USDA Feasibility Study for Hotels and Resorts in Minnesota

    NAICS 721110

    A hotel loan in greater Minnesota is underwritten against a lodging base that is not growing. Census counted 925 hotels and motels with paid employees in 2023, twenty fewer than in 2019, while the national count rose 1.7%. What Minnesota does have is lodging spread far into the countryside: of the 883 properties the county file places, 315 are in non-metro counties, about 24.7 hotels for every 100,000 non-metro residents against 12.5 in metro counties. For a sponsor seeking a USDA Business and Industry (B&I) guarantee that is both the opening and the difficulty. Demand in lake towns, Boundary Waters gateways and along the North Shore is real but uneven through the year, wages are low, and in several markets tribal casino hotels already sell rooms. A lender-grade feasibility study converts those conditions into a rate, an occupancy curve and a coverage ratio that a reviewer can test line by line.

    Data current as of November 2026.

    When USDA requires a hotel feasibility study, and which program fits

    Two triggers apply. A hotel company that is new and wants a B&I guarantee on more than $1,000,000 cannot skip the study: 7 CFR 5001.306(a)(3)(i) requires one from an independent consultant the Agency judges qualified, on a scope the Agency writes. A newly formed hotel company borrowing near the Minnesota 7(a) average of about $1.4 million is over that line. An operating company buying, expanding or repositioning a property falls under 5001.306(a)(3)(ii), where USDA may ask for a study when the file lacks information; lenders usually do ask when rooms are added in a market the borrower has not run. SBA has the same discretion in 13 CFR 120.160(b).

    B&I is the natural USDA route for a for-profit hotel on an eligible site. Loans under $5 million carry an 85% guarantee in FY2026 (91 FR 11272), and the term can follow the building's useful life up to 40 years with no balloon (5001.402). SBA 504 has carried more Minnesota hotel loans than 7(a) since FY2010, 192 against 119, and 7(a) stays the fast option for smaller acquisitions. Community Facilities does not finance commercial lodging. REAP can share the cost of an efficiency retrofit at an operating hotel, but since the rule effective 16 October 2026 only after 12 months of data and for at most a quarter of the cost, so it never pays for construction. A conventional loan without a guarantee belongs in every study as the baseline, because the guarantee fee has to buy something: a longer term, a lower equity requirement or a lender willing to lend at all.

    Two eligibility screens bite on lodging. A hotel bar that hosts charitable pull-tabs earns rent from the charity, and 7 CFR 5001.127(b) disqualifies a borrower when more than 15% of annual gross revenue, including lease income from space or machines, comes from gambling. Separately, the borrower, every owner above 20% (passive investors aside) and anyone in control must have no delinquent federal tax or federal debt, no outstanding federal court judgment and no debarment (5001.127(a)); a debt on a repayment plan still disqualifies until paid.

    Hotels in Minnesota: market evidence

    Minnesota: hotels and motels, supply and rural footprint

    MeasureMinnesotaUnited States
    Establishments, 2019 → 2023945 → 925 (-2.1%)54,955 → 55,895
    Per 100,000 residents (2023)16.116.6
    Average employees per establishment25.326.8
    Average annual pay per employee$31,920$39,374
    Share of establishments in non-metro counties35.7% (315 in 35 counties)
    Share of state population in non-metro counties (2025)21.9%

    Non-metro counties with the most hotels and motels (2023): Cook County (24); Cass County (21); Otter Tail County (20); Crow Wing County (17); Itasca County (13); Kandiyohi County (13).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Three numbers frame the market case. Density is near the national figure, 16.1 hotels per 100,000 residents against 16.6, so Minnesota is neither short of rooms nor overbuilt in aggregate; any shortage argument must be made for one town and its drive-in market. The count fell 2.1% between 2019 and 2023 while the national count grew, and a reviewer will read that as soft demand unless the study shows the properties that closed were obsolete motels rather than viable rooms. And pay is low: $31,920 per employee, 18.9% under the national average, across 23,358 jobs and 25.3 employees per property.

    Those figures double as pro forma benchmarks. Payroll averages $806,034 per Minnesota hotel; a projection whose labour line sits far below that for a similar room count needs a reason, such as owner-operators, limited service or a management contract priced elsewhere. Low pay is also a staffing risk in towns that fill in summer and empty in November, so the study has to show who works the peak and at what wage.

    Expect a reviewer to press on three points: the monthly occupancy curve (a lake or North Shore property cannot be modelled on an annual average), the competitive set, including the tribal casino hotels the hub lists at Hinckley, Onamia, Walker, Carlton, Morton, Welch, Tower and Grand Portage, and the named room-night sources behind any growth rate.

    Rural footprint and B&I eligibility in Minnesota

    Lodging leans rural. 35.7% of county-placed hotels are in non-metro counties, against 21.9% of the population, and the leading non-metro counties are Cook (24), Cass (21), Otter Tail (20), Crow Wing (17), Itasca (13) and Kandiyohi (13). Hotels here follow the lakes and the Lake Superior shore more than they follow residents. Another 42 properties are not assigned to any county in the file, so the true rural count is higher, not lower.

    Non-metro status is only a proxy. What counts is 7 CFR 5001.3, which carves out every Minnesota city above 50,000 in the 2020 census plus the urbanized land contiguous with it, and which forbids approving a hotel application on the hope that its site will qualify later. Minnesota has 20 such places. Most lie inside the Twin Cities urbanized area, but Duluth (88,330), Rochester (124,292) and St. Cloud (72,647) are excluded on their own, and the Minnesota USDA page treats Hermantown and Proctor as presumptively excluded with Duluth. On the western border, Moorhead and East Grand Forks screen out because they sit in urbanized areas of North Dakota cities above 50,000, while Bemidji, Brainerd–Baxter, Willmar and Mankato–North Mankato screen as eligible. A highway hotel in a metro county can still qualify beyond the urbanized edge, and a resort in a non-metro county can fail if an urbanized boundary reaches it, so the parcel determination comes before any market work.

    Financing benchmarks: USDA B&I next to SBA

    Minnesota: SBA lending to hotels and motels

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201646$43.7 million114$96.2 million
    FY2017 to FY201921$20.8 million30$38.6 million
    FY2020 to FY202334$40.6 million31$35.9 million
    FY2024 to FY202618$31.8 million17$31.4 million

    Average 7(a) loan, FY2020 to FY2026: $1.4 million. Average 504 loan: $1.4 million. Of the 46 7(a) loans approved in FY2010 to FY2016 for Minnesota hotels and motels, 6.5% were charged off (national: 3.0% of 4,928), on average 97 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermB&I rule (FY2026)What it means for a Minnesota hotel
    Guarantee85% under $5 million; 80% from $5 million to $25 million (91 FR 11272)Most rural conversions and rebuilds stay in the 85% tier
    Fees3.0% of the guaranteed amount once; 0.55% a year on the guaranteed share of the 31 December balanceReduced fee of 1.0% and 0.50% with an 80% guarantee where 5001.454(d) criteria are met
    Maximum$25 million per borrower (5001.406(c))Rarely binding for rural lodging
    Term and rateUseful life up to 40 years, no balloon (5001.402); rate negotiated, fixed or variable (5001.401)Building-weighted loans can run 25 years or more
    Equity, new hotel company20% balance sheet equity (4:1) or 25% of project cost; 25% if the guarantee issues before completion (5001.105(d)(3) and (4))The default for a start-up owner
    Equity, existing operator10% balance sheet equity, 10% of project cost, or the contributed-capital test (5001.105(d)(1))Acquisitions by an operating company
    CollateralAppraisal over $250,000; as-is and prospective values; going-concern value deducted before discounting (5001.203)The business value of a hotel is not collateral
    GuaranteesOwners of 20% or more guarantee at least their share of the guaranteed amount (5001.204)Personal statements go in the file

    The state record shows hotel loans getting larger. Minnesota's 7(a) average was $1,194,900 in FY2020 to FY2023 and $1,766,133 in FY2024 to FY2026, and 504 loans in the latest period averaged $1,848,471 (computed from the pack). That keeps most rural projects inside the 85% B&I tier with room below $5 million. The seasoned-loss line is the caution: three of the 46 Minnesota hotel 7(a) loans approved in FY2010 to FY2016 were charged off, 6.5% against 3.0% nationally, and the losses came on average 97 months after approval, long after any start-up period. A Minnesota study should therefore test coverage in a weak year well into the loan, not only in the first stabilised year, and the lender's analysis should show reserves for the furniture, fixtures and systems a hotel replaces before then; 5001.202 asks lenders to address capital expenditure and maintenance reserves.

    Worked example (illustrative)

    Inputs. Loan A is $1,400,000, the state's FY2020 to FY2026 7(a) hotel average of $1,392,635 rounded. Loan B is an illustrative $5,500,000 new build, chosen to show what crossing the $5 million tier costs. Both use a 7.25% fixed rate over 25 years with monthly payments; the rate is an assumption for illustration, not a quote, and both rate and term sit within 5001.401 and 5001.402. The first retention fee assumes 12 payments are made before the first 31 December balance date. In the equity rows the guaranteed loan is the hotel's only debt.

    Computed: B&I terms on two Minnesota hotel loans (Python, exact to the cent)

    LineLoan A: near the state 7(a) averageLoan B: above the $5 million tier line
    Loan amount$1,400,000.00$5,500,000.00
    FY2026 B&I guarantee85%80%
    Guaranteed amount$1,190,000.00$4,400,000.00
    Lender's unguaranteed exposure$210,000.00$1,100,000.00
    Upfront guarantee fee (3.0% of guaranteed)$35,700.00$132,000.00
    First retention fee on the balance after 12 payments (0.55%)$6,448.66$23,843.79
    Monthly principal and interest (7.25%, 25 years)$10,119.30$39,754.38
    Annual debt service$121,431.55$477,052.53
    Net operating income for 1.25x$151,789.44$596,315.66
    Debt service as a share of the average Minnesota hotel payroll ($806,034)15.1%59.2%
    Coverage if the rate is 2 points higher1.06x1.06x
    Coverage if NOI falls 15%1.06x1.06x
    New business: 25% of project cost$466,666.67 on $1,866,666.67$1,833,333.33 on $7,333,333.33
    New business: 20% balance sheet equity$350,000.00$1,375,000.00
    Existing hotel: 10% of project cost$155,555.56 on $1,555,555.56$611,111.11 on $6,111,111.11
    Independent study compulsory if borrower is newYes (over $1,000,000)Yes (over $1,000,000)

    Loan A needs $151,789.44 of net operating income for 1.25x, and its debt service equals 15.1% of what the average Minnesota hotel spends on payroll. Either a 15% fall in NOI or a rate two points higher takes coverage to about 1.06x, so a property underwritten at exactly 1.25x cannot absorb both at once. Crossing $5 million costs five points of guarantee: Loan B's lender keeps $1,100,000 at its own risk, which is why larger projects often phase rooms or add equity. On the same $1,400,000, SBA 7(a) would guarantee $1,050,000 with a guaranty fee ceiling of $36,875 (13 CFR 120.210 and 120.220), against B&I's $1,190,000 guaranteed for a $35,700 fee.

    Minnesota risks a hotel study has to carry

    • Season and weather. 5001.202 calls for quarterly cash flow for seasonal borrowers. A lake resort's shoulder months, not its July, decide whether payments are met from operations or from reserves.
    • Casino competition. Tribal casino hotels at the eight locations named on the hub price rooms partly as an adjunct to gaming; the study should show their room counts and the rate gap.
    • Labour. At $31,920 average pay, housekeeping and front desk turnover is a cost driver; the staffing plan should match the occupancy curve month by month.
    • Pull-tab and tenant screens. Bar rent from a charity is tested against the 15% limit in 5001.127(b). The hub notes adult-use cannabis sales began in Minnesota on 16 September 2025, and 5001.127(d) bars a borrower that derives income from illegal drugs, so retail space leased inside a hotel needs a tenant screen.
    • Lender and program timing. The hub reports that USDA removed ten lenders from the guaranteed program on 12 May 2026; confirm the lender's current status. A continuing resolution funds USDA at FY2026 levels through 11 December 2026, and no FY2027 fee notice had appeared in late October 2026, so this page uses FY2026 terms.

    What a lender-grade hotel feasibility study in Minnesota must prove

    1. The parcel is rural under 5001.3 on the date of application, with the USDA map determination attached.
    2. Room-night demand by month and by segment (leisure, lake and trail visitors, business travel, events), with sources a reviewer can check.
    3. A competitive set with room counts, positioning and rate, including casino hotels within the drive-in market.
    4. An average daily rate and occupancy ramp to a stated stabilisation year, with the closures behind the state's 2.1% decline explained for the local market.
    5. A payroll line benchmarked against the $806,034 state average per property and $31,920 per worker, adjusted for service level.
    6. Capital reserves for furniture, fixtures and equipment, sized for the replacement cycle that coincides with the 97-month loss timing in the SBA record.
    7. Quarterly cash flow, 1.25x coverage at stabilisation, and stress cases for rate, occupancy and interest.
    8. Gambling rent as a separate line and percentage, owner screening under 5001.127(a), and an operator or franchise plan with named experience.

    Hiring a USDA hotel feasibility study consultant in Minnesota

    For a new hotel company borrowing more than $1,000,000 under B&I, the independent study is a condition of the guarantee and the Agency decides its scope. For an operating company, or a smaller loan, USDA and the lender decide case by case, and the decision often turns on how far the projection departs from the property's own history. The USDA feasibility study consultant you engage must be independent of the deal: no stake in the hotel, the franchise sale, the construction contract or the loan.

    What the fee buys, per the site's cost page, is a report covering all five Part 5001 components and an Excel model whose five to ten year hotel projection runs rate, occupancy and cost sensitivities; it comes in PDF and Word, includes a midpoint call and a revision round, and is revised free until USDA or the lender accepts it. Appraisals, environmental site assessments, engineering and lender packaging are bought separately.

    A single hotel with usable comparables is quoted in the standard B&I band of $6,900 to $12,500; loans above $10 million, phased resorts or markets without comparables move to $10,500 to $14,500. Either way the fee is fixed before signing, the schedule is six to seven weeks (seven to nine in the complex band), and a three to four week rush adds 20% to 35%. Have ready the site and its control documents, the room count and brand decision, a construction or acquisition budget, three years of statements for an existing property, owner résumés and the lender's term sheet. To start, request a scoped proposal; the contact page promises a reply within one business day.

    Minnesota hospitality precedent (not lodging)

    The inputs contain no publicly identified USDA hotel financing in Minnesota. The nearest in-state hospitality precedent on the hub is Northern Fire Hospitality LLC's 2023 purchase and upgrade of the Pizza Ranch in Bemidji, carried by a $3,017,500 B&I guarantee, which shows the program working in a lakes-region town but is a restaurant, not a hotel. The site's hotel case study (New York) is linked below as an out-of-state analysis, not as a Minnesota project.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Minnesota hotel project need a USDA feasibility study?

    It does when a newly formed hotel company asks for a B&I guaranteed loan above $1,000,000; 7 CFR 5001.306(a)(3)(i) makes an independent study a condition and lets the Agency set its scope. Minnesota's recent 7(a) hotel loans averaged about $1.4 million, so most new hotel companies cross the line. Established operators and smaller loans are at USDA and lender discretion, and lenders often ask anyway because three of 46 seasoned Minnesota hotel 7(a) loans were charged off.

    What does a hotel feasibility study consultant charge for a Minnesota project?

    Expect a fixed quote in one of two bands. A single hotel with usable comparables falls in the standard B&I band, $6,900 to $12,500; a resort phased over several seasons, a loan above $10 million or a market with no comparable properties falls in the complex band, $10,500 to $14,500. Lake resorts with few nearby comparables often price toward the top. Appraisals, environmental reports and engineering are outside the fee.

    How long does a hotel feasibility study take?

    Budget about six or seven weeks from signature for an ordinary hotel and up to nine for a complex resort, on the site's published schedule. The longest phase is usually the market work in weeks two to four: interviewing competing properties, assembling rate and occupancy evidence and building the monthly demand curve. A rush schedule of three to four weeks costs 20% to 35% more and depends on analyst capacity.

    Who is allowed to prepare a B&I hotel study?

    A consultant the Agency accepts as qualified and independent, meaning no financial interest in the hotel, its franchise, its construction or the loan. Brand feasibility reports from a franchisor and appraisals are useful inputs but do not replace the study, because they answer different questions. The preparer should be able to defend a seasonal occupancy curve, a rate position against casino and chain competitors, and coverage under stress.

    How long does a hotel feasibility study remain usable?

    Nothing in Part 5001 dates a hotel study, but its evidence ages: reviewers generally expect market data from the last 18 months or so, per the site's cost page, and the hotel appraisal itself lapses after twelve months under 5001.203. In Minnesota lake markets a new competing property, a change in casino hotel capacity or a lost group contract can make a study stale sooner, so update it if the application slips.

    Can one hotel study support both SBA 504 and B&I?

    Yes, provided it is written to USDA's stricter standard. A study built on USDA's five components and a stress-tested projection also answers what SBA can require under 13 CFR 120.160(b). That matters in Minnesota, where 192 hotel loans went through 504 from FY2010 to FY2026 against 119 under 7(a), so lenders often compare a 504 structure with a B&I guarantee before choosing.

    Do tribal casino hotels count as competition for a new Minnesota hotel?

    They should be in the competitive set wherever they share the drive-in market. The Minnesota hub lists casino hotels at Hinckley, Onamia, Walker, Carlton, Morton, Welch, Tower and Grand Portage. Their room rates may be set with gaming revenue in mind, so a study should report their room counts and published rates, explain the guest segments a new property would draw that they do not, and test occupancy if they expand.

    Can a hotel with a pull-tab bar still use B&I?

    Usually, but it must be measured. Minnesota charities run pull-tabs in bars across the state, and a host hotel receives rent for the space. Under 7 CFR 5001.127(b) a borrower is ineligible if gambling income, including lease income from space or machines, exceeds 15% of annual gross revenue. Room revenue normally keeps a hotel well under that limit, but the study should still show the rent as a separate line and percentage.

    Are Moorhead and East Grand Forks hotel sites eligible?

    They screen as presumptively excluded. Both cities are under 50,000 but sit inside the urbanized areas of Fargo and Grand Forks, North Dakota cities above 50,000, and 7 CFR 5001.3 excludes the urbanized area contiguous and adjacent to such a city. Bemidji, Brainerd–Baxter, Willmar and Mankato–North Mankato screen as eligible. Each parcel still needs a dated USDA map determination before the application goes in.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee, retention fee and guarantee percentage for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. USAspending.gov, prime award data by assistance listing 10.768, 10.766 and 10.868, FY2024 to FY2026 (counts may be incomplete): https://www.usaspending.gov/
    10. USDA Feasibility Study Consultants, Minnesota state page (state office, eligibility screens, sectors and precedents as the site reports them): https://usda-feasibility-study.com/minnesota
    11. USDA Rural Development Minnesota awards chart and releases; USDA Food Supply Chain awards list (2022 to 2024), as compiled on the site's Minnesota page: https://usda-feasibility-study.com/minnesota
    12. Minnesota Gambling Control Board, FY2025 charitable gambling receipts and rent limits, as reported on the site's Minnesota page: https://usda-feasibility-study.com/minnesota
    13. USDA Feasibility Study Consultants, OneRD lender revocations of May 2026: https://usda-feasibility-study.com/blog/usda-lender-revocations-may-2026
    14. USDA Feasibility Study Consultants, cost and timeline page (fee bands, phases, inclusions, exclusions, rush terms): https://usda-feasibility-study.com/usda-feasibility-study-cost
    15. USDA Feasibility Study Consultants, contact page (response time): https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours