Short answer
FIELDS is the Fertilizer Investment & Expansion for Long-term Domestic Supply Program, a fiscal year 2026 grant competition in which the Commodity Credit Corporation (CCC) provides $500 million, through USDA's Rural Business-Cooperative Service (RBCS), to expand or bring into operation new, independent domestic fertilizer production capacity [1]. Awards range from $15 million to $150 million, about 10 are expected, and every award requires non-Federal matching funds equal to 50 percent of total eligible project costs [1]. The authority is section 5(b) of the CCC Charter Act, 15 U.S.C. 714c(b), and the notice was published on Grants.gov, not in the Federal Register [1][2][6].
A feasibility study is mandatory. The notice requires "a recently completed feasibility study, prepared for the project and dated no more than 3 years before submission, signed by a qualified consultant", and the Agency must concur that the study is acceptable and adequate [1]. The FY2026 application window closed on 17 August 2026, and RBCS anticipates awards in December 2026 to January 2027 [1]. Data current as of November 2026.
| Question | Answer from the FY2026 notice |
|---|---|
| Official name | Fertilizer Investment & Expansion for Long-term Domestic Supply Program (FIELDS) [1] |
| Who funds and who runs it | Commodity Credit Corporation funds; Rural Business-Cooperative Service administers [1] |
| Legal authority | Section 5(b) of the CCC Charter Act, 15 U.S.C. 714c(b) [1] |
| Funding opportunity number | RD-RBS-26-01-FIELDS; Assistance Listing 10.383 [1][2] |
| Money available | $500 million; RBCS may add funds from any available source [1] |
| Award size | $15 million minimum, $150 million maximum (raised from $100 million on 7 July 2026) [1][2] |
| Expected awards | About 10 [1] |
| Match | Non-Federal, at least 50% of total eligible project costs, committed before the award agreement is executed [1] |
| Feasibility study | Required: dated no more than 3 years before submission, signed by a qualified consultant, accepted by the Agency [1] |
| Deadline | 17 August 2026 through Grants.gov (closed) [1] |
| Awards expected | December 2026 to January 2027 [1] |
| Performance period | Up to 60 months, with up to 24 months of no-cost extension case by case [1] |
What FIELDS is, officially
The acronym is USDA's own. The notice's title is "Fertilizer Investment & Expansion for Long-term Domestic Supply Program (FIELDS)", issued as funding opportunity RD-RBS-26-01-FIELDS under Assistance Listing 10.383, and signed on 7 July 2026 by the Acting Administrator of RBCS [1]. Grants.gov lists the opportunity under the Rural Business-Cooperative Service, with $500,000,000 in program funding, 10 expected awards, an award floor of $15,000,000, an award ceiling of $150,000,000, a cost-sharing requirement, a posted date of 1 July 2026 and an archive date of 16 September 2026 [2]. A search of the Federal Register for the program's name and for its predecessor returned no FIELDS funding notice; the only Federal Register documents for the predecessor program were information-collection notices [6][5].
The legal basis is not a farm bill program or a regulation in the Code of Federal Regulations. The CCC funds FIELDS under section 5(b) of its Charter Act, which lets the CCC "make available materials and facilities required in connection with the production and marketing of agricultural commodities (other than tobacco)" [1]. That has two practical consequences. First, the rules for each round live in the notice, so a sponsor cannot assume the next round will repeat this one. Second, the federal grant rules in 2 CFR part 200 do much of the work that a program regulation would otherwise do, including how matching funds are counted [1][3].
