USDA Feasibility Study for Assisted Living and Senior Care in Mississippi

    NAICS 6233

    Mississippi's 358 assisted living and nursing facilities employ 18,831 people, and more than half of the facilities Census can place, 123 of them, are in non-metro counties. Few have borrowed through SBA: just eight 7(a) loans in FY2020 to FY2026, but at an average of $2.5 million, twice the national figure. A USDA assisted living feasibility study in Mississippi has to make the case that a specific community in an aging rural county will fill its units at rents residents can pay and staff them at wages the market supports, so that a lender can hold a Business and Industry (B&I) guarantee or a Community Facilities (CF) loan against it.

    Assisted living in Mississippi: market evidence

    Mississippi: assisted living and nursing facilities, supply and rural footprint

    MeasureMississippiUnited States
    Establishments, 2019 → 2023366 → 358 (-2.2%)43,506 → 44,649
    Per 100,000 residents (2023)12.213.3
    Average employees per establishment52.653.5
    Average annual pay per employee$36,248$41,324
    Share of establishments in non-metro counties53.0% (123 in 20 counties)
    Share of state population in non-metro counties (2025)50.0%

    Non-metro counties with the most assisted living and nursing facilities (2023): Lee County (20); Lauderdale County (12); Jones County (8); Lincoln County (8); Lowndes County (8); Adams County (6).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading a combined category. The Census class here joins nursing homes and assisted living, and the 52.6-employee average, with payroll of about $1.91 million per facility (computed), describes a skilled nursing building more than a 40-unit assisted living community. A pro forma should not copy those staffing totals; it should copy the wage. Mississippi pays $36,248 a year on average in this class, 87.7 percent of the U.S. level, and caregivers are the largest cost line in senior housing. Supply is 8.2 percent thinner per resident than nationally (12.2 against 13.3 per 100,000) and fell by eight facilities from 2019 to 2023 while the U.S. count rose 2.6 percent, which supports a shortage argument in principle. A reviewer will push back in three places: the age-qualified, income-qualified population within the market area, not the county total; the private-pay rent that residents of that county can afford from income and home equity; and whether the nursing homes in the count already offer assisted living wings that compete directly.

    Rural footprint and B&I eligibility in Mississippi

    The 20 non-metro counties with published counts contain 123 facilities, 53.0 percent of the placed total, a little ahead of their half share of the state's people. Lee County has 20, Lauderdale 12, Jones, Lincoln and Lowndes 8 each, and Adams 6. The hub points to measurable demand in aging Delta and Pine Belt counties.

    Eligibility follows 7 CFR 5001.3 for both B&I and CF guaranteed loans. Any site counts as rural except one inside a municipality that the most recent decennial count put above 50,000, or inside the urbanized area that adjoins such a municipality. On the Mississippi hub, the 2020 Census put Jackson, Gulfport and Southaven above that size; Hattiesburg (48,730) screens as eligible, Biloxi (49,449) probably does not because of the Gulfport urbanized area, and Madison, Ridgeland, Flowood, Brandon, Pearl and Clinton are presumptively out. Senior communities often seek suburban sites near hospitals, so the eligibility check belongs at site selection, not after design.

    Under 5001.127 a for-profit sponsor fails if the company, a controlling owner or a more-than-20-percent owner has an unpaid federal court judgment, is delinquent on federal tax or federal debt, or is debarred. Each person or entity owning 20 percent or more also signs an unsecured guarantee for at least that percentage of the guaranteed amount (5001.204).

    Program fit for a Mississippi senior care project

    • B&I for a privately owned assisted living community: land, construction, furnishings, start-up losses and working capital; loans under $5 million carry the 85 percent guarantee. The hub describes assisted living as a significant share of B&I health care lending.
    • Community Facilities for a nonprofit, public or tribal owner, which the hub names as an alternative in eligible rural communities; the FY2026 CF guaranteed loan has an 80 percent guarantee and a 1.25 percent fee.
    • SBA 7(a) has made 13 Mississippi loans in this class since FY2010; SBA 504 one, for $604,000, in FY2024 to FY2026. A new or special-purpose project contributes 15 to 20 percent under 504 (13 CFR 120.910).
    • REAP can co-fund efficiency improvements at an operating private community, within the 25 percent cost share the October 2026 rule allows.
    • A conventional loan generally waits for stabilised occupancy; the study can show when that point arrives for a later refinance.

    Financing benchmarks: USDA B&I next to SBA

    Mississippi: SBA lending to assisted living and nursing facilities

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20164$2.6 million0$0
    FY2017 to FY20191$100,0000$0
    FY2020 to FY20236$16.1 million0$0
    FY2024 to FY20262$3.9 million1$604,000

    Average 7(a) loan, FY2020 to FY2026: $2.5 million. Average 504 loan: $604,000. Mississippi had fewer than 30 seasoned 7(a) loans for assisted living and nursing facilities; nationally, 3.3% of 1,086 FY2010 to FY2016 loans were charged off, on average 85 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    B&I termFiscal 2026 ruleSource
    Guarantee85% for loans under $5 million; 80% from $5 million up to $25 million91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount; 1.0% reduced fee where granted91 FR 11272
    Retention fee0.55% each year of the guaranteed share outstanding91 FR 11272
    Guarantee issued before construction ends0.50% added to the upfront fee; equity goes in first91 FR 11272; 7 CFR 5001.205(e)(2)
    Termmatches useful life, capped at 40 years, no balloon payment7 CFR 5001.402
    Equity, new business20% balance-sheet equity or 25% of project cost; 25% if guaranteed during construction7 CFR 5001.105(d)(3), (4)
    Studyrequired above $1 million for a new business7 CFR 5001.306(a)(3)(i)

    B&I terms summarised from the FY2026 notice and 7 CFR Part 5001.

    What the record says about scale and risk. Mississippi's handful of SBA loans in this class has been large: six loans worth $16.1 million in FY2020 to FY2023 and two worth $3.9 million since, for a FY2020 to FY2026 average of $2.5 million, more than double the national average of about $1.22 million (computed). Eight loans is too few to call a trend, but it fits the shape of senior housing finance: few deals, each sizeable, often new construction. With so few seasoned state loans, the national loss record is the benchmark: 3.3 percent of 1,086 loans charged off, on average 85 months after approval, a late pattern that reflects occupancy and cost pressures years after opening rather than failed lease-up.

    Worked example (illustrative)

    Because Mississippi recorded fewer than ten 7(a) loans in this class in FY2020 to FY2026, Loan A uses the national average ($1,219,305) rounded to $1,220,000, at an illustrative 7.25 percent over 25 years. Loan B uses the state's eight-loan average ($2,499,500) rounded to $2,500,000, at 7.00 percent over 30 years, a term within the 40-year useful-life limit for a new building.

    Input or resultLoan A: national average sizeLoan B: Mississippi average size
    Loan amount$1,220,000.00$2,500,000.00
    Program and fee scheduleB&I, fiscal 2026 noticeB&I, fiscal 2026 notice
    Guarantee percentage85%85%
    Guaranteed amount$1,037,000.00$2,125,000.00
    Upfront guarantee fee$31,110.00$63,750.00
    Upfront fee if the guarantee is issued before construction is complete (+0.50%)$36,295.00$74,375.00
    First annual retention fee (guaranteed share of the balance after 12 payments)$5,619.55$11,568.78
    Interest rate (illustrative, fixed)7.25%7.00%
    Amortization, years (no balloon)2530
    Monthly payment$8,818.24$16,632.56
    Annual debt service$105,818.92$199,590.75
    NOI needed for 1.25x coverage$132,273.66$249,488.44
    Coverage on that 1.25x NOI if the rate were 2 points higher1.06x1.03x
    Equity, new business, 25% of project cost (5001.105(d)(4))$406,666.67$833,333.33
    Total project cost on that basis$1,626,666.67$3,333,333.33
    Equity, new business, 20% balance-sheet route if this loan is the only debt$305,000.00$625,000.00
    Equity, new business with guarantee issued before completion, 25% balance-sheet route (5001.105(d)(3))$406,666.67$833,333.33
    Equity, existing business, 10% of project cost (5001.105(d)(1))$135,555.56$277,777.78

    Computed in Python from the inputs shown; guarantee and fee rates from 91 FR 11272; equity routes from 7 CFR 5001.105(d), assuming the guaranteed loan is the only debt.

    Per-unit test. For an illustrative 40-unit community, Loan B's 1.25x NOI of $249,488.44 is $6,237.21 per unit per year, or $519.77 per unit per month left after care staff, food, utilities, insurance and management. At 60 units it is $346.51 a month. Loan A's smaller debt needs $275.57 per unit per month at 40 units. The study must show monthly rents, net of vacancy and bad debt, that clear operating costs by those amounts at stabilised occupancy.

    Stress tests. If the rate were two points higher, Loan B's coverage would fall from 1.25x to 1.03x, which is why fixed rates or caps matter in senior housing. A 20 percent drop in NOI, roughly what slower lease-up or a wage increase can cause, takes coverage to 1.00x. Lease-up losses should be funded from equity or a reserve, not assumed away; under 5001.205(e)(2) the construction-period guarantee needs cash flow for construction contingencies and start-up working capital.

    What a lender-grade assisted living feasibility study in Mississippi must prove

    1. The primary market area, with drive-time boundaries and the share of residents expected from outside it, typically adult children's locations.
    2. Age- and income-qualified demand: households aged 75 and over in the area with incomes and assets sufficient for the planned rents.
    3. Competitive supply by name: assisted living, nursing homes with assisted living units, personal care homes and any pipeline, with occupancy and rates.
    4. Penetration and capture rates compared with what existing communities achieve.
    5. Rents and care fees by unit type and care level, supported by a local rate survey.
    6. Staffing plan and wages, using the $36,248 class average as a floor and showing caregiver recruitment in the county.
    7. Lease-up schedule month by month, with the reserve that funds losses until stabilisation.
    8. Licensing and regulatory approvals confirmed by the sponsor's specialists, since the study depends on them.
    9. Parcel eligibility under 5001.3 and ownership fit for B&I or CF.

    Risks and mitigants in Mississippi

    Slow lease-up is the most common problem; mitigants are presales or deposits, a conservative absorption rate and an operating reserve. Labour shortages raise wages; the study tests a higher wage scale. Rural incomes cap private-pay rents, so the study shows how many households can pay without exhausting savings. Hospital instability in rural Mississippi, with 35 rural hospitals at risk according to the hub's CHQPR figures, affects referral flows and residents' access to care, which the study should address for the specific site.

    Filing, documents and what reviewers return

    For B&I the lender files; for CF the nonprofit or public owner applies; both go to the Rural Development office in Jackson the hub lists. The sponsor provides site control, architectural plans and budget, the operator's experience and track record, any management agreement, licensing status, owner financial statements and organisational documents. Studies are sent back for counting all seniors instead of income-qualified ones, ignoring nursing homes' assisted living units, or assuming lease-up faster than local comparables achieved.

    Program example

    The hub's Mississippi precedent table contains no assisted living or senior care financing, so this page offers no senior care precedent. The closest state records are health care: a $6,000,000 B&I guarantee for Panola Medical Center in Batesville and a $19,710,000 CF loan for a King's Daughters Medical Center office building in Brookhaven (both 2022, per the hub). They show Rural Development financing Mississippi health facilities, not senior housing.

    Hiring a USDA assisted living feasibility study consultant in Mississippi

    For B&I, a new business seeking more than $1,000,000 must present a feasibility study by a consultant who is independent and acceptable to the Agency, which sets the scope (7 CFR 5001.306(a)(3)(i)). Both example loans cross that threshold for a new operating company. An established operator expanding a community, or a smaller loan, is at USDA's discretion; senior housing lenders usually expect a market study regardless.

    Expect a senior care engagement to be priced at the upper, complex end of the site's B&I pricing (up to $14,500, with seven to nine weeks of work), because comparable rent and occupancy data for rural Mississippi communities usually must be gathered by direct survey. A nonprofit CF project falls in the Community Facilities band. The engagement includes demand and penetration analysis, a competitive survey, lease-up and operating projections with sensitivity cases, management review, the Excel model and the acceptance guarantee; appraisals, environmental and licensing work are separate.

    An assisted living feasibility study consultant should ask early for your operator's track record and unit mix. Our homepage sets out where a USDA feasibility study consultant fits in the lending process. Send the site, unit count, care levels, owner type, budget and lender via the contact page for a written proposal.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Is a market or feasibility study mandatory for a Mississippi assisted living loan?

    Under B&I it becomes mandatory once a newly formed operating company asks for a guaranteed loan above $1,000,000 (7 CFR 5001.306(a)(3)(i)). Mississippi's FY2020 to FY2026 SBA loans in this class averaged $2.5 million, so most new communities cross the line. Expansions by an existing operator and CF loans are at Agency discretion, though few lenders will finance a new senior community without independent demand and lease-up analysis.

    What does an assisted living feasibility study consultant cost in Mississippi?

    A new rural Mississippi community usually prices between $10,500 and $14,500 on the site's fee schedule because rents and occupancy at competitors must be surveyed directly; a straightforward expansion can fit the standard band, $6,900 to $12,500. The proposal fixes the fee. USDA's own upfront fee on the $2,500,000 example loan is $63,750.00, or $74,375.00 if the guarantee issues during construction.

    How long does a senior living study take?

    Seven to nine weeks for a complex B&I engagement, according to the cost page, and six to seven for a standard one, with a rush option at a premium. In Mississippi the competitive survey of assisted living, nursing homes with assisted living units and personal care homes in the market area usually sets the timeline.

    Who may prepare an assisted living study for USDA?

    A qualified consultant with no financial interest in the community, the operator, the developer or the loan, acceptable to the Agency (5001.306(a)(3)(i)). Operators and developers supply their track records and budgets, but the demand and feasibility conclusions must come from the independent author. Rural Development decides acceptability for each file.

    How long is an assisted living feasibility study valid?

    Part 5001 gives no expiry date. The cost page cites a USDA expectation that data be generally no more than about 18 months old, and the appraisal must be under one year old at closing (5001.203). Because a new competitor can change capture rates in a small Mississippi market, update the supply survey if the start of construction slips.

    Can the same study serve an SBA and a USDA lender?

    It can, provided the engagement lists both lenders and the model runs both debt structures; SBA's rules let a lender demand a study too (13 CFR 120.160(b)). For a Mississippi community the difference is material: a B&I loan's term can run to 30 years or more for a new building, lowering annual debt service against a typical shorter 7(a) amortisation, and the guarantee is 85 rather than 75 percent.

    Why use the national average loan in a Mississippi example?

    Mississippi recorded only eight 7(a) loans in this class in FY2020 to FY2026, too few for a reliable state benchmark, so the example shows the national average of $1,219,305 alongside the state's eight-loan average of $2,499,500. The study for an actual project replaces both with its own budget, and the national loss record (3.3 percent charged off, 85 months on average) stands in for state history.

    Do Census staffing figures fit a small Mississippi assisted living community?

    Not directly. The Census class combines nursing homes and assisted living, so its 52.6 employees per facility and about $1.91 million payroll describe larger nursing buildings. A 40 to 60-unit community needs its own staffing plan by shift and care level. The class's $36,248 average pay is the more useful benchmark, as a floor for caregiver wages.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. REAP final rule, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. 2020 Census city counts, the hub's senior care sector note, CHQPR hospital figures and USDA precedents, as cited on the Mississippi hub
    10. Site pages: /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours