Sixteen marinas in Mississippi report paid staff to the Census Bureau, half the national rate per resident, and none of them, nor any other Mississippi marina, appears in SBA's loan records from FY2010 to FY2026. For a sponsor planning slips on the Gulf Coast, the Ross Barnett Reservoir, Grenada or Sardis Lake or the Tennessee-Tombigbee Waterway, that means a lender has no state loan history and almost no public operating data to compare against. A USDA marina feasibility study in Mississippi must therefore generate the evidence directly, slip by slip and season by season, before anyone can size a Business and Industry (B&I) guarantee.
Marinas in Mississippi: market evidence
Mississippi: marinas, supply and rural footprint
| Measure | Mississippi | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 17 → 16 (-5.9%) | 3,757 → 3,734 |
| Per 100,000 residents (2023) | 0.5 | 1.1 |
| Average employees per establishment | 13.2 | 8.7 |
| Average annual pay per employee | $29,802 | $51,262 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 50.0% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Few marinas, unusual profile. Mississippi has 0.5 payroll marinas per 100,000 residents against 1.1 nationally, and lost one between 2019 and 2023. Two figures stand out. The state's marinas employ 13.2 people on average, 52 percent more than the national 8.7, yet pay only $29,802 a year, 58.1 percent of the national level; only hotels, among the asset classes this site covers in Mississippi, show a wider gap. The likeliest reading is that the few payroll marinas carry seasonal and part-time staff for fuel, stores, rentals or food service, with payroll of about $394,875 per marina (computed); a pro forma should not borrow national marina staffing or wages without checking local operators. The county file places only 5 of the 16 marinas, all in one metro county, so public data cannot show where the rural marinas are or how they perform. A lender will ask the study for slip counts, occupancy, rates and fuel volumes from named competitors, because no published source supplies them.
Regional comparison
| State | Payroll establishments 2023 | Change since 2019 | Per 100k residents | Staff per site | Average pay | SBA 7(a) loans, 2020-26 | Average 7(a) loan, 2020-26 |
|---|---|---|---|---|---|---|---|
| Mississippi | 16 | -5.9% | 0.5 | 13.2 | $29,802 | 0 | none |
| Alabama | 63 | +10.5% | 1.2 | 7.9 | $45,401 | 3 | $2,103,667 |
| Louisiana | 30 | -18.9% | 0.7 | 7.9 | $35,445 | 1 | $1,020,000 |
| Tennessee | 103 | -8.0% | 1.4 | 6.7 | $46,984 | 2 | $3,529,500 |
| Arkansas | 34 | +9.7% | 1.1 | 6.2 | $41,810 | 2 | $1,728,600 |
| United States | 3,734 | -0.6% | 1.1 | 8.7 | $51,262 | 112 | $1,281,853 |
Computed from each state's own pack (Census County Business Patterns 2019 and 2023; SBA 7(a) FOIA data as of 30 Sep 2026); Alabama, Louisiana, Tennessee and Arkansas values are those states'.
Every neighbour has more marinas per resident, from Louisiana's 0.7 to Tennessee's 1.4, and all of them pay more, $35,445 to $46,984. SBA's regional record is thin too: eight marina loans across the four neighbours in FY2020 to FY2026, with averages from $1,020,000 in Louisiana to $3,529,500 in Tennessee, and none in Mississippi. Nationally, 112 loans averaged $1,281,853 in that period, and of 155 seasoned FY2010 to FY2016 loans, 5.2 percent were charged off, on average 91 months after approval, a late pattern consistent with long-lived docks that face storm damage and dredging costs years after opening.
Rural footprint and B&I eligibility in Mississippi
The hub places marina demand on the Gulf Coast and on large inland systems: the Ross Barnett Reservoir, Grenada Lake, Sardis Lake and the Tennessee-Tombigbee Waterway, and describes these as eligible rural counties that fit B&I.
The parcel test is where marina projects in Mississippi most often run into trouble. Under 7 CFR 5001.3, a site is ineligible if it lies within a city or town that the latest decennial census counted at more than 50,000, or within the urbanized area attached to it. On the hub's 2020 figures, Gulfport (72,926) is over the line and Biloxi likely sits inside its urbanized area, which removes much of the developed coast; the hub wants Ocean Springs and Bay St. Louis checked on the map. Inland, the hub lists Ridgeland, Flowood, Brandon and Madison among the presumptively excluded Jackson suburbs, so reservoir shoreline close to them needs a parcel determination before design. Lakes and waterway sites in rural counties will usually pass.
The marina company must also be clear of the 5001.127 bars: no unpaid federal court judgment, delinquent federal tax or federal debt, or debarment for the company, a controlling owner or anyone holding more than 20 percent; and no more than 15 percent of revenue from gambling. Anyone owning a fifth of the company or more signs a personal guarantee under 5001.204.
Program fit
- B&I finances docks, slips, dry stack storage, fuel systems, ship stores, buildings, dredging and working capital on eligible ground, with USDA covering 85 percent of loans below $5 million.
- SBA lending: the record holds no Mississippi marina loan under either 7(a) or 504, though both are used for marinas nationally.
- REAP can co-fund efficiency or a sized renewable system at an operating marina, within the 25 percent cap; EV chargers and retail energy dispensing are excluded under the October 2026 rule, which matters for fuel docks.
- Community Facilities applies to public or nonprofit harbours and boat ramps, not private marinas.
Financing benchmarks: USDA B&I next to SBA
There is no Mississippi SBA marina table to show: the pack records zero 7(a) and zero 504 loans for the state from FY2010 to FY2026. The national figures above, 112 recent loans at an average of $1,281,853 and a 5.2 percent seasoned loss rate, are the benchmarks a lender will use.
| B&I term | Fiscal 2026 rule | Source |
|---|---|---|
| Guarantee | 85% below $5 million; 80% from $5 million to $25 million | 91 FR 11272 |
| Upfront and annual fees | 3.0% of the guaranteed share; 0.55% retention each year | 91 FR 11272 |
| Guarantee during construction | 0.50% added to the fee; contractor bonded or vetted; independent budget check | 91 FR 11272; 7 CFR 5001.205(e)(2) |
| Term | useful life of docks, bulkheads and buildings, up to 40 years | 7 CFR 5001.402 |
| Equity | 10% for an existing marina; 25% of cost or 20% balance-sheet for a new one | 7 CFR 5001.105(d) |
| Appraisal | over $250,000; going-concern value deducted before discounts | 7 CFR 5001.203 |
| Study | required above $1 million for a new business | 7 CFR 5001.306(a)(3)(i) |
B&I terms summarised from the FY2026 notice and 7 CFR Part 5001.
Worked example (illustrative)
No Mississippi SBA marina loan exists to set a size, so Loan A borrows the national FY2020 to FY2026 average of $1,281,853, rounded to $1,280,000, for an existing marina's dock replacement at an illustrative 7.50 percent with 20-year amortisation. For Loan B the page assumes a $3,000,000 new marina built under a construction-period guarantee, at 7.25 percent over 25 years.
| Input or result | Loan A: national average size | Loan B: illustrative new marina |
|---|---|---|
| Loan amount | $1,280,000.00 | $3,000,000.00 |
| Program and fee schedule | B&I, fiscal 2026 notice | B&I, fiscal 2026 notice |
| Guarantee percentage | 85% | 85% |
| Guaranteed amount | $1,088,000.00 | $2,550,000.00 |
| Upfront guarantee fee | $32,640.00 | $76,500.00 |
| Upfront fee if the guarantee is issued before construction is complete (+0.50%) | $38,080.00 | $89,250.00 |
| First annual retention fee (guaranteed share of the balance after 12 payments) | $5,849.77 | $13,818.56 |
| Interest rate (illustrative, fixed) | 7.50% | 7.25% |
| Amortization, years (no balloon) | 20 | 25 |
| Monthly payment | $10,311.59 | $21,684.21 |
| Annual debt service | $123,739.11 | $260,210.47 |
| Quarterly debt service | $30,934.78 | $65,052.62 |
| NOI needed for 1.25x coverage | $154,673.89 | $325,263.09 |
| Coverage on that 1.25x NOI if the rate were 2 points higher | 1.08x | 1.06x |
| Equity, existing business, 10% of project cost (5001.105(d)(1)) | $142,222.22 | $333,333.33 |
| Equity, new business, 25% of project cost (5001.105(d)(4)) | $426,666.67 | $1,000,000.00 |
| Total project cost on that basis | $1,706,666.67 | $4,000,000.00 |
| Equity, new business with guarantee issued before completion, 25% balance-sheet route (5001.105(d)(3)) | $426,666.67 | $1,000,000.00 |
Computed in Python from the inputs shown; guarantee and fee rates from 91 FR 11272; equity routes from 7 CFR 5001.105(d), assuming the guaranteed loan is the only debt.
