Meat Processing and Cold Storage Feasibility (Legacy Program Example): Kansas USDA Feasibility Study Case Study

    Last updated 2026-11-08

    How to read this case study. The engagement summary reflects the published record. Client names, actual costs, loan terms and proprietary data are confidential, so the project budget, market sizing and financial projections below are a modeled example built from public data for this project type and location. They show the analysis a lender-grade study performs, not the client's figures.

    Data current as of November 2026.

    Engagement summary

    In 2022 we prepared a feasibility study for a meat processing and cold storage project in Liberal, Kansas, under the USDA Food Supply Chain Guaranteed Loan Program, with a non-regulated lender. The loan was greater than $25 million. This is a legacy-program example: the Food Supply Chain program no longer has funding and Rural Development no longer accepts applications for it [4], so the second half of this page shows how the same project would be financed today under the Business and Industry (B&I) program or the Strengthening Processing for US Ranchers (SPUR) program.

    FieldPublished record
    ProgramUSDA Food Supply Chain Guaranteed Loan Program (legacy)
    AssetMeat and poultry processing, with cold storage
    LocationLiberal, Kansas (Seward County)
    Loan size tierGreater than $25 million
    Year2022
    Lender typeNon-regulated lender
    OutcomePrepared under the Food Supply Chain program, which has since closed to new applications

    The modeled project on this page is a further-processing plant (grinding, portioning and case-ready packing of beef owned by its customers) with a 9,000-position freezer and cooler warehouse on the same site. A plant with its own kill floor would change the economics, the inspection path and the cattle supply analysis; the method below still applies.

    The Food Supply Chain program and why it matters now

    USDA opened the Food Supply Chain Guaranteed Loan Program on 9 December 2021 with a notice of funding opportunity under section 1001(b)(4) of the American Rescue Plan Act [3]. The notice made about $1 billion of loan guarantees available, accepted applications until funds were exhausted, capped the aggregate loan amount a borrower could receive at $40 million, guaranteed 90% of fixed-rate loans at or below the Wall Street Journal prime rate plus 200 basis points and 80% of all other loans, and set no geographic restrictions [3]. Those last two terms made it unusual: a meat or cold storage plant over $25 million, in a town or a city, could carry a 90% guarantee.

    On 14 January 2026, in an information-collection notice, USDA stated that the program no longer has funding available, that Rural Development is no longer accepting applications for new loans, and that loans in the portfolio are being serviced under established regulations [4]. No Federal Register notice formally ends the program, and the Federal Register does not give the date the funds ran out.

    Food Supply Chain term (86 FR 70086)Value
    AuthorityAmerican Rescue Plan Act, section 1001(b)(4)
    FundingAbout $1 billion in loan guarantees, until exhausted
    Maximum aggregate loan per borrower$40 million
    Guarantee90% for fixed-rate loans at or below WSJ prime + 200 basis points; 80% for all other loans
    GeographyNo geographic restrictions
    StatusNo funding; no new applications; existing loans serviced (91 FR 1496, 14 January 2026)

    For a sponsor today, the lesson of the legacy program is structural. A $38 million loan that fitted Food Supply Chain does not fit B&I, which stops at $25 million per borrower [1]. SPUR, opened on 27 October 2026 under the same American Rescue Plan authority, covers meat, poultry and seafood processing with a 90% guarantee and no geographic restriction [5], but its maximum loan is not stated in the Federal Register notice.

    The question the lender and USDA needed answered

    For a new plant of this size the questions are the same under any guarantee. Will customers commit enough volume, at a processing fee that covers labour, packaging and debt? Can a town of 19,010 staff a plant of more than 200 people next to some of the largest packing plants in the country? How long does it take to win the grant of federal inspection and reach full volume, and who pays the debt in the meantime? And how much of the loan is covered by collateral that a special-purpose meat plant can support?

    Today's part 5001 rules make the study mandatory for a loan over $1,000,000 to a new business: an independent qualified consultant acceptable to the Agency must prepare it, with the Agency setting the scope (5001.306(a)(3)(i)) [1]. SPUR loans are administered under part 5001 as amended or supplemented by the SPUR funding notice [5], so the part 5001 study rule is the baseline for SPUR as well, subject to anything the full notice changes.

    RuleRequirementEffect on a project like this one
    7 CFR 5001.306(a)(3)(i)Independent study for loans over $1,000,000 to a new businessStudy mandatory under B&I; baseline under SPUR
    7 CFR 5001.205(e)(2)Guarantee before construction completion: confirmed budget and timetable, contingencies, start-up working capital, fixed-price contract, equity firstBudget, schedule and reserve in the study
    7 CFR 5001.202Quarterly cash flow through start-up; projections without history substantiatedRamp model; customer evidence
    7 CFR 5001.105(d)(3)25% equity for a new business with construction and an early guaranteeEquity tested at closing
    7 CFR 5001.406(c)B&I limit $25 million per borrowerForces a restructured B&I deal
    9 CFR part 304Federal grant of inspection before inspected product is soldStart-up timing in the cash flow [7]

    Project description (modeled)

    ComponentModeled scopeDriver
    Processing building44,000 sq ft, sanitary constructionGrinding, portioning, case-ready lines
    Capacity400,000 lb of finished product a day on two shiftsCustomer volumes plus growth
    Business modelProcessing for a fee; customers own the meatLimits commodity price risk
    Cold storage50,000 sq ft: 36,000 sq ft freezer, 14,000 sq ft cooler; 9,000 positionsCustomers' finished goods plus regional shippers
    RefrigerationCentral ammonia systemShared by plant and warehouse
    WastewaterOn-site pretreatment ($2,900,000)City discharge limits
    InspectionFederal grant of inspectionRequired to sell inspected product [7]
    PhaseTiming (modeled)Milestone
    Customer agreements, design, permitsMonths 1 to 12 before closingProcessing agreements, discharge permit path, design-build price
    ClosingNote month 0Equity spent first; guarantee issued before completion
    ConstructionNote months 1 to 18Monthly draws with inspection
    Commissioning and grant of inspectionMonths 17 to 19Sanitation procedures, hazard analysis plan, trials
    Operating year 1, interest-onlyMonths 19 to 30Ramp to 200,000 lb a day
    Full paymentsFrom month 31Within 3 years of the note (5001.402)

    Project cost and sources and uses

    Every line is an assumption with a range; the last column names the document a real study uses instead.

    Line itemBasisModeled costAssumption rangeHow a real study sources it
    Land (about 20 acres, industrial zoning)allowance$900,000$500,000 to $1,500,000Purchase contract; appraisal
    Site work, truck courts, utility extensionsallowance$3,200,000$2,200,000 to $4,500,000Civil engineer estimate
    Wastewater pretreatment (equalization, dissolved air flotation)allowance$2,900,000$2,000,000 to $4,000,000Engineer design; discharge permit terms
    Processing building, sanitary construction44,000 sq ft x $370$16,280,000$300 to $450 per sq ftDesign-build bid
    Grinding, blending and forming linesequipment$3,100,000$2,200,000 to $4,000,000Equipment quotes
    Portioning, slicing and case-ready linesequipment$2,600,000$1,800,000 to $3,400,000Equipment quotes
    Packaging (vacuum, tray-seal, case packing, palletizing)equipment$1,900,000$1,300,000 to $2,600,000Equipment quotes
    Food safety: metal detection, X-ray, labs, sanitation systemsequipment$800,000$500,000 to $1,100,000Equipment quotes
    Cold storage (36,000 sq ft freezer, 14,000 sq ft cooler), insulated panel50,000 sq ft x $165$8,250,000$130 to $210 per sq ftDesign-build bid
    Central ammonia refrigeration (plant and warehouse)allowance$5,400,000$4,000,000 to $7,000,000Refrigeration contractor bid
    Pallet racking9,000 positions x $100$900,000$75 to $130 per positionRacking quote
    Electrical service, substation share, backup powerallowance$2,000,000$1,400,000 to $2,800,000Utility letter; electrical bid
    Hard cost subtotal (excluding land)$47,330,000
    Architecture, process and refrigeration engineering6% of buildings, site and refrigeration$2,162,0005% to 8%Design contracts
    Permits, discharge permit, connection feesallowance$500,000$300,000 to $900,000City and state fee schedules
    Legal, appraisal, feasibility study, title, closingallowance$600,000$400,000 to $900,000Engagement letters
    Contingency7% of buildings, site and refrigeration; 5% of equipment$3,087,0005% to 10%Lender and engineer review
    Commissioning, trials, hiring and trainingallowance$1,100,000$700,000 to $1,800,000Start-up budget
    Working capital (receivables, packaging, supplies)allowance$3,500,000Sized from monthly rampMonthly cash flow
    Interest during constructionaverage 45% of $38,000,000 drawn for 18 months at 7.25%$1,860,000Depends on draw scheduleLender draw schedule
    Base project cost before guarantee fees$61,039,000

    The base project costs $61,039,000 before guarantee fees. Wastewater pretreatment and refrigeration together cost more than the processing equipment, which is typical: a meat plant is a building and its utilities first and a set of lines second. Working capital of $3,500,000 is sized to the shortfall in the first two operating years, shown below.

    The sources depend on the program, and that comparison is the point of a legacy case study.

    Measure (same modeled project, same 7.25% rate)Food Supply Chain (2022, legacy)B&I today, option A: $25M loan plus more equityB&I today, option B: $25M B&I plus $13M unguaranteed loanSPUR today
    Guaranteed loan$38,000,000$25,000,000$25,000,000 + $13,000,000 unguaranteed$38,000,000
    Guarantee90% if fixed at or below WSJ prime + 2 points; otherwise 80%80%80% of the B&I loan90%
    Guaranteed amount$34,200,000 (90%) or $30,400,000 (80%)$20,000,000$20,000,000$34,200,000
    Lender exposure$3,800,000 or $7,600,000$5,000,000$18,000,000$3,800,000
    Upfront guarantee feeSet by the 2021 notice (not modeled here)$700,000 (3.0% + 0.50% early guarantee)$700,000$1,197,000 (3.0% + 0.50% early guarantee)
    Annual retention fee, year 1Not modeled$110,000$110,000$188,100
    Project cost including fee$61,039,000 + FSC fee$61,739,000$61,739,000$62,236,000
    Equity$23,039,000 (37.7%)$36,739,000 (59.5%)$23,739,000 (38.5%)$24,236,000 (38.9%)
    Annual debt service from year 2$3,295,999$2,168,421$3,750,676$3,295,999
    DSCR, year 41.77x2.70x1.56x1.77x
    Geographic testNone5001.3 rural area (Liberal passes on population)5001.3 rural areaNone
    Maximum loan$40 million aggregate per borrower$25 million (5001.406(c))$25 million guaranteedNot stated in the Federal Register notice
    Lender must keepNot modeledUnguaranteed 20%Unguaranteed 20% plus the second loanAt least 10% of the loan
    StatusClosed: no funding, no new applications (91 FR 1496)OpenOpenOpen from 27 Oct 2026 until funds are exhausted

    All four columns use the same project, the same 7.25% fixed rate and 25-year amortization, so they isolate the program terms. Rates in 2022 were different, and the Food Supply Chain fee schedule is not reproduced here, so the legacy column is a structural comparison, not a reconstruction of the engagement.

    Three findings come out of the table:

    1. SPUR is the closest successor. It guarantees 90% of the full $38,000,000 ($34,200,000), leaves the lender $3,800,000 at risk, and carries a fee of $1,197,000, 3.0% plus 0.50% for a guarantee issued before construction completion [5]. The lender must keep at least 10% of the loan [5]. Coverage in year 4 is 1.77x before the retention fee.
    2. B&I alone needs far more equity. At the $25 million limit the sponsor would have to put in $36,739,000, 59.5% of cost, though coverage on the smaller loan rises to 2.70x.
    3. B&I with a second loan works on coverage but not on risk. Adding a $13,000,000 unguaranteed loan at 9.0% over 15 years keeps equity near the legacy level but gives coverage of 1.56x and leaves the lender $18,000,000 at risk, about five times the SPUR exposure. A lender and the state office would both look hard at that structure.

    Market analysis

    Kansas meat and poultry processing

    MeasureKansasUnited States
    Establishments, 2019 → 202377 → 88 (+14.3%)3,501 → 3,716
    Per 100,000 residents (2023)3.01.1
    Average employees per establishment222.4149.7
    Average annual pay per employee$60,595$50,981
    Share of establishments in non-metro counties40.9% (9 in 3 counties)
    Share of state population in non-metro counties (2025)28.8%

    Non-metro counties with the most meat and poultry processing (2023): Ford County (3); Labette County (3); Lyon County (3).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Kansas had 88 meat and poultry plants in 2023, up 14.3% from 2019, at 3.0 per 100,000 residents against 1.1 nationally. They are very large, 222.4 employees on average against 149.7 nationally, and they pay $60,595 a year, 18.9% above the national $50,981. The county file places only 22 of the 88 plants, because Census does not show counties with very few plants, so the non-metro share in the table understates how much of the state's meat employment sits in the southwest.

    The site's Kansas guide reports that Ford, Finney and Seward counties hold four large beef plants with a combined published capacity of about 23,800 head a day [14]. That is the supply base a further processor in Liberal buys services from and sells services to, and the labour market it competes in.

    Kansas cold storage

    MeasureKansasUnited States
    Establishments, 2019 → 20239 → 11 (+22.2%)1,350 → 1,367
    Per 100,000 residents (2023)0.40.4
    Average employees per establishment73.448.4
    Average annual pay per employee$54,735$56,901
    Share of establishments in non-metro counties0.0% (0 in 0 counties)
    Share of state population in non-metro counties (2025)28.8%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Kansas had only 11 refrigerated warehouses with paid employees in 2023, none in a non-metro county. The large plants run their own freezers, but third-party cold storage in southwest Kansas does not appear in the Census county file. For the warehouse half of the project that is both the opportunity and the evidence problem: there are no local comparables, so the study has to build demand from named customers' storage agreements.

    Regional comparison

    StateMeat and poultry plants, 2023Per 100,000Employees eachAverage payNon-metro shareRefrigerated warehousesWarehouse non-metro share
    Kansas883.0222.4$60,59540.9%110.0%
    Nebraska1226.1250.3$58,44241.0%180.0%
    Iowa1494.6228.3$56,63058.4%2623.1%
    Texas2921.0154.3$50,48818.4%1390.0%
    Oklahoma771.9131.7$48,44618.2%70.0%
    Colorado831.4111.2$52,3178.0%170.0%
    United States3,7161.1149.7$50,9811,367

    Kansas, Nebraska and Iowa form the core of the beef and pork processing belt, with very large plants and pay well above the national average. Kansas has fewer refrigerated warehouses per head than Nebraska or Iowa. Oklahoma's Texas County, next to Seward County, adds another large food processing workforce to the regional labour market.

    Seward County and the southwest Kansas labour shed

    CountyOMB 2023Population, 2025Change since 2020All manufacturing: plants / employeesFood (311): plants / employeesMeat (3116): plants / employeesManufacturing jobs per 100 residents
    Seward County, KSNon-metro21,073-4.1%13 / 3,304 (high)not shownnot shown15.7
    Ford County, KSNon-metro33,993-0.9%25 / 6,711 (moderate)4 / 6,0483 / 6,01919.7
    Finney County, KSNon-metro37,505-2.5%31 / 3,740 (high)6 / 3,231not shown10.0
    Texas County, OKNon-metro20,322-5.0%12 / 2,497 (high)7 / 2,398not shown12.3
    Stevens County, KSNon-metro4,984-5.0%8 / 205 (high)3 / 94not shown4.1
    Haskell County, KSNon-metro3,599-4.8%7 / 103 (low)3 / 69not shown2.9
    Meade County, KSNon-metro3,852-5.1%5 / 21 (moderate)not shownnot shown0.5
    Sedgwick County, KSMetro538,4332.8%473 / 42,288 (low)30 / 1,8735 / 1,2247.9

    Seward County had 13 manufacturers employing 3,304 people in 2023 (high noise), 15.7 manufacturing jobs per 100 residents, and its population fell -4.1% from 2020 to 2025. Every county in the table except Sedgwick lost population. The modeled plant needs about 213 workers at stabilization, equal to 6.4% of the county's 2023 manufacturing employment. That is the labour question the study had to answer with a recruitment plan, a wage strategy against the large plants, housing and transport, not with a population table.

    Eligibility under each program

    PlaceCensus base 2020Estimate 2025ChangeB&I (5001.3)FSC and SPUR
    Wichita397,589400,9870.9%Over 50,000: excluded from B&I with its contiguous urbanized areaNo geographic test
    Dodge City27,79327,653-0.5%Under 50,000: passes B&I on population; contiguity decidesNo geographic test
    Garden City28,15827,402-2.7%Under 50,000: passes B&I on population; contiguity decidesNo geographic test
    Liberal19,84319,010-4.2%Under 50,000: passes B&I on population; contiguity decidesNo geographic test

    Liberal had 19,010 residents in the 2025 estimate, down -4.2% since 2020. It passes the B&I rural area test on population, and the nearest city over 50,000 (Wichita) is far from contiguous [1]. The site's Kansas guide lists Liberal among the eligible places [14]. Food Supply Chain had no geographic restrictions [3], and SPUR has none [5], so for those programs the test does not arise.

    Financing benchmarks

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20164$587,9001$957,000
    FY2017 to FY20190$01$228,000
    FY2020 to FY20233$786,0001$2.6 million
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $262,000. Average 504 loan: $2.6 million. Kansas had fewer than 30 seasoned 7(a) loans for meat and poultry processing; nationally, 3.7% of 214 FY2010 to FY2016 loans were charged off, on average 72 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    SBA lending to Kansas meat processors is almost non-existent: ten loans across both programs since FY2010, all small. Nationally, 3.7% of seasoned meat-processing 7(a) loans were charged off. USAspending lists 3 B&I loans in Kansas for FY2024 to FY2026 (counts may be incomplete). A $38 million meat plant loan is far outside the SBA market, which is why the legacy and current USDA programs are the realistic guaranteed routes.

    Financial feasibility

    Operating assumptions

    Operating assumption (modeled)ValueEvidence a real study uses
    Plant capacity400,000 lb of finished product a day on two shiftsLine ratings; process engineer
    Finished product, years 1 to 5200,000, 238,000, 262,000, 275,000, 280,000 lb a dayCo-packing and processing agreements
    Operating days250 a yearPlant schedule
    Processing fee (customer owns the meat)$0.43 per lb, +2.5% a yearContract terms; competing processor quotes
    Packaging, utilities, sanitation$0.102 per lbSupplier quotes; tariffs
    Plant staffing78 FTE plus 0.42 per 1,000 lb a day, at $60,595 plus 25%Kansas meat processing pay, CBP 2023 (pack)
    Cold storage positions9,000Racking layout
    Cold storage occupancy, years 1 to 545%, 65%, 78%, 85%, 87%Anchor storage agreements
    Storage and handling$25.00 per position a month; $20.00 per pallet in and out; 8 turns; 6% accessorialRate sheets; customer inventory data
    Warehouse staffing8 FTE plus 1.5 per 1,000 occupied positions, at $54,735 plus 25%Kansas refrigerated warehousing pay, CBP 2023 (pack)
    Warehouse power1,400,000 kWh plus 500,000 kWh at full occupancy, at 8.5 centsRefrigeration load; utility tariff
    Insurance, property tax, management and administration$3,750,000 in year 1, +2.5% a yearQuotes; assessor; organisation chart

    Five-year pro forma

    Operating yearYear 1Year 2Year 3Year 4Year 5
    Finished product, lb a day200,000238,000262,000275,000280,000
    Processing fee per lb$0.430$0.441$0.452$0.463$0.475
    Processing revenue$21,500,000$26,224,625$29,590,853$31,835,579$33,224,768
    Cold storage occupancy45.0%65.0%78.0%85.0%87.0%
    Cold storage revenue$1,974,780$2,938,034$3,631,410$4,076,025$4,297,089
    Total revenue$23,474,780$29,162,659$33,222,263$35,911,604$37,521,857
    Employees (FTE)176195207213215
    Labour with 25% benefits$13,233,564$14,992,852$16,295,981$17,218,370$17,844,796
    Packaging, utilities, sanitation$5,100,000$6,220,725$7,019,226$7,551,696$7,881,224
    Equipment maintenance$168,000$252,000$252,000$252,000$252,000
    Warehouse power and operating costs$378,625$415,253$443,731$464,813$479,358
    Insurance, property tax, management and administration$3,750,000$3,843,750$3,939,844$4,038,340$4,139,298
    Replacement reserve (1.5%)$352,122$437,440$498,334$538,674$562,828
    Net operating income$492,470$3,000,639$4,773,147$5,847,711$6,362,353
    Debt service on $38 million (year 1 interest-only)$2,755,000$3,295,999$3,295,999$3,295,999$3,295,999
    DSCR0.18x0.91x1.45x1.77x1.93x
    Retention fee if SPUR (0.55% of 90%)$188,100$185,331$182,355$179,156$175,716
    DSCR after SPUR retention fee0.17x0.86x1.37x1.68x1.83x

    The plant reaches 1.45x coverage in year 3 and 1.77x at stabilization in year 4 on $35,911,604 of revenue. The first two years do not cover the debt: year-1 NOI of $492,470 against interest-only payments of $2,755,000, and year-2 NOI of $3,000,639 against full payments of $3,295,999. The cumulative shortfall ($2,262,530 plus $295,360) is what sizes the $3,500,000 working capital line. A large share of year-1 cost is the labour force hired before volume arrives, and the grant of inspection must be in place before inspected product can be sold [7].

    Break-even

    Break-even, year 4 prices (cold storage at base occupancy)Finished product neededShare of 400,000 lb capacity
    1.00x on $38 million (FSC or SPUR structure)226,219 lb a day56.6%
    1.25x on $38 million241,972 lb a day60.5%
    1.00x on the $25 million B&I loan alone (option A)204,664 lb a day51.2%
    Base case, year 4275,000 lb a day68.8%

    On the full $38 million loan the plant breaks even at 226,219 lb a day, 56.6% of capacity, against a base case of 275,000 lb. That is a narrow margin of volume, which is why signed processing agreements with minimum volumes matter more than any market statistic.

    Sensitivity and stress tests

    Scenario (year 4, $38 million loan)NOIDebt serviceDSCR
    Base case, year 4$5,847,711$3,295,9991.77x
    Processing fee 5% lower$4,279,809$3,295,9991.30x
    Processing fee 10% lower$2,711,907$3,295,9990.82x
    Volume 15% lower$3,689,930$3,295,9991.12x
    Labour 10% higher$4,125,874$3,295,9991.25x
    Cold storage occupancy 65%$5,130,504$3,295,9991.56x
    Largest processing customer (30% of volume) leaves$1,532,148$3,295,9990.46x
    Rate 8.25% (+1 point)$5,847,711$3,595,3331.63x
    Rate 9.25% (+2 points)$5,847,711$3,905,1011.50x
    Construction overrun of 10% ($3,603,000) added to the loan$5,847,711$3,608,5121.62x

    A toll processor earns a thin fee on a large volume, so the fee is the assumption that decides the file: 5% lower gives 1.30x, 10% lower 0.82x. Losing the largest customer, modeled at 30% of volume, gives 0.46x. Labour 10% higher gives 1.25x, and volume 15% lower 1.12x. Rates matter less: +1 point gives 1.63x, +2 points 1.50x, and a 10% building overrun added to the loan gives 1.62x. Cold storage occupancy of 65% instead of 85% still leaves 1.56x.

    Equity test

    Equity test (5001 baseline)B&I option ASPUR (if the 5001 test applies unchanged)
    25% of project cost, new business with construction and early guarantee (5001.105(d)(3))$15,434,750$15,559,000
    Modeled equity$36,739,000 (59.5%)$24,236,000 (38.9%)
    ResultPass, with equity far above the minimum because the loan is cappedPass
    Equity injected before guaranteed funds (5001.205(e)(2))RequiredBaseline; the SPUR funding notice may amend it

    Under the part 5001 baseline, a new business that builds and asks for the guarantee before completion needs 25% balance-sheet equity or 25% of project cost [1]. Whether SPUR applies that test unchanged is not settled by the Federal Register notice; the full funding notice may amend it [5]. The Food Supply Chain notice's own equity terms are not reproduced here.

    Collateral

    Collateral (modeled)ValueDiscount or treatmentLendable value
    Real estate at completion, prospective (special-purpose meat plant and cold storage)$41,000,00070% (assumption)$28,700,000
    Processing equipment, orderly liquidation (35% of cost)$2,940,000Already discounted$2,940,000
    Discounted collateral$31,640,000
    Coverage of a $38 million loan0.83x
    Coverage of a $25 million B&I loan1.27x

    A special-purpose meat plant carries a heavy appraisal discount, and processing equipment resells far below cost. Discounted collateral covers 0.83x of a $38 million loan and 1.27x of a $25 million loan. That is one more reason the guarantee percentage matters: at 90% the lender's unguaranteed share is small enough for the collateral to cover it.

    Technical and environmental feasibility

    The technical section of a meat-plant study follows the inspection path. A plant needs a federal grant of inspection before it can sell inspected product, and that requires written sanitation procedures, recall procedures and a hazard analysis plan in place before the grant [7]. The study reviews the plant design against those requirements, the line capacities against customer volumes by product, the ammonia refrigeration design and its process safety documentation, the wastewater pretreatment design against the city's discharge limits, and the electrical and water service. For the warehouse it reviews freezer floor heave protection, dock design and backup power.

    Environmental review is a separate Agency requirement from the five feasibility components. For a meat plant its questions are wastewater, odour, ammonia storage, truck traffic, stormwater and site history; each has a permit schedule that belongs in the construction timetable.

    Management and governance feasibility

    A new processing company is judged on its people and its contracts. The study reviewed the plant manager's and food safety manager's records in federally inspected plants, the processing agreements (volume minimums, fee escalation, term, termination and product ownership), the cold storage anchor agreements, and the owners' governance and guarantee capacity. Under part 5001, owners of 20% or more guarantee the loan in proportion to their ownership for its life, and the borrower and its controlling owners must be free of federal judgments, delinquent federal debt and debarment [1].

    Labour is a management question here as much as a market one. A plant of 213 people in a county whose population is falling needs a recruitment plan, a wage strategy against the large packers, training, and an answer on housing.

    Economic and community impact (modeled)

    Effect (modeled)AmountBasis
    Jobs, year 4 (FTE)213Staffing model
    Wages, year 4 (before benefits)$13,774,696FTE x Kansas meat processing and warehousing pay, +2.5% a year
    Finished product a year, year 468,750,000 lbThroughput model
    Cold storage positions for regional shippers9,000Racking layout
    Construction spending (land and hard costs)$48,230,000Budget
    Plant jobs as a share of Seward County manufacturing employment (2023)6.4%CBP 2023 (high noise)

    The modeled plant adds about 213 jobs and $13,774,696 of wages by year 4, at Kansas meat processing and warehousing pay levels. It adds further-processing and third-party cold storage capacity to a region whose meat output is concentrated in a few very large plants, which was the purpose of the Food Supply Chain program and is the purpose of SPUR.

    Risks and mitigants

    RiskEffect in the modelMitigant
    Processing fee pressure0.82x at -10% feeFee escalators; cost pass-through for packaging and utilities
    Customer concentration0.46x if the largest customer leavesMinimum volumes; notice periods; diversified customer base
    Labour1.25x with labour 10% higherRecruitment, housing and wage plan; automation
    Slow ramp and inspection timingShortfall of $2,262,530 in year 1$3,500,000 working capital; interest-only through year 1
    Volume1.12x at -15% volumeSigned agreements; break-even at 56.6% of capacity
    Rate1.63x at +1 pointFixed rate at closing
    Construction overrun1.62x if 10% is debt-financedDesign-build contract; contingency
    Program availabilityFood Supply Chain closed; SPUR loan limit not statedConfirm SPUR terms in the full funding notice before structuring
    Collateral0.83x on $38 million90% guarantee; equity; owner guarantees

    What the five Part 5001 components showed

    Part 5001 organises an acceptable study into economic, market, technical, financial and management feasibility [6].

    ComponentWhat the modeled study foundWhat a reviewer checks
    EconomicConcentrated packing base; no third-party cold storage in the county file for southwest KansasCustomer shipping and storage data
    MarketVolume depends on a few processing customers; warehouse demand on named shippersProcessing and storage agreements
    TechnicalInspection path, wastewater and refrigeration drive cost and scheduleDesign, permits, inspection plan
    Financial1.77x stabilized on $38 million; years 1 and 2 below 1.00x and funded; break-even at 56.6% of capacityRamp model, stresses, program comparison
    ManagementInspected-plant experience and a labour plan carry the caseRésumés, agreements, recruitment plan

    Meat processing studies are sent back for recurring reasons:

    1. Revenue from day one, ignoring the time to win and validate the grant of inspection.
    2. A processing fee with no contract behind it.
    3. A labour plan that assumes workers are available in a county where the large plants already employ them.
    4. No wastewater pretreatment in the budget.
    5. A loan structure that ignores the program's limit, such as a $38 million B&I loan.
    6. Collateral valued at cost.
    7. A program described as open after it has closed.

    Program terms that applied, then and now

    TermFood Supply Chain (legacy)B&I (FY2026 notice)SPUR (FY2027 SPUR rates)
    Guarantee90% or 80% by rate structure [3]85% under $5 million; 80% from $5 million to $25 million [2]90% [5]
    Guarantee feePer the 2021 notice (not reproduced)3.0%; reduced fee 1.0% for qualifying loans [2]3% [5]
    Retention feePer the 2021 notice (not reproduced)0.55% a year [2]0.55% a year [5]
    Fee for guarantee before construction completionPer the 2021 notice (not reproduced)0.50% [2]0.5% [5]
    Maximum loan$40 million aggregate per borrower [3]$25 million (5001.406(c)) [1]Not stated in the Federal Register notice
    GeographyNo restrictions [3]5001.3 rural area [1]No restrictions [5]
    Lender retentionNot reproducedUnguaranteed portionAt least 10% of the loan [5]
    Governing rule2021 notice7 CFR part 5001 [1]7 CFR part 5001 as amended or supplemented by the funding notice [5]
    StatusNo funding; no new applications [4]OpenOpen from 27 October 2026 until funds are exhausted [5]

    Lessons for sponsors of similar projects

    1. Check the program's status before you model it. Food Supply Chain is closed; a study written for it today would describe a program that cannot take the application.
    2. Structure to the limit. A loan over $25 million does not fit B&I; SPUR may fit, but confirm its loan limit in the full funding notice.
    3. Compare lender exposure, not just coverage. A B&I loan plus an unguaranteed second loan can show acceptable coverage while leaving the lender with several times the risk of a single 90% guarantee.
    4. Fund the ramp and the inspection timeline. Two years below 1.00x is normal for a new meat plant; an unfunded shortfall is not.
    5. Contract the fee and the volume. In toll processing a 10% fee change moves coverage more than two points of interest rate.
    6. Treat labour as a feasibility component. In southwest Kansas the workforce plan is part of the market case.
    7. Price wastewater early. It is a permit condition and a large line.

    If you are planning a meat processing or cold storage project that once would have gone to Food Supply Chain, a USDA feasibility study consultant can test it against today's SPUR and B&I terms before you commit to a structure. Complex studies take seven to nine weeks, with fees on the cost page [15]. Request a proposal for a fifteen-minute scoping call and a written, fixed-fee proposal [16].

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Is the USDA Food Supply Chain Guaranteed Loan Program still open?

    No. USDA stated on 14 January 2026 that the program has no funding available, that Rural Development no longer accepts applications for new loans, and that existing loans are being serviced under established regulations [4]. No Federal Register notice formally ends the program, and the Federal Register does not give the date the funds ran out. A meat or food supply chain project today has to use another route, most often SPUR or B&I.

    What were the Food Supply Chain program's main terms?

    The 9 December 2021 notice made about $1 billion of guarantees available until funds were exhausted, under section 1001(b)(4) of the American Rescue Plan Act [3]. A borrower could receive up to $40 million in aggregate. Fixed-rate loans at or below the Wall Street Journal prime rate plus 200 basis points carried a 90% guarantee and all other loans 80%, and the program had no geographic restrictions [3]. Fees and other terms were set in the notice and are not reproduced on this page.

    How would a $38 million meat plant be financed today?

    SPUR is the closest fit. It guarantees 90% of loans to establish, reopen, retrofit, expand or improve meat, poultry or seafood processing, anywhere in the U.S., with a 3% fee, a 0.55% retention fee, an extra 0.5% if the guarantee is issued before construction completion, and a lender share of at least 10% [5]. Its maximum loan is not stated in the Federal Register notice, so confirm it in the full funding notice. B&I stops at $25 million per borrower [1].

    Can B&I finance a project above $25 million?

    Not with a single guaranteed loan above the limit: part 5001 caps B&I at $25 million per borrower, with a higher limit only for qualifying rural cooperatives [1]. A larger project needs more equity or other financing alongside the guaranteed loan. In the model a $25 million B&I loan requires $36,739,000 of equity, 59.5% of cost, or a $13,000,000 unguaranteed second loan that leaves the lender with $18,000,000 at risk.

    Does SPUR require a feasibility study?

    SPUR loans are administered under 7 CFR part 5001 as amended or supplemented by the SPUR funding notice [5]. Under part 5001, a guaranteed loan over $1,000,000 to a new business requires a feasibility study by an independent qualified consultant acceptable to the Agency (5001.306(a)(3)(i)) [1]. That is the baseline. Whether the full SPUR notice changes it is not settled in the Federal Register text, so confirm with Rural Development before scoping the study.

    Does a meat plant in Liberal, Kansas qualify as rural for B&I?

    Liberal passes the B&I population test, with about 19,010 residents in the 2025 estimate, and is far from any city over 50,000 [1]. The site's Kansas guide lists it among eligible places [14]. For SPUR the question does not arise: the program has no geographic restriction, so a plant inside a city over 50,000 can also qualify [5]. The Food Supply Chain program had no geographic restriction either [3].

    How long before a new meat plant covers its debt?

    In the model, coverage is 0.18x in the first operating year on interest-only payments and 0.91x in year 2 on full payments, rising to 1.45x in year 3 and 1.77x in year 4. The plant hires most of its workforce before volume arrives and cannot sell inspected product until it has a federal grant of inspection [7]. The study sizes the $3,500,000 working capital line from that ramp.

    What is the biggest risk in a toll processing plant?

    The fee and the customers behind it. The plant earns a fee per pound on meat its customers own, so a small fee change moves a large amount of revenue: in the model a 10% lower fee takes coverage from 1.77x to 0.82x, and losing the largest customer takes it to 0.46x. Signed agreements with volume minimums, fee escalators and long notice periods are the main mitigants.

    How much equity does a new meat plant need?

    Under the part 5001 baseline, a new business that builds and asks for the guarantee before completion needs 25% balance-sheet equity or 25% of project cost [1]. For the modeled SPUR structure that is about $15,559,000; the model uses $24,236,000. Whether the SPUR notice applies the part 5001 equity test unchanged is not settled by the Federal Register text [5]. Under B&I, the $25 million limit pushes equity much higher on a project this size.

    What would a study like this cost?

    The site's cost page lists $10,500 to $14,500 for complex engagements, such as loans over $10 million, multi-use projects or markets with limited comparable data, and $6,900 to $12,500 for standard B&I studies [15]. A meat processing and cold storage project over $25 million falls in the complex band. Complex studies take seven to nine weeks and include all five Part 5001 components, sensitivity analysis and an Excel workbook [15][16].

    Sources

    [1] 7 CFR part 5001, OneRD Guaranteed Loans (CFR 2026 edition, title 7 vol. 15, revised 1 Jan 2026), govinfo; sections 5001.3, 5001.105, 5001.127, 5001.202, 5001.203, 5001.204, 5001.205, 5001.306, 5001.401, 5001.402, 5001.406, 5001.454, 5001.455. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 11 Nov 2026)

    [2] USDA, OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026, 91 FR 11272 (9 Mar 2026). https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 6 Nov 2026)

    [3] USDA RBCS, Notice of Funding Opportunity, Food Supply Chain Guaranteed Loan Program, 86 FR 70086 (9 Dec 2021), FR Doc 2021-26693. https://www.govinfo.gov/content/pkg/FR-2021-12-09/html/2021-26693.htm (accessed 11 Nov 2026)

    [4] USDA, information collection notice, OMB 0570-0077, 91 FR 1496 (14 Jan 2026), FR Doc 2026-00583. https://www.govinfo.gov/content/pkg/FR-2026-01-14/html/2026-00583.htm (accessed 11 Nov 2026)

    [5] USDA RBCS, Notice of Funding Opportunity for the Strengthening Processing for US Ranchers (SPUR) Guaranteed Loan Program, 91 FR 67540-67541 (27 Oct 2026), FR Doc 2026-21858. https://www.govinfo.gov/content/pkg/FR-2026-10-27/html/2026-21858.htm (accessed 11 Nov 2026)

    [6] OneRD Guaranteed Loan Regulation, 85 FR 42494 (14 Jul 2020), appendix A to subpart D of part 5001, Elements of an Acceptable Feasibility Study, pp. 42556-42557. https://www.govinfo.gov/content/pkg/FR-2020-07-14/pdf/2020-13991.pdf (accessed 7 Nov 2026)

    [7] 9 CFR part 304, Application for Inspection; Grant of Inspection (CFR 2026 edition), govinfo. https://www.govinfo.gov/content/pkg/CFR-2026-title9-vol2/xml/CFR-2026-title9-vol2-part304.xml (accessed 7 Nov 2026)

    [8] U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files. https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23st.zip ; https://www2.census.gov/programs-surveys/cbp/datasets/2023/cbp23co.zip ; https://www2.census.gov/programs-surveys/cbp/datasets/2019/cbp19st.zip (accessed 7 Nov 2026)

    [9] U.S. Census Bureau, Vintage 2025 county population estimates (co-est2025-alldata). https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/counties/totals/co-est2025-alldata.csv (accessed 7 Nov 2026)

    [10] U.S. Census Bureau, Vintage 2025 city and town population estimates (sub-est2025). https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/cities/totals/sub-est2025.csv (accessed 8 Nov 2026)

    [11] OMB metropolitan and micropolitan statistical area delineation file, July 2023 (list1_2023). https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx (accessed 7 Nov 2026)

    [12] U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026. https://data.sba.gov/dataset/7-a-504-foia (accessed 7 Nov 2026)

    [13] USAspending.gov, award counts by place of performance for Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), FY2024 to FY2026. https://api.usaspending.gov/api/v2/search/spending_by_award_count/ (accessed 7 Nov 2026)

    [14] usda-feasibility-study.com, Kansas USDA feasibility study guide (site page; plant capacities attributed there to industry and company sources). https://usda-feasibility-study.com/kansas (read 7 Nov 2026)

    [15] usda-feasibility-study.com, USDA Feasibility Study Cost & Timeline (site page). https://usda-feasibility-study.com/usda-feasibility-study-cost (read 7 Nov 2026)

    [16] usda-feasibility-study.com, Contact & Request a Proposal (site page). https://usda-feasibility-study.com/contact (read 7 Nov 2026)

    [17] usda-feasibility-study.com, Selected Engagements (site page). https://usda-feasibility-study.com/engagements (read 7 Nov 2026)

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours