Section 9003 Feasibility Study for Biorefinery and Biobased Product Loan Guarantees

    Last updated 2026-11-08

    Short answer

    Every Section 9003 loan guarantee application must include a feasibility study. The program, formally the Biorefinery, Renewable Chemical, and Biobased Product Manufacturing Assistance Program, is governed by 7 CFR part 4279 subpart C for loanmaking and part 4287 subpart D for servicing [1][2]. Its Phase 1 application must contain a feasibility study "prepared by a qualified, independent third party," organised around a seven-part table of required components in 4279.261(e), with the author's resume or statement of qualifications attached [1]. Phase 2 adds a technical assessment by a qualified independent engineer, an appraisal, environmental documentation and, for projects with eligible costs of $25 million or more, a credit rating from a nationally recognized statistical rating organization [1].

    The guarantee covers loans of up to $250 million to one borrower and up to 80% of eligible project costs, with the guarantee share falling from 80% (or 90% if three conditions are met) to 60% as the loan grows [1]. Rural Development decides whether a project is technically and economically feasible from the technical report and the feasibility study, and projects without feasibility are not selected [1].

    Data current as of November 2026.

    QuestionAnswer from the rules
    Is a feasibility study required?Yes, in every Phase 1 application (4279.261(e)) [1]
    Who may prepare it?A qualified, independent third party; the author's qualifications must be submitted [1]
    What else is technical?A technical assessment by a qualified independent engineer in Phase 2 (4279.261(k)(8)) [1]
    Largest loan$250 million to one borrower; no minimum [1]
    Loan as share of projectUp to 80% of eligible project costs; total federal participation also capped at 80% [1]
    Guarantee share80% up to $125 million (90% if conditions met); 80% to under $150 million; 70% to under $200 million; 60% to $250 million [1]
    Longest term20 years from closing or the project's useful life, whichever is less [1]
    Application deadlinesOctober 1 and April 1, unless a Federal Register notice says otherwise [1]
    Latest rule changeFinal rule effective 9 July 2026, amending two servicing provisions in part 4287 [2]

    The site's explainer covers what the program finances, why it sits outside the OneRD rule and how its two-phase process differs from Business and Industry lending: Section 9003: The $250 Million USDA Loan Guarantee. This page is for the sponsor and lender who need to commission the study and want to know what it must contain, how it is scored and what it costs to get the structure wrong.

    The independent feasibility study requirement

    Part 4279 defines a feasibility study as "an analysis by an independent qualified consultant or consultants of the economic, market, technical, financial, and management feasibility of a proposed Project or business in terms of its expectation for success" [1]. The application rule adds that the study should be built from information gathered from other qualified parties and documents, such as independent engineer reports, marketing studies, feedstock studies, business plans and financial statements prepared by a certified public accountant, and that any information used must be submitted as attachments [1].

    Independence is policed through the rule's definitions. A conflict of interest exists where a person has competing personal, professional or financial interests that prevent impartial action; an arm's-length transaction is one between disinterested parties with no affiliation and no security, monetary or stockholder interest in each other [1]. Contract costs above actual cost on agreements made at less than arm's length, or with an appearance of conflict, are ineligible project costs [1]. In practice that rules out the technology licensor, the engineering, procurement and construction (EPC) contractor, the developer, an equity investor and the loan packager as study authors.

    DocumentPhaseRulePrepared by
    Feasibility study (Table 1 components)Phase 14279.261(e)Qualified, independent third party
    Business plan (ten items)Phase 14279.261(f)Borrower; may be omitted where the study covers it
    Financial model, monthly for three years after stabilized operationPhase 14279.261(d)Borrower and its advisors, in an active electronic format
    Audited financial statements; balance sheet not over 90 days old; pro forma at startupPhase 14279.261(c)Borrower and its accountant
    Scoring informationPhase 14279.261(g)Borrower and lender
    Appraisal, with Phase I environmental site assessmentPhase 24279.261(k)(2), 4279.244State certified general appraiser; specialized appraiser
    Credit rating with recovery analysis (eligible costs of $25 million or more)Phase 24279.261(k)(5)Nationally recognized statistical rating organization
    Lender's credit evaluation with sensitivity reviewPhase 24279.261(k)(6), 4279.215Lender
    Technical assessmentPhase 24279.261(k)(8)Qualified independent engineer
    Environmental documentationPhase 24279.261(k)(4)Under 7 CFR part 1970

    The business plan line deserves attention. The rule lets the borrower omit any or all of the ten business plan items if they are in the feasibility study [1]. A study that covers ownership and affiliates, succession, management experience, products and strategy, vendors and models of major components, resource availability, site and distribution, market and competition, three years of stabilized projections and the use of funds removes a document and a source of inconsistency from the file.

    Eligibility: borrower, project and lender

    TestRuleWhat the study or application must show
    Borrower typeIndividual, entity, tribe, state or local government unit, farm cooperative, farmer cooperative organization, association of agricultural producers, national laboratory, institution of higher education, rural electric cooperative, public power entity, or a consortium (4279.209(a))Organizational documents and ownership chart
    Borrower exclusionsBorrower or certain owners with a federal judgment, delinquent federal taxes or debt, or debarment (4279.209(b))Certifications
    LocationProject in a State (4279.210(a)); a rural location earns 5 points but is not requiredSite description
    Project typeCommercial-scale biorefinery using eligible technology, or technologically new commercial-scale biobased product manufacturing (4279.210(b))Technology description and commercial-scale evidence
    EquitySignificant cash equity from the borrower and principals; loans to the project are not equity (4279.210(c))Sources and uses; equity commitments
    LenderFederal or state chartered bank, Farm Credit institution with direct lending authority, Bank for Cooperatives, examined credit union, or the National Rural Utilities Cooperative Finance Corporation; well capitalized; experienced in similar projects (4279.208)Lender eligibility file

    Four definitions decide most eligibility questions, and a study that does not address them leaves the reviewer to do it.

    DefinitionWhat it requiresWhere the study proves it
    Advanced biofuelFuel from renewable biomass other than corn kernel starch, including cellulosic, sugar and starch (other than corn-starch ethanol), waste-derived, renewable diesel-equivalent, biogas and butanol (4279.202)Market and technical sections
    Eligible technologyA technology adopted in a viable commercial-scale biorefinery, or one demonstrated to have technical and economic potential for commercial application (4279.202)Technical section, scale-up history
    Commercial-scaleRevenue recovers full project cost with an investor-grade return; profitable without public or private subsidies after construction (volumetric excise tax not counted); feedstock contracts adequate for proposed off-take; market entry, transport infrastructure and competitive products (4279.202)Financial and market sections; subsidy-free case
    Technologically newEquipment, process or method whose first commercial-scale U.S. use was within the last five years and which is used in no more than three U.S. commercial-scale facilities (4279.202)Technical section, for biobased product manufacturing

    The commercial-scale test is the one most often under-documented. It asks the study to show profitability without subsidies, which means the financial section needs a case that strips out tax credits, carbon credits and renewable identification number value and still recovers the project's cost.

    Eligible project costs (4279.210(d))Ineligible project costs (4279.210(e))
    Equipment purchase and installation, including an integrated demonstration unit later used in the projectDistributions to owners or relatives who keep an ownership share
    New construction or retrofitting, land, site work, contingency reservesAny line of credit
    Permit and license fees; professional services, including loan packagers (not finders)Equipment and processes for turning corn kernel starch into biofuel
    Working capital; insurance and bondsPayments above actual cost on less-than-arm's-length or conflicted contracts
    Financing costs and capitalized construction interest (not the guarantee or renewal fees)
    Debt service reserve and other required cash reserves
    Limited refinancing of interim construction loans or up to 20% of the loan to secure a first lien

    Professional fees for planning and developing the project, including the feasibility study, are eligible uses of loan proceeds when reasonable and customary in the area [1].

    What the feasibility study must contain: Table 1

    Table 1 of 4279.261(e) lists the elements of an acceptable study. The list below follows its seven parts; the right-hand column is what a Rural Development reviewer and the lender will test in each [1].

