How to read this case study. The engagement summary reflects the published record. Client names, actual costs, loan terms and proprietary data are confidential, so the project budget, market sizing and financial projections below are a modeled example built from public data for this project type and location. They show the analysis a lender-grade study performs, not the client's figures.
Data current as of November 2026.
Engagement summary
In 2022 we prepared a feasibility study for a meat processing and cold storage project in Liberal, Kansas, under the USDA Food Supply Chain Guaranteed Loan Program, with a non-regulated lender. The loan was greater than $25 million. This is a legacy-program example: the Food Supply Chain program no longer has funding and Rural Development no longer accepts applications for it [4], so the second half of this page shows how the same project would be financed today under the Business and Industry (B&I) program or the Strengthening Processing for US Ranchers (SPUR) program.
| Field | Published record |
|---|---|
| Program | USDA Food Supply Chain Guaranteed Loan Program (legacy) |
| Asset | Meat and poultry processing, with cold storage |
| Location | Liberal, Kansas (Seward County) |
| Loan size tier | Greater than $25 million |
| Year | 2022 |
| Lender type | Non-regulated lender |
| Outcome | Prepared under the Food Supply Chain program, which has since closed to new applications |
The modeled project on this page is a further-processing plant (grinding, portioning and case-ready packing of beef owned by its customers) with a 9,000-position freezer and cooler warehouse on the same site. A plant with its own kill floor would change the economics, the inspection path and the cattle supply analysis; the method below still applies.
The Food Supply Chain program and why it matters now
USDA opened the Food Supply Chain Guaranteed Loan Program on 9 December 2021 with a notice of funding opportunity under section 1001(b)(4) of the American Rescue Plan Act [3]. The notice made about $1 billion of loan guarantees available, accepted applications until funds were exhausted, capped the aggregate loan amount a borrower could receive at $40 million, guaranteed 90% of fixed-rate loans at or below the Wall Street Journal prime rate plus 200 basis points and 80% of all other loans, and set no geographic restrictions [3]. Those last two terms made it unusual: a meat or cold storage plant over $25 million, in a town or a city, could carry a 90% guarantee.
On 14 January 2026, in an information-collection notice, USDA stated that the program no longer has funding available, that Rural Development is no longer accepting applications for new loans, and that loans in the portfolio are being serviced under established regulations [4]. No Federal Register notice formally ends the program, and the Federal Register does not give the date the funds ran out.
| Food Supply Chain term (86 FR 70086) | Value |
|---|---|
| Authority | American Rescue Plan Act, section 1001(b)(4) |
| Funding | About $1 billion in loan guarantees, until exhausted |
| Maximum aggregate loan per borrower | $40 million |
| Guarantee | 90% for fixed-rate loans at or below WSJ prime + 200 basis points; 80% for all other loans |
| Geography | No geographic restrictions |
| Status | No funding; no new applications; existing loans serviced (91 FR 1496, 14 January 2026) |
For a sponsor today, the lesson of the legacy program is structural. A $38 million loan that fitted Food Supply Chain does not fit B&I, which stops at $25 million per borrower [1]. SPUR, opened on 27 October 2026 under the same American Rescue Plan authority, covers meat, poultry and seafood processing with a 90% guarantee and no geographic restriction [5], but its maximum loan is not stated in the Federal Register notice.
The question the lender and USDA needed answered
For a new plant of this size the questions are the same under any guarantee. Will customers commit enough volume, at a processing fee that covers labour, packaging and debt? Can a town of 19,010 staff a plant of more than 200 people next to some of the largest packing plants in the country? How long does it take to win the grant of federal inspection and reach full volume, and who pays the debt in the meantime? And how much of the loan is covered by collateral that a special-purpose meat plant can support?
Today's part 5001 rules make the study mandatory for a loan over $1,000,000 to a new business: an independent qualified consultant acceptable to the Agency must prepare it, with the Agency setting the scope (5001.306(a)(3)(i)) [1]. SPUR loans are administered under part 5001 as amended or supplemented by the SPUR funding notice [5], so the part 5001 study rule is the baseline for SPUR as well, subject to anything the full notice changes.
| Rule | Requirement | Effect on a project like this one |
|---|---|---|
| 7 CFR 5001.306(a)(3)(i) | Independent study for loans over $1,000,000 to a new business | Study mandatory under B&I; baseline under SPUR |
| 7 CFR 5001.205(e)(2) | Guarantee before construction completion: confirmed budget and timetable, contingencies, start-up working capital, fixed-price contract, equity first | Budget, schedule and reserve in the study |
| 7 CFR 5001.202 | Quarterly cash flow through start-up; projections without history substantiated | Ramp model; customer evidence |
| 7 CFR 5001.105(d)(3) | 25% equity for a new business with construction and an early guarantee | Equity tested at closing |
| 7 CFR 5001.406(c) | B&I limit $25 million per borrower | Forces a restructured B&I deal |
| 9 CFR part 304 | Federal grant of inspection before inspected product is sold | Start-up timing in the cash flow [7] |
Project description (modeled)
| Component | Modeled scope | Driver |
|---|---|---|
| Processing building | 44,000 sq ft, sanitary construction | Grinding, portioning, case-ready lines |
| Capacity | 400,000 lb of finished product a day on two shifts | Customer volumes plus growth |
| Business model | Processing for a fee; customers own the meat | Limits commodity price risk |
| Cold storage | 50,000 sq ft: 36,000 sq ft freezer, 14,000 sq ft cooler; 9,000 positions | Customers' finished goods plus regional shippers |
| Refrigeration | Central ammonia system | Shared by plant and warehouse |
| Wastewater | On-site pretreatment ($2,900,000) | City discharge limits |
| Inspection | Federal grant of inspection | Required to sell inspected product [7] |
| Phase | Timing (modeled) | Milestone |
|---|---|---|
| Customer agreements, design, permits | Months 1 to 12 before closing | Processing agreements, discharge permit path, design-build price |
| Closing | Note month 0 | Equity spent first; guarantee issued before completion |
| Construction | Note months 1 to 18 | Monthly draws with inspection |
| Commissioning and grant of inspection | Months 17 to 19 | Sanitation procedures, hazard analysis plan, trials |
| Operating year 1, interest-only | Months 19 to 30 | Ramp to 200,000 lb a day |
| Full payments | From month 31 | Within 3 years of the note (5001.402) |
Project cost and sources and uses
Every line is an assumption with a range; the last column names the document a real study uses instead.
| Line item | Basis | Modeled cost | Assumption range | How a real study sources it |
|---|---|---|---|---|
| Land (about 20 acres, industrial zoning) | allowance | $900,000 | $500,000 to $1,500,000 | Purchase contract; appraisal |
| Site work, truck courts, utility extensions | allowance | $3,200,000 | $2,200,000 to $4,500,000 | Civil engineer estimate |
| Wastewater pretreatment (equalization, dissolved air flotation) | allowance | $2,900,000 | $2,000,000 to $4,000,000 | Engineer design; discharge permit terms |
| Processing building, sanitary construction | 44,000 sq ft x $370 | $16,280,000 | $300 to $450 per sq ft | Design-build bid |
| Grinding, blending and forming lines | equipment | $3,100,000 | $2,200,000 to $4,000,000 | Equipment quotes |
| Portioning, slicing and case-ready lines | equipment | $2,600,000 | $1,800,000 to $3,400,000 | Equipment quotes |
| Packaging (vacuum, tray-seal, case packing, palletizing) | equipment | $1,900,000 | $1,300,000 to $2,600,000 | Equipment quotes |
| Food safety: metal detection, X-ray, labs, sanitation systems | equipment | $800,000 | $500,000 to $1,100,000 | Equipment quotes |
| Cold storage (36,000 sq ft freezer, 14,000 sq ft cooler), insulated panel | 50,000 sq ft x $165 | $8,250,000 | $130 to $210 per sq ft | Design-build bid |
| Central ammonia refrigeration (plant and warehouse) | allowance | $5,400,000 | $4,000,000 to $7,000,000 | Refrigeration contractor bid |
| Pallet racking | 9,000 positions x $100 | $900,000 | $75 to $130 per position | Racking quote |
| Electrical service, substation share, backup power | allowance | $2,000,000 | $1,400,000 to $2,800,000 | Utility letter; electrical bid |
| Hard cost subtotal (excluding land) | $47,330,000 | |||
| Architecture, process and refrigeration engineering | 6% of buildings, site and refrigeration | $2,162,000 | 5% to 8% | Design contracts |
| Permits, discharge permit, connection fees | allowance | $500,000 | $300,000 to $900,000 | City and state fee schedules |
| Legal, appraisal, feasibility study, title, closing | allowance | $600,000 | $400,000 to $900,000 | Engagement letters |
| Contingency | 7% of buildings, site and refrigeration; 5% of equipment | $3,087,000 | 5% to 10% | Lender and engineer review |
| Commissioning, trials, hiring and training | allowance | $1,100,000 | $700,000 to $1,800,000 | Start-up budget |
| Working capital (receivables, packaging, supplies) | allowance | $3,500,000 | Sized from monthly ramp | Monthly cash flow |
| Interest during construction | average 45% of $38,000,000 drawn for 18 months at 7.25% | $1,860,000 | Depends on draw schedule | Lender draw schedule |
| Base project cost before guarantee fees | $61,039,000 |
The base project costs $61,039,000 before guarantee fees. Wastewater pretreatment and refrigeration together cost more than the processing equipment, which is typical: a meat plant is a building and its utilities first and a set of lines second. Working capital of $3,500,000 is sized to the shortfall in the first two operating years, shown below.
The sources depend on the program, and that comparison is the point of a legacy case study.
| Measure (same modeled project, same 7.25% rate) | Food Supply Chain (2022, legacy) | B&I today, option A: $25M loan plus more equity | B&I today, option B: $25M B&I plus $13M unguaranteed loan | SPUR today |
|---|---|---|---|---|
| Guaranteed loan | $38,000,000 | $25,000,000 | $25,000,000 + $13,000,000 unguaranteed | $38,000,000 |
| Guarantee | 90% if fixed at or below WSJ prime + 2 points; otherwise 80% | 80% | 80% of the B&I loan | 90% |
| Guaranteed amount | $34,200,000 (90%) or $30,400,000 (80%) | $20,000,000 | $20,000,000 | $34,200,000 |
| Lender exposure | $3,800,000 or $7,600,000 | $5,000,000 | $18,000,000 | $3,800,000 |
| Upfront guarantee fee | Set by the 2021 notice (not modeled here) | $700,000 (3.0% + 0.50% early guarantee) | $700,000 | $1,197,000 (3.0% + 0.50% early guarantee) |
| Annual retention fee, year 1 | Not modeled | $110,000 | $110,000 | $188,100 |
| Project cost including fee | $61,039,000 + FSC fee | $61,739,000 | $61,739,000 | $62,236,000 |
| Equity | $23,039,000 (37.7%) | $36,739,000 (59.5%) | $23,739,000 (38.5%) | $24,236,000 (38.9%) |
| Annual debt service from year 2 | $3,295,999 | $2,168,421 | $3,750,676 | $3,295,999 |
| DSCR, year 4 | 1.77x | 2.70x | 1.56x | 1.77x |
| Geographic test | None | 5001.3 rural area (Liberal passes on population) | 5001.3 rural area | None |
| Maximum loan | $40 million aggregate per borrower | $25 million (5001.406(c)) | $25 million guaranteed | Not stated in the Federal Register notice |
| Lender must keep | Not modeled | Unguaranteed 20% | Unguaranteed 20% plus the second loan | At least 10% of the loan |
| Status | Closed: no funding, no new applications (91 FR 1496) | Open | Open | Open from 27 Oct 2026 until funds are exhausted |
All four columns use the same project, the same 7.25% fixed rate and 25-year amortization, so they isolate the program terms. Rates in 2022 were different, and the Food Supply Chain fee schedule is not reproduced here, so the legacy column is a structural comparison, not a reconstruction of the engagement.
Three findings come out of the table:
- SPUR is the closest successor. It guarantees 90% of the full $38,000,000 ($34,200,000), leaves the lender $3,800,000 at risk, and carries a fee of $1,197,000, 3.0% plus 0.50% for a guarantee issued before construction completion [5]. The lender must keep at least 10% of the loan [5]. Coverage in year 4 is 1.77x before the retention fee.
- B&I alone needs far more equity. At the $25 million limit the sponsor would have to put in $36,739,000, 59.5% of cost, though coverage on the smaller loan rises to 2.70x.
- B&I with a second loan works on coverage but not on risk. Adding a $13,000,000 unguaranteed loan at 9.0% over 15 years keeps equity near the legacy level but gives coverage of 1.56x and leaves the lender $18,000,000 at risk, about five times the SPUR exposure. A lender and the state office would both look hard at that structure.
Market analysis
Kansas meat and poultry processing
| Measure | Kansas | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 77 → 88 (+14.3%) | 3,501 → 3,716 |
| Per 100,000 residents (2023) | 3.0 | 1.1 |
| Average employees per establishment | 222.4 | 149.7 |
| Average annual pay per employee | $60,595 | $50,981 |
| Share of establishments in non-metro counties | 40.9% (9 in 3 counties) | |
| Share of state population in non-metro counties (2025) | 28.8% |
Non-metro counties with the most meat and poultry processing (2023): Ford County (3); Labette County (3); Lyon County (3).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Kansas had 88 meat and poultry plants in 2023, up 14.3% from 2019, at 3.0 per 100,000 residents against 1.1 nationally. They are very large, 222.4 employees on average against 149.7 nationally, and they pay $60,595 a year, 18.9% above the national $50,981. The county file places only 22 of the 88 plants, because Census does not show counties with very few plants, so the non-metro share in the table understates how much of the state's meat employment sits in the southwest.
The site's Kansas guide reports that Ford, Finney and Seward counties hold four large beef plants with a combined published capacity of about 23,800 head a day [14]. That is the supply base a further processor in Liberal buys services from and sells services to, and the labour market it competes in.
Kansas cold storage
| Measure | Kansas | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 9 → 11 (+22.2%) | 1,350 → 1,367 |
| Per 100,000 residents (2023) | 0.4 | 0.4 |
| Average employees per establishment | 73.4 | 48.4 |
| Average annual pay per employee | $54,735 | $56,901 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 28.8% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Kansas had only 11 refrigerated warehouses with paid employees in 2023, none in a non-metro county. The large plants run their own freezers, but third-party cold storage in southwest Kansas does not appear in the Census county file. For the warehouse half of the project that is both the opportunity and the evidence problem: there are no local comparables, so the study has to build demand from named customers' storage agreements.
Regional comparison
| State | Meat and poultry plants, 2023 | Per 100,000 | Employees each | Average pay | Non-metro share | Refrigerated warehouses | Warehouse non-metro share |
|---|---|---|---|---|---|---|---|
| Kansas | 88 | 3.0 | 222.4 | $60,595 | 40.9% | 11 | 0.0% |
| Nebraska | 122 | 6.1 | 250.3 | $58,442 | 41.0% | 18 | 0.0% |
| Iowa | 149 | 4.6 | 228.3 | $56,630 | 58.4% | 26 | 23.1% |
| Texas | 292 | 1.0 | 154.3 | $50,488 | 18.4% | 139 | 0.0% |
| Oklahoma | 77 | 1.9 | 131.7 | $48,446 | 18.2% | 7 | 0.0% |
| Colorado | 83 | 1.4 | 111.2 | $52,317 | 8.0% | 17 | 0.0% |
| United States | 3,716 | 1.1 | 149.7 | $50,981 | 1,367 |
Kansas, Nebraska and Iowa form the core of the beef and pork processing belt, with very large plants and pay well above the national average. Kansas has fewer refrigerated warehouses per head than Nebraska or Iowa. Oklahoma's Texas County, next to Seward County, adds another large food processing workforce to the regional labour market.
Seward County and the southwest Kansas labour shed
| County | OMB 2023 | Population, 2025 | Change since 2020 | All manufacturing: plants / employees | Food (311): plants / employees | Meat (3116): plants / employees | Manufacturing jobs per 100 residents |
|---|---|---|---|---|---|---|---|
| Seward County, KS | Non-metro | 21,073 | -4.1% | 13 / 3,304 (high) | not shown | not shown | 15.7 |
| Ford County, KS | Non-metro | 33,993 | -0.9% | 25 / 6,711 (moderate) | 4 / 6,048 | 3 / 6,019 | 19.7 |
| Finney County, KS | Non-metro | 37,505 | -2.5% | 31 / 3,740 (high) | 6 / 3,231 | not shown | 10.0 |
| Texas County, OK | Non-metro | 20,322 | -5.0% | 12 / 2,497 (high) | 7 / 2,398 | not shown | 12.3 |
| Stevens County, KS | Non-metro | 4,984 | -5.0% | 8 / 205 (high) | 3 / 94 | not shown | 4.1 |
| Haskell County, KS | Non-metro | 3,599 | -4.8% | 7 / 103 (low) | 3 / 69 | not shown | 2.9 |
| Meade County, KS | Non-metro | 3,852 | -5.1% | 5 / 21 (moderate) | not shown | not shown | 0.5 |
| Sedgwick County, KS | Metro | 538,433 | 2.8% | 473 / 42,288 (low) | 30 / 1,873 | 5 / 1,224 | 7.9 |
Seward County had 13 manufacturers employing 3,304 people in 2023 (high noise), 15.7 manufacturing jobs per 100 residents, and its population fell -4.1% from 2020 to 2025. Every county in the table except Sedgwick lost population. The modeled plant needs about 213 workers at stabilization, equal to 6.4% of the county's 2023 manufacturing employment. That is the labour question the study had to answer with a recruitment plan, a wage strategy against the large plants, housing and transport, not with a population table.
Eligibility under each program
| Place | Census base 2020 | Estimate 2025 | Change | B&I (5001.3) | FSC and SPUR |
|---|---|---|---|---|---|
| Wichita | 397,589 | 400,987 | 0.9% | Over 50,000: excluded from B&I with its contiguous urbanized area | No geographic test |
| Dodge City | 27,793 | 27,653 | -0.5% | Under 50,000: passes B&I on population; contiguity decides | No geographic test |
| Garden City | 28,158 | 27,402 | -2.7% | Under 50,000: passes B&I on population; contiguity decides | No geographic test |
| Liberal | 19,843 | 19,010 | -4.2% | Under 50,000: passes B&I on population; contiguity decides | No geographic test |
Liberal had 19,010 residents in the 2025 estimate, down -4.2% since 2020. It passes the B&I rural area test on population, and the nearest city over 50,000 (Wichita) is far from contiguous [1]. The site's Kansas guide lists Liberal among the eligible places [14]. Food Supply Chain had no geographic restrictions [3], and SPUR has none [5], so for those programs the test does not arise.
Financing benchmarks
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 4 | $587,900 | 1 | $957,000 |
| FY2017 to FY2019 | 0 | $0 | 1 | $228,000 |
| FY2020 to FY2023 | 3 | $786,000 | 1 | $2.6 million |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $262,000. Average 504 loan: $2.6 million. Kansas had fewer than 30 seasoned 7(a) loans for meat and poultry processing; nationally, 3.7% of 214 FY2010 to FY2016 loans were charged off, on average 72 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
SBA lending to Kansas meat processors is almost non-existent: ten loans across both programs since FY2010, all small. Nationally, 3.7% of seasoned meat-processing 7(a) loans were charged off. USAspending lists 3 B&I loans in Kansas for FY2024 to FY2026 (counts may be incomplete). A $38 million meat plant loan is far outside the SBA market, which is why the legacy and current USDA programs are the realistic guaranteed routes.
Financial feasibility
Operating assumptions
| Operating assumption (modeled) | Value | Evidence a real study uses |
|---|---|---|
| Plant capacity | 400,000 lb of finished product a day on two shifts | Line ratings; process engineer |
| Finished product, years 1 to 5 | 200,000, 238,000, 262,000, 275,000, 280,000 lb a day | Co-packing and processing agreements |
| Operating days | 250 a year | Plant schedule |
| Processing fee (customer owns the meat) | $0.43 per lb, +2.5% a year | Contract terms; competing processor quotes |
| Packaging, utilities, sanitation | $0.102 per lb | Supplier quotes; tariffs |
| Plant staffing | 78 FTE plus 0.42 per 1,000 lb a day, at $60,595 plus 25% | Kansas meat processing pay, CBP 2023 (pack) |
| Cold storage positions | 9,000 | Racking layout |
| Cold storage occupancy, years 1 to 5 | 45%, 65%, 78%, 85%, 87% | Anchor storage agreements |
| Storage and handling | $25.00 per position a month; $20.00 per pallet in and out; 8 turns; 6% accessorial | Rate sheets; customer inventory data |
| Warehouse staffing | 8 FTE plus 1.5 per 1,000 occupied positions, at $54,735 plus 25% | Kansas refrigerated warehousing pay, CBP 2023 (pack) |
| Warehouse power | 1,400,000 kWh plus 500,000 kWh at full occupancy, at 8.5 cents | Refrigeration load; utility tariff |
| Insurance, property tax, management and administration | $3,750,000 in year 1, +2.5% a year | Quotes; assessor; organisation chart |
Five-year pro forma
| Operating year | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 |
|---|---|---|---|---|---|
| Finished product, lb a day | 200,000 | 238,000 | 262,000 | 275,000 | 280,000 |
| Processing fee per lb | $0.430 | $0.441 | $0.452 | $0.463 | $0.475 |
| Processing revenue | $21,500,000 | $26,224,625 | $29,590,853 | $31,835,579 | $33,224,768 |
| Cold storage occupancy | 45.0% | 65.0% | 78.0% | 85.0% | 87.0% |
| Cold storage revenue | $1,974,780 | $2,938,034 | $3,631,410 | $4,076,025 | $4,297,089 |
| Total revenue | $23,474,780 | $29,162,659 | $33,222,263 | $35,911,604 | $37,521,857 |
| Employees (FTE) | 176 | 195 | 207 | 213 | 215 |
| Labour with 25% benefits | $13,233,564 | $14,992,852 | $16,295,981 | $17,218,370 | $17,844,796 |
| Packaging, utilities, sanitation | $5,100,000 | $6,220,725 | $7,019,226 | $7,551,696 | $7,881,224 |
| Equipment maintenance | $168,000 | $252,000 | $252,000 | $252,000 | $252,000 |
| Warehouse power and operating costs | $378,625 | $415,253 | $443,731 | $464,813 | $479,358 |
| Insurance, property tax, management and administration | $3,750,000 | $3,843,750 | $3,939,844 | $4,038,340 | $4,139,298 |
| Replacement reserve (1.5%) | $352,122 | $437,440 | $498,334 | $538,674 | $562,828 |
| Net operating income | $492,470 | $3,000,639 | $4,773,147 | $5,847,711 | $6,362,353 |
| Debt service on $38 million (year 1 interest-only) | $2,755,000 | $3,295,999 | $3,295,999 | $3,295,999 | $3,295,999 |
| DSCR | 0.18x | 0.91x | 1.45x | 1.77x | 1.93x |
| Retention fee if SPUR (0.55% of 90%) | $188,100 | $185,331 | $182,355 | $179,156 | $175,716 |
| DSCR after SPUR retention fee | 0.17x | 0.86x | 1.37x | 1.68x | 1.83x |
The plant reaches 1.45x coverage in year 3 and 1.77x at stabilization in year 4 on $35,911,604 of revenue. The first two years do not cover the debt: year-1 NOI of $492,470 against interest-only payments of $2,755,000, and year-2 NOI of $3,000,639 against full payments of $3,295,999. The cumulative shortfall ($2,262,530 plus $295,360) is what sizes the $3,500,000 working capital line. A large share of year-1 cost is the labour force hired before volume arrives, and the grant of inspection must be in place before inspected product can be sold [7].
Break-even
| Break-even, year 4 prices (cold storage at base occupancy) | Finished product needed | Share of 400,000 lb capacity |
|---|---|---|
| 1.00x on $38 million (FSC or SPUR structure) | 226,219 lb a day | 56.6% |
| 1.25x on $38 million | 241,972 lb a day | 60.5% |
| 1.00x on the $25 million B&I loan alone (option A) | 204,664 lb a day | 51.2% |
| Base case, year 4 | 275,000 lb a day | 68.8% |
On the full $38 million loan the plant breaks even at 226,219 lb a day, 56.6% of capacity, against a base case of 275,000 lb. That is a narrow margin of volume, which is why signed processing agreements with minimum volumes matter more than any market statistic.
Sensitivity and stress tests
| Scenario (year 4, $38 million loan) | NOI | Debt service | DSCR |
|---|---|---|---|
| Base case, year 4 | $5,847,711 | $3,295,999 | 1.77x |
| Processing fee 5% lower | $4,279,809 | $3,295,999 | 1.30x |
| Processing fee 10% lower | $2,711,907 | $3,295,999 | 0.82x |
| Volume 15% lower | $3,689,930 | $3,295,999 | 1.12x |
| Labour 10% higher | $4,125,874 | $3,295,999 | 1.25x |
| Cold storage occupancy 65% | $5,130,504 | $3,295,999 | 1.56x |
| Largest processing customer (30% of volume) leaves | $1,532,148 | $3,295,999 | 0.46x |
| Rate 8.25% (+1 point) | $5,847,711 | $3,595,333 | 1.63x |
| Rate 9.25% (+2 points) | $5,847,711 | $3,905,101 | 1.50x |
| Construction overrun of 10% ($3,603,000) added to the loan | $5,847,711 | $3,608,512 | 1.62x |
A toll processor earns a thin fee on a large volume, so the fee is the assumption that decides the file: 5% lower gives 1.30x, 10% lower 0.82x. Losing the largest customer, modeled at 30% of volume, gives 0.46x. Labour 10% higher gives 1.25x, and volume 15% lower 1.12x. Rates matter less: +1 point gives 1.63x, +2 points 1.50x, and a 10% building overrun added to the loan gives 1.62x. Cold storage occupancy of 65% instead of 85% still leaves 1.56x.
Equity test
| Equity test (5001 baseline) | B&I option A | SPUR (if the 5001 test applies unchanged) |
|---|---|---|
| 25% of project cost, new business with construction and early guarantee (5001.105(d)(3)) | $15,434,750 | $15,559,000 |
| Modeled equity | $36,739,000 (59.5%) | $24,236,000 (38.9%) |
| Result | Pass, with equity far above the minimum because the loan is capped | Pass |
| Equity injected before guaranteed funds (5001.205(e)(2)) | Required | Baseline; the SPUR funding notice may amend it |
Under the part 5001 baseline, a new business that builds and asks for the guarantee before completion needs 25% balance-sheet equity or 25% of project cost [1]. Whether SPUR applies that test unchanged is not settled by the Federal Register notice; the full funding notice may amend it [5]. The Food Supply Chain notice's own equity terms are not reproduced here.
Collateral
| Collateral (modeled) | Value | Discount or treatment | Lendable value |
|---|---|---|---|
| Real estate at completion, prospective (special-purpose meat plant and cold storage) | $41,000,000 | 70% (assumption) | $28,700,000 |
| Processing equipment, orderly liquidation (35% of cost) | $2,940,000 | Already discounted | $2,940,000 |
| Discounted collateral | $31,640,000 | ||
| Coverage of a $38 million loan | 0.83x | ||
| Coverage of a $25 million B&I loan | 1.27x |
A special-purpose meat plant carries a heavy appraisal discount, and processing equipment resells far below cost. Discounted collateral covers 0.83x of a $38 million loan and 1.27x of a $25 million loan. That is one more reason the guarantee percentage matters: at 90% the lender's unguaranteed share is small enough for the collateral to cover it.
Technical and environmental feasibility
The technical section of a meat-plant study follows the inspection path. A plant needs a federal grant of inspection before it can sell inspected product, and that requires written sanitation procedures, recall procedures and a hazard analysis plan in place before the grant [7]. The study reviews the plant design against those requirements, the line capacities against customer volumes by product, the ammonia refrigeration design and its process safety documentation, the wastewater pretreatment design against the city's discharge limits, and the electrical and water service. For the warehouse it reviews freezer floor heave protection, dock design and backup power.
Environmental review is a separate Agency requirement from the five feasibility components. For a meat plant its questions are wastewater, odour, ammonia storage, truck traffic, stormwater and site history; each has a permit schedule that belongs in the construction timetable.
Management and governance feasibility
A new processing company is judged on its people and its contracts. The study reviewed the plant manager's and food safety manager's records in federally inspected plants, the processing agreements (volume minimums, fee escalation, term, termination and product ownership), the cold storage anchor agreements, and the owners' governance and guarantee capacity. Under part 5001, owners of 20% or more guarantee the loan in proportion to their ownership for its life, and the borrower and its controlling owners must be free of federal judgments, delinquent federal debt and debarment [1].
Labour is a management question here as much as a market one. A plant of 213 people in a county whose population is falling needs a recruitment plan, a wage strategy against the large packers, training, and an answer on housing.
Economic and community impact (modeled)
| Effect (modeled) | Amount | Basis |
|---|---|---|
| Jobs, year 4 (FTE) | 213 | Staffing model |
| Wages, year 4 (before benefits) | $13,774,696 | FTE x Kansas meat processing and warehousing pay, +2.5% a year |
| Finished product a year, year 4 | 68,750,000 lb | Throughput model |
| Cold storage positions for regional shippers | 9,000 | Racking layout |
| Construction spending (land and hard costs) | $48,230,000 | Budget |
| Plant jobs as a share of Seward County manufacturing employment (2023) | 6.4% | CBP 2023 (high noise) |
The modeled plant adds about 213 jobs and $13,774,696 of wages by year 4, at Kansas meat processing and warehousing pay levels. It adds further-processing and third-party cold storage capacity to a region whose meat output is concentrated in a few very large plants, which was the purpose of the Food Supply Chain program and is the purpose of SPUR.
Risks and mitigants
| Risk | Effect in the model | Mitigant |
|---|---|---|
| Processing fee pressure | 0.82x at -10% fee | Fee escalators; cost pass-through for packaging and utilities |
| Customer concentration | 0.46x if the largest customer leaves | Minimum volumes; notice periods; diversified customer base |
| Labour | 1.25x with labour 10% higher | Recruitment, housing and wage plan; automation |
| Slow ramp and inspection timing | Shortfall of $2,262,530 in year 1 | $3,500,000 working capital; interest-only through year 1 |
| Volume | 1.12x at -15% volume | Signed agreements; break-even at 56.6% of capacity |
| Rate | 1.63x at +1 point | Fixed rate at closing |
| Construction overrun | 1.62x if 10% is debt-financed | Design-build contract; contingency |
| Program availability | Food Supply Chain closed; SPUR loan limit not stated | Confirm SPUR terms in the full funding notice before structuring |
| Collateral | 0.83x on $38 million | 90% guarantee; equity; owner guarantees |
What the five Part 5001 components showed
Part 5001 organises an acceptable study into economic, market, technical, financial and management feasibility [6].
| Component | What the modeled study found | What a reviewer checks |
|---|---|---|
| Economic | Concentrated packing base; no third-party cold storage in the county file for southwest Kansas | Customer shipping and storage data |
| Market | Volume depends on a few processing customers; warehouse demand on named shippers | Processing and storage agreements |
| Technical | Inspection path, wastewater and refrigeration drive cost and schedule | Design, permits, inspection plan |
| Financial | 1.77x stabilized on $38 million; years 1 and 2 below 1.00x and funded; break-even at 56.6% of capacity | Ramp model, stresses, program comparison |
| Management | Inspected-plant experience and a labour plan carry the case | Résumés, agreements, recruitment plan |
Meat processing studies are sent back for recurring reasons:
- Revenue from day one, ignoring the time to win and validate the grant of inspection.
- A processing fee with no contract behind it.
- A labour plan that assumes workers are available in a county where the large plants already employ them.
- No wastewater pretreatment in the budget.
- A loan structure that ignores the program's limit, such as a $38 million B&I loan.
- Collateral valued at cost.
- A program described as open after it has closed.
Program terms that applied, then and now
| Term | Food Supply Chain (legacy) | B&I (FY2026 notice) | SPUR (FY2027 SPUR rates) |
|---|---|---|---|
| Guarantee | 90% or 80% by rate structure [3] | 85% under $5 million; 80% from $5 million to $25 million [2] | 90% [5] |
| Guarantee fee | Per the 2021 notice (not reproduced) | 3.0%; reduced fee 1.0% for qualifying loans [2] | 3% [5] |
| Retention fee | Per the 2021 notice (not reproduced) | 0.55% a year [2] | 0.55% a year [5] |
| Fee for guarantee before construction completion | Per the 2021 notice (not reproduced) | 0.50% [2] | 0.5% [5] |
| Maximum loan | $40 million aggregate per borrower [3] | $25 million (5001.406(c)) [1] | Not stated in the Federal Register notice |
| Geography | No restrictions [3] | 5001.3 rural area [1] | No restrictions [5] |
| Lender retention | Not reproduced | Unguaranteed portion | At least 10% of the loan [5] |
| Governing rule | 2021 notice | 7 CFR part 5001 [1] | 7 CFR part 5001 as amended or supplemented by the funding notice [5] |
| Status | No funding; no new applications [4] | Open | Open from 27 October 2026 until funds are exhausted [5] |
Lessons for sponsors of similar projects
- Check the program's status before you model it. Food Supply Chain is closed; a study written for it today would describe a program that cannot take the application.
- Structure to the limit. A loan over $25 million does not fit B&I; SPUR may fit, but confirm its loan limit in the full funding notice.
- Compare lender exposure, not just coverage. A B&I loan plus an unguaranteed second loan can show acceptable coverage while leaving the lender with several times the risk of a single 90% guarantee.
- Fund the ramp and the inspection timeline. Two years below 1.00x is normal for a new meat plant; an unfunded shortfall is not.
- Contract the fee and the volume. In toll processing a 10% fee change moves coverage more than two points of interest rate.
- Treat labour as a feasibility component. In southwest Kansas the workforce plan is part of the market case.
- Price wastewater early. It is a permit condition and a large line.
Related pages
- USDA Food Supply Chain engagements: the program page that lists this legacy engagement.
- USDA B&I engagements: today's B&I studies.
- Meat processing feasibility study and cold storage feasibility study: national rules, SPUR and B&I terms and worked examples.
- Kansas meat processing feasibility study, Kansas cold storage feasibility study and the Kansas USDA feasibility study guide.
- Case studies: other engagements written up in full.
If you are planning a meat processing or cold storage project that once would have gone to Food Supply Chain, a USDA feasibility study consultant can test it against today's SPUR and B&I terms before you commit to a structure. Complex studies take seven to nine weeks, with fees on the cost page [15]. Request a proposal for a fifteen-minute scoping call and a written, fixed-fee proposal [16].