USDA Feasibility Study for Assisted Living and Senior Care in South Dakota

    NAICS 6233

    South Dakota has far more senior care capacity per resident than most states: Census counted 214 assisted living, continuing care and nursing facilities in 2023, 23.3 per 100,000 residents against 13.3 nationally, the sixth-highest rate in this site's data. Those facilities are large employers in small towns, averaging 45.1 staff each. A new assisted living building in South Dakota is therefore tested against an existing network of homes, many run by nonprofits and local governments, and the feasibility study has to show who the residents will be, how they will pay, and whether the town can staff the building.

    The financing question is often which USDA program, not whether. A for-profit operator borrows under Business and Industry (B&I); a nonprofit, county or tribal owner usually belongs in Community Facilities (CF), which USDA funded 5 times by loan and 37 times by grant in South Dakota in fiscal 2024 to 2026.

    Data current as of November 2026.

    Which program fits a South Dakota senior care project

    RouteFit in South DakotaWhat to check first
    USDA B&I guaranteeFor-profit assisted living, memory care and senior housing with services, outside Sioux Falls and Rapid CityRural parcel (7 CFR 5001.3); new-business equity (5001.105(d))
    USDA Community FacilitiesNonprofit, public or tribal homes; guaranteed loans at 80% with a 1.25% fee and 0.50% retention in fiscal 2026 (91 FR 11272), plus direct loans and grantsEligible owner; community need
    SBA 7(a)Acquisitions and smaller expansions by private operators; 14 South Dakota loans since fiscal 201075% guarantee above $150,000; fee ceilings (13 CFR 120.210, 120.220)
    SBA 504Owner-occupied buildings; 20 South Dakota loans since fiscal 2010Single-purpose building raises injection to 15% or 20% (120.910)
    REAPEfficiency upgrades at an operating for-profit facilityRule effective 16 October 2026
    Conventional or HUD-insuredLarger stabilized propertiesLender policy

    When the B&I study is compulsory

    A new assisted living company borrowing more than $1,000,000 under B&I must submit a feasibility study from an independent consultant the Agency accepts, with the scope set by the Agency (7 CFR 5001.306(a)(3)(i)). The rule's threshold is "over" $1,000,000, so a loan of exactly that amount, close to South Dakota's fiscal 2020 to 2026 SBA average of $1,012,780, sits on the line. New buildings of any meaningful size cross it. Expansions by operating homes are discretionary (5001.306(a)(3)(ii)). Community Facilities applicants should expect the Agency to ask for a feasibility or market study for new facilities, though the CF rules are outside this page's sources.

    Assisted living and senior care in South Dakota: market evidence

    South Dakota: assisted living and nursing facilities, supply and rural footprint

    MeasureSouth DakotaUnited States
    Establishments, 2019 → 2023217 → 214 (-1.4%)43,506 → 44,649
    Per 100,000 residents (2023)23.313.3
    Average employees per establishment45.153.5
    Average annual pay per employee$36,232$41,324
    Share of establishments in non-metro counties49.6% (58 in 11 counties)
    Share of state population in non-metro counties (2025)48.7%

    Non-metro counties with the most assisted living and nursing facilities (2023): Brown County (14); Lawrence County (9); Codington County (8); Brookings County (6); Beadle County (3); Bon Homme County (3).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    South Dakota carries 1.76 times the national number of facilities per resident, but the count slipped from 217 to 214 (-1.4%) while the national count rose 2.6%. Facilities are smaller than the U.S. average (45.1 staff against 53.5) and pay 12.3% less, $36,232 per employee. Payroll per facility averaged $1,634,486 in 2023, the largest single cost in the pro forma. The type mix moved in a way that matters for a new assisted living project:

    South Dakota senior care by type, 2019 and 2023 (computed from the CBP state files)

    Care type (NAICS)2019 count2023 countEmployees, 2023Pay per employee, 2023
    Assisted living facilities for the elderly (623312)89752,469$31,122
    Continuing care retirement communities (623311)40401,821$38,702
    Nursing care facilities (623110)88995,364$37,745

    Assisted living establishments fell from 89 to 75 while nursing facility establishments rose from 88 to 99. Fewer, larger assisted living homes can mean consolidation rather than lost demand, and the study should identify which homes closed, merged or converted, and what happened to their residents.

    Senior care facilities in selected South Dakota counties (CBP county file; Vintage 2025 population)

    County (largest town)OMB statusFacilities, 2023Residents, 2025Facilities per 100k residents
    Gregory (Gregory)Non-metro34,03774.3
    Day (Webster)Non-metro35,48454.7
    Bon Homme (Springfield)Non-metro37,24441.4
    Grant (Milbank)Non-metro37,53439.8
    Brown (Aberdeen)Non-metro1437,56137.3
    Lawrence (Spearfish)Non-metro929,45930.6
    Codington (Watertown)Non-metro829,56227.1
    Pennington (Rapid City)Metro18116,79215.4
    Minnehaha (Sioux Falls)Metro30212,69114.1

    Demand drivers and competing supply

    Small farm counties carry the most facilities per resident (Gregory County has 74.3 per 100,000), because a home in the county seat serves a wide rural area. Regional centers such as Aberdeen (Brown County, 14 facilities) draw residents from surrounding counties. A study defines a primary market area from where current residents came, then counts age- and income-qualified households in it, applies a penetration rate supported by comparable homes, and subtracts existing units and any under construction. The competitive inventory must name each assisted living, memory care and nursing home in the area with units, occupancy, rates, payer mix and age. Payer mix deserves its own chapter: private pay, long-term care insurance and any state Medicaid waiver participation each carry a different rate and collection risk.

    Revenue model, costs and capital

    Revenue is occupied units times monthly rate by care level, plus community and level-of-care fees, ramped from opening to stabilized occupancy over a stated number of months. Costs are staffing by shift and licence type, food, utilities, insurance, property tax, maintenance, marketing and management fees. Capital items are land, the building (with memory care's secured design if included), furnishings, kitchen and laundry, call and security systems, pre-opening staffing and marketing, an interest reserve and working capital to carry the fill-up period. Because fill-up takes many months, the operating deficit before stabilization is usually funded in the budget rather than from operations.

    Rural footprint and B&I eligibility in South Dakota

    The pack places 58 of 117 county-located facilities (49.6%) in 11 non-metro counties, matching the 48.7% of residents there; Brown (14), Lawrence (9), Codington (8), Brookings (6), Beadle (3) and Bon Homme (3) lead. Census assigns only 117 of the 214 facilities to a county, so the county figures understate the rural network.

    Under 7 CFR 5001.3 the question is whether the parcel lies outside a place of more than 50,000 people and its contiguous urbanized area. Only Sioux Falls (213,748) and Rapid City (80,589) exceed that line, and they hold 48 of the county-located facilities through Minnehaha and Pennington counties. A home in any other town qualifies on population; suburban sites at the Sioux Falls or Rapid City edge require a map check. The South Dakota state hub lists the excluded places.

    Financing benchmarks: USDA B&I next to SBA

    South Dakota: SBA lending to assisted living and nursing facilities

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20169$7.4 million7$4.7 million
    FY2017 to FY20190$02$1.4 million
    FY2020 to FY20234$4.5 million8$7.2 million
    FY2024 to FY20261$601,6003$2.7 million

    Average 7(a) loan, FY2020 to FY2026: $1.0 million. Average 504 loan: $900,636. South Dakota had fewer than 30 seasoned 7(a) loans for assisted living and nursing facilities; nationally, 3.3% of 1,086 FY2010 to FY2016 loans were charged off, on average 85 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    SBA lending to South Dakota senior care is thin and slightly smaller than national: five 7(a) loans in fiscal 2020 to 2026 averaged $1,012,780, 16.9% below the national average of $1,219,305, and 504 was used more often (11 loans averaging $900,636). None of the nine seasoned South Dakota 7(a) loans from fiscal 2010 to 2016 was charged off. The national sector record, 3.3% of 1,086, with losses arriving on average 85 months after approval, shows the risk sits late, after the fill-up, when rate pressure and staffing costs meet.

    B&I guaranteed loan terms for loans obligated in fiscal 2026

    TermRule and source
    Guarantee share85% for loans under $5 million; 80% from $5 million to $25 million; 80% on the reduced-fee path (91 FR 11272)
    Upfront guarantee fee3.0% of the guaranteed amount, or 1.0% on the reduced-fee path; plus 0.50% if the guarantee issues before construction is complete (91 FR 11272; 5001.454)
    Annual retention fee0.55% (0.50% on the reduced-fee path) of the guaranteed share of principal outstanding on 31 December; the rate is fixed at obligation (5001.455)
    Loan ceiling$25 million per borrower (5001.406(c))
    TermUseful life, at most 40 years; no balloon; first full payment within 3 years of the note if interest-only (5001.402)
    RateNegotiated; fixed, variable or combined; no higher than the lender charges on similar non-guaranteed loans; variable rates reset no more than quarterly (5001.401)
    Equity, existing business10% balance sheet equity (or debt to equity of 9:1), 10% of eligible project cost, or the contributed-capital test (5001.105(d)(1))
    Equity, new business20% balance sheet equity (or 4:1) or 25% of project cost; 10% with sales contracts that cover debt service; 25% (or 3:1) if the guarantee issues before construction ends (5001.105(d)(2) to (4))
    CollateralAppraisal for real estate over $250,000; as-is and prospective values for construction; going-concern value deducted before discounting; appraisals no older than one year (5001.203)
    GuarantorsOwners of 20% or more guarantee at least their share of the guaranteed amount for the full term (5001.204)
    Feasibility studyRequired from an independent qualified consultant for loans over $1,000,000 to a new business; at the Agency's discretion otherwise (5001.306(a)(3))

    A new assisted living building above $5 million drops to the 80% B&I tier and carries a 3.0% fee on the guaranteed amount. For a nonprofit or public owner, Community Facilities guaranteed loans in fiscal 2026 carry an 80% guarantee with a 1.25% upfront fee and 0.50% retention (91 FR 11272), which is materially cheaper. Lenders discount senior housing collateral heavily, since the appraisal removes going-concern value (5001.203), and the guarantee therefore carries most of the credit.

    Worked example (illustrative)

    Loan A, $1,000,000, rounds the state's five-loan fiscal 2020 to 2026 SBA 7(a) average of $1,012,780 and represents an expansion or small new building over 25 years. Loan B, $7,500,000, is an illustrative new assisted living building amortized over 30 years, chosen because new buildings typically exceed $5 million. Both use an illustrative 7.00% fixed rate (not a quote) within 5001.401 and 5001.402. B&I fees are from the fiscal 2026 notice; equity rows assume the guaranteed loan is the only debt.

    LineLoan A: near the South Dakota SBA averageLoan B: illustrative new assisted living building
    Loan amount$1,000,000$7,500,000
    B&I guarantee share for fiscal 2026 loans (91 FR 11272)85%80%
    Guaranteed amount$850,000.00$6,000,000.00
    Unguaranteed portion held by the lender$150,000.00$1,500,000.00
    Upfront guarantee fee (3.0% of the guaranteed amount)$25,500.00$180,000.00
    First-year retention fee, upper bound (0.55% of the guaranteed share of the full balance)$4,675.00$33,000.00
    Retention fee on the balance left after 12 monthly payments$4,603.48$32,664.78
    Illustrative rate and amortization (not a quote)7.00% fixed, 25 years, monthly7.00% fixed, 30 years, monthly
    Monthly principal and interest$7,067.79$49,897.69
    Annual debt service$84,813.50$598,772.25
    Net operating income needed for 1.25x coverage$106,016.88$748,465.31
    Cushion above 1.00x coverage$21,203.38$149,693.06
    Cushion in wages at the South Dakota senior-care average pay ($36,232)0.59 positions4.13 positions
    Interest-only payment for a start-up year, if structured (5001.402)$70,000.00$525,000.00
    Annual debt service if the rate is 2.00 points higher$100,703.56$724,160.36
    Coverage at that higher rate on the same income1.05x1.03x
    Coverage if income lands 10% below plan1.125x1.125x
    New business: equity at 25% of project cost (5001.105(d)(4))$333,333.33 on a $1,333,333.33 project$2,500,000.00 on a $10,000,000.00 project
    New business: 20% balance sheet equity test (debt to equity 4:1, loan as the only debt)$250,000.00$1,875,000.00
    Existing business: 10% of project cost (5001.105(d)(1))$111,111.11 on a $1,111,111.11 project$833,333.33 on a $8,333,333.33 project
    Reduced-fee path (1.0% fee, 0.50% retention, 80% guarantee): upfront fee$8,000.00$60,000.00
    Independent study compulsory for a new business? (5001.306(a)(3)(i))No; the Agency may still require one (5001.306(a)(3)(ii))Yes, above $1,000,000
    Application track (5001.306)Full 5001.306(a) processingFull 5001.306(a) processing
    SBA 7(a) comparison: guaranteed share and guaranty fee ceiling (13 CFR 120.210, 120.220)75%: $750,000.00 guaranteed, fee ceiling $26,250.00not shown at this size

    Community Facilities guaranteed loan fees on the same amounts (fiscal 2026 notice: 80% guarantee, 1.25% fee, 0.50% retention)

    LineLoan ALoan B
    Guaranteed amount at 80%$800,000.00$6,000,000.00
    Upfront guarantee fee at 1.25%$10,000.00$75,000.00
    First-year retention fee upper bound at 0.50%$4,000.00$30,000.00

    What the comparison shows. For Loan B, a nonprofit owner using Community Facilities would pay $75,000 upfront instead of $180,000 under B&I. Debt service is the same for the same rate and term: $598,772.25 a year for Loan B, requiring $748,465.31 of net operating income at 1.25x. Loan B's cushion above break-even, $149,693.06, covers about four positions at the state's average senior care pay, and a two-point rate increase cuts coverage to 1.03x, the thinnest result on this page. Loan A, at exactly $1,000,000, is not over the compulsory study threshold, but a lender would almost certainly still ask for one.

    What a lender-grade assisted living feasibility study in South Dakota must prove

    1. A primary market area drawn from resident origin data, not a radius.
    2. Age- and income-qualified households in that area and a penetration rate supported by comparable homes.
    3. A named inventory of competing assisted living, memory care and nursing homes, with units, occupancy, rates and payer mix.
    4. A fill-up schedule by month and the operating deficit funded in the budget.
    5. Staffing by shift and licence level at local wages, tested against $31,122 for assisted living and $37,745 for nursing care.
    6. Licensing and regulatory requirements for the care levels offered, confirmed with the state licensing agency.
    7. Payer mix and collection risk, including any Medicaid waiver share.
    8. Program fit: B&I for a for-profit owner, Community Facilities for a nonprofit or public one.
    9. Sensitivity to occupancy, monthly rate, wage growth and interest.

    Risks and mitigants

    RiskWhy it bites in South DakotaHow the study tests or mitigates it
    Existing supply23.3 facilities per 100,000 residents, 1.76 times the U.S. ratePenetration analysis against named competitors
    StaffingSmall towns, 45.1 staff per facilityLabour market study; wage sensitivity; recruitment plan
    Fill-upMonths of losses before stabilizationFunded operating deficit and interest reserve
    Payer mixPublic-pay rates differ from private ratesPayer-mix scenarios
    Assisted living consolidation89 to 75 assisted living establishments since 2019Explain closures and conversions nearby

    Process and documents

    For B&I, the sponsor chooses a lender approved under the OneRD rule and agrees the study scope; for Community Facilities, the nonprofit or public owner works with the USDA Rural Development state office serving South Dakota directly or through a lender. The sponsor provides the building program and unit mix, care levels, site control, the construction budget, the operator's experience and financial statements, letters of support, and, for an expansion, occupancy and rate history. Senior care studies come back for penetration rates above any comparable market, fill-up that is too fast, wages below local rates, and payer assumptions with no evidence.

    Program context, honestly labelled

    The inputs contain no South Dakota assisted living project financed by USDA, so none is named. USAspending records 5 Community Facilities loans and 37 Community Facilities grants in South Dakota in fiscal 2024 to 2026, without a breakdown by facility type. The national healthcare guide linked below covers senior care lending across the country and is not a South Dakota project.

    Hiring a USDA assisted living feasibility study consultant in South Dakota

    Hire an independent assisted living feasibility study consultant before the lender's credit memo, not after. Under B&I the study is compulsory for a new company borrowing over $1,000,000 (5001.306(a)(3)(i)); under Community Facilities and SBA it is the lender's or Agency's call, and for new senior housing it is nearly always asked for. The study covers all five components (economic, market, technical, financial, management), with a resident-origin market area, penetration and fill-up analysis and a five to ten year projection.

    The site's pricing guide by program prices Community Facilities studies at $6,900 to $12,000 over 6 to 8 weeks, and B&I studies at $6,900 to $12,500 (standard) or $10,500 to $14,500 (complex, including loans over $10 million or phased campuses). The written acceptance guarantee covers revisions until the lender or USDA accepts the report.

    Owners still deciding between B&I and Community Facilities can ask the USDA feasibility study consultant to model both structures in one report. Describe the building, care levels, town and owner type on the contact page to request a proposal; the page commits to a response within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Is a feasibility study required for an assisted living loan in South Dakota?

    Under B&I, a new company borrowing more than $1,000,000 must have one from an independent consultant (7 CFR 5001.306(a)(3)(i)). New assisted living buildings almost always exceed that. Operating homes expanding, and smaller loans, fall to the Agency's or lender's discretion. Nonprofit and public owners using Community Facilities should expect a market and financial study for any new building, and SBA lenders may require one under 13 CFR 120.160(b).

    Should a South Dakota assisted living project use B&I or Community Facilities?

    It depends on the owner. B&I serves for-profit businesses; Community Facilities serves nonprofits, public bodies and tribes. In fiscal 2026 the CF guaranteed loan carried a 1.25% upfront fee and 0.50% retention at 80%, against B&I's 3.0% and 0.55% at 85% or 80% (91 FR 11272). On a $7.5 million loan the upfront fee difference is $105,000. CF also offers direct loans and grants, which B&I does not.

    What does an assisted living feasibility study consultant charge?

    The site's cost page lists Community Facilities studies at $6,900 to $12,000 and standard B&I studies at $6,900 to $12,500; complex B&I work such as phased campuses or loans above $10 million runs $10,500 to $14,500. Senior housing often needs primary research in small South Dakota markets, which can move a project toward the complex band. The fee is fixed in the written proposal before work starts.

    How long does a senior care feasibility study take?

    Community Facilities studies take 6 to 8 weeks and standard B&I studies 6 to 7 weeks, per the site's cost page; complex B&I work runs 7 to 9 weeks. Rush delivery in 3 to 4 weeks costs 20% to 35% more. Calls to competing homes for occupancy and rates are usually the longest step in rural South Dakota.

    How many units can a South Dakota town support?

    The study answers it from qualified households, not a rule of thumb. It counts age- and income-qualified households in the market area, applies a penetration rate taken from comparable markets, and subtracts existing and planned units. With 214 facilities statewide and up to 74.3 per 100,000 residents in some farm counties, many towns already have a home; the remaining demand may be for memory care or a different price point rather than more of the same.

    Who can prepare the feasibility study?

    For a compulsory B&I study, an independent consultant acceptable to the Agency with no financial interest in the project. The developer, operator, architect, contractor and lender cannot. The consultant must be able to defend market area, penetration and wage assumptions to the USDA Rural Development state office serving South Dakota.

    How long does an assisted living study stay current?

    Part 5001 has no expiry for the study itself; senior housing market data is generally expected to be under 18 months old for USDA, per the site's pricing guide, and appraisals must be under a year old (5001.203). A new competing home, a change in public reimbursement, or a long delay before construction all justify an update before submission, because each one moves the fill-up schedule the lender relies on.

    Can one study support SBA, B&I and Community Facilities applications?

    Usually, if it is written to the five USDA components by an independent author. The market, financial and management chapters are common to all three; the borrower structure and program terms differ and can be set out in separate financing scenarios. A study prepared only for an SBA lender may need technical and economic sections before USDA will accept it.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan statistical area delineation, July 2023 (Census delineation file): https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for fiscal year 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, 11 December 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 89 FR 79698, OneRD guarantee loan final rule, 30 September 2024 (govinfo): https://www.govinfo.gov/content/pkg/FR-2024-09-30/html/2024-21920.htm
    9. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    10. USAspending.gov prime award data for Assistance Listings 10.768, 10.766 and 10.868, place of performance South Dakota, fiscal 2024 to 2026: https://www.usaspending.gov/search
    11. USDA RBCS, Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    12. USDA Feasibility Study Consultants, USDA feasibility study cost and timeline (fee bands, phases, rush terms, data recency): https://usda-feasibility-study.com/usda-feasibility-study-cost
    13. USDA Feasibility Study Consultants, contact and proposal request page: https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.