The notice sets five tests for the fertilizer that FIELDS will support: production that is independent and outside the dominant fertilizer suppliers; made in America; innovative; "energy dominant and secure"; and farmer focused [1]. It also says CCC "will prioritize projects that are in the later stages of development, technically feasible, financially viable, and have already identified other sources of funding" [1]. A feasibility study that cannot show those four things is a weak study for this program, however well written.
| Program fact | Detail | Source |
|---|---|---|
| Purpose | Expand or bring into operation new, independent domestic fertilizer production capacity | [1] |
| Eligible project types | Expansions or upgrades of existing facilities, new domestic production facilities, shovel-ready projects, on-site terminals and transportation infrastructure | [1] |
| Distribution | An eligible use, but "may not serve as the primary or standalone purpose" | [1] |
| Nutrients named | Nitrogen, sulfur, phosphorus and potash | [1] |
| Instrument | Grant, made through a Financial Assistance Agreement (Form RD 4280-2 or successor) | [1] |
| Information collection | OMB Control Number 0570-0081, the number first issued for the Fertilizer Production Expansion Program | [1][5] |
| Program contact | FIELDS@usda.gov | [1] |
FIELDS compared with the 2022 Fertilizer Production Expansion Program
FIELDS shares an assistance listing and an information-collection number with the Fertilizer Production Expansion Program (FPEP), which RBCS launched in 2022 [1][5]. The FY2026 notice limits prior FPEP recipients to "a project or project phase that is demonstrably separate from, and additive to, the scope of work funded under the FPEP award", and it lets the Administrator award discretionary points to applicants that have not previously received an FPEP award [1]. The differences matter for anyone reusing an FPEP-era study.
| Feature | FPEP, as described in 2022 | FIELDS, FY2026 notice |
|---|---|---|
| What is supported | Fertilizer and nutrient alternatives [5] | Process manufacturing of fertilizer; projects focused primarily on nutrient substitutes or alternatives are ineligible [1] |
| Market-share exclusion | Production or distribution share at or above the fourth-largest firm in nitrogen, phosphate or potash [5] | Production share at or above the fourth-largest firm in nitrogen, sulfur, phosphate or potash [1] |
| Policy pillars | Independent, made in America, innovative, sustainable, farmer focused [5] | Independent, made in America, innovative, energy dominant and secure, farmer focused [1] |
| Estimated respondents in the information collection | 135 [5] | Not stated |
| Prior award holders | Not applicable | Only separate and additive projects; no duplication of earlier federal funding [1] |
The practical lesson: a study written for FPEP in 2022 or 2023 is now more than three years old for most projects, and it may have argued points FIELDS no longer rewards, such as nutrient alternatives or greenhouse gas reductions. It will need a new date, a new signature and, in most cases, a new market chapter [1].
Where FIELDS stands in November 2026
The FY2026 round is closed. Applications were due on 17 August 2026, and the notice states the Agency "will not solicit or consider new scoring or eligibility information that is submitted after the application deadline" [1]. Grants.gov shows the opportunity as archived since 16 September 2026 [2]. RBCS anticipates announcement and award dates of December 2026 to January 2027 [1]. As of 8 November 2026, no FY2027 FIELDS notice appeared on Grants.gov or in the Federal Register [2][6].
What that means for a sponsor today:
- If you applied: the study you submitted is the one RBCS is scoring. Selection is not an award: the notice says "Notification of selection does not guarantee an award", and the Agency may request organizational information for risk assessment and more detail on costs [1]. Keep the study's assumptions current in case the Agency asks for clarification.
- If you did not apply: a study prepared now stays inside the notice's three-year window for any round that keeps the same rule [1]. A future round may change the rule, so the study should also be written to serve the lenders and equity investors who will provide the match, which is useful whatever FIELDS does next.
- If you hold an FPEP award: any new application has to separate its scope cleanly from the FPEP project [1].
When FIELDS requires a feasibility study, and what "acceptable" means
The requirement sits in section 4.2 of the notice, under financial viability. Applicants must provide a business plan; three years of historical balance sheets and income statements (or what exists for younger firms); current statements within 90 days; two years of pro forma and projected financial analysis with assumptions; source documentation for key personnel, construction labor and the operating workforce; and the feasibility study [1].
The notice defines the study and the person who writes it:
- Feasibility study: a study, "including an opinion or finding, prepared by qualified consultant(s), that evaluates the economic, market, technical, financial, and management feasibility of a proposed project or operation to determine whether it is practical and viable and to assess its likelihood of success" [1].
