Vermont has four times the national density of RV parks and campgrounds, 6.2 per 100,000 residents against 1.5, and the count rose from 36 to 40 between 2019 and 2023. Yet no Vermont campground took an SBA 7(a) loan in FY2020 to FY2026, and only one took a 504 loan ($249,000). Almost every park is a micro business: all 37 parks with a reported size class have fewer than five employees on the March payroll. Where the loan files are silent, the feasibility study for a Vermont campground must do the talking: it has to show that a brief, rain-prone season yields enough paid site-nights, at a rate campers here will pay, to keep the mortgage current while the gate is chained shut.
RV parks and campgrounds in Vermont: market evidence
Vermont: RV parks and campgrounds, supply and rural footprint
| Measure | Vermont | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 36 → 40 (+11.1%) | 4,586 → 5,016 |
| Per 100,000 residents (2023) | 6.2 | 1.5 |
| Average employees per establishment | 1.8 | 5.2 |
| Average annual pay per employee | $64,740 | $38,654 |
| Share of establishments in non-metro counties | 64.7% (22 in 5 counties) | |
| Share of state population in non-metro counties (2025) | 64.7% |
Non-metro counties with the most RV parks and campgrounds (2023): Windham County (5); Windsor County (5); Addison County (4); Caledonia County (4); Orange County (4).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
What the small numbers say, and what they do not. The $64,740 pay figure is not a wage benchmark. Census takes its headcount from the pay period containing 12 March, when nearly every Vermont campground is shut, while its payroll figure spans all twelve months. A park with one year-round manager in March and a dozen seasonal workers in July shows 1.8 employees sharing a full year's payroll, which inflates pay per head. The same quirk makes the 73 employees counted in 2023 (52 in 2019) a floor, not a measure of summer staffing. Payroll per park, $118,150 against $202,772 nationally, is the more useful figure: Vermont parks are small, owner-run operations. Growth of 11.1 percent outpaced the national 9.4 percent, so the sector is adding parks despite the absence of SBA lending, which suggests they are financed with owner equity, seller financing or local bank loans that do not appear in these data.
Where the parks are
The county file places 34 of the 40 parks. Grand Isle County, in Lake Champlain, has 5 parks for 7,511 residents (6.66 per 10,000), the highest density in the state, followed by Windham and Windsor (5 each), Addison, Caledonia, Franklin and Orange (4 each) and Chittenden (3). Grand Isle and Franklin are metro counties under the OMB delineation because of commuting ties to Burlington, which shows how poorly the metro label describes a lakeside campground. Counties with fewer than three parks are not shown.
Regional comparison (other states' packs)
In Maine's pack, campgrounds number 141 (10.1 per 100,000 people, 6.0 percent more than in 2019), and lenders there made 11 7(a) campground loans from FY2020 through FY2026 at an average of $1,019,609. New Hampshire's shows 77 parks (5.5 per 100,000), down 4.9 percent, and seven 7(a) loans averaging $539,071, with 72.0 percent of its parks in non-metro counties. New York has 224 parks but only 1.1 per 100,000 residents. Both New England neighbours show the same March-payroll quirk (pay of $75,974 in Maine and $58,566 in New Hampshire). The comparison that matters is lending: Maine and New Hampshire lenders financed campgrounds through 7(a) in recent years; Vermont lenders did not.
National benchmarks
Nationally, 467 SBA 7(a) loans went to RV parks and campgrounds in FY2020 to FY2026, averaging $1,256,324, and 197 504 loans averaged $848,061. Across the U.S., the 349 campground 7(a) loans approved from FY2010 through FY2016 have a 3.7 percent charge-off rate, with the typical loss arriving 68 months in.
Demand, revenue and costs
Demand comes from RV owners and tent campers within a day's drive, seasonal site holders who rent for the whole season, and visitors drawn by a lake, river, trail network, ski area or event venue nearby. The income model prices each kind of site separately (full hook-up, water and electric only, tent pad, cabin, glamping tent), multiplies by occupied nights, then layers on seasonal leases and the small lines: camp store, firewood, propane, laundry and activities. Costs are labour (mostly seasonal), utilities for electric pedestals and water, septic or wastewater operation, insurance, property tax, reservation software and card fees, and maintenance. Capital items are land, roads and site pads, electric, water and sewer or septic for each site, bathhouses, a store and office, recreation amenities, and any cabins or glamping units.
Rural footprint and B&I eligibility in Vermont
The 22 placed non-metro parks are 64.7 percent of the placed total, identical to the non-metro share of Vermont's population; the density is 5.3 parks per 100,000 residents in both metro and non-metro counties. Under 7 CFR 5001.3, B&I excludes only sites inside a city or town above 50,000 or the urbanized area attached to it. Burlington, Vermont's biggest city, had 44,019 people in 2025, so no lakeside campground in Grand Isle or Franklin County fails on population; USDA still rules on the exact parcel. The Vermont state guide sets out the rural test.
Owners holding 20 percent or more sign personal guarantees (5001.204), and neither they nor the company may be debarred or carry unpaid federal judgments, taxes or loans (5001.127).
Program fit
A rural campground can use B&I to buy land, cut roads and pads, run power and water to sites, build a bathhouse or cabins and fund opening working capital; below $5 million the guarantee is 85 percent and the amortization can follow the life of the improvements. Its long amortization is useful for a business whose cash arrives in a few months. SBA's two programs remain open to Vermont parks, but since FY2020 only that lone 504 loan has been made. REAP can fund efficiency or solar for an operating park under the October 2026 rule; EV charging pedestals are excluded from REAP. Community Facilities does not fund private campgrounds. Owners adding glamping units, cabins or an event space should check whether those elements change the project's risk profile and appraisal.
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee | 85% under $5 million | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount; plus 0.50% if issued before construction completion | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed balance on 31 December | 91 FR 11272; 7 CFR 5001.455 |
| Term | useful life, 40 years at most, no balloon; first full payment within 3 years | 7 CFR 5001.402 |
| Equity, existing park | 10% balance sheet equity (or 9:1), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new park | 20% balance sheet equity (or 4:1), or 25% of project cost | 7 CFR 5001.105(d)(4) |
| Seasonal borrowers | quarterly cash flow analysis | 7 CFR 5001.202 |
| Independent feasibility study | required above $1,000,000 for a new business | 7 CFR 5001.306(a)(3)(i) |
| SBA 504, for comparison | 10% borrower; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
Financing benchmarks: USDA B&I next to SBA
Vermont: SBA lending to RV parks and campgrounds
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 2 | $275,000 | 1 | $176,000 |
| FY2017 to FY2019 | 3 | $2.4 million | 1 | $405,000 |
| FY2020 to FY2023 | 0 | $0 | 1 | $249,000 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
| Vermont had fewer than 30 seasoned 7(a) loans for RV parks and campgrounds; nationally, 3.7% of 349 FY2010 to FY2016 loans were charged off, on average 68 months after approval. |
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Eight loans in 17 years. Vermont's campground lending totals five 7(a) and three 504 loans since FY2010. The largest group, three 7(a) loans in FY2017 to FY2019, totalled $2.4 million, an average of $800,000, which hints at what a purchase or expansion costs; the most recent loan, a $249,000 504 loan, is the only one since FY2020. With no current local lending benchmark, a Vermont lender will judge the project on the study's evidence, the sponsor's equity and the national figures above.
Worked example (illustrative)
With no Vermont 7(a) campground loans to average since FY2020, the example borrows $1,260,000, close to the U.S. figure of $1,256,324, fixed at an assumed 7.75 percent and repaid over 25 years.
| Input or result | Value |
|---|---|
| Loan amount | $1,260,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% |
| Guaranteed amount | $1,071,000.00 |
| Upfront guarantee fee (3.0%) | $32,130.00 |
| Upfront fee if issued before construction completion (3.5%) | $37,485.00 |
| First annual retention fee (0.55% of the guaranteed share after 12 payments) | $5,810.29 |
| Monthly payment | $9,517.14 |
| Annual debt service (NOI for 1.00x) | $114,205.71 |
| NOI for 1.25x coverage | $142,757.14 |
| Coverage at that NOI with a rate 2 points higher | 1.06x |
| Coverage if NOI falls 20% | 1.00x |
| Equity, new park, 25% of project cost (5001.105(d)(4)) | $420,000.00 |
| Total project cost on that basis | $1,680,000.00 |
| Equity, new park, 20% balance sheet route (loan as sole liability) | $315,000.00 |
| Equity, existing park, 10% of project cost (5001.105(d)(1)) | $140,000.00 |
| Independent study under 5001.306(a)(3) | required for a new business |
Occupied-site-night test. Assume 80 sites open for an illustrative 150-night season at 60 percent average occupancy, or 7,200 occupied site-nights. The park must earn $19.83 of net operating income per occupied site-night, after every cost, to reach 1.25x, and $15.86 to cover debt; per site, that is $1,784.46 of NOI a season. The study converts that margin into a required nightly rate by adding operating cost per site-night, then checks the rate against nearby parks.
Off-season reserve. If the park earns essentially all of its income in about six months, the six monthly payments due while it is closed total $57,102.84. Part 5001.202 has the lender analyse seasonal borrowers by quarter, so the study should show cash at the end of each quarter and size a reserve, or a working capital line, that covers the closed months even after a wet summer.
Evidence the study must build when local comparables are thin
- A survey of every campground within the drive market: site counts by type, nightly and seasonal rates, open dates, occupancy where operators will share it, and waiting lists for seasonal sites.
- Demand generators near the site (lakes, rivers, trails, ski areas, events) with visitor counts where they exist.
- Signed or reserved seasonal site agreements, or letters of intent, for any seasonal share of revenue.
- Weather sensitivity: the share of revenue lost in a wet or cold month, using local weather history.
- Utility capacity: power for pedestals, water supply and septic or wastewater approvals for each site.
- Staffing plan for the season, priced from actual seasonal wages rather than the Census average.
- Permits and land use approvals for new sites or expansion, including any Act 250 permit.
- Off-season cash and reserve needs, quarter by quarter.
Risks and mitigants
Weather is the first risk: a rainy July can erase a large share of a season. A high share of seasonal site holders, booked in advance, steadies revenue. Flooding near lakes and rivers threatens sites and infrastructure, so flood maps and insurance cost are underwriting items. Septic and water capacity can cap growth. Owner dependence is high in a business with 1.8 recorded employees, so key-person planning and management depth matter to the lender. Campground improvements have limited value apart from the business, and 5001.203 appraisals deduct going concern value.
Process and documents
After its own analysis, the bank forwards the B&I package and study to USDA's Vermont Rural Development office. The sponsor supplies the site plan and number of sites by type, utility and septic approvals, rate sheets and reservation data for an existing park, three years of statements, seasonal site agreements, the capital budget, resumes and personal financial statements. Reviewers send back studies that project peak-season occupancy across the whole season, ignore the closed months, or rely on statewide supply figures.
Program example
None. The inputs name no USDA-financed Vermont campground.
Hiring a USDA RV park feasibility study consultant in Vermont
A newly organised campground company that needs more than $1,000,000 of B&I credit must deliver an outside study whose content USDA dictates (5001.306(a)(3)(i)); the example loan qualifies. an operating park, or a lighter loan, is judged case by case, and with no recent SBA campground lending in Vermont the answer will usually be yes. An RV park feasibility study consultant should not be the seller, the site developer or the lender.
The pricing page quotes a standard B&I campground engagement at between $6,900 and $12,500, typically delivered within seven weeks; the same page warns that glamping and similar outdoor stays usually need operator-by-operator rate gathering, which adds time. For that flat fee you get all five analytical chapters, a month-by-month seasonal projection with bad-weather cases, the written report and its spreadsheet, one round of changes, and a commitment to revise until accepted; engineering, septic design and appraisals are separate. Insist that your USDA feasibility study consultant phones or visits the competing parks; no Vermont dataset records their rates or fill.
Describe the park on the contact page (town, site count, season, loan size, lender); a senior analyst gets back to you by the next working day.
Last updated 2026-11-08
USDA Feasibility, Inc.