Per-slip test. For an illustrative 150-slip marina, Loan B's 1.25x NOI of $325,263.09 equals $2,168.42 per slip per year, $180.70 a month, after staff, insurance, utilities, maintenance and dredging reserves; at 200 slips it is $135.53 a month. Loan A's existing marina with 120 slips needs $107.41 a month per slip. The study must show slip rental, dry storage, fuel, service and store margins that clear costs by those amounts at realistic occupancy.
Winter test. Each quarter Loan B costs $65,052.62 in debt service. If the slowest quarter yields 5 percent of annual NOI, $16,263.15, the marina must carry $48,789.46 from other quarters or a reserve, which is why 5001.202 asks for quarterly cash flow from seasonal borrowers. Two points of additional rate would reduce coverage to 1.06x. A storm year that cuts NOI by 20 percent takes coverage to 1.00x, so insurance deductibles and business interruption cover belong in the model.
Evidence the study must build when Mississippi data are this thin
- A slip inventory of every marina, harbour and ramp within boating range, with slip sizes, occupancy, wait lists and rates, gathered by survey.
- Boat registration and ownership data for the counties around the water body, and the share of boats stored at home.
- Water-level, channel depth and dredging history for the reservoir, lake or harbour, with the managing agency's records.
- Fuel volume and service revenue from comparable operators in Mississippi and the neighbouring states.
- Storm and flood exposure, with insurance quotes and design standards for coastal sites.
- Permit status for docks and dredging, confirmed by the sponsor's specialists.
- Pre-leasing evidence: deposits or wait-list commitments for new slips.
What a lender-grade marina feasibility study in Mississippi must prove
- Slip demand by boat size from registrations, wait lists and competitor occupancy.
- Rates and occupancy by season, from named competitors.
- Ancillary revenue (fuel, service, store, dry storage, rentals) with margins.
- Staffing and payroll reconciled with the unusual local profile of 13.2 employees at $29,802.
- Capital costs for docks, bulkheads, utilities and dredging, from marine contractors, with contingency.
- Storm resilience and insurance cost.
- Parcel eligibility under 5001.3, particularly on the coast and near the Jackson suburbs.
Risks, process and frequent review comments
Hurricanes and floods on the coast, drought and drawdowns on reservoirs, and sedimentation are the physical risks; design standards, insurance and dredging reserves mitigate them. Demand is discretionary and falls in recessions, so the study needs a downside year. The lender files with the Rural Development state office in Jackson identified on the hub; the sponsor provides site control or submerged land leases, permits, contractor bids, any operating history and owners' financials. Studies come back for national occupancy rates, missing dredging costs or an unchecked eligibility boundary.
Program example
The hub names no USDA-financed marina in Mississippi, and none of the other inputs supplies a Mississippi or national marina financing that could be cited as program evidence. This page therefore presents no example.
Hiring a USDA marina feasibility study consultant in Mississippi
A newly formed marina company seeking more than $1,000,000 under B&I must, under 7 CFR 5001.306(a)(3)(i), file a study from an independent author USDA finds acceptable, covering the scope USDA sets; both example loans are over that size. For an established marina refinancing or replacing docks, USDA may ask but is not required to.
A Mississippi marina with no local comparables is a clear case for complex-tier pricing on the cost page, which runs to $14,500 and takes seven to nine weeks, because the slip inventory and operator data must be collected directly. The fee includes demand, competition and ancillary revenue analysis, seasonal projections and stress cases, a review of management, the Excel model and the acceptance guarantee; marine engineering, permitting and appraisal are separate.
A marina feasibility study consultant should begin with a slip-by-slip survey of your water body. Our homepage sets out the responsibilities of a USDA feasibility study consultant toward the lender. Name the water body, site, slip count, services, budget and lending bank on the contact page, and a fixed fee comes back in writing.
Last updated 2026-11-08
USDA Feasibility, Inc.