Solar and storage projects in Hawaii target the nation's highest power prices, but low export credits mean savings must come from self-consumption and storage dispatch. An independent USDA feasibility study consultant builds an hourly, load-matched savings model under the current tariff; the independent USDA feasibility study company carries a no-grant base case.
USAspending records 17 REAP grants in Hawaii from FY2024 to FY2026, totalling $2,409,501, or $1.66 per resident against $11.77 in Idaho. Hawaii pays more for power than any state and uses REAP less than most. The REAP rule that took effect on 16 October 2026 changes how the remaining projects get built: the grant now arrives after a year of operation, so the study must support the loan that pays for the system up front.
Program Fit
REAP grants and guaranteed loans under the revised rule (91 FR 62600): grants cover at most 25 percent of project cost, capped at $500,000 for renewable energy systems, and are paid only after 12 months of operation, so bridge or construction financing covers the full system cost.
The REAP rule effective 16 October 2026, read for Hawaii
| Topic | Rule | Hawaii effect |
|---|---|---|
| Timing and data | Project Period ends 12 to 24 months before the application (12 to 36 in the first window); 12 months of actual production or savings plus 12 months of pre-installation data | The grant reimburses an operating system; the loan or the owner pays for construction |
| Award size and share | $1,500 to $500,000 for renewable systems, $250,000 for efficiency; grant at most 25% of cost | A $388,667 grant now implies a project of at least $1,554,668 (computed) |
| Combined cap | Grant plus guaranteed loan at most 75% of cost | Owner equity of at least 25% in every structure |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible | Screen agricultural parcels before design |
| Sizing and storage | Ground-mount systems must show commensurate historical use; storage limited to 120% of prior annual use | Battery sizing has to be justified by the load, which matters on islands where storage carries the savings |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Adding a battery to an existing array is out of scope |
| Foreign components | Solar or wind with any component from a foreign adversary under 15 CFR 791.4 ineligible, except systems installed before publication | Country-of-origin list for every module, inverter and battery |
| Economics | Simple payback must not exceed useful life | Payback is an eligibility test |
| Installers | Licensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Contractor qualifications go in the file |
| Competition | One competition for requests of $20,000 or less and one national competition for the rest, in annual windows | No state allocation to compete for |
Source: FACTS_REAP_RULE.md summary of 91 FR 62600. As of 7 November 2026 no funding notice under the rule had appeared in the Federal Register.
| FY2026 guarantee terms (91 FR 11272) | Guarantee | Upfront fee | Annual retention |
|---|---|---|---|
| REAP guaranteed loan | 80% | 1.0% | 0.25% |
| B&I loan under $5 million | 85% | 3.0% | 0.55% |
REAP's guaranteed loan is the cheaper vehicle for an energy system: on the same loan it carries a third of B&I's upfront fee rate and less than half of its retention rate.
Required by rule or requested by the lender
A REAP guaranteed loan is made under 7 CFR 5001, where 5001.306(a)(3)(i) requires an independent feasibility study for a guaranteed loan above $1,000,000 to a new business and 5001.306(a)(3)(ii) lets the Agency require one below that. Most Hawaii commercial and farm systems borrow less than $1,000,000, so the study is usually the lender's or the Agency's request, and the grant application's own technical report follows the rule's data requirements.
What the Study Covers
Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.
- Market demand and competitive supply analysis
- Technical and site feasibility, including environmental considerations
- Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
- Management and operational capacity assessment
- Economic feasibility and rural community impact
For a Hawaii system "market demand" is the host's own load: twelve months of interval data, the tariff, how much output can be used on site, and how storage shifts it into the evening peak.
Hawaii Market Evidence
September 2026 residential rates ran from 43.1 cents on Oahu to 51.6 cents on Molokai (Hawaiian Electric); Hualua Farm in Hawi received a $388,667 REAP grant for a 246 kW solar array (USDA RD, 2024). USDA's Honolulu determination treats only the Urban Honolulu and East Honolulu census-designated places as urban, so most of Oahu and all neighbor-island territory is B&I-eligible; every Hawaii study includes a dated, address-level USDA map determination.
Solar power generation in Hawaii: market evidence
| Measure | Hawaii | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 8 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.6 | 0.3 |
| Average employees per establishment | 2.0 | 12.3 |
| Average annual pay per employee | $87,500 | $138,631 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 19.8% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Interpretation. NAICS 221114 counts companies that sell solar power, not farms and businesses that install arrays for their own use, which is what REAP finances. Hawaii went from none to eight such firms between 2019 and 2023, twice the national density, but they average two employees each: small project companies, not utilities. The county file places four on Maui and three on Oahu, none in the non-metro counties (computed). For a REAP study the useful benchmarks are not here; they are the host's bills and the tariff.
Regional comparison (computed)
Rows are Alaska's and California's own pack figures.
| State | Establishments 2019 → 2023 | Per 100,000 residents | Avg. employees | Avg. pay | SBA 7(a) loans FY2020-26 (average) | REAP grants FY2024-26 (USAspending) |
|---|---|---|---|---|---|---|
| Hawaii (this page) | 0 → 8 | 0.6 | 2.0 | $87,500 | 2 ($1,400,000) | 17; $2,409,501; $1.66 per resident |
| Alaska | 3 → 0 | 0.0 | 0 | $4,593,521.72; $6.26 per resident | ||
| California | 94 → 240 (+155.3%) | 0.6 | 16.4 | $147,225 | 28 ($295,082) | $28,847,015.40; $0.73 per resident |
| United States | 942 (2023) | 0.3 | 12.3 | $138,631 | 138 ($478,591) |
REAP amounts are USAspending grant totals by state for Assistance Listing 10.868, FY2024 to FY2026; per-resident figures use 2020 Census populations as USAspending reports them.
Alaska, with similar island-grid economics in many communities, drew almost four times Hawaii's REAP dollars per resident. California, with lower rates, drew less than half. Hawaii's low uptake points to a gap in prepared applications rather than in economics, and under the new rule that gap now has to be closed with financing, not grant timing.
Hawaii's REAP awards under the new share limit (computed)
| Recipient (hub) | Grant | Minimum project cost if the grant were 25% |
|---|---|---|
| Hualua Farm, Hawi (246 kW, 2024) | $388,667 | $1,554,668 |
| Molokai Sea Farms, Kaunakakai (2024) | $80,000 | $320,000 |
| Garden Island Dental, Lihue (14.4 kW, 2024) | $28,511 | $114,044 |
| Johnny V Enterprises, Hana (off-grid, 2024) | $23,124 | $92,496 |
| Sugar Hill (off-grid, meat cold storage) | $10,342 | $41,368 |
Computed as grant divided by 0.25. These awards were made under the earlier rules; the table shows how much project each grant would require today.
Rural footprint and B&I eligibility in Hawaii
REAP guaranteed loans use the OneRD rural definition in 7 CFR 5001.3: outside cities and towns above 50,000 and their contiguous urbanized areas. In Honolulu County USDA treats only the Urban Honolulu and East Honolulu census-designated places as urban, so on the Hawaii hub's calculation 72.4 percent of residents live in eligible areas, and every neighbor-island site outside the Kahului–Wailuku urban area (57,905, which needs a map check) screens eligible. The pack's non-metro proxy, 19.8 percent of residents and none of the eight power firms, is not a guide here. Whether an agricultural producer outside a rural area can still use REAP is a program question the study should confirm with the Hilo office.
Financing benchmarks: REAP and B&I next to SBA
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 1 | $50,000 | 1 | $146,000 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 2 | $2.8 million | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $1.4 million. Hawaii had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
What it means in Hawaii. The two recent Hawaii loans averaged $1.4 million, three times the national FY2020 to FY2026 average of $478,591, and both went to power-generation firms rather than to farms installing their own systems. The national record is the warning: 12.9 percent of seasoned solar-generation loans were charged off, on average 51 months after approval, and 6.04 percent of dollars were lost (computed), the worst loss rate among the asset classes on this site's Hawaii pages. A host-owned system whose savings depend on the host's own load is a different credit, and the study's job is to show that difference with metered data.
Worked example (illustrative)
Inputs: an $800,000 solar and battery system at a Hawaii farm or business, a REAP guaranteed loan at fixed 7.25% over 20 years, FY2026 REAP fees. Structure A borrows the full 75 percent and forgoes a grant; Structure B plans a 25 percent grant after the first year, which caps the loan at 50 percent.
| Item | A: loan 75%, no grant | B: loan 50%, later grant 25% |
|---|---|---|
| Loan | $600,000 | $400,000 |
| Guaranteed amount (80%) | $480,000 | $320,000 |
| Upfront fee (1.0% of guaranteed) | $4,800 | $3,200 |
| Balance after 12 payments | $586,138.33 | $390,758.89 |
| First annual retention fee (0.25%) | $1,172.28 | $781.52 |
| Monthly payment | $4,742.26 | $3,161.50 |
| Annual debt service | $56,907.07 | $37,938.05 |
| Annual savings for 1.25x coverage | $71,133.84 | $47,422.56 |
| Owner cash at construction | $200,000 | $400,000, of which $200,000 is repaid by the grant if awarded |
| Simple payback on $800,000 at the A savings level | 11.25 years | same system |
| Self-consumed output needed for 1.25x coverage (hub residential rates) | Structure A | Structure B |
|---|---|---|
| Oahu, 43.1¢ | 165,044 kWh | 110,029 kWh |
| Maui, 44.7¢ | 159,136 kWh | 106,091 kWh |
| Hawaii Island, 46.6¢ | 152,648 kWh | 101,765 kWh |
| Lanai, 49.5¢ | 143,705 kWh | 95,803 kWh |
| Molokai, 51.6¢ | 137,856 kWh | 91,904 kWh |
Computed in Python. Residential rates are used because they are the rates on the hub; a business on a commercial schedule must use its own energy and demand charges.
Structure B needs less savings to cover its loan but asks the owner for twice the cash at construction, and the $200,000 returns only if the grant wins a national competition that has not yet opened. Lenders will underwrite A and treat any grant as a prepayment. The kWh table is the heart of a Hawaii REAP study: every kilowatt-hour has to be used on site or stored and used, because exported output earns far less than the retail rate it displaces.
What a lender-grade solar feasibility study in Hawaii must prove
- Twelve months of load. Interval data from the meter, matching the rule's pre-installation data requirement.
- Self-consumption. Hourly production against hourly load, with exports valued at the actual export credit rather than the retail rate.
- Storage dispatch. Battery size justified by the load and within 120 percent of prior annual use.
- Tariff accuracy. The host's commercial or agricultural schedule, demand charges and any time-of-use periods.
- Eligibility screens. Cropland status for ground mounts, a single location, no excluded components, and foreign-component documentation.
- Payback within useful life. Simple payback calculated as the rule requires and compared with the system's life.
- A no-grant base case. Coverage with the REAP guaranteed loan alone, and bridge financing if a grant is planned.
- Installer qualifications. State licensing and at least three similar installations.
Evidence the study must build when local comparables are thin
Hawaii has no public dataset of host-owned system performance, so the study assembles it: the host's utility bills and interval data, a production model for the exact roof or ground area, quotes from qualified installers with component origin lists, the utility's current tariff sheets and export terms, and, for farms, the irrigation, cooling or processing loads by month. For an off-grid site, generator fuel records replace the utility bill as the savings baseline.
Risks and mitigants
| Risk | Hawaii signal | Mitigant in the study |
|---|---|---|
| Export value | Low export credits (hub) | Hourly self-consumption model |
| Grant timing | Paid after 12 months; competitive | No-grant base case; Structure A |
| Storage rules | Retrofits and stand-alone storage excluded; 120% cap | Battery sized and installed with the array |
| Sector losses | 12.9% of 31 seasoned national loans charged off | Host-load savings, not merchant sales |
| Storms | Hurricane Lowell on Kauai, 2026 (hub) | Wind-rated racking; insurance |
| Supply chain | Foreign-adversary component bar | Country-of-origin schedule |
Process, documents and what gets a study sent back
The owner provides twelve months of bills and interval data, the installer's proposal and qualifications, the component list with origins, site and roof documents or a lease, any existing system details, and financial statements; owners of 20 percent or more guarantee at least their share of the guaranteed loan (5001.204). Studies are returned when savings are priced at retail for exported output, when a battery is sized beyond the 120 percent limit, when a ground mount sits on cropland, or when the grant is counted at closing.
Program evidence, honestly labelled
The Hawaii hub lists five REAP grants in its precedent table, shown above, and reports GoFarm Hawaii's figure of $19.5 million in REAP funding to Hawaii since 2018. They are public program records, not engagements of this firm, and were made under the rules in force before 16 October 2026. The Pennsylvania rooftop solar case study below is a national program example from outside Hawaii; the national renewable energy feasibility study page explains the new rule in full.
Hiring a USDA solar feasibility study consultant in Hawaii
When it is required. By rule, above $1,000,000 of guaranteed loan to a new business (5001.306(a)(3)(i)); by request below that, which is common because lenders now carry the whole construction cost.
What the engagement includes. The cost page lists the five Part 5001 components, a sensitivity-tested five- to ten-year projection, demand drivers, operator benchmarks, a management review, PDF and Word reports with the Excel model, kickoff and midpoint calls, one revision round and free revisions until USDA or the lender accepts. For energy work it adds full projections with debt service coverage and interconnection and utility rate modeling.
What you provide. Bills and interval data, installer proposals and qualifications, component origins, site documents and owner financials.
Fees and timing. The cost page prices REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks, and for guaranteed loans above $600,000 at $7,500 to $11,500 over five to seven weeks; across all island projects the hub cites four to eight weeks.
How to start. Send twelve months of bills, the island and the system size through the Get Your Free Consultation form below; the firm replies within 24 hours with next steps and a fixed-fee proposal. A solar feasibility study consultant who is not the installer is what makes the savings model credible, and the home page explains how this independent USDA feasibility study consultant prepares energy studies for lenders.
Last updated 2026-11-08