    PartRequired elementsWhat the reviewer tests
    (A) Executive summaryProject overview; separate determinations of economic, market, technical, financial and management feasibility; recommendations for implementationWhether each determination is an actual finding, not a description
    (B) Economic feasibilityFeedstock description and confirmation it is not already used for advanced biofuels or biobased products; feedstock source management, volumes and costs, collection, pre-treatment, transport, storage and risks; proof that federal or public woody biomass cannot be used for a higher-value product; impacts on similar biorefineries and on plants using similar feedstock in the supply area; resource conservation, public health and environmental effects; site; trained or trainable labor; utilities, rail, air and road; jobs and rural economic impact; work with producer associations or cooperativesFeedstock draw area and competing demand; contract coverage; labor and infrastructure evidence
    (C) Market feasibilitySales organization; market and market area; marketing plan for principal products and byproducts; competition and similar facilities; off-take commitments, their duration and counterparty strength; industry status, market risks, competitive threats and advantagesSigned contracts versus letters of intent; counterparty ratings; price assumptions
    (D) Technical feasibilitySite suitability; scale at which the process is proven (pilot, demonstration or semi-work scale) with results; integration of processes and integrated demonstration unit results; specific volume; operation and development costs with stated accuracy; project timeline through commissioning and ramp-up; commercial replicability; construction, production, regulatory, design and scale-up risksConsistency with the independent engineer's assessment; scale-up gap
    (E) Financial feasibilityReliability of projections and assumptions, all sources and uses; projected statements over the project's useful life; dependence on investment and productivity incentives, loans and grants, renewable identification numbers, tax credits and other credits; constraints; ability to achieve income and cash flow; cost accounting; short-term credit; raw materials; sensitivity analysis on feedstock and energy costs and product and byproduct prices; project, financing, operational and tax risksSubsidy dependence; coverage under stress; ramp-up cash
    (F) Management feasibilityExperience in producing the product, acquiring feedstock, selling off-take and receiving federal assistance; plan for feedstock and labor procurement, marketing and succession; company-stage, conflict-of-interest and management risksOperator depth for a first-of-a-kind plant
    (G) QualificationsResume or statement of qualifications of the author and contributors, including prior experienceIndependence and relevant experience

    Two parts of Table 1 have no close parallel in a Business and Industry study. The economic section must look outward at the effect of the project on other biorefineries and on existing plants using the same feedstock, and that finding earns 5 scoring points only when it is established "through an independent third-party Feasibility Study" [1]. And the financial section must quantify how far the project depends on credits and subsidies, which feeds both the 90% guarantee test and a 4-point scoring criterion.

    The technical report and the 120-day demonstration

    Rural Development's technical feasibility determination is based on the technical report [1]. Part 4279 requires that every project use an independent, third-party professional engineer and that the assessment show the design, procurement, installation, startup, operation and maintenance will let the project perform as specified over its useful life, reliably and cost-effectively, on verifiable data [1].

    Technical report section (4279.261(k)(8))Content
    (i) Qualifications of project teamDelivery method (design-bid-build or design-build), component manufacturers' history and installed units at scale, team credentials and references, operator qualifications
    (ii) Agreements and permitsCodes, zoning, licenses, land use agreements, emissions and effluent permits, warranties, environmental issues, with schedules
    (iii) Resource assessmentType, quantity and storage of feedstock; competing uses; shipping and receiving; invasive species controls
    (iv) Design and engineeringComplete integrated facility design; monthly and annual performance; effect of feedstock interruption; site, foundations, backup equipment; site control for at least the financing term
    (v) Project development scheduleEach task from resource assessment through startup and shakedown
    (vi) Equipment procurementAvailability and delivery within the schedule
    (vii) Equipment installationSite development, installation plan, startup and shakedown conditions
    (viii) Operations and maintenanceWarranties, spare parts, maintenance schedules, useful life and major replacements, operating costs and staffing, risk plan for major component failures
    (ix) DecommissioningProcess, requirements and costs

    Where a technology has no history of successful use in a commercial-scale biorefinery, the borrower must provide, before a conditional commitment is issued, evidence of 120 days of continuous, steady-state production from an integrated demonstration unit, reported in 30-day intervals and proving yield and quality consistent with the commercial design basis [1]. The feasibility study's yield, uptime and ramp-up assumptions should be the ones that demonstration supports. A study that projects design output in year one while the demonstration ran below design is the inconsistency a reviewer looks for first.

