | 60.2% |
| Month 4 | 10.0 of 24 | 6.5 of 16 | 64.6% |
| Month 5 | 12.0 of 24 | 8.0 of 16 | 69.0% |
| Month 6 | 14.0 of 24 | 9.5 of 16 | 73.4% |
| Month 7 | 16.0 of 24 | 11.0 of 16 | 77.8% |
| Month 8 | 18.0 of 24 | 12.5 of 16 | 82.1% |
| Month 9 | 20.0 of 24 | 14.0 of 16 | 86.5% |
| Month 10 | 21.6 of 24 | 14.4 of 16 | 89.0% |
| Month 11 | 21.6 of 24 | 14.4 of 16 | 89.0% |
| Month 12 | 21.6 of 24 | 14.4 of 16 | 89.0% |
The model assumes four assisted living apartments and two memory care suites are occupied at opening, from deposits taken during construction, and that the wing then gains two assisted living residents and one and a half memory care residents a month until it reaches the 90% ceiling in month 10. The existing building is assumed at 88% in Year 1, 89% in Year 2 and 90% thereafter. Absorption is the assumption reviewers question most; a real study sets it from the openings of comparable rural communities and from the sponsor's waiting list, and shows it month by month as here.
Five-year pro forma
| Line (modeled) | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|---|---|---|---|---|
| Average occupied assisted living units | 49.6 | 57.2 | 57.6 | 57.6 | 57.6 |
| Average occupied memory care suites | 9.6 | 14.4 | 14.4 | 14.4 | 14.4 |
| Campus occupancy (80 units) | 74.0% | 89.5% | 90.0% | 90.0% | 90.0% |
| Assisted living, private pay (rent and care) | $2,654,592 | $3,153,184 | $3,270,492 | $3,368,606 | $3,469,665 |
| Assisted living, Frail Elderly waiver residents | $416,640 | $490,090 | $503,387 | $513,455 | $523,724 |
| Memory care, private pay | $679,219 | $1,049,394 | $1,080,875 | $1,113,302 | $1,146,701 |
| Memory care, waiver residents | $56,678 | $86,718 | $88,452 | $90,221 | $92,026 |
| Ancillary and second-person fees | $39,072 | $48,674 | $50,414 | $51,926 | $53,484 |
| Total operating revenue | $3,846,202 | $4,828,059 | $4,993,620 | $5,137,511 | $5,285,599 |
| Salaries, wages, benefits and agency labor | $2,038,706 | $2,240,053 | $2,318,454 | $2,399,600 | $2,483,586 |
| Raw food | $260,480 | $324,491 | $336,093 | $346,176 | $356,561 |
| Resident and medical supplies | $56,240 | $70,061 | $72,566 | $74,743 | $76,985 |
| Utilities | $180,000 | $185,400 | $190,962 | $196,691 | $202,592 |
| Property and liability insurance | $140,000 | $144,200 | $148,526 | $152,982 | $157,571 |
| Repairs and maintenance | $76,000 | $78,280 | $80,628 | $83,047 | $85,539 |
| Marketing and admissions | $135,000 | $77,250 | $79,568 | $81,955 | $84,413 |
| Administration, IT and professional fees | $185,000 | $190,550 | $196,266 | $202,154 | $208,219 |
| Licenses, dues and training | $28,000 | $28,840 | $29,705 | $30,596 | $31,514 |
| Bad debt (1% of revenue) | $38,462 | $48,281 | $49,936 | $51,375 | $52,856 |
| USDA retention fee passed through (0.50% of guaranteed balance) | $45,191 | $44,492 | $43,738 | $42,926 | $42,050 |
| Total operating expenses | $3,183,079 | $3,431,896 | $3,546,443 | $3,662,245 | $3,781,887 |
| Net operating income | $663,123 | $1,396,163 | $1,447,178 | $1,475,266 | $1,503,713 |
| Replacement reserve deposit ($450 per unit, escalated) | $36,000 | $37,080 | $38,192 | $39,338 | $40,518 |
| Cash flow available for debt service | $627,123 | $1,359,083 | $1,408,985 | $1,435,928 | $1,463,194 |
| CF guaranteed loan debt service | $1,016,261 | $1,016,261 | $1,016,261 | $1,016,261 | $1,016,261 |
| Debt service coverage | 0.62x | 1.34x | 1.39x | 1.41x | 1.44x |
All figures are modeled. Coverage is cash flow after the replacement reserve divided by annual debt service on the CF guaranteed loan. The existing campus is assumed to carry no other debt and to be exempt from property tax as a nonprofit; both assumptions are checked against the sponsor's audited statements in a real study.
In Year 3 the combined campus earns $4,993,620 of revenue and $1,447,178 of net operating income, a 29.0% margin, and covers debt service 1.39x. Year 1 coverage is 0.62x: the campus is open, staffed and paying debt service on the whole loan while the wing fills. That is the normal shape of a lease-up and the reason the reserve below exists.
Debt service on the CF guaranteed loan (illustrative rate)
The rate is an assumption: 7.50% fixed, amortized over 25 years with monthly payments. CF guaranteed loan rates are negotiated between lender and borrower, may be fixed or variable, and may not exceed what the lender charges on similar loans without a guarantee; the term may run to the useful life of the facility, up to 40 years, with no balloon [1]. The annual retention fee of 0.50% is charged on the guaranteed share of the 31 December balance [5]; the model assumes the bank passes it to the borrower and counts it as an operating expense.
| Loan year | Opening balance | Interest | Principal | Debt service | Closing balance | Guaranteed portion (80%) | Retention fee on 31 Dec balance |
|---|---|---|---|---|---|---|---|
| Year 1 | $11,460,000 | $853,997 | $162,263 | $1,016,261 | $11,297,737 | $9,038,189 | $45,191 |
| Year 2 | $11,297,737 | $841,401 | $174,860 | $1,016,261 | $11,122,877 | $8,898,301 | $44,492 |
| Year 3 | $11,122,877 | $827,826 | $188,435 | $1,016,261 | $10,934,442 | $8,747,553 | $43,738 |
| Year 4 | $10,934,442 | $813,197 | $203,064 | $1,016,261 | $10,731,378 | $8,585,103 | $42,926 |
| Year 5 | $10,731,378 | $797,433 | $218,828 | $1,016,261 | $10,512,550 | $8,410,040 | $42,050 |
Annual debt service is $1,016,261. Net operating income of $1,270,326 after reserves would give 1.25 times coverage. Over 25 years the loan costs $25,406,517 in payments, of which $13,946,517 is interest at the assumed rate.
Break-even occupancy
| Campus occupancy in Year 3 (all 80 units) | Revenue | Net operating income | Cash flow for debt service | Coverage |
|---|---|---|---|---|
| 70% | $3,883,927 | $439,394 | $401,202 | 0.39x |
| 75% | $4,161,350 | $691,340 | $653,148 | 0.64x |
| 80% | $4,438,774 | $943,286 | $905,094 | 0.89x |
| 85% | $4,716,197 | $1,195,232 | $1,157,040 | 1.14x |
| 90% | $4,993,620 | $1,447,178 | $1,408,985 | 1.39x |
| Break-even, 82.2% | 1.00x | |||
| 1.25x coverage, 87.2% | 1.25x |
The campus breaks even at 82.2% occupancy in Year 3 and reaches 1.25 times coverage at 87.2%. Against a 90% ceiling, that leaves less than eight points between the highest occupancy the projections may assume and the point at which the campus stops covering its debt. In practice the margin is the most important number in the study: it tells the lender how much room there is for a slow year, a competitor's opening or a staffing crisis that forces the campus to close admissions.
Sensitivity and stress tests
| Scenario (modeled) | Year 1 coverage | Year 3 coverage | Year 5 coverage | Note |
|---|---|---|---|---|
| Base case | 0.62x | 1.39x | 1.44x | |
| Occupancy capped at 85% instead of 90% | 0.52x | 1.14x | 1.18x | |
| Occupancy capped at 80% | 0.37x | 0.89x | 0.92x | |
| Private assisted living rate 5% lower | 0.50x | 1.24x | 1.28x | |
| Wages and benefits 10% higher | 0.42x | 1.16x | 1.20x | |
| Waiver share of assisted living residents 35% instead of 20% | 0.44x | 1.16x | 1.19x | |
| Interest rate 1 point higher (variable rate, re-amortized) | 0.57x | 1.27x | 1.32x | |
| Interest rate 2 points higher (variable rate, re-amortized) | 0.52x | 1.17x | 1.22x | |
| Construction overrun of 10% of hard cost, financed with more debt | 0.55x | 1.25x | 1.30x | loan rises to $12,690,000 |
| Opening delayed 6 months (lease-up starts in month 7) | 0.09x | 1.39x | 1.44x | debt service starts on schedule while the new wing is empty |
Four results stand out. A permanent occupancy ceiling of 85% instead of 90% takes Year 3 coverage to 1.14 times, and 80% takes it below 1.00. A 10% rise in wages and benefits costs about as much coverage as a 15-point shift to waiver residents. A variable rate two points higher re-amortized from the start still leaves coverage above 1.15 times in Year 3, so rate risk is smaller here than occupancy and labor risk. A 10% construction overrun financed with more debt raises the loan to $12,690,000 and brings Year 3 coverage to 1.25 times exactly, which is why the budget carries a 7% contingency and a fixed-price contract matters.
Reserves and the lease-up year
| Year 1 scenario (modeled) | Cash flow for debt service | Debt service | Year 1 shortfall | Lease-up reserve left ($700,000 at opening) | Result |
|---|---|---|---|---|---|
| Base case | $627,123 | $1,016,261 | -$389,138 | $310,862 | covered |
| Opening delayed 6 months | $91,494 | $1,016,261 | -$924,767 | -$224,767 | not covered |
| Occupancy capped at 85% | $525,605 | $1,016,261 | -$490,656 | $209,344 | covered |
| Wages and benefits 10% higher | $423,252 | $1,016,261 | -$593,008 | $106,992 | covered |
| Waiver share of assisted living residents 35% | $443,720 | $1,016,261 | -$572,541 | $127,459 | covered |
The sponsor's $700,000 lease-up reserve covers the base-case Year 1 shortfall of -$389,138 with about $311,000 to spare, and it covers each single stress shown except a six-month opening delay, which leaves a gap of about $225,000. A study that finds this does not reject the project; it recommends a larger reserve, a debt service reserve funded at closing, a construction schedule with float, or a sponsor liquidity covenant. Part 5001's credit evaluation rule asks the lender to address reserves for capital expenditure, debt service and maintenance, and to confirm working capital is adequate [1]; the model's replacement reserve of $450 per unit a year and the lease-up reserve are the two lines that answer it.
Equity test under the CF guaranteed rule
There is no fixed equity floor for CF guaranteed loans in Part 5001 [1]. B&I's 10% to 25% equity table (5001.105(d)) does not apply to a CF borrower. What the rule does reward is other money: sponsor funds of 23.4% of cost earn 10 priority points, and moving above 50% would earn 15 [1]. The lender will still look at the sponsor's balance sheet after closing, because a nonprofit that empties its reserves to build has nothing left for the lease-up year. The model leaves the existing campus debt-free and puts $3,504,112 of sponsor money into the project, including the full lease-up reserve.
Financing benchmarks: SBA next to CF
SBA lending to senior care in Kansas is thin, but it shows typical loan sizes for small for-profit operators, who cannot use CF [10]; SBA lenders may also require a feasibility study of their own borrowers [12]:
Kansas: SBA lending to assisted living and nursing facilities
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 5 | $2.7 million | 3 | $8.8 million |
| FY2017 to FY2019 | 6 | $4.2 million | 2 | $1.7 million |
| FY2020 to FY2023 | 7 | $3.0 million | 3 | $2.2 million |
| FY2024 to FY2026 | 12 | $7.2 million | 4 | $4.1 million |
Average 7(a) loan, FY2020 to FY2026: $541,368. Average 504 loan: $889,286. Kansas had fewer than 30 seasoned 7(a) loans for assisted living and nursing facilities; nationally, 3.3% of 1,086 FY2010 to FY2016 loans were charged off, on average 85 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
The modeled CF loan of $11,460,000 is more than twenty times the average Kansas 7(a) senior care loan; an expansion of this size is outside what SBA lending in the state usually finances. USDA Community Facilities activity in Kansas is also light. USAspending records 17 CF awards in Kansas from 1 October 2023 to 30 September 2026, 5 loans and 12 grants, against 25 in Nebraska, 32 in Missouri, 45 in Iowa and 47 in Oklahoma; Colorado had 12 [11]. Kansas ranks 37th of the 51 states with data. Counts are by program, not facility type, so they include fire halls and clinics as well as senior care. The Kansas precedent most often cited is a hospital: this site's Kansas page records $119,133,000 of Community Facilities financing for a 25-bed critical access replacement hospital in Colby [13]. For assisted living specifically, the closest published CF precedent on this site's state pages is outside Kansas: a $300,000 CF loan for 15 assisted living and memory care units in Bird Island, Minnesota [18].
Technical and environmental feasibility
The technical section of a CF study covers the building, the license and the construction risk. For this modeled project the issues are:
- Licensure. The wing must be licensed in the right category for each unit type, and memory care needs the state's approval for a secure unit. The study confirms the license category, staffing minimums and any plan review with the state licensing agency before the pro forma is final. Kansas has no certificate of need for assisted living [13], so there is no approval gate, but also no protection from a competitor.
- Life safety and design. Connecting a new wing to an older building often triggers upgrades to the existing building's fire protection, egress and emergency power. The budget carries $240,000 for generator and life safety work and $295,000 for secure entry and campus nurse call. A real study takes these from the architect's code review.
- Construction while operating. Renovating the kitchen and dining room of an occupied building needs a phasing plan, temporary food service and a schedule the residents can live with.
- Construction contract and draws. The lender will expect a fixed-price contract with an independent general contractor, retainage, a draw schedule and, if the guarantee is requested before completion, the 0.50% fee [5]. Construction obligations entered before the application can make a CF guarantee unavailable (5001.116(c)) [1].
- Environmental review. USDA completes an environmental review before it commits; a campus expansion on previously developed land is usually straightforward, but flood zone, wetlands and historic properties are checked before design is fixed.
- Collateral. Real estate over $250,000 needs a USPAP appraisal with as-is and prospective values; going concern value is deducted before collateral is discounted, and the appraisal may be no more than a year old at closing [1]. A senior care building is special-purpose collateral, so the appraisal's alternative-use analysis matters.
Management and governance feasibility
For a CF borrower, management feasibility has two parts. The first is the operator: the executive director's and director of nursing's experience, the existing campus's occupancy, inspection and complaint history, and, if memory care is new, who will run it. A sponsor adding memory care without a memory care director in place should expect the reviewer to ask for one, or for a management agreement with an operator that has run secure units. The second is the board: CF requires a nonprofit to show significant ties to the community, through association with or control by a public body or through broadly based local membership [1]. The study reads the bylaws, board minutes and the resolution authorizing the debt, and it confirms local government support letters are in the file.
Economic and community impact (modeled)
| Impact measure (modeled) | Value | Basis |
|---|---|---|
| Construction spending in the county (hard cost plus contingency) | $11,572,000 | Budget above |
| Permanent jobs added (full-time equivalents) | 17.3 | Staffing plan: 41.3 FTE after expansion against 24.0 before |
| Permanent jobs on campus after expansion | 41.3 | Staffing plan |
| Year 3 payroll, benefits and agency labor | $2,318,454 | Pro forma |
| Residents served at stabilized occupancy | 72 (of 80 units) | 90% occupancy |
| Memory care suites in a seven-county area | 16 | New service line for the sponsor |
| Seven-county population, July 2025 | 52,088 | Census Vintage 2025 |
The impact a State Office weighs is the service, not the jobs alone. A 16-suite memory care unit brings a secure setting to a seven-county area of about 52,000 people where the county data show no more than a handful of senior care establishments outside Ford County. Families who would otherwise drive a parent to a larger town keep that parent near home, and the campus adds about 17 permanent jobs in a county whose net migration was negative in 2025.
Risks and mitigants
| Risk | How it shows up | Mitigant tested in the study |
|---|---|---|
| Slow lease-up | Year 1 coverage 0.62x; shortfall of -$389,138 | Lease-up reserve; pre-leasing deposits; monthly absorption from comparables |
| Occupancy ceiling | 90% cap leaves under eight points above break-even | Payer mix and pricing that lower break-even; covenant at a realistic level |
| Competing supply | No certificate of need in Kansas [13] | Inventory of licensed and approved projects; fair share test |
| Staffing | Labor is 46.4% of revenue | Local wage survey; recruitment plan; agency labor scenario |
| Waiver dependence | Waiver residents pay well below private rates | 35% waiver stress; private-pay floor |
| Construction overrun or delay | 10% overrun brings Year 3 coverage to 1.25x; 6-month delay leaves the reserve short | 7% contingency; fixed-price contract; schedule float; larger reserve |
| Rate risk on a variable loan | +2 points gives 1.17x in Year 3 | Fixed rate or a cap; rate change before closing needs Agency approval [1] |
| Funding timing | Dodge City is outside the pool reserved for places of 20,000 or less [1] | Schedule the application around the State Office's funding calendar |
| Memory care as a new activity | May require an independent feasibility study [1] | Settle the report type with the lender before fieldwork |
What the five Part 5001 components showed
Part 5001's appendix A organizes a feasibility study into economic, market, technical, financial and management components, and appendix B adds the need-for-facility content specific to Community Facilities [2]. Applied to this modeled expansion:
| Component | What the model shows | What a reviewer would still ask |
|---|---|---|
| Economic | 17.3 new jobs; about $11.6 million of construction spending including contingency | Construction labor availability in southwest Kansas |
| Market and need | Base-case demand of 168 assisted living units and 77 memory care units in a 52,088-person area | A licensed-unit inventory and measured penetration rates |
| Technical | A buildable wing on an owned campus; license and life safety items budgeted | Architect's code review; state plan review for the secure unit |
| Financial | Year 3 coverage 1.39x; break-even 82.2% under a 90% ceiling | Lease-up evidence; reserve size under a delay |
| Management | Established operator; memory care leadership to be named | Resumes, board resolution, community ties |
Why studies like this are sent back
- Occupancy above 90% in the projections, or stabilization in the first months after opening [1].
- Demand counted from all seniors rather than income- and asset-qualified residents.
- No licensed-unit inventory, or one that leaves out small residential homes and approved projects.
- Staffing copied from a nursing home or from a metro operator.
- A lender's financial feasibility analysis submitted where the borrower's situation called for an independent study or an examination opinion [1][2].
- No lease-up reserve, or initial operating costs placed in the loan budget although CF guaranteed loan funds cannot pay them [1].
- A market study written by the developer or operator rather than an independent consultant.
Program terms that applied
| Term | CF guaranteed rule | Source |
|---|---|---|
| Guarantee | 80% in FY2026; 90% is the regulatory ceiling | 91 FR 11272; 5001.407 [1][5] |
| Up-front guarantee fee | 1.25% of the guaranteed amount ($114,600 on the modeled loan) | 91 FR 11272 [5] |
| Annual retention fee | 0.50% of the guaranteed share of the outstanding balance ($45,191 in Year 1 of the model) | 91 FR 11272 [5] |
| Fee if the guarantee is issued before construction completion | 0.50% | 91 FR 11272 [5] |
| Maximum loan | $100 million of CF guaranteed loans per borrower | Part 5001 [1] |
| Rate | Negotiated; fixed or variable; no higher than the lender's similar loans without a guarantee | 5001.401 [1] |
| Term | Useful life, up to 40 years or state law, whichever is less; no balloon | 5001.402 [1] |
| Rural area | Outside cities over 50,000 and their contiguous urbanized areas; funds reserved first for places of 20,000 or less | 5001.3, 5001.103(c), 5001.316(e) [1] |
| Feasibility evidence | Financial feasibility report always; independent study over $1 million to a new entity or activity | 5001.304 [1][2] |
| Occupancy in projections | No more than 90% for assisted living | 5001.304 [1] |
| Tax status | Interest on a guaranteed loan cannot be tax-exempt | Part 5001 [1] |
The FY2026 fee notice governs loans obligated in fiscal year 2026 [5]; a 2024 obligation, like this engagement, was priced under that year's notice, which this site has not read. A Federal Register check on 11 November 2026 found no FY2027 notice yet [19].
Lessons for sponsors of similar projects
- Check the population count before anything else. A town between 20,000 and 50,000 can use a CF guarantee but not CF direct money or grants, and it competes outside the pool reserved for small places until July.
- Treat 90% as a ceiling, not a target. Build the debt so that break-even sits well below it; in this model the margin is under eight points, and that is the figure the lender will focus on.
- Fund the lease-up from your own money. CF guaranteed loan funds cannot pay initial operating expenses, so the reserve has to come from the sponsor, and it has to survive a construction delay.
- Settle the report type early. Whether memory care is a new activity, and whether three audited years show capacity to pay, decides which report the lender submits; the fieldwork is the same, but the deliverable is not.
- Count supply from licenses, not from business counts. The Census count is a screen; the licensing roster, with units and approved projects, is the inventory.
- Put sponsor money in the stack. Other funds of 20% or more earn 10 priority points, and they make the lender's credit evaluation easier.
Related pages
- The CF guaranteed engagement page lists this program's engagements, including this one.
- The national assisted living feasibility study page sets out B&I, CF and SBA rules and worked examples for senior care [14].
- The Kansas assisted living feasibility study page and the Kansas state page carry the state's data, office and precedents.
- The Community Facilities feasibility study page explains the program as a whole.
- Other long-form work is on the case studies page, including the Texas assisted living case study.
If you are planning an assisted living or memory care expansion in a rural town and need a USDA feasibility study consultant, the engagement index describes the process: a fifteen-minute scoping call, a written proposal inside one business day and a firm fixed fee before you sign [16]. Request a proposal for your study [17].