- Qualified consultant: "An independent third-party person possessing the knowledge, expertise, and experience to perform the specific task required" [1].
Four tests follow from the text. The study must be prepared for this project, not adapted from an industry template. It must be dated no more than three years before submission. It must be signed by a qualified consultant who is independent of the applicant. And the Agency must concur that it is "acceptable and adequate" [1]. The project narrative must also "include summaries of any feasibility studies, business, and marketing plans" when addressing the scoring criteria, so the study's conclusions reappear in the 20-page narrative where reviewers score them [1].
| Document in the financial viability package | FY2026 requirement | What the feasibility study adds |
|---|---|---|
| Business plan | Required; goals, why attainable, plan, pro forma and financial statements [1] | Independent test of the plan's assumptions |
| Historical financial statements | Three years, or what is available [1] | Benchmarks for margins and working capital |
| Current financial statements | Within 90 days of submission [1] | Starting balance sheet for the projections |
| Pro forma and projections | At least two years, with assumptions [1] | Market-based price, volume and cost inputs; sensitivity cases |
| Feasibility study | Signed, dated within 3 years, Agency concurrence [1] | The opinion on economic, market, technical, financial and management feasibility |
| Key personnel documentation | Resumes and workforce sources [1] | Management chapter and staffing plan |
| Environmental checklist | Required for NEPA review under 7 CFR part 1b [1] | Site, permits and environmental risk chapter |
| Design and construction documents | For construction projects [1] | Construction cost and schedule review |
USDA's FIELDS opportunity also posts a separate "Feasibility Study Guide" dated 30 June 2026 [2]. Its contents are not summarized here; see VERIFY.
What a FIELDS feasibility study must prove
RBCS reads the study against the notice's definitions, eligibility rules and scoring criteria. A study that answers the questions below in this order makes the reviewer's job easy and supports every scored criterion.
- That the project is process manufacturing. The notice defines process manufacturing as operations "that alter a fertilizer's chemistry or physical characteristics", such as producing ammonia from natural gas, converting ammonia into urea, granulating, drying or coating, and it excludes "mixing, blending, or bagging alone" [1]. The technical chapter should describe the conversion step plainly.
- That the applicant passes the independence test. Market share is production capacity as a percentage of an industry's total capacity, calculated both globally and domestically, and an applicant at or above the fourth-largest firm in a nutrient is ineligible [1]. The study should show the calculation and its sources.
- That the project materially increases domestic capacity. Projects that "do not materially increase domestic commercial fertilizer process manufacturing capacity" are ineligible, and the narrative must estimate the increase in volume with its unit of measure [1].
- That farmers will use the product. The narrative must estimate the acreage covered and the number of farmers served, and the market criteria ask for producers, acres, end users and offtake [1]. The study supplies the numbers and their basis.
- That inputs are secured. The market impact criterion scores "the adequacy of the input supply and procurement plan, including the type, quantity, quality, frequency, and duration of procurement arrangements" against current, initial and maximum operating capacity [1].
- That demand is validated. Evidence of customer demand, production availability at operating capacity, market drivers, partnerships, end-user commitments and competitive conditions [1].
- That the technology works at this scale. The notice rules out fertilizer process manufacturing "that is not commercially available and in use", and it scores "the demonstrated track record of the proposed technologies or systems" [1].
- That the money is there. Matching and other funding must be secured, and confirmed match commitments earn more points [1].
- That the project is implementation ready. Indicators include financing, engineering and design, technical validation, site control, permitting and environmental review, equipment procurement, contractor arrangements and offtake [1].
- That the business survives without the grant period. The market demand criterion asks for "the operational and economic factors supporting the long-term viability of the business beyond the FIELDS project period" [1].
- That the risks are known and managed. Construction delays, equipment availability, labor, service providers, operating capital, market loss, legal compliance, zoning, environmental, waste and utilities [1].
- A clear opinion. The definition requires "an opinion or finding" on whether the project is practical and viable [1]. A study that describes the market without concluding fails the definition.
| Study chapter | Notice requirement it answers | Evidence a reviewer expects |
|---|---|---|
| Executive summary and opinion | Definition of feasibility study; narrative summary [1] | Signed conclusion on viability and likelihood of success |
| Applicant and eligibility | Section 3.1: domestic ownership, independence, market share [1] | Ownership chart, capacity-share calculation, certification support |
| Technical feasibility | Criterion 1(b); ineligible item (b) [1] | Process description, licensor references, operating plants using the technology |
| Input supply | Criterion 2(i)(a) [1] | Feedstock contracts or letters by type, quantity, quality, frequency and duration |
| Market and demand | Criterion 2(i) and 2(ii) [1] | Service area, nutrient demand, competing supply, prices, offtake and producer commitments |
| Financial feasibility | Criterion 1(a) and 1(c) [1] | Projections with assumptions, sources and uses, match commitments, sensitivity cases |
| Work plan and budget | Criterion 3 [1] | Milestones, cost basis for each budget line, key personnel |
| Risk | Criterion 4 [1] | Risk register with mitigation and monitoring |
| Management | Criterion 3(iii) [1] | Resumes, operating track record, organization chart |
| Outcomes | Section 6.3 reporting [1] | Baseline capacity, added volume, producers and acres served, jobs |
Eligibility: who can apply and what can be funded
Eligible applicants are entities "regardless of legal structure", including Tribes, Tribal Entities, Alaska Native Corporations, for-profit entities, corporations, non-profit entities, producer-owned cooperatives and corporations, certified benefit corporations, and state or local government entities; private entities must be independently owned and operated [1]. Every applicant must operate in the United States or its territories with a project physically located there, be domestically owned (majority of ownership held directly or indirectly by U.S. citizens), process manufacture or plan to do so in compliance with applicable law, and be registered in SAM [1].
Several rules catch sponsors late:
- One application per affiliated group. Multiple applications from affiliated entities, with affiliation as SBA defines it at 13 CFR 121.103, are not permitted; multiple projects owned by the same applicant must be combined into one application [1].
- Market share justification. An applicant that believes the top-four measure misstates competition in its segment may submit a justification, and Capper-Volstead farmer associations may do the same [1]. If the applicant manufactures an eligible nutrient not listed among nitrogen, sulfur, phosphate and potash, no certification is required [1].
- Tribal land consent. A Tribal Government Resolution of Consent is required when a project is on Tribal lands and the applicant is neither the Tribe nor a Tribal entity owned by the Tribe; Grants.gov notes that documents showing an Alaska Native Corporation's legal authority over its fee lands are accepted in lieu [1][2].
- Federal debt and debarment. Applicants are screened through the Do Not Pay system for debarment, suspension and unresolved federal debt [1].
| Eligible uses (examples in the notice) | Limit |
|---|---|
| Construction of a new facility or purchase of an existing facility to expand capacity, including land | None stated [1] |
| Pre-development costs such as engineering and professional fees | Cannot be the primary use of funds [1] |
| Working capital to support expanded capacity or output | Cannot be the primary use of funds [1] |
| Modernizing or expanding an existing facility and its buildings | None stated [1] |
| New or modernized process manufacturing equipment | None stated [1] |
| Equipment and technology that improve processing, worker conditions or safety | None stated [1] |
| Compliance with occupational and other safety requirements | None stated [1] |
| Logistics: distribution, transportation and storage that benefit producers | Cannot be the primary use of funds [1] |
| Ineligible activities and costs | Note |
|---|---|
| Research and development | Item (a) [1] |
| Process manufacturing of fertilizer that is not commercially available and in use | Item (b) [1] |
| Projects focused primarily on nutrient substitutes or alternatives to commercial fertilizer | Item (c) [1] |
| Projects that do not materially increase domestic capacity | Item (d) [1] |
| Standalone mixing, blending, repackaging, bagging, storage, warehousing, distribution or resale | Eligible only if integral to an otherwise eligible capacity project [1] |
| Projects that have not secured the required matching funds | Item (f) [1] |
| Precision agriculture technologies such as drones; site-specific application, remote sensing, GIS and GPS | Funded under other USDA authorities [1] |
| Indirect project costs | Not eligible project costs [1] |
| Salaries or administrative costs of any State or local government | Not allowed [1] |
Matching funds: how much, from whom, and when
The match rule is short: "All award requests are subject to a matching requirement equal to 50 percent of total eligible project costs. For example, for a project with $50 million in total eligible costs, an applicant may request up to $25 million and must provide at least $25 million in matching funds" [1]. The match must be non-Federal, and before execution of the award agreement applicants "must demonstrate that they have secured commitments to sufficient non-Federal matching funding in the amount needed to complete the project as described in the application" [1]. Applicants also certify, at application, that matching funds "and other funding needed to complete the project as proposed in the application has been secured" [1].
Can more than one entity provide the match? Yes. The notice ties cost sharing to the definition in 2 CFR 200.1 [1], and 2 CFR 200.306(b) requires the agency to accept "any cost sharing funds (including cash and third-party in-kind contributions, and also including funds committed by the recipient, subrecipient, or third parties)" that meet seven conditions [3]. The notice itself asks applicants to summarize "commitments - financial, infrastructure, workforce or otherwise - from federal, Tribal, state, local, or third-party contributors" [1]. A typical match therefore stacks several sources: the applicant's own cash, equity from investors or a farmer cooperative, a state or local grant, and loan proceeds. What matters is that each piece passes the 2 CFR 200.306(b) tests and is committed in writing.
| 2 CFR 200.306(b) condition for counting a contribution [3] | What it means for a FIELDS sponsor |
|---|---|
| (1) Verifiable in the recipient's records | Bank statements, executed subscription agreements, loan commitments |
| (2) Not counted as a contribution for any other Federal award | A dollar matched to another federal grant cannot match FIELDS too |
| (3) Necessary and reasonable for the award's objectives | Spent on the approved project scope |
| (4) Allowable under the cost principles (subpart E) | Indirect costs are excluded by the notice [1] |
| (5) Not paid by the Federal Government under another Federal award, unless a statute allows | Other federal grants generally cannot count |
| (6) In the approved budget when the agency requires it | Show every match source in the SF-424C budget |
| (7) Conforms to other provisions of part 200 | Records, procurement and property rules apply |
Third-party in-kind contributions are valued under rules in the same section: donated land and buildings at no more than fair market value established by an independent appraiser, donated equipment at no more than fair market value, and volunteer professional services at rates consistent with the local labor market [3]. Most FIELDS matches will be cash, because the budgets are large and RBCS awards more points for "confirmed commitments for matching funds" [1].
Two open points deserve a written question to RBCS before a sponsor relies on them. First, the notice does not say whether proceeds of a federally guaranteed loan (for example a USDA Business and Industry guaranteed loan) count as non-Federal match; the 2 CFR 200.306(b)(5) test turns on whether funds are "paid by the Federal Government under another Federal award" [3]. Second, section 8.6 says the Agency "has incorporated flexibility to reduce the matching funds requirements for applications from Tribes, Tribal entities owned by Tribes, and Alaska Native Corporations", while section 3.2 states the 50 percent rule without a reduced rate [1]. Tribal sponsors should ask for the reduced rate in writing; see our tribal USDA funding page.
How FIELDS applications are scored
All eligible, complete applications are scored and ranked; funding goes in rank order until money runs out, the Agency may offer partial funding, and it may decline to fund lower-scoring applications even when funds remain [1]. Failing to address any criterion makes the application ineligible [1]. The notice says "Merely addressing the elements of this criterion is not sufficient" and that scores reflect "the strength of the supporting evidence" [1].
| Criterion | Points | What earns the top band | Where the study supplies the evidence |
|---|---|---|---|
| 1. Financial viability and technical merit | 0 to 25 | Strong projections with support; demonstrated technology track record; secured financing, with more points for confirmed match [1] | Financial and technical chapters |
| 2(i). Market impact | 0 to 12 | Input supply plan; added capacity and availability; competition; producers and acres; barriers addressed; local support [1] | Market impact chapter |
| 2(ii). Market demand and opportunities | 0 to 18 | Validated demand, capacity at full operation, market drivers, partnerships, end-user commitments, applicant capability, sustainability [1] | Market and demand chapter |
| 3. Work plan and budget | 0 to 25 as headed; sub-criteria total 19 | Work plan 0 to 7, budget 0 to 6, key personnel and service providers 0 to 6 [1] | Work plan review, cost basis, management chapter |
| 4. Major risks and mitigation | 0 to 6 | The most significant risks with credible mitigation [1] | Risk chapter |
| 5. Nitrogen or sulfur-related products | Up to 5 | Process manufacturing of nitrogen- or sulfur-related fertilizer for U.S. agriculture [1] | Technical and market chapters |
| 6. Executed off-take agreements | Up to 5 | Executed agreements, with terms, supporting viability [1] | Offtake summary |
| 7. Administrator points | 0 to 10 | Rural economic recovery and access to domestic fertilizer, applicants without a prior FPEP award; up to 10 for geographic diversity [1] | Rural impact data |
Two scoring facts change how the study should be written. The notice gives priority to implementation-ready projects and says applications with "strong, well-documented evidence" that financing, engineering, site control, permits, procurement and offtake are in place "will receive higher scores than applications that rely on preliminary assumptions, contingent commitments, or less developed project plans" [1]. And ten points (criteria 5 and 6), plus the confirmed-match element of criterion 1, reward concrete facts a study can only report, not create: a nitrogen or sulfur product, executed offtake and committed match. A study cannot manufacture those points, but it can make sure none are lost by describing them precisely.
FIELDS timeline, from notice to closeout
| Date or interval | Event | Source |
|---|---|---|
| 1 July 2026 | Notice posted on Grants.gov | [1][2] |
| 7 July 2026 | Notice updated: maximum award $150 million, about 10 awards, pre-development costs cannot be the primary use, one section 3.3 item removed | [2] |
| 48 hours before close | Deadline to request a waiver of electronic submission, by email to FIELDS@usda.gov | [1] |
| 17 August 2026 | Applications due through Grants.gov | [1] |
| Within 30 days of receipt | Written acknowledgement from RBCS | [1] |
| 16 September 2026 | Grants.gov opportunity archived | [2] |
| December 2026 to January 2027 | Anticipated announcements and awards | [1] |
| Award to 60 months | Period of performance; project must be implementation ready upon award, pending environmental review | [1] |
| Up to 24 more months | No-cost extension, case by case | [1] |
| Semiannually (periods end 31 March and 30 September) | SF-425 financial report and performance report, due 30 working days after period end | [1] |
| Within 120 days after award ends | Final project and financial status report | [1] |
| One year after completion | Outcome report on added volume, producers, new producers and acres, due within 60 days after the first full calendar year | [1] |
| Ten years after award | Any sale or ownership change must be notified and is subject to USDA review; partial repayment possible | [1] |
Disbursement comes in one of two ways: all funds after completion and a valid inspection, or reimbursement through 90 percent of the award with the final 10 percent held until construction is complete and inspected [1]. Reimbursement requests can be made "no more frequently than bi-monthly" on Form SF-271, and payment is ordinarily made within 30 days [1]. Either way, the sponsor finances construction first, which is why the worked example below sizes a bridge. Costs incurred before the award are generally not paid; 2 CFR 200.458 allows pre-award costs only "with the written approval of the Federal agency" [1][4].
Worked funding example (illustrative)
The numbers below are illustrative, chosen to show how the rules interact. They are not a quote of any real project. Assume an independent producer plans a $100,000,000 eligible-cost expansion that converts purchased ammonia into a granular nitrogen product, with $4,000,000 of costs that FIELDS will not pay (indirect costs and pre-award costs without written approval) funded separately [1][4].
| Sources and uses | Amount | Share of eligible cost | Share of match |
|---|---|---|---|
| Total eligible project costs | $100,000,000 | 100.0% | n/a |
| FIELDS grant request (50% cap) | $50,000,000 | 50.0% | n/a |
| Required non-Federal match | $50,000,000 | 50.0% | 100.0% |
| Sponsor cash equity | $18,000,000 | 18.0% | 36.0% |
| Farmer cooperative equity investment | $7,000,000 | 7.0% | 14.0% |
| State economic development grant (non-federal) | $5,000,000 | 5.0% | 10.0% |
| Commercial bank term loan, not federally guaranteed | $20,000,000 | 20.0% | 40.0% |
| Costs outside FIELDS (indirect, unapproved pre-award) | $4,000,000 | n/a | n/a |
| Total funding the sponsor must arrange | $54,000,000 | n/a | n/a |
The request sits within the $15 million to $150 million award range [1]. Four separate entities provide the match, which 2 CFR 200.306(b) permits as long as each contribution is verifiable, non-Federal, in the approved budget and not counted toward another federal award [3]. Each must be committed before the award agreement is signed [1]. The state grant should be checked for any federal pass-through money, which would fail condition (5) [3].
Cash flow during construction. Under the reimbursement option, the federal share is paid after the sponsor spends, and the last 10 percent waits for completion and inspection [1].
| Disbursement assumption (24-month build, level spending) | Result |
|---|---|
| Monthly eligible spending | $4,166,667 |
| Federal share of each month's spending (50%) | $2,083,333 |
| Reimbursement requests | Every two months, paid 30 days after request [1] |
| Federal share the sponsor carries between requests | About $4,166,667 at each request date |
| Reimbursed before completion (90% of award) | $45,000,000 [1] |
| Held until completion and inspection (10%) | $5,000,000 [1] |
| Peak federal share carried by the sponsor (level spending) | $5,000,000 at completion |
| Peak if the sponsor chooses payment after completion instead | $50,000,000 [1] |
Construction spending is rarely level. If the heaviest two months run at twice the average, the carried federal share doubles to about $8.3 million during those months. The study should therefore include a monthly sources-and-uses schedule and show which lender or investor covers the bridge.
Debt service on the match loan. If the $20,000,000 bank loan carries an illustrative 7.5% rate over 15 years with monthly amortization, the payment is $185,402.47 a month, or $2,224,830 a year. At a 1.25 times debt service coverage ratio, the plant must generate $2,781,037 of net operating income in its first full year of debt service; at 1.50 times, $3,337,244. The study's financial chapter has to show that the added tonnage, at a conservative netback price, produces that income after feedstock, energy, labor, freight and maintenance.
Risks a FIELDS study must test
| Risk | Why RBCS cares | Test in the study |
|---|---|---|
| Feedstock price and supply (natural gas, ammonia, sulfur, phosphate rock, potash) | Scored under input supply; drives margins [1] | Contract terms, supplier diversity, price sensitivity cases |
| Product price cycle | Long-term viability beyond the project period is scored [1] | Multi-year price history and a low-price case; see our fertilizer market evidence page |
| Technology scale-up | Fertilizer not commercially available and in use is ineligible [1] | Operating references at similar scale, licensor guarantees |
| Construction cost and delay | Named risk; implementation readiness is scored [1] | Fixed-price or guaranteed-maximum contract, contingency, schedule float |
| Market-share eligibility | An ineligible applicant cannot be funded [1] | Capacity-share calculation, global and domestic, with sources |
| Match falling through | Projects without secured match are ineligible [1] | Executed commitments; backup sources |
| Permits and environmental review | NEPA review under 7 CFR part 1b; zoning, waste and utility issues are named risks [1] | Permit matrix with status and dates |
| Logistics and freight | Logistics may not be the primary purpose, but delivered cost decides sales [1] | Rail, truck and barge access; freight-adjusted netback |
| Labor | Named risk; workforce documentation required [1] | Local labor market, wages, training plan |
| Ownership change | Sale within ten years triggers USDA review [1] | Exit and succession plans that respect the restriction |
| Build America, Buy America | Applies to infrastructure awards to states, local governments, Tribes, institutions of higher education and nonprofits [1] | Domestic content review of iron, steel, manufactured products and materials |
How a FIELDS study works with loans and other USDA financing
Most FIELDS sponsors will borrow part of the match, and the lender will read the same study. If the lender uses a USDA Business and Industry guarantee, 7 CFR part 5001 adds its own rules: for guaranteed loans over $1,000,000 to a new business, a feasibility study by an independent qualified consultant acceptable to the Agency is required, and new businesses generally need at least 20 percent balance sheet equity or 25 percent of project costs at closing [7]. B&I loans are capped at $25 million per borrower, and for FY2026 carry an 85 percent guarantee and 3.0 percent fee under $5 million and an 80 percent guarantee at $5 million to $25 million [7][8]. One study written to both standards can serve the grant application and the loan, provided its market and financial chapters meet the stricter of the two. Whether those B&I loan proceeds may count as FIELDS match is the open question noted above.
For the grant and loan rules side by side, see our pages on B&I feasibility studies, USDA feasibility study requirements and what USDA expects in a feasibility report. For another CCC-era processing grant with a 50 percent match, see our article on MPPEP Phase 4 feasibility requirements.
Hiring a FIELDS feasibility study consultant
The notice makes independence a definition, not a preference: the qualified consultant is "an independent third-party person" with the knowledge, expertise and experience for the task, and the Agency judges whether the study is acceptable and adequate [1]. In practice that rules out the technology licensor, the engineering-procurement-construction contractor, an equity investor or anyone paid on success. A FIELDS study also needs more than one discipline: fertilizer markets and pricing, process technology, project finance and federal grant rules. Many sponsors pair a market and financial consultant with an independent engineer and reference the engineer's report in the technical chapter.
On this site, an engagement includes all five feasibility components (economic, market, technical, financial and management), a five to ten year projection with sensitivity analysis, market area and demand analysis, a competitive supply inventory, comparable operator benchmarks, a management assessment, PDF and Word reports with an Excel workbook, a kickoff and a midpoint call, one round of revisions and a written acceptance guarantee; environmental assessments, engineering, legal work, appraisals and grant application drafting are separate [9]. You provide the project description and budget, engineering and equipment information, feedstock and offtake agreements or letters, ownership and financial statements, and match commitments; a structured data request follows within one to two business days of signing [11].
Cost and timing: the site's cost page lists $9,500 to $18,000 for OneRD complex engagements (cross-program structures and combined guaranteed loan and grant packages) over 7 to 10 weeks, and $10,500 to $14,500 for complex B&I studies over 7 to 9 weeks; every proposal quotes a firm fixed fee, and a rush option at a 20% to 35% premium is subject to analyst capacity [9]. Because the next FIELDS round, if any, has no published date, the safest plan is to commission the study when engineering and offtake are far enough along to be described as facts, then refresh the market chapter when a notice appears.
To start, use the contact page or email info@usda-feasibility-study.com; the site states a senior analyst responds within one business day with a scoped proposal or follow-up questions [10].
Request a scoped proposal for your FIELDS feasibility study at usda-feasibility-study.com/contact.
Related pages
- U.S. fertilizer market evidence for a FIELDS feasibility study
- USDA funding and feasibility studies for tribes and tribal enterprises
- Industrial and manufacturing feasibility studies for USDA financing
- USDA feasibility study cost and timeline
- USDA feasibility study framework
- NEPA part 1b and feasibility timelines
USDA Feasibility, Inc.