    Guarantee terms you can confirm

    Loan amountMaximum guaranteeSource
    Up to $125 million80%, or 90% if total federal participation is not over 60% of eligible project costs, feedstock and off-take agreements run at least one year, and tax credits, carbon credits and other subsidies are not over 10% of annual revenue in the base case4279.232(c)(1)
    Over $125 million and under $150 million80%4279.232(c)(2)
    $150 million to under $200 million70%4279.232(c)(3)
    $200 million to $250 million60%4279.232(c)(4)
    FeeRateBasis
    Guarantee fee, 90% guarantee3.0%Loan x guarantee % x rate, paid once at loan note guarantee issuance (4279.231(a)(1))
    Guarantee fee, under 90%, loan over 75% of eligible costs2.0%4279.231(a)(2)(i)
    Guarantee fee, under 90%, loan over 65% to 75%1.5%4279.231(a)(2)(ii)
    Guarantee fee, under 90%, loan 65% or less1.0%4279.231(a)(2)(iii)
    Annual renewal fee, loan originally over 75% of eligible costs1.00%Outstanding principal at 31 December x rate x guarantee %, due 31 January, payable during construction (4279.231(b))
    Annual renewal fee, over 65% to 75%0.75%4279.231(b)(4)(ii)
    Annual renewal fee, 65% or less0.50%4279.231(b)(4)(iii)

    These are the rule's default rates; the rule allows the Agency to set others by Federal Register notice [1].

    TermRule
    Loan sizeUp to 80% of eligible project costs; reduced dollar for dollar by other direct federal loans or grants; borrower supplies at least 20% from non-federal sources (4279.232(a), (b))
    Interest rateNegotiated, fixed or variable, no higher than the lender charges similar non-guaranteed loans; variable rates tied to a published base and adjusted no more than quarterly; changes between conditional commitment and guarantee need Agency approval (4279.233)
    TermLesser of 20 years from closing or useful life; first full installment within three years of the note; no balloon except release of the debt service reserve (4279.234)
    CollateralFirst lien on all project assets, the same for guaranteed and unguaranteed portions (4279.235)
    Lender retentionAt least 7.5% of the loan, from the unguaranteed portion (4279.224)
    GuarantorsUnconditional guarantees from owners of 20% or more for the full term; others when warranted; may be required to be secured (4279.245)
    AppraisalReal estate collateral over $250,000; not over one year old; "as-completed" value for construction; Phase I environmental site assessment (4279.244)
    ConstructionIndependent professional design and cost estimate; onsite inspector or independent engineer; firm fixed-price EPC contract with performance guarantees or equivalent contracts; contingencies agreed with the Agency; 100% performance and payment bonds or a secured parent guarantee; borrower bears changes and overruns (4279.256)
    ReportingMonthly construction reports; quarterly progress reports through steady-state design capacity; annual reports and inspections for the life of the loan (4279.256(i), 4279.290)

    The 9 July 2026 final rule changed the servicing side. Debt write-downs are now prohibited where the same owners or principals keep control of the business, except under the Bankruptcy Code, and borrowers, guarantors and related parties not at arm's length are prohibited from remaining involved in a project whenever the Agency takes a loss [2]. For a sponsor, the practical meaning is that there is no path to keep a failed plant after a loss claim, which makes the downside cases in the feasibility study more than a formality.

    Scoring: where the study earns points

    Rural Development scores each Phase 1 application that meets the minimum technical and economic feasibility requirements, out of 125 points; an application needs at least 55 points to be considered for a guarantee [1].

    Criterion (4279.266)MaximumWhat the feasibility study supplies
    (a) Established market: off-take commitment (6), duration (6), counterparty credit rating (4), subsidy dependence (4)20Contract status, terms, counterparty ratings, base-case subsidy share
    (b) No similar facilities in the feedstock supply area5Supply-area mapping of existing facilities
    (c) Feedstock not previously used commercially for these products10Feedstock history
    (d) Feedstock from producer associations or cooperatives (50% = 5 points; 30% = 3 points)5Supply plan by source
    (e) Financial participation: loan plus other direct federal funding as a share of eligible costs (50% or less = 20 points, falling to 4 points at 70%)20Sources and uses
    (f) Positive effect on resource conservation, public health and the environment (3, 6 or 10 points; 5 deducted for food or feed feedstock)10Impact analysis
    (g) No economically significant negative impact on existing plants using similar feedstocks, established through an independent third-party feasibility study (none for wood pellets)5Competitive impact finding
    (h) Rural economic development: rural location (5), wages above county median household wages (5), majority of feedstock harvested from the land (10)20Site, wage and feedstock data
    (i) Local ownership over 20% (3) or over 50% (5)5Ownership analysis
    (j) Commercial replicability, regional (5) or national (10)10Replication analysis
    (k) Technology not yet operating at commercial scale as of 1 October of the funding year5Technology status
    (l) Administrator bonus points for portfolio diversity and partnerships10Not controlled by the applicant

    Most of these points rest on facts the feasibility study establishes. Criterion (g) is the clearest case: the rule awards its points only when the finding comes from an independent third-party study [1].

    How the 9003 study compares with a Business and Industry study

    ItemSection 9003Business and Industry (B&I)
    When a study is requiredEvery Phase 1 application [1]Guaranteed loans over $1 million to a new business; discretionary otherwise [3]
    Content standardTable 1 in 4279.261(e), with feedstock, competitive-impact and subsidy-dependence elements [1]Appendix A to subpart D of part 5001 [3]
    Technical reviewIndependent professional engineer required on every project [1]Depends on project; technical feasibility is one of five components [3]
    Loan ceiling$250 million [1]$25 million [3]
    Guarantee share60% to 90% by loan size and conditions [1]85% under $5 million and 80% from $5 million to $25 million in FY2026 [4]
    Application timingTwo deadlines a year with ranking [1]Continuous [3]

    The same consultant can prepare both kinds of study, but a B&I study reformatted for a 9003 file will usually miss the competitive-impact finding, the subsidy-free case and the feedstock supply-area analysis that Table 1 requires.

    Worked example: structure, fees and coverage (illustrative)

    This example uses an assumed project with eligible project costs of $150 million, an illustrative fixed rate of 7.0% and a 20-year level annual amortization. It shows how the loan size and guarantee choice change fees, coverage and scoring. It is not a quote, and actual rates are negotiated between the lender and borrower [1].

    StructureA: $90M loan, 90% guaranteeB: $90M loan, 80% guaranteeC: $120M loan (maximum)D: $75M loan
    Loan as share of eligible costs60%60%80%50%
    Guarantee90% (if all three conditions met)80%80% (federal share over 60%, so no 90%)80%
    Guaranteed amount$81,000,000$72,000,000$96,000,000$60,000,000
    Guarantee fee rate3.0%1.0%2.0%1.0%
    One-time guarantee fee$2,430,000$720,000$1,920,000$600,000
    Annual renewal fee rate0.50%0.50%1.00%0.50%
    First-year renewal fee on the full balanceabout $405,000about $360,000about $960,000about $300,000
    Non-federal funds required$60,000,000$60,000,000$30,000,000$75,000,000
    Annual debt service (7.0%, 20 years)$8,495,363$8,495,363$11,327,151$7,079,469
    Cash flow needed for 1.25x coverage$10,619,204$10,619,204$14,158,939$8,849,337
    Financial participation points (criterion e)1212020

    The 90% guarantee in column A is a maximum the rule allows when the conditions are met; it comes with the 3.0% fee rate, so on these numbers the extra 10 points of guarantee cost $1,710,000 more at closing than column B and about $45,000 more in the first renewal year. Column C shows the opposite trade: borrowing the maximum halves the equity requirement but doubles the renewal rate, adds $2.8 million to annual debt service and scores no financial participation points. Column D buys 8 more scoring points than A or B with $15 million more equity.

    Operating sensitivity for the $90 million loan (illustrative)

    CaseProduct revenueCredit and subsidy revenueFeedstock costOther operating costCash flow before debt serviceCoverage
    Base$54,000,000$6,000,000 (10.0% of revenue)$27,000,000$15,000,000$18,000,0002.12x
    Feedstock cost +20%$54,000,000$6,000,000$32,400,000$15,000,000$12,600,0001.48x
    Product price -15%$45,900,000$6,000,000$27,000,000$15,000,000$9,900,0001.17x
    Credits and subsidies to zero$54,000,000$0$27,000,000$15,000,000$12,000,0001.41x
    Feedstock +20% and price -10%$48,600,000$6,000,000$32,400,000$15,000,000$7,200,0000.85x
    Output at 80% of design$43,200,000$4,800,000$21,600,000$15,000,000$11,400,0001.34x

    "Cash flow before debt service" here is revenue less feedstock and other operating costs, before taxes, capital spending and reserves; a real study would also model those. Three points follow from the table. The base case meets the 10% subsidy limit exactly; if credit revenue were $9 million on $54 million of product sales, the subsidy share would be 14.3%, the project would lose eligibility for the 90% guarantee and drop from 4 to 2 points under criterion (a)(4) [1]. The single-variable cases look survivable, but the combined feedstock and price case does not cover debt service, which is exactly the correlation a biorefinery faces when commodity markets move together. And the 80% output case is the first-of-a-kind ramp-up risk in numbers; Table 1 asks the study to address scale-up risk and the technical report to support the yield the model uses [1].

    Process and timeline

    StepTiming or rule
    Letter of intent identifying borrower, lender, sponsors, project, feedstock, technology, products, cost and loan requestAt least 30 calendar days before the application deadline (4279.260(a)(1))
    Phase 1 application, including the feasibility study, financial model and business planDeadlines 1 October and 1 April unless a Federal Register notice says otherwise; incomplete applications rejected (4279.260(b), (c))
    Eligibility and technical and economic feasibility determinationOn a complete Phase 1 application (4279.265)
    RankingBy about 31 October and 30 April; up to 50% of budget authority (excluding biobased product manufacturing) for the first window (4279.267(a), (b))
    Invitation to Phase 2Highest scores first, minimum 55 points, subject to budget authority and other funding (4279.267(c))
    Unselected ranked applicationsCarried forward one more application cycle (4279.267(d))
    Phase 2Appraisal, loan agreement terms, environmental documentation, credit rating, lender credit evaluation, technical assessment (4279.261(k))
    120-day integrated demonstration evidenceBefore the conditional commitment, for technology without commercial-scale history (4279.265(b)(2))
    Conditional commitmentVoid unless accepted by lender and borrower within 60 days (4279.278(b))
    Closing and loan note guaranteeLender certifies 16 conditions, including no material adverse change (4279.281)
    After constructionAnnual borrower reports and annual inspections for the life of the loan (4279.290)

    Deadlines can move. In December 2024 USDA reopened the 1 October 2024 deadline and extended it to 31 December 2024 by Federal Register notice [5]. USDA's 2024 information collection estimate for the program counted 26 respondents and 7,803 total burden hours [6]. For the study itself, the practical schedule works backward from the letter of intent: feedstock and off-take evidence, the demonstration data and the engineer's scope must exist before the study can reach conclusions.

    Why 9003 feasibility studies get sent back

    • No subsidy-free case, so the commercial-scale test is unanswered.
    • Off-take described as "strong interest" without stating whether agreements are signed, letters of intent or letters of interest, the three levels the scoring rule distinguishes.
    • Feedstock volumes quoted without a draw area, competing users or contract terms.
    • No finding on effects on other biorefineries or plants using similar feedstock.
    • Yields and uptime that exceed what the pilot, demonstration or semi-work scale results support.
    • A single-variable sensitivity analysis where feedstock and product prices plausibly move together.
    • The study, the financial model and the independent engineer's report use different capacity, cost or schedule figures.
    • The author has a role in the project, or the qualifications statement is missing.

    Hiring a Section 9003 feasibility study consultant

    The rule leaves the choice of consultant to the borrower and lender but sets the bar: qualified, independent, third party, with prior experience documented in the qualifications section [1]. Ask any candidate to show where each Table 1 element will appear, how the study will reconcile with the independent engineer, and whether it will deliver the five separate determinations and a recommendation. Professional fees for planning and developing the project, including the study, are eligible uses of loan proceeds when reasonable and customary [1], and an agent may not act as both loan packager and loan service provider on the same loan [1].

    What this site provides on a 9003 engagement is the independent feasibility study: economic, market, financial and management analysis, the subsidy-free and combined-stress cases, the competitive-impact finding, the executive determinations and recommendation, and the authors' qualifications. The technical assessment is the independent engineer's; engineering, environmental site assessments, appraisals and legal work are outside the site's scope [7]. The study is written to be consistent with the engineer's report, and the financial projections are built to the monthly-then-annual format of 4279.261(d) so the lender's model and the study can be reconciled.

    The site's cost page does not list Section 9003. Its published tiers top out at complex OneRD engagements of $9,500 to $18,000 over 7 to 10 weeks [7]; a 9003 study is scoped and quoted individually, at a firm fixed fee in a written proposal, after a fifteen-minute scoping call [7][8]. What you provide: technology and demonstration data, the engineer's scope or draft report, feedstock and off-take agreements or term sheets, the sources and uses, the financial model, ownership documents and management resumes.

    Request a scoped proposal for your Section 9003 feasibility study at the contact page. A senior analyst responds within one business day [8].

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Section 9003 loan guarantee require a feasibility study?

    Yes. Every Phase 1 application must include one under 7 CFR 4279.261(e), prepared by a qualified, independent third party and covering the seven parts of Table 1: an executive summary with separate feasibility determinations and recommendations, economic, market, technical, financial and management feasibility, and the qualifications of the author and contributors. Rural Development's feasibility determination rests on the study, the technical report and the lender's credit evaluation, and projects found without technical or economic feasibility are not selected.

    Who can prepare a 9003 feasibility study?

    A qualified, independent third party. The study must include a resume or statement of qualifications of its author and contributors with prior experience. The rule's definitions of conflict of interest and arm's-length transaction exclude anyone with a competing financial or professional interest in the project, which in practice rules out the technology provider, EPC contractor, developer, equity investors and the loan packager.

    What is the difference between the feasibility study and the technical report?

    The feasibility study, in Phase 1, evaluates all five dimensions of feasibility and ends in determinations and a recommendation. The technical assessment, in Phase 2, is prepared by a qualified independent professional engineer and shows that the design, procurement, installation, startup, operation and maintenance will let the plant perform as specified over its useful life. Rural Development bases its technical feasibility finding on the technical report, so the study's yield, cost and schedule assumptions should match it.

    How much can a Section 9003 guarantee cover?

    Loans up to $250 million to one borrower, limited to 80% of eligible project costs, with total federal participation also capped at 80%. The guarantee is 80% for loans up to $125 million, or 90% if federal participation is at most 60% of eligible costs, feedstock and off-take agreements run at least a year and subsidies are at most 10% of base-case revenue; 80% up to $150 million; 70% up to $200 million; and 60% up to $250 million.

    What fees does the program charge?

    By default, a one-time guarantee fee of 3.0% of the guaranteed amount for a 90% guarantee, or 2.0%, 1.5% or 1.0% for a lower guarantee depending on whether the loan is over 75%, over 65% or at most 65% of eligible costs. An annual renewal fee of 1.00%, 0.75% or 0.50% on the same bands applies to the outstanding balance times the guarantee share, including during construction. The Agency can set other rates by Federal Register notice.

    How long can a 9003 loan run?

    No longer than the lesser of 20 years from closing or the project's useful life as determined by the lender and confirmed by the Agency. The first full payment of principal and interest must fall due within three years of the note, interest must be paid at least annually during any interest-only period, and balloon payments are not allowed except for a final payment from the debt service reserve account.

    When are Section 9003 applications due?

    Phase 1 deadlines are 1 October and 1 April each year unless the Agency sets others by Federal Register notice, and a non-binding letter of intent is due at least 30 calendar days before the deadline. Applications are ranked by about 31 October and 30 April. In December 2024, for example, USDA reopened the 1 October 2024 deadline to 31 December 2024 by notice, so check the Federal Register before planning around a date.

    How are 9003 applications scored?

    On 125 points across off-take and subsidy dependence, feedstock novelty and supply area, cooperative feedstock supply, financial participation, environmental and health effects, impact on existing plants, rural development, local ownership, replicability and technology status, plus up to 10 Administrator points. A minimum of 55 points is needed to be considered. The 5 points for showing no significant harm to existing plants require an independent third-party feasibility study.

    How much equity does a 9003 project need?

    At least 20% of eligible project costs from non-federal sources, because the loan and total federal participation are each capped at 80%. The rule also requires a significant cash equity investment from the borrower and principals, and loans to the project do not count as equity. Lower federal participation earns more scoring points: 20 points at 50% or less, 12 at 60%, and none above 70%.

    How much does a Section 9003 feasibility study cost?

    This site quotes each engagement at a firm fixed fee in a written proposal. Its cost page does not list Section 9003; its highest published tier, complex OneRD engagements, runs $9,500 to $18,000 over 7 to 10 weeks, and a 9003 study is scoped individually because of its size and technical content. Reasonable professional fees for planning and developing the project, including the study, are eligible uses of loan proceeds.

    What changed in the July 2026 rule?

    The final rule effective 9 July 2026 amended the servicing subpart. It prohibits debt write-downs where the same owners or principals keep control, except under the Bankruptcy Code, and prohibits borrowers, guarantors and related parties not at arm's length from remaining involved in a project after the Agency takes a loss. The loanmaking rules in part 4279 subpart C, including the feasibility study requirements, were not changed.

    Can one study serve both a 9003 application and a Business and Industry loan?

    Only if it is written to the 9003 standard. Table 1 adds elements a B&I study under Appendix A does not require: feedstock source analysis and supply-area impacts, effects on existing plants using similar feedstock, dependence on renewable identification numbers and tax credits, and the qualifications of every contributor. A 9003-grade study generally covers what a B&I reviewer needs, but the financing section must model each structure under consideration.

    Sources

    [1] 7 CFR part 4279 subpart C, Biorefinery, Renewable Chemical, and Biobased Product Manufacturing Assistance Loans (CFR 2026 edition, title 7 vol. 15, revised 1 Jan 2026), govinfo; sections 4279.201 to 4279.290. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part4279.xml (accessed 8 Nov 2026)

    [2] USDA RBCS, Revisions to the Biorefinery, Renewable Chemical, and Biobased Product Manufacturing Assistance Loan Program, final rule, 91 FR 42335 (9 Jul 2026), effective 9 Jul 2026, amending 7 CFR 4287.345(c) and adding 4287.358(h). https://www.govinfo.gov/content/pkg/FR-2026-07-09/html/2026-13841.htm (accessed 8 Nov 2026)

    [3] 7 CFR part 5001, OneRD Guaranteed Loans (CFR 2026 edition, title 7 vol. 15), govinfo; sections 5001.303, 5001.306, 5001.406, appendix A to subpart D. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 8 Nov 2026)

    [4] USDA, OneRD Annual Notice of Guarantee Fee Rates ... for Fiscal Year 2026, 91 FR 11272 (9 Mar 2026). https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 6 Nov 2026)

    [5] USDA RBCS, Notice of Extension of Application Deadline for Biorefinery, Renewable Chemical, and Biobased Product Manufacturing Assistance Program, 89 FR 100949 (13 Dec 2024). https://www.govinfo.gov/content/pkg/FR-2024-12-13/html/2024-29361.htm (accessed 8 Nov 2026)

    [6] USDA, Submission for OMB Review; Comment Request (Biorefinery, Renewable Chemical, and Biobased Product Manufacturing Assistance Program), 89 FR 18591 (14 Mar 2024). https://www.govinfo.gov/content/pkg/FR-2024-03-14/html/2024-05431.htm (accessed 8 Nov 2026)

    [7] usda-feasibility-study.com, USDA Feasibility Study Cost & Timeline (site page). https://usda-feasibility-study.com/usda-feasibility-study-cost (read 8 Nov 2026)

    [8] usda-feasibility-study.com, Contact & Request a Proposal (site page). https://usda-feasibility-study.com/contact (read 8 Nov 2026)

    [9] usda-feasibility-study.com, Section 9003: The $250 Million USDA Loan Guarantee Most Applicants Have Never Heard Of (site article). https://usda-feasibility-study.com/blog/usda-section-9003-biorefinery-loan-guarantee (read 8 Nov 2026)

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours