USDA FIELDS Feasibility Study for Fertilizer Production Grants

    Last updated 2026-11-08

    Short answer

    FIELDS is the Fertilizer Investment & Expansion for Long-term Domestic Supply Program, a fiscal year 2026 grant competition in which the Commodity Credit Corporation (CCC) provides $500 million, through USDA's Rural Business-Cooperative Service (RBCS), to expand or bring into operation new, independent domestic fertilizer production capacity [1]. Awards range from $15 million to $150 million, about 10 are expected, and every award requires non-Federal matching funds equal to 50 percent of total eligible project costs [1]. The authority is section 5(b) of the CCC Charter Act, 15 U.S.C. 714c(b), and the notice was published on Grants.gov, not in the Federal Register [1][2][6].

    A feasibility study is mandatory. The notice requires "a recently completed feasibility study, prepared for the project and dated no more than 3 years before submission, signed by a qualified consultant", and the Agency must concur that the study is acceptable and adequate [1]. The FY2026 application window closed on 17 August 2026, and RBCS anticipates awards in December 2026 to January 2027 [1]. Data current as of November 2026.

    QuestionAnswer from the FY2026 notice
    Official nameFertilizer Investment & Expansion for Long-term Domestic Supply Program (FIELDS) [1]
    Who funds and who runs itCommodity Credit Corporation funds; Rural Business-Cooperative Service administers [1]
    Legal authoritySection 5(b) of the CCC Charter Act, 15 U.S.C. 714c(b) [1]
    Funding opportunity numberRD-RBS-26-01-FIELDS; Assistance Listing 10.383 [1][2]
    Money available$500 million; RBCS may add funds from any available source [1]
    Award size$15 million minimum, $150 million maximum (raised from $100 million on 7 July 2026) [1][2]
    Expected awardsAbout 10 [1]
    MatchNon-Federal, at least 50% of total eligible project costs, committed before the award agreement is executed [1]
    Feasibility studyRequired: dated no more than 3 years before submission, signed by a qualified consultant, accepted by the Agency [1]
    Deadline17 August 2026 through Grants.gov (closed) [1]
    Awards expectedDecember 2026 to January 2027 [1]
    Performance periodUp to 60 months, with up to 24 months of no-cost extension case by case [1]

    What FIELDS is, officially

    The acronym is USDA's own. The notice's title is "Fertilizer Investment & Expansion for Long-term Domestic Supply Program (FIELDS)", issued as funding opportunity RD-RBS-26-01-FIELDS under Assistance Listing 10.383, and signed on 7 July 2026 by the Acting Administrator of RBCS [1]. Grants.gov lists the opportunity under the Rural Business-Cooperative Service, with $500,000,000 in program funding, 10 expected awards, an award floor of $15,000,000, an award ceiling of $150,000,000, a cost-sharing requirement, a posted date of 1 July 2026 and an archive date of 16 September 2026 [2]. A search of the Federal Register for the program's name and for its predecessor returned no FIELDS funding notice; the only Federal Register documents for the predecessor program were information-collection notices [6][5].

    The legal basis is not a farm bill program or a regulation in the Code of Federal Regulations. The CCC funds FIELDS under section 5(b) of its Charter Act, which lets the CCC "make available materials and facilities required in connection with the production and marketing of agricultural commodities (other than tobacco)" [1]. That has two practical consequences. First, the rules for each round live in the notice, so a sponsor cannot assume the next round will repeat this one. Second, the federal grant rules in 2 CFR part 200 do much of the work that a program regulation would otherwise do, including how matching funds are counted [1][3].

    The notice sets five tests for the fertilizer that FIELDS will support: production that is independent and outside the dominant fertilizer suppliers; made in America; innovative; "energy dominant and secure"; and farmer focused [1]. It also says CCC "will prioritize projects that are in the later stages of development, technically feasible, financially viable, and have already identified other sources of funding" [1]. A feasibility study that cannot show those four things is a weak study for this program, however well written.

    Program factDetailSource
    PurposeExpand or bring into operation new, independent domestic fertilizer production capacity[1]
    Eligible project typesExpansions or upgrades of existing facilities, new domestic production facilities, shovel-ready projects, on-site terminals and transportation infrastructure[1]
    DistributionAn eligible use, but "may not serve as the primary or standalone purpose"[1]
    Nutrients namedNitrogen, sulfur, phosphorus and potash[1]
    InstrumentGrant, made through a Financial Assistance Agreement (Form RD 4280-2 or successor)[1]
    Information collectionOMB Control Number 0570-0081, the number first issued for the Fertilizer Production Expansion Program[1][5]
    Program contactFIELDS@usda.gov[1]

    FIELDS compared with the 2022 Fertilizer Production Expansion Program

    FIELDS shares an assistance listing and an information-collection number with the Fertilizer Production Expansion Program (FPEP), which RBCS launched in 2022 [1][5]. The FY2026 notice limits prior FPEP recipients to "a project or project phase that is demonstrably separate from, and additive to, the scope of work funded under the FPEP award", and it lets the Administrator award discretionary points to applicants that have not previously received an FPEP award [1]. The differences matter for anyone reusing an FPEP-era study.

    FeatureFPEP, as described in 2022FIELDS, FY2026 notice
    What is supportedFertilizer and nutrient alternatives [5]Process manufacturing of fertilizer; projects focused primarily on nutrient substitutes or alternatives are ineligible [1]
    Market-share exclusionProduction or distribution share at or above the fourth-largest firm in nitrogen, phosphate or potash [5]Production share at or above the fourth-largest firm in nitrogen, sulfur, phosphate or potash [1]
    Policy pillarsIndependent, made in America, innovative, sustainable, farmer focused [5]Independent, made in America, innovative, energy dominant and secure, farmer focused [1]
    Estimated respondents in the information collection135 [5]Not stated
    Prior award holdersNot applicableOnly separate and additive projects; no duplication of earlier federal funding [1]

    The practical lesson: a study written for FPEP in 2022 or 2023 is now more than three years old for most projects, and it may have argued points FIELDS no longer rewards, such as nutrient alternatives or greenhouse gas reductions. It will need a new date, a new signature and, in most cases, a new market chapter [1].

    Where FIELDS stands in November 2026

    The FY2026 round is closed. Applications were due on 17 August 2026, and the notice states the Agency "will not solicit or consider new scoring or eligibility information that is submitted after the application deadline" [1]. Grants.gov shows the opportunity as archived since 16 September 2026 [2]. RBCS anticipates announcement and award dates of December 2026 to January 2027 [1]. As of 8 November 2026, no FY2027 FIELDS notice appeared on Grants.gov or in the Federal Register [2][6].

    What that means for a sponsor today:

    • If you applied: the study you submitted is the one RBCS is scoring. Selection is not an award: the notice says "Notification of selection does not guarantee an award", and the Agency may request organizational information for risk assessment and more detail on costs [1]. Keep the study's assumptions current in case the Agency asks for clarification.
    • If you did not apply: a study prepared now stays inside the notice's three-year window for any round that keeps the same rule [1]. A future round may change the rule, so the study should also be written to serve the lenders and equity investors who will provide the match, which is useful whatever FIELDS does next.
    • If you hold an FPEP award: any new application has to separate its scope cleanly from the FPEP project [1].

    When FIELDS requires a feasibility study, and what "acceptable" means

    The requirement sits in section 4.2 of the notice, under financial viability. Applicants must provide a business plan; three years of historical balance sheets and income statements (or what exists for younger firms); current statements within 90 days; two years of pro forma and projected financial analysis with assumptions; source documentation for key personnel, construction labor and the operating workforce; and the feasibility study [1].

    The notice defines the study and the person who writes it:

    • Feasibility study: a study, "including an opinion or finding, prepared by qualified consultant(s), that evaluates the economic, market, technical, financial, and management feasibility of a proposed project or operation to determine whether it is practical and viable and to assess its likelihood of success" [1].
    • Qualified consultant: "An independent third-party person possessing the knowledge, expertise, and experience to perform the specific task required" [1].

    Four tests follow from the text. The study must be prepared for this project, not adapted from an industry template. It must be dated no more than three years before submission. It must be signed by a qualified consultant who is independent of the applicant. And the Agency must concur that it is "acceptable and adequate" [1]. The project narrative must also "include summaries of any feasibility studies, business, and marketing plans" when addressing the scoring criteria, so the study's conclusions reappear in the 20-page narrative where reviewers score them [1].

    Document in the financial viability packageFY2026 requirementWhat the feasibility study adds
    Business planRequired; goals, why attainable, plan, pro forma and financial statements [1]Independent test of the plan's assumptions
    Historical financial statementsThree years, or what is available [1]Benchmarks for margins and working capital
    Current financial statementsWithin 90 days of submission [1]Starting balance sheet for the projections
    Pro forma and projectionsAt least two years, with assumptions [1]Market-based price, volume and cost inputs; sensitivity cases
    Feasibility studySigned, dated within 3 years, Agency concurrence [1]The opinion on economic, market, technical, financial and management feasibility
    Key personnel documentationResumes and workforce sources [1]Management chapter and staffing plan
    Environmental checklistRequired for NEPA review under 7 CFR part 1b [1]Site, permits and environmental risk chapter
    Design and construction documentsFor construction projects [1]Construction cost and schedule review

    USDA's FIELDS opportunity also posts a separate "Feasibility Study Guide" dated 30 June 2026 [2]. Its contents are not summarized here; see VERIFY.

    What a FIELDS feasibility study must prove

    RBCS reads the study against the notice's definitions, eligibility rules and scoring criteria. A study that answers the questions below in this order makes the reviewer's job easy and supports every scored criterion.

    1. That the project is process manufacturing. The notice defines process manufacturing as operations "that alter a fertilizer's chemistry or physical characteristics", such as producing ammonia from natural gas, converting ammonia into urea, granulating, drying or coating, and it excludes "mixing, blending, or bagging alone" [1]. The technical chapter should describe the conversion step plainly.
    2. That the applicant passes the independence test. Market share is production capacity as a percentage of an industry's total capacity, calculated both globally and domestically, and an applicant at or above the fourth-largest firm in a nutrient is ineligible [1]. The study should show the calculation and its sources.
    3. That the project materially increases domestic capacity. Projects that "do not materially increase domestic commercial fertilizer process manufacturing capacity" are ineligible, and the narrative must estimate the increase in volume with its unit of measure [1].
    4. That farmers will use the product. The narrative must estimate the acreage covered and the number of farmers served, and the market criteria ask for producers, acres, end users and offtake [1]. The study supplies the numbers and their basis.
    5. That inputs are secured. The market impact criterion scores "the adequacy of the input supply and procurement plan, including the type, quantity, quality, frequency, and duration of procurement arrangements" against current, initial and maximum operating capacity [1].
    6. That demand is validated. Evidence of customer demand, production availability at operating capacity, market drivers, partnerships, end-user commitments and competitive conditions [1].
    7. That the technology works at this scale. The notice rules out fertilizer process manufacturing "that is not commercially available and in use", and it scores "the demonstrated track record of the proposed technologies or systems" [1].
    8. That the money is there. Matching and other funding must be secured, and confirmed match commitments earn more points [1].
    9. That the project is implementation ready. Indicators include financing, engineering and design, technical validation, site control, permitting and environmental review, equipment procurement, contractor arrangements and offtake [1].
    10. That the business survives without the grant period. The market demand criterion asks for "the operational and economic factors supporting the long-term viability of the business beyond the FIELDS project period" [1].
    11. That the risks are known and managed. Construction delays, equipment availability, labor, service providers, operating capital, market loss, legal compliance, zoning, environmental, waste and utilities [1].
    12. A clear opinion. The definition requires "an opinion or finding" on whether the project is practical and viable [1]. A study that describes the market without concluding fails the definition.
    Study chapterNotice requirement it answersEvidence a reviewer expects
    Executive summary and opinionDefinition of feasibility study; narrative summary [1]Signed conclusion on viability and likelihood of success
    Applicant and eligibilitySection 3.1: domestic ownership, independence, market share [1]Ownership chart, capacity-share calculation, certification support
    Technical feasibilityCriterion 1(b); ineligible item (b) [1]Process description, licensor references, operating plants using the technology
    Input supplyCriterion 2(i)(a) [1]Feedstock contracts or letters by type, quantity, quality, frequency and duration
    Market and demandCriterion 2(i) and 2(ii) [1]Service area, nutrient demand, competing supply, prices, offtake and producer commitments
    Financial feasibilityCriterion 1(a) and 1(c) [1]Projections with assumptions, sources and uses, match commitments, sensitivity cases
    Work plan and budgetCriterion 3 [1]Milestones, cost basis for each budget line, key personnel
    RiskCriterion 4 [1]Risk register with mitigation and monitoring
    ManagementCriterion 3(iii) [1]Resumes, operating track record, organization chart
    OutcomesSection 6.3 reporting [1]Baseline capacity, added volume, producers and acres served, jobs

    Eligibility: who can apply and what can be funded

    Eligible applicants are entities "regardless of legal structure", including Tribes, Tribal Entities, Alaska Native Corporations, for-profit entities, corporations, non-profit entities, producer-owned cooperatives and corporations, certified benefit corporations, and state or local government entities; private entities must be independently owned and operated [1]. Every applicant must operate in the United States or its territories with a project physically located there, be domestically owned (majority of ownership held directly or indirectly by U.S. citizens), process manufacture or plan to do so in compliance with applicable law, and be registered in SAM [1].

    Several rules catch sponsors late:

    • One application per affiliated group. Multiple applications from affiliated entities, with affiliation as SBA defines it at 13 CFR 121.103, are not permitted; multiple projects owned by the same applicant must be combined into one application [1].
    • Market share justification. An applicant that believes the top-four measure misstates competition in its segment may submit a justification, and Capper-Volstead farmer associations may do the same [1]. If the applicant manufactures an eligible nutrient not listed among nitrogen, sulfur, phosphate and potash, no certification is required [1].
    • Tribal land consent. A Tribal Government Resolution of Consent is required when a project is on Tribal lands and the applicant is neither the Tribe nor a Tribal entity owned by the Tribe; Grants.gov notes that documents showing an Alaska Native Corporation's legal authority over its fee lands are accepted in lieu [1][2].
    • Federal debt and debarment. Applicants are screened through the Do Not Pay system for debarment, suspension and unresolved federal debt [1].
    Eligible uses (examples in the notice)Limit
    Construction of a new facility or purchase of an existing facility to expand capacity, including landNone stated [1]
    Pre-development costs such as engineering and professional feesCannot be the primary use of funds [1]
    Working capital to support expanded capacity or outputCannot be the primary use of funds [1]
    Modernizing or expanding an existing facility and its buildingsNone stated [1]
    New or modernized process manufacturing equipmentNone stated [1]
    Equipment and technology that improve processing, worker conditions or safetyNone stated [1]
    Compliance with occupational and other safety requirementsNone stated [1]
    Logistics: distribution, transportation and storage that benefit producersCannot be the primary use of funds [1]
    Ineligible activities and costsNote
    Research and developmentItem (a) [1]
    Process manufacturing of fertilizer that is not commercially available and in useItem (b) [1]
    Projects focused primarily on nutrient substitutes or alternatives to commercial fertilizerItem (c) [1]
    Projects that do not materially increase domestic capacityItem (d) [1]
    Standalone mixing, blending, repackaging, bagging, storage, warehousing, distribution or resaleEligible only if integral to an otherwise eligible capacity project [1]
    Projects that have not secured the required matching fundsItem (f) [1]
    Precision agriculture technologies such as drones; site-specific application, remote sensing, GIS and GPSFunded under other USDA authorities [1]
    Indirect project costsNot eligible project costs [1]
    Salaries or administrative costs of any State or local governmentNot allowed [1]

    Matching funds: how much, from whom, and when

    The match rule is short: "All award requests are subject to a matching requirement equal to 50 percent of total eligible project costs. For example, for a project with $50 million in total eligible costs, an applicant may request up to $25 million and must provide at least $25 million in matching funds" [1]. The match must be non-Federal, and before execution of the award agreement applicants "must demonstrate that they have secured commitments to sufficient non-Federal matching funding in the amount needed to complete the project as described in the application" [1]. Applicants also certify, at application, that matching funds "and other funding needed to complete the project as proposed in the application has been secured" [1].

    Can more than one entity provide the match? Yes. The notice ties cost sharing to the definition in 2 CFR 200.1 [1], and 2 CFR 200.306(b) requires the agency to accept "any cost sharing funds (including cash and third-party in-kind contributions, and also including funds committed by the recipient, subrecipient, or third parties)" that meet seven conditions [3]. The notice itself asks applicants to summarize "commitments - financial, infrastructure, workforce or otherwise - from federal, Tribal, state, local, or third-party contributors" [1]. A typical match therefore stacks several sources: the applicant's own cash, equity from investors or a farmer cooperative, a state or local grant, and loan proceeds. What matters is that each piece passes the 2 CFR 200.306(b) tests and is committed in writing.

    2 CFR 200.306(b) condition for counting a contribution [3]What it means for a FIELDS sponsor
    (1) Verifiable in the recipient's recordsBank statements, executed subscription agreements, loan commitments
    (2) Not counted as a contribution for any other Federal awardA dollar matched to another federal grant cannot match FIELDS too
    (3) Necessary and reasonable for the award's objectivesSpent on the approved project scope
    (4) Allowable under the cost principles (subpart E)Indirect costs are excluded by the notice [1]
    (5) Not paid by the Federal Government under another Federal award, unless a statute allowsOther federal grants generally cannot count
    (6) In the approved budget when the agency requires itShow every match source in the SF-424C budget
    (7) Conforms to other provisions of part 200Records, procurement and property rules apply

    Third-party in-kind contributions are valued under rules in the same section: donated land and buildings at no more than fair market value established by an independent appraiser, donated equipment at no more than fair market value, and volunteer professional services at rates consistent with the local labor market [3]. Most FIELDS matches will be cash, because the budgets are large and RBCS awards more points for "confirmed commitments for matching funds" [1].

    Two open points deserve a written question to RBCS before a sponsor relies on them. First, the notice does not say whether proceeds of a federally guaranteed loan (for example a USDA Business and Industry guaranteed loan) count as non-Federal match; the 2 CFR 200.306(b)(5) test turns on whether funds are "paid by the Federal Government under another Federal award" [3]. Second, section 8.6 says the Agency "has incorporated flexibility to reduce the matching funds requirements for applications from Tribes, Tribal entities owned by Tribes, and Alaska Native Corporations", while section 3.2 states the 50 percent rule without a reduced rate [1]. Tribal sponsors should ask for the reduced rate in writing; see our tribal USDA funding page.

    How FIELDS applications are scored

    All eligible, complete applications are scored and ranked; funding goes in rank order until money runs out, the Agency may offer partial funding, and it may decline to fund lower-scoring applications even when funds remain [1]. Failing to address any criterion makes the application ineligible [1]. The notice says "Merely addressing the elements of this criterion is not sufficient" and that scores reflect "the strength of the supporting evidence" [1].

    CriterionPointsWhat earns the top bandWhere the study supplies the evidence
    1. Financial viability and technical merit0 to 25Strong projections with support; demonstrated technology track record; secured financing, with more points for confirmed match [1]Financial and technical chapters
    2(i). Market impact0 to 12Input supply plan; added capacity and availability; competition; producers and acres; barriers addressed; local support [1]Market impact chapter
    2(ii). Market demand and opportunities0 to 18Validated demand, capacity at full operation, market drivers, partnerships, end-user commitments, applicant capability, sustainability [1]Market and demand chapter
    3. Work plan and budget0 to 25 as headed; sub-criteria total 19Work plan 0 to 7, budget 0 to 6, key personnel and service providers 0 to 6 [1]Work plan review, cost basis, management chapter
    4. Major risks and mitigation0 to 6The most significant risks with credible mitigation [1]Risk chapter
    5. Nitrogen or sulfur-related productsUp to 5Process manufacturing of nitrogen- or sulfur-related fertilizer for U.S. agriculture [1]Technical and market chapters
    6. Executed off-take agreementsUp to 5Executed agreements, with terms, supporting viability [1]Offtake summary
    7. Administrator points0 to 10Rural economic recovery and access to domestic fertilizer, applicants without a prior FPEP award; up to 10 for geographic diversity [1]Rural impact data

    Two scoring facts change how the study should be written. The notice gives priority to implementation-ready projects and says applications with "strong, well-documented evidence" that financing, engineering, site control, permits, procurement and offtake are in place "will receive higher scores than applications that rely on preliminary assumptions, contingent commitments, or less developed project plans" [1]. And ten points (criteria 5 and 6), plus the confirmed-match element of criterion 1, reward concrete facts a study can only report, not create: a nitrogen or sulfur product, executed offtake and committed match. A study cannot manufacture those points, but it can make sure none are lost by describing them precisely.

    FIELDS timeline, from notice to closeout

    Date or intervalEventSource
    1 July 2026Notice posted on Grants.gov[1][2]
    7 July 2026Notice updated: maximum award $150 million, about 10 awards, pre-development costs cannot be the primary use, one section 3.3 item removed[2]
    48 hours before closeDeadline to request a waiver of electronic submission, by email to FIELDS@usda.gov[1]
    17 August 2026Applications due through Grants.gov[1]
    Within 30 days of receiptWritten acknowledgement from RBCS[1]
    16 September 2026Grants.gov opportunity archived[2]
    December 2026 to January 2027Anticipated announcements and awards[1]
    Award to 60 monthsPeriod of performance; project must be implementation ready upon award, pending environmental review[1]
    Up to 24 more monthsNo-cost extension, case by case[1]
    Semiannually (periods end 31 March and 30 September)SF-425 financial report and performance report, due 30 working days after period end[1]
    Within 120 days after award endsFinal project and financial status report[1]
    One year after completionOutcome report on added volume, producers, new producers and acres, due within 60 days after the first full calendar year[1]
    Ten years after awardAny sale or ownership change must be notified and is subject to USDA review; partial repayment possible[1]

    Disbursement comes in one of two ways: all funds after completion and a valid inspection, or reimbursement through 90 percent of the award with the final 10 percent held until construction is complete and inspected [1]. Reimbursement requests can be made "no more frequently than bi-monthly" on Form SF-271, and payment is ordinarily made within 30 days [1]. Either way, the sponsor finances construction first, which is why the worked example below sizes a bridge. Costs incurred before the award are generally not paid; 2 CFR 200.458 allows pre-award costs only "with the written approval of the Federal agency" [1][4].

    Worked funding example (illustrative)

    The numbers below are illustrative, chosen to show how the rules interact. They are not a quote of any real project. Assume an independent producer plans a $100,000,000 eligible-cost expansion that converts purchased ammonia into a granular nitrogen product, with $4,000,000 of costs that FIELDS will not pay (indirect costs and pre-award costs without written approval) funded separately [1][4].

    Sources and usesAmountShare of eligible costShare of match
    Total eligible project costs$100,000,000100.0%n/a
    FIELDS grant request (50% cap)$50,000,00050.0%n/a
    Required non-Federal match$50,000,00050.0%100.0%
    Sponsor cash equity$18,000,00018.0%36.0%
    Farmer cooperative equity investment$7,000,0007.0%14.0%
    State economic development grant (non-federal)$5,000,0005.0%10.0%
    Commercial bank term loan, not federally guaranteed$20,000,00020.0%40.0%
    Costs outside FIELDS (indirect, unapproved pre-award)$4,000,000n/an/a
    Total funding the sponsor must arrange$54,000,000n/an/a

    The request sits within the $15 million to $150 million award range [1]. Four separate entities provide the match, which 2 CFR 200.306(b) permits as long as each contribution is verifiable, non-Federal, in the approved budget and not counted toward another federal award [3]. Each must be committed before the award agreement is signed [1]. The state grant should be checked for any federal pass-through money, which would fail condition (5) [3].

    Cash flow during construction. Under the reimbursement option, the federal share is paid after the sponsor spends, and the last 10 percent waits for completion and inspection [1].

    Disbursement assumption (24-month build, level spending)Result
    Monthly eligible spending$4,166,667
    Federal share of each month's spending (50%)$2,083,333
    Reimbursement requestsEvery two months, paid 30 days after request [1]
    Federal share the sponsor carries between requestsAbout $4,166,667 at each request date
    Reimbursed before completion (90% of award)$45,000,000 [1]
    Held until completion and inspection (10%)$5,000,000 [1]
    Peak federal share carried by the sponsor (level spending)$5,000,000 at completion
    Peak if the sponsor chooses payment after completion instead$50,000,000 [1]

    Construction spending is rarely level. If the heaviest two months run at twice the average, the carried federal share doubles to about $8.3 million during those months. The study should therefore include a monthly sources-and-uses schedule and show which lender or investor covers the bridge.

    Debt service on the match loan. If the $20,000,000 bank loan carries an illustrative 7.5% rate over 15 years with monthly amortization, the payment is $185,402.47 a month, or $2,224,830 a year. At a 1.25 times debt service coverage ratio, the plant must generate $2,781,037 of net operating income in its first full year of debt service; at 1.50 times, $3,337,244. The study's financial chapter has to show that the added tonnage, at a conservative netback price, produces that income after feedstock, energy, labor, freight and maintenance.

    Risks a FIELDS study must test

    RiskWhy RBCS caresTest in the study
    Feedstock price and supply (natural gas, ammonia, sulfur, phosphate rock, potash)Scored under input supply; drives margins [1]Contract terms, supplier diversity, price sensitivity cases
    Product price cycleLong-term viability beyond the project period is scored [1]Multi-year price history and a low-price case; see our fertilizer market evidence page
    Technology scale-upFertilizer not commercially available and in use is ineligible [1]Operating references at similar scale, licensor guarantees
    Construction cost and delayNamed risk; implementation readiness is scored [1]Fixed-price or guaranteed-maximum contract, contingency, schedule float
    Market-share eligibilityAn ineligible applicant cannot be funded [1]Capacity-share calculation, global and domestic, with sources
    Match falling throughProjects without secured match are ineligible [1]Executed commitments; backup sources
    Permits and environmental reviewNEPA review under 7 CFR part 1b; zoning, waste and utility issues are named risks [1]Permit matrix with status and dates
    Logistics and freightLogistics may not be the primary purpose, but delivered cost decides sales [1]Rail, truck and barge access; freight-adjusted netback
    LaborNamed risk; workforce documentation required [1]Local labor market, wages, training plan
    Ownership changeSale within ten years triggers USDA review [1]Exit and succession plans that respect the restriction
    Build America, Buy AmericaApplies to infrastructure awards to states, local governments, Tribes, institutions of higher education and nonprofits [1]Domestic content review of iron, steel, manufactured products and materials

    How a FIELDS study works with loans and other USDA financing

    Most FIELDS sponsors will borrow part of the match, and the lender will read the same study. If the lender uses a USDA Business and Industry guarantee, 7 CFR part 5001 adds its own rules: for guaranteed loans over $1,000,000 to a new business, a feasibility study by an independent qualified consultant acceptable to the Agency is required, and new businesses generally need at least 20 percent balance sheet equity or 25 percent of project costs at closing [7]. B&I loans are capped at $25 million per borrower, and for FY2026 carry an 85 percent guarantee and 3.0 percent fee under $5 million and an 80 percent guarantee at $5 million to $25 million [7][8]. One study written to both standards can serve the grant application and the loan, provided its market and financial chapters meet the stricter of the two. Whether those B&I loan proceeds may count as FIELDS match is the open question noted above.

    For the grant and loan rules side by side, see our pages on B&I feasibility studies, USDA feasibility study requirements and what USDA expects in a feasibility report. For another CCC-era processing grant with a 50 percent match, see our article on MPPEP Phase 4 feasibility requirements.

    Hiring a FIELDS feasibility study consultant

    The notice makes independence a definition, not a preference: the qualified consultant is "an independent third-party person" with the knowledge, expertise and experience for the task, and the Agency judges whether the study is acceptable and adequate [1]. In practice that rules out the technology licensor, the engineering-procurement-construction contractor, an equity investor or anyone paid on success. A FIELDS study also needs more than one discipline: fertilizer markets and pricing, process technology, project finance and federal grant rules. Many sponsors pair a market and financial consultant with an independent engineer and reference the engineer's report in the technical chapter.

    On this site, an engagement includes all five feasibility components (economic, market, technical, financial and management), a five to ten year projection with sensitivity analysis, market area and demand analysis, a competitive supply inventory, comparable operator benchmarks, a management assessment, PDF and Word reports with an Excel workbook, a kickoff and a midpoint call, one round of revisions and a written acceptance guarantee; environmental assessments, engineering, legal work, appraisals and grant application drafting are separate [9]. You provide the project description and budget, engineering and equipment information, feedstock and offtake agreements or letters, ownership and financial statements, and match commitments; a structured data request follows within one to two business days of signing [11].

    Cost and timing: the site's cost page lists $9,500 to $18,000 for OneRD complex engagements (cross-program structures and combined guaranteed loan and grant packages) over 7 to 10 weeks, and $10,500 to $14,500 for complex B&I studies over 7 to 9 weeks; every proposal quotes a firm fixed fee, and a rush option at a 20% to 35% premium is subject to analyst capacity [9]. Because the next FIELDS round, if any, has no published date, the safest plan is to commission the study when engineering and offtake are far enough along to be described as facts, then refresh the market chapter when a notice appears.

    To start, use the contact page or email info@usda-feasibility-study.com; the site states a senior analyst responds within one business day with a scoped proposal or follow-up questions [10].

    Request a scoped proposal for your FIELDS feasibility study at usda-feasibility-study.com/contact.

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    What is USDA FIELDS?

    FIELDS is the Fertilizer Investment & Expansion for Long-term Domestic Supply Program, a fiscal year 2026 grant competition funded by the Commodity Credit Corporation and run by USDA's Rural Business-Cooperative Service. It offered $500 million to expand or start independent domestic fertilizer production, in awards of $15 million to $150 million with a 50 percent non-Federal match [1].

    Is FIELDS still open?

    No. Applications closed on 17 August 2026 and the Grants.gov listing was archived on 16 September 2026. RBCS anticipates awards in December 2026 to January 2027. As of 8 November 2026 no FY2027 FIELDS notice had been published on Grants.gov or in the Federal Register [1][2][6].

    Does FIELDS require a feasibility study?

    Yes. Every application needed a recently completed feasibility study prepared for the project, dated no more than three years before submission and signed by a qualified consultant, and the Agency must concur that it is acceptable and adequate [1].

    Who can prepare a FIELDS feasibility study?

    A qualified consultant, which the notice defines as an independent third-party person with the knowledge, expertise and experience to perform the task [1]. The applicant's own staff, the technology licensor or the construction contractor are not independent third parties.

    How much is the FIELDS match?

    At least 50 percent of total eligible project costs, from non-Federal sources, with commitments secured before the award agreement is executed. On a $50 million eligible project, the grant could be up to $25 million and the match at least $25 million [1].

    Can more than one entity provide the FIELDS match?

    Yes. Federal cost-sharing rules require the agency to accept cash and third-party in-kind contributions, including funds committed by third parties, if they are verifiable, non-Federal, allowable, in the approved budget and not counted toward another federal award [3]. The notice asks applicants to summarize commitments from Tribal, state, local and third-party contributors [1].

    Can a USDA B&I guaranteed loan be part of the match?

    The notice does not say. The federal test is whether funds are paid by the Federal Government under another Federal award [3]. Ask RBCS in writing before relying on guaranteed loan proceeds as match, and keep a backup source.

    Can a fertilizer blending or bagging plant get a FIELDS grant?

    Not on its own. Process manufacturing excludes mixing, blending or bagging alone, and standalone blending, bagging, storage or distribution projects are ineligible unless they are integral to a project that materially increases process manufacturing capacity [1].

    Are large fertilizer companies eligible?

    No if they, with affiliates, hold a production market share at or above the fourth-largest firm in nitrogen, sulfur, phosphate or potash. Applicants certify their global and domestic capacity share and may submit a justification if the top-four measure misstates competition in their segment [1].

    What scores highest in a FIELDS application?

    Market criteria carry up to 30 points and financial viability and technical merit up to 25. Nitrogen or sulfur projects can earn up to 5 more points and executed offtake agreements up to 5, and implementation-ready projects with documented financing, permits and offtake score above those built on preliminary assumptions [1].

    How long is a FIELDS feasibility study valid?

    For FY2026, it had to be dated no more than three years before submission [1]. A future round may set a different rule, and a study's market data should be refreshed whenever prices or the competitive set change.

    How does FIELDS pay the grant?

    Either in full after completion and a valid inspection, or by reimbursement through 90 percent of the award with the last 10 percent held until construction is complete and inspected. Reimbursement requests can be made no more often than bi-monthly and are ordinarily paid within 30 days [1].

    Can tribes apply for FIELDS?

    Yes. Tribes, Tribal Entities and Alaska Native Corporations are eligible applicants, and the notice says the Agency built in flexibility to reduce matching requirements for Tribes, Tribe-owned entities and Alaska Native Corporations, though it states no reduced rate [1].

    How much does a FIELDS feasibility study cost?

    This site quotes a firm fixed fee after scoping. Its cost page lists $9,500 to $18,000 for OneRD complex engagements, including combined guaranteed loan and grant packages, and $10,500 to $14,500 for complex B&I studies [9].

    Sources

    [1] USDA Rural Business-Cooperative Service for the Commodity Credit Corporation, Fertilizer Investment & Expansion for Long-Term Domestic Supply Program (FIELDS), Fiscal Year 2026 Notice of Funding Opportunity, RD-RBS-26-01-FIELDS, published 1 July 2026, updated and signed 7 July 2026, Grants.gov attachment. https://apply07.grants.gov/grantsws/rest/opportunity/att/download/353544 (accessed 8 Nov 2026)

    [2] Simpler.Grants.gov, Opportunity Listing: Fertilizer Investment & Expansion for Long-term Domestic Supply (FIELDS), RD-RBS-26-01-FIELDS, version 2, last updated 7 July 2026. https://simpler.grants.gov/opportunity/30bdfbe8-643e-441c-bf78-d8737edd3682 (accessed 8 Nov 2026)

    [3] 2 CFR 200.306, Cost sharing (CFR 2026 edition), govinfo. https://www.govinfo.gov/content/pkg/CFR-2026-title2-vol01/xml/CFR-2026-title2-vol01-sec200-306.xml (accessed 8 Nov 2026)

    [4] 2 CFR 200.458, Pre-award costs (CFR 2026 edition), govinfo. https://www.govinfo.gov/content/pkg/CFR-2026-title2-vol01/xml/CFR-2026-title2-vol01-sec200-458.xml (accessed 8 Nov 2026)

    [5] USDA RBCS, Notice of New Information Collection: Fertilizer Production Expansion Program, OMB 0570-0081, 87 FR 60980 (7 Oct 2022), govinfo. https://www.govinfo.gov/content/pkg/FR-2022-10-07/html/2022-21889.htm (accessed 8 Nov 2026)

    [6] Federal Register API searches for "fertilizer FIELDS" (documents since 1 June 2025), "Long-term Domestic Supply" and "Fertilizer Production Expansion" (all years). https://www.federalregister.gov/api/v1/documents.json?conditions%5Bterm%5D=%22Long-term+Domestic+Supply%22 (accessed 8 Nov 2026)

    [7] 7 CFR part 5001, OneRD Guaranteed Loans (CFR 2026 edition, title 7 vol. 15), sections 5001.105(d), 5001.306(a)(3), 5001.406(c), govinfo. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 8 Nov 2026)

    [8] USDA, OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026, 91 FR 11272 (9 Mar 2026). https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 6 Nov 2026)

    [9] usda-feasibility-study.com, USDA Feasibility Study Cost & Timeline (site page). https://usda-feasibility-study.com/usda-feasibility-study-cost (read 8 Nov 2026)

    [10] usda-feasibility-study.com, Contact & Request a Proposal (site page). https://usda-feasibility-study.com/contact (read 8 Nov 2026)

    [11] usda-feasibility-study.com, About (site page). https://usda-feasibility-study.com/about (read 8 Nov 2026)

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours