Washington has far more senior care sites per resident than the country, and far fewer of them where USDA can lend. Census counted 2,405 assisted living, continuing care and nursing facilities with paid employees in 2023, up 14.6% from 2019 while the national count rose 2.6%, and the state's density of 30.7 per 100,000 residents is 2.3 times the US rate. Yet only 136 of them, 5.7%, are in non-metro counties that hold 10.2% of the population, and several rural counties have a third of the state's per-capita supply. The hub notes that assisted living in Washington needs no certificate of need, which lowers the barrier to building; the feasibility study must therefore show why a rural market is under-served and how the new building will fill at the 90% occupancy ceiling USDA allows in projections.
Data current as of November 2026.
Which USDA program fits Washington assisted living, and when a study is required
Program choice starts with the operator and the level of care. Business and Industry (B&I) guarantees cover nursing homes and assisted living only where constant on-site medical care is provided, and independent living is ineligible (7 CFR 5001.105(b)(20)). A for-profit operator meeting that test can use B&I: 85% guaranteed below $5 million and 80% to $25 million in fiscal 2026 (91 FR 11272). A nonprofit or public sponsor has Community Facilities options. CF direct loans and grants serve cities, towns and unincorporated areas of 20,000 or less (7 CFR 1942.17), with direct loan terms up to the shortest of useful life, state statutory limit or 40 years and a financial feasibility report required; CF grants cover 15% to 75% of cost depending on population and income (7 CFR part 3570). CF guaranteed loans use the 7 CFR 5001.3 rural test with funds reserved first for places of 20,000 or less, and carry an 80% guarantee, a 1.25% fee and 0.50% retention in fiscal 2026. A nonprofit operator also benefits from 5001.116(b), which keeps not-for-profit health care out of the "inherently commercial" category.
The study rules overlap. For B&I, a guaranteed loan above $1,000,000 to a new business requires an independent study from a consultant the Agency accepts, scoped by the Agency (5001.306(a)(3)(i)). For senior housing more generally, 5001.304 requires a financial feasibility report in every case, requires an independent study above $1,000,000 for a new entity or new activity, and limits projected occupancy for assisted living and skilled nursing to 90%. SBA 7(a) is the program Washington operators have used most, 301 loans since FY2010, and SBA may ask for a study under 13 CFR 120.160(b). REAP can fund efficiency at an operating facility after a year of results, for at most 25% of cost, under the rule effective 16 October 2026.
Federal-debt, tax, judgment and debarment checks under 5001.127(a) cover the operator and its larger active owners, and any rent from space or machines is counted against the 15% gambling ceiling in 5001.127(b).
Assisted living in Washington: market evidence
Washington: assisted living and nursing facilities, supply and rural footprint
| Measure | Washington | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 2,099 → 2,405 (+14.6%) | 43,506 → 44,649 |
| Per 100,000 residents (2023) | 30.7 | 13.3 |
| Average employees per establishment | 21.4 | 53.5 |
| Average annual pay per employee | $45,834 | $41,324 |
| Share of establishments in non-metro counties | 5.7% (136 in 11 counties) | |
| Share of state population in non-metro counties (2025) | 10.2% |
Non-metro counties with the most assisted living and nursing facilities (2023): Lewis County (22); Grant County (21); Whitman County (17); Clallam County (16); Grays Harbor County (13); Island County (11).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The high density does not mean Washington is over-built in the way a reviewer might assume. The average Washington facility has 21.4 employees against 53.5 nationally, so the count is inflated by very small homes. Pay is 10.9% above the national average at $45,834, and payroll averages about $983,123 per facility. A pro forma for a 40 to 60 unit building has to be benchmarked against the minority of Washington facilities of that size, not the average.
Computed: Washington senior care segments, 2019 and 2023 (Census CBP state files)
| NAICS | Segment | Washington 2019 | Washington 2023 | Change | US change | Sites with 1 to 4 employees | Employees, 2023 |
|---|---|---|---|---|---|---|---|
| 623312 | Assisted living for the elderly | 1,603 | 1,824 | +13.8% | +1.2% | 1,181 | 21,682 |
| 623311 | Continuing care retirement communities | 188 | 205 | +9.0% | +5.2% | 36 | 11,572 |
| 623110 | Nursing care facilities (skilled nursing) | 308 | 376 | +22.1% | +3.5% | 119 | 18,332 |
The segment table explains the headline. Assisted living establishments grew +13.8% in Washington against +1.2% nationally, and 1,181 of the 1,824, 64.7% of those Census sizes, have fewer than five employees. Skilled nursing grew 22.1% here and continuing care communities 9.0%. A new rural assisted living building therefore competes with two very different kinds of supply: small residential homes that charge less and offer less, and larger licensed communities, mostly in metropolitan counties.
Rural footprint and B&I eligibility in Washington
The rural gap is the strongest demand argument on this page. Lewis County has 22 facilities, 25.0 per 100,000 residents; Grant 21 (19.9); Clallam 16 (20.5); Grays Harbor 13 (16.6); Island 11 (12.8); Mason 11 (15.5); and Kittitas and Jefferson have three or four, under 9 per 100,000, against 30.7 statewide. Whitman (35.0) and Adams (41.9) are the exceptions. The hub describes demand across aging rural counties in central and eastern Washington.
Computed: non-metro Washington counties with the most senior care facilities, 2023 (Census CBP county file; Vintage 2025 population)
| County | OMB 2023 status | Facilities, 2023 | Residents, 2025 | Facilities per 100k residents |
|---|---|---|---|---|
| Lewis County | Nonmetropolitan | 22 | 88,062 | 25.0 |
| Grant County | Nonmetropolitan | 21 | 105,727 | 19.9 |
| Whitman County | Nonmetropolitan | 17 | 48,512 | 35.0 |
| Clallam County | Nonmetropolitan | 16 | 78,202 | 20.5 |
| Grays Harbor County | Nonmetropolitan | 13 | 78,144 | 16.6 |
| Island County | Nonmetropolitan | 11 | 85,657 | 12.8 |
| Mason County | Nonmetropolitan | 11 | 71,165 | 15.5 |
| Adams County | Nonmetropolitan | 9 | 21,488 | 41.9 |
| Okanogan County | Nonmetropolitan | 9 | 45,230 | 19.9 |
| Kittitas County | Nonmetropolitan | 4 | 48,803 | 8.2 |
| Jefferson County | Nonmetropolitan | 3 | 33,970 | 8.8 |
Lower per-capita supply is a starting point, not proof of demand. The study must translate it into age-qualified, income-qualified households within the primary market area and their likely penetration rate. Eligibility then depends on the program: B&I and CF guaranteed loans use 7 CFR 5001.3 (outside cities above 50,000 at the 2020 Census and their contiguous urbanized areas, decided before approval), while CF direct loans and grants require a place of 20,000 or less. The Washington state page screens Wenatchee (35,575 in 2020), Walla Walla (34,060), Mount Vernon (35,219) and Moses Lake (25,146) as eligible for B&I; all four exceed 20,000, so a nonprofit there would look to the CF guarantee rather than CF direct money.
Financing benchmarks: USDA next to SBA
Washington: SBA lending to assisted living and nursing facilities
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 35 | $14.8 million | 16 | $16.2 million |
| FY2017 to FY2019 | 78 | $44.7 million | 4 | $1.5 million |
| FY2020 to FY2023 | 119 | $126.9 million | 5 | $6.3 million |
| FY2024 to FY2026 | 69 | $60.5 million | 1 | $864,000 |
Average 7(a) loan, FY2020 to FY2026: $997,025. Average 504 loan: $1.2 million. Of the 35 7(a) loans approved in FY2010 to FY2016 for Washington assisted living and nursing facilities, 0.0% were charged off (national: 3.3% of 1,086).
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Computed: average senior care loan size by period (SBA FOIA, pack JSON)
| Period | Washington average 7(a) loan | US average 7(a) loan | Washington average 504 loan |
|---|---|---|---|
| Fiscal 2010 to 2016 | $423,183 | $935,046 | $1,012,562 |
| Fiscal 2017 to 2019 | $573,571 | $907,177 | $368,750 |
| Fiscal 2020 to 2023 | $1,066,699 | $1,255,070 | $1,252,800 |
| Fiscal 2024 to 2026 | $876,862 | $1,170,760 | $864,000 |
SBA lending to Washington senior care grew quickly: 35 7(a) loans in fiscal 2010 to 2016, then 119 in 2020 to 2023 at an average of $1,066,699. None of the 35 seasoned loans was charged off, against 3.3% nationally, though 35 loans is a small base. Washington averages stay below national ones, consistent with small homes. A new rural building of 40 or more units costs several times the state average loan, so it usually moves past the $1,000,000 study line and toward a USDA structure.
| Term | B&I guarantee | CF guarantee | What it means in Washington |
|---|---|---|---|
| Borrower | For-profit; assisted living only with constant on-site medical care (5001.105(b)(20)) | Nonprofit or public body | Independent living is outside B&I |
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million | 80% (91 FR 11272) | A 48-unit building above $5 million gets 80% either way |
| Upfront fee | 3.0% of the guaranteed amount | 1.25% of the guaranteed amount | The CF fee is less than half |
| Retention | 0.55% a year | 0.50% a year | Small difference over the term |
| Occupancy in projections | At most 90% (5001.304) | At most 90% (5001.304) | Underwrite to 90%, not 95% |
| Rural test | 5001.3 (50,000 and contiguous urbanized areas) | 5001.3, with priority for places of 20,000 or less | CF direct and grants need 20,000 or less |
| Equity, new operator | 20% balance sheet equity (4:1) or 25% of cost (5001.105(d)(4)) | Set by the CF program and lender | Agency may raise it for weak collateral or study (5001.105(d)(5)) |
| Term | Useful life, up to 40 years (5001.402) | Useful life, up to 40 years | 30 years is common for new buildings |
Worked example (illustrative)
Inputs. Loan A is $1,000,000, the Washington FY2020 to FY2026 senior care 7(a) average of $997,025 rounded, sized here for an illustrative 16-unit residential building. Loans B and C are the same illustrative $6,000,000, 48-unit new building, financed once with a B&I guarantee and once with a CF guarantee. All three assume 7.25% fixed over 30 years, monthly (an assumption within 5001.401 and 5001.402). Unit NOI is computed at 90% occupancy, the projection ceiling in 5001.304. Each retention figure applies its rate to what is still owed once twelve instalments are paid, and the equity tests assume no debt other than this loan.
Computed: B&I and CF guarantees on Washington senior care loans (Python, exact to the cent)
| Line | Loan A: B&I at the state 7(a) average | Loan B: B&I, illustrative new building | Loan C: CF guarantee, same building |
|---|---|---|---|
| Loan amount | $1,000,000.00 | $6,000,000.00 | $6,000,000.00 |
| Guarantee (fiscal 2026 notice) | 85% | 80% | 80% |
| Guaranteed amount | $850,000.00 | $4,800,000.00 | $4,800,000.00 |
| Lender's unguaranteed share | $150,000.00 | $1,200,000.00 | $1,200,000.00 |
| Upfront guarantee fee | $25,500.00 (3.0%) | $144,000.00 (3.0%) | $60,000.00 (1.25%) |
| Balance after 12 payments | $990,321.43 | $5,941,928.60 | $5,941,928.60 |
| First annual retention fee | $4,629.75 (0.55%) | $26,144.49 (0.55%) | $23,767.71 (0.50%) |
| Monthly principal and interest | $6,821.76 | $40,930.58 | $40,930.58 |
| Annual debt service | $81,861.15 | $491,166.92 | $491,166.92 |
| NOI for 1.00x (break-even) | $81,861.15 | $491,166.92 | $491,166.92 |
| NOI for 1.25x | $102,326.44 | $613,958.65 | $613,958.65 |
| Coverage if NOI falls 15% | 1.06x | 1.06x | 1.06x |
| Coverage if the rate is 2 points higher | 1.04x | 1.04x | 1.04x |
| NOI per occupied unit per month for 1.25x (illustrative units, occupancy at the 90% cap) | $592.17 (16 units) | $1,184.33 (48 units) | $1,184.33 (48 units) |
| Independent study compulsory for a new entity | No: $1,000,000 is not more than $1,000,000 | Yes (over $1,000,000) | Yes (over $1,000,000) |
| New business, 5001.105(d)(4): 25% of project cost | $333,333.33 on $1,333,333.33 | $2,000,000.00 on $8,000,000.00 | $2,000,000.00 on $8,000,000.00 |
| New business, 5001.105(d)(4): 20% balance sheet equity (4:1) | $250,000.00 | $1,500,000.00 | $1,500,000.00 |
| Existing business, 5001.105(d)(1): 10% of project cost | $111,111.11 on $1,111,111.11 | $666,666.67 on $6,666,666.67 | $666,666.67 on $6,666,666.67 |
Three conclusions follow. First, Loan A sits exactly at $1,000,000, which is not more than $1,000,000, so 5001.306(a)(3)(i) does not force an independent study for a B&I borrower; 5001.304 would still require one for a new entity in a CF-guaranteed senior facility above that amount, and both rules apply to Loans B and C. Second, the 48-unit building needs $1,184.33 of NOI per occupied unit per month for 1.25x at 90% occupancy; that figure, after care staff, food and utilities, is what the market study must show residents can pay. Third, the CF guarantee saves $84,000.00 at closing and $2,376.78 in the first retention fee on the same loan, a reason for a nonprofit sponsor to qualify for CF. A rate two points higher takes coverage to 1.04x on a 30-year loan, so a variable rate needs a cap or a reserve.
Washington risks an assisted living study has to carry
- Level of care. B&I requires constant on-site medical care for assisted living; a lighter-care or independent-living model needs a different program.
- Licensing and certificate of need. The hub reports that assisted living facilities licensed under chapter 18.20 RCW need no certificate of need, while nursing homes do; a mixed campus needs both tracks.
- Labour. Average pay of $45,834 is 10.9% above the national level, and staffing ratios drive margins.
- Payer mix. Private pay against Medicaid contracts changes revenue per unit; the study should show the mix and its effect on coverage.
- Competition from small homes. 1,181 small assisted living establishments compete on price in many markets.
- Calendar. A for-profit sponsor filing for B&I this autumn faces the intake change the hub dates to 20 November 2026; nonprofit CF applications run through a separate process.
What a lender-grade assisted living feasibility study in Washington must prove
- The program and eligibility: level of care for B&I, nonprofit status and population for CF, and a dated 5001.3 or place-size determination.
- A primary market area with age 75-plus and 85-plus households, income-qualified and asset-qualified counts.
- Competitive supply: every licensed community and small home in the market area, with units, rates, occupancy and services.
- Penetration and capture rates that reconcile demand with supply and support the absorption schedule.
- Lease-up to stabilised occupancy no higher than 90% (5001.304), month by month.
- Revenue by unit type and care level, payer mix and rate escalation.
- Staffing by shift, priced at Washington wages and benchmarked against $45,834 per worker.
- Capital budget, operating reserves, and coverage of at least 1.25x at stabilisation with occupancy and rate stresses.
- The operator's licensing history, management agreement and experience with communities of similar size.
Hiring a USDA assisted living feasibility study consultant in Washington
Under B&I, a new operator borrowing more than $1,000,000 needs an independent study scoped by the Agency; under 5001.304, a new entity or new activity in assisted living above $1,000,000 needs one too, and a financial feasibility report is required in all cases. Choose a USDA feasibility study consultant that holds no interest in the facility, the operator, the developer or the lender.
Senior housing studies fall in three of the site's published bands: Community Facilities work at $6,900 to $12,000 (six to eight weeks), ordinary B&I work at $6,900 to $12,500 (six to seven weeks) and complex B&I work at $10,500 to $14,500 (seven to nine weeks). Each covers the five Part 5001 components, a five to ten year projection with occupancy and rate sensitivities, market and competitive analysis, operator benchmarks, a management assessment, PDF and Word reports with an Excel model, two scheduled calls, a revision round and the written acceptance guarantee. Appraisals, environmental work, engineering, legal work and grant or lender packaging are separate. Rush delivery in three to four weeks is quoted at a 20% to 35% premium.
Bring the unit mix and care model, site and design information, the development budget, licensing status, the operator's résumé and any existing facility's statements, and the lender's or agency's term sheet. The national assisted living feasibility guide and the assisted living market report give the national method and context. For a Washington project, request a proposal through the contact page; a senior analyst responds within one business day.
Washington precedent (program evidence, not the firm's work)
The hub's precedent table lists a 2022 Community Facilities direct loan of $7,800,000 to The Mustard Seed Project for elder care on the Key Peninsula, compiled from USDA Rural Development releases. It shows CF direct money reaching senior care in a small Washington community; it is not a B&I loan and not the firm's engagement. The site's Texas assisted living case study is an out-of-state analysis comparing CF direct and B&I structures.
Last updated 2026-11-08