USDA Feasibility Study for Assisted Living and Senior Care in Washington

    NAICS 6233

    Washington has far more senior care sites per resident than the country, and far fewer of them where USDA can lend. Census counted 2,405 assisted living, continuing care and nursing facilities with paid employees in 2023, up 14.6% from 2019 while the national count rose 2.6%, and the state's density of 30.7 per 100,000 residents is 2.3 times the US rate. Yet only 136 of them, 5.7%, are in non-metro counties that hold 10.2% of the population, and several rural counties have a third of the state's per-capita supply. The hub notes that assisted living in Washington needs no certificate of need, which lowers the barrier to building; the feasibility study must therefore show why a rural market is under-served and how the new building will fill at the 90% occupancy ceiling USDA allows in projections.

    Data current as of November 2026.

    Which USDA program fits Washington assisted living, and when a study is required

    Program choice starts with the operator and the level of care. Business and Industry (B&I) guarantees cover nursing homes and assisted living only where constant on-site medical care is provided, and independent living is ineligible (7 CFR 5001.105(b)(20)). A for-profit operator meeting that test can use B&I: 85% guaranteed below $5 million and 80% to $25 million in fiscal 2026 (91 FR 11272). A nonprofit or public sponsor has Community Facilities options. CF direct loans and grants serve cities, towns and unincorporated areas of 20,000 or less (7 CFR 1942.17), with direct loan terms up to the shortest of useful life, state statutory limit or 40 years and a financial feasibility report required; CF grants cover 15% to 75% of cost depending on population and income (7 CFR part 3570). CF guaranteed loans use the 7 CFR 5001.3 rural test with funds reserved first for places of 20,000 or less, and carry an 80% guarantee, a 1.25% fee and 0.50% retention in fiscal 2026. A nonprofit operator also benefits from 5001.116(b), which keeps not-for-profit health care out of the "inherently commercial" category.

    The study rules overlap. For B&I, a guaranteed loan above $1,000,000 to a new business requires an independent study from a consultant the Agency accepts, scoped by the Agency (5001.306(a)(3)(i)). For senior housing more generally, 5001.304 requires a financial feasibility report in every case, requires an independent study above $1,000,000 for a new entity or new activity, and limits projected occupancy for assisted living and skilled nursing to 90%. SBA 7(a) is the program Washington operators have used most, 301 loans since FY2010, and SBA may ask for a study under 13 CFR 120.160(b). REAP can fund efficiency at an operating facility after a year of results, for at most 25% of cost, under the rule effective 16 October 2026.

    Federal-debt, tax, judgment and debarment checks under 5001.127(a) cover the operator and its larger active owners, and any rent from space or machines is counted against the 15% gambling ceiling in 5001.127(b).

    Assisted living in Washington: market evidence

    Washington: assisted living and nursing facilities, supply and rural footprint

    MeasureWashingtonUnited States
    Establishments, 2019 → 20232,099 → 2,405 (+14.6%)43,506 → 44,649
    Per 100,000 residents (2023)30.713.3
    Average employees per establishment21.453.5
    Average annual pay per employee$45,834$41,324
    Share of establishments in non-metro counties5.7% (136 in 11 counties)
    Share of state population in non-metro counties (2025)10.2%

    Non-metro counties with the most assisted living and nursing facilities (2023): Lewis County (22); Grant County (21); Whitman County (17); Clallam County (16); Grays Harbor County (13); Island County (11).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The high density does not mean Washington is over-built in the way a reviewer might assume. The average Washington facility has 21.4 employees against 53.5 nationally, so the count is inflated by very small homes. Pay is 10.9% above the national average at $45,834, and payroll averages about $983,123 per facility. A pro forma for a 40 to 60 unit building has to be benchmarked against the minority of Washington facilities of that size, not the average.

    Computed: Washington senior care segments, 2019 and 2023 (Census CBP state files)

    NAICSSegmentWashington 2019Washington 2023ChangeUS changeSites with 1 to 4 employeesEmployees, 2023
    623312Assisted living for the elderly1,6031,824+13.8%+1.2%1,18121,682
    623311Continuing care retirement communities188205+9.0%+5.2%3611,572
    623110Nursing care facilities (skilled nursing)308376+22.1%+3.5%11918,332

    The segment table explains the headline. Assisted living establishments grew +13.8% in Washington against +1.2% nationally, and 1,181 of the 1,824, 64.7% of those Census sizes, have fewer than five employees. Skilled nursing grew 22.1% here and continuing care communities 9.0%. A new rural assisted living building therefore competes with two very different kinds of supply: small residential homes that charge less and offer less, and larger licensed communities, mostly in metropolitan counties.

    Rural footprint and B&I eligibility in Washington

    The rural gap is the strongest demand argument on this page. Lewis County has 22 facilities, 25.0 per 100,000 residents; Grant 21 (19.9); Clallam 16 (20.5); Grays Harbor 13 (16.6); Island 11 (12.8); Mason 11 (15.5); and Kittitas and Jefferson have three or four, under 9 per 100,000, against 30.7 statewide. Whitman (35.0) and Adams (41.9) are the exceptions. The hub describes demand across aging rural counties in central and eastern Washington.

    Computed: non-metro Washington counties with the most senior care facilities, 2023 (Census CBP county file; Vintage 2025 population)

    CountyOMB 2023 statusFacilities, 2023Residents, 2025Facilities per 100k residents
    Lewis CountyNonmetropolitan2288,06225.0
    Grant CountyNonmetropolitan21105,72719.9
    Whitman CountyNonmetropolitan1748,51235.0
    Clallam CountyNonmetropolitan1678,20220.5
    Grays Harbor CountyNonmetropolitan1378,14416.6
    Island CountyNonmetropolitan1185,65712.8
    Mason CountyNonmetropolitan1171,16515.5
    Adams CountyNonmetropolitan921,48841.9
    Okanogan CountyNonmetropolitan945,23019.9
    Kittitas CountyNonmetropolitan448,8038.2
    Jefferson CountyNonmetropolitan333,9708.8

    Lower per-capita supply is a starting point, not proof of demand. The study must translate it into age-qualified, income-qualified households within the primary market area and their likely penetration rate. Eligibility then depends on the program: B&I and CF guaranteed loans use 7 CFR 5001.3 (outside cities above 50,000 at the 2020 Census and their contiguous urbanized areas, decided before approval), while CF direct loans and grants require a place of 20,000 or less. The Washington state page screens Wenatchee (35,575 in 2020), Walla Walla (34,060), Mount Vernon (35,219) and Moses Lake (25,146) as eligible for B&I; all four exceed 20,000, so a nonprofit there would look to the CF guarantee rather than CF direct money.

    Financing benchmarks: USDA next to SBA

    Washington: SBA lending to assisted living and nursing facilities

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201635$14.8 million16$16.2 million
    FY2017 to FY201978$44.7 million4$1.5 million
    FY2020 to FY2023119$126.9 million5$6.3 million
    FY2024 to FY202669$60.5 million1$864,000

    Average 7(a) loan, FY2020 to FY2026: $997,025. Average 504 loan: $1.2 million. Of the 35 7(a) loans approved in FY2010 to FY2016 for Washington assisted living and nursing facilities, 0.0% were charged off (national: 3.3% of 1,086).

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Computed: average senior care loan size by period (SBA FOIA, pack JSON)

    PeriodWashington average 7(a) loanUS average 7(a) loanWashington average 504 loan
    Fiscal 2010 to 2016$423,183$935,046$1,012,562
    Fiscal 2017 to 2019$573,571$907,177$368,750
    Fiscal 2020 to 2023$1,066,699$1,255,070$1,252,800
    Fiscal 2024 to 2026$876,862$1,170,760$864,000

    SBA lending to Washington senior care grew quickly: 35 7(a) loans in fiscal 2010 to 2016, then 119 in 2020 to 2023 at an average of $1,066,699. None of the 35 seasoned loans was charged off, against 3.3% nationally, though 35 loans is a small base. Washington averages stay below national ones, consistent with small homes. A new rural building of 40 or more units costs several times the state average loan, so it usually moves past the $1,000,000 study line and toward a USDA structure.

    TermB&I guaranteeCF guaranteeWhat it means in Washington
    BorrowerFor-profit; assisted living only with constant on-site medical care (5001.105(b)(20))Nonprofit or public bodyIndependent living is outside B&I
    Guarantee85% under $5 million; 80% from $5 million to $25 million80% (91 FR 11272)A 48-unit building above $5 million gets 80% either way
    Upfront fee3.0% of the guaranteed amount1.25% of the guaranteed amountThe CF fee is less than half
    Retention0.55% a year0.50% a yearSmall difference over the term
    Occupancy in projectionsAt most 90% (5001.304)At most 90% (5001.304)Underwrite to 90%, not 95%
    Rural test5001.3 (50,000 and contiguous urbanized areas)5001.3, with priority for places of 20,000 or lessCF direct and grants need 20,000 or less
    Equity, new operator20% balance sheet equity (4:1) or 25% of cost (5001.105(d)(4))Set by the CF program and lenderAgency may raise it for weak collateral or study (5001.105(d)(5))
    TermUseful life, up to 40 years (5001.402)Useful life, up to 40 years30 years is common for new buildings

    Worked example (illustrative)

    Inputs. Loan A is $1,000,000, the Washington FY2020 to FY2026 senior care 7(a) average of $997,025 rounded, sized here for an illustrative 16-unit residential building. Loans B and C are the same illustrative $6,000,000, 48-unit new building, financed once with a B&I guarantee and once with a CF guarantee. All three assume 7.25% fixed over 30 years, monthly (an assumption within 5001.401 and 5001.402). Unit NOI is computed at 90% occupancy, the projection ceiling in 5001.304. Each retention figure applies its rate to what is still owed once twelve instalments are paid, and the equity tests assume no debt other than this loan.

    Computed: B&I and CF guarantees on Washington senior care loans (Python, exact to the cent)

    LineLoan A: B&I at the state 7(a) averageLoan B: B&I, illustrative new buildingLoan C: CF guarantee, same building
    Loan amount$1,000,000.00$6,000,000.00$6,000,000.00
    Guarantee (fiscal 2026 notice)85%80%80%
    Guaranteed amount$850,000.00$4,800,000.00$4,800,000.00
    Lender's unguaranteed share$150,000.00$1,200,000.00$1,200,000.00
    Upfront guarantee fee$25,500.00 (3.0%)$144,000.00 (3.0%)$60,000.00 (1.25%)
    Balance after 12 payments$990,321.43$5,941,928.60$5,941,928.60
    First annual retention fee$4,629.75 (0.55%)$26,144.49 (0.55%)$23,767.71 (0.50%)
    Monthly principal and interest$6,821.76$40,930.58$40,930.58
    Annual debt service$81,861.15$491,166.92$491,166.92
    NOI for 1.00x (break-even)$81,861.15$491,166.92$491,166.92
    NOI for 1.25x$102,326.44$613,958.65$613,958.65
    Coverage if NOI falls 15%1.06x1.06x1.06x
    Coverage if the rate is 2 points higher1.04x1.04x1.04x
    NOI per occupied unit per month for 1.25x (illustrative units, occupancy at the 90% cap)$592.17 (16 units)$1,184.33 (48 units)$1,184.33 (48 units)
    Independent study compulsory for a new entityNo: $1,000,000 is not more than $1,000,000Yes (over $1,000,000)Yes (over $1,000,000)
    New business, 5001.105(d)(4): 25% of project cost$333,333.33 on $1,333,333.33$2,000,000.00 on $8,000,000.00$2,000,000.00 on $8,000,000.00
    New business, 5001.105(d)(4): 20% balance sheet equity (4:1)$250,000.00$1,500,000.00$1,500,000.00
    Existing business, 5001.105(d)(1): 10% of project cost$111,111.11 on $1,111,111.11$666,666.67 on $6,666,666.67$666,666.67 on $6,666,666.67

    Three conclusions follow. First, Loan A sits exactly at $1,000,000, which is not more than $1,000,000, so 5001.306(a)(3)(i) does not force an independent study for a B&I borrower; 5001.304 would still require one for a new entity in a CF-guaranteed senior facility above that amount, and both rules apply to Loans B and C. Second, the 48-unit building needs $1,184.33 of NOI per occupied unit per month for 1.25x at 90% occupancy; that figure, after care staff, food and utilities, is what the market study must show residents can pay. Third, the CF guarantee saves $84,000.00 at closing and $2,376.78 in the first retention fee on the same loan, a reason for a nonprofit sponsor to qualify for CF. A rate two points higher takes coverage to 1.04x on a 30-year loan, so a variable rate needs a cap or a reserve.

    Washington risks an assisted living study has to carry

    • Level of care. B&I requires constant on-site medical care for assisted living; a lighter-care or independent-living model needs a different program.
    • Licensing and certificate of need. The hub reports that assisted living facilities licensed under chapter 18.20 RCW need no certificate of need, while nursing homes do; a mixed campus needs both tracks.
    • Labour. Average pay of $45,834 is 10.9% above the national level, and staffing ratios drive margins.
    • Payer mix. Private pay against Medicaid contracts changes revenue per unit; the study should show the mix and its effect on coverage.
    • Competition from small homes. 1,181 small assisted living establishments compete on price in many markets.
    • Calendar. A for-profit sponsor filing for B&I this autumn faces the intake change the hub dates to 20 November 2026; nonprofit CF applications run through a separate process.

    What a lender-grade assisted living feasibility study in Washington must prove

    1. The program and eligibility: level of care for B&I, nonprofit status and population for CF, and a dated 5001.3 or place-size determination.
    2. A primary market area with age 75-plus and 85-plus households, income-qualified and asset-qualified counts.
    3. Competitive supply: every licensed community and small home in the market area, with units, rates, occupancy and services.
    4. Penetration and capture rates that reconcile demand with supply and support the absorption schedule.
    5. Lease-up to stabilised occupancy no higher than 90% (5001.304), month by month.
    6. Revenue by unit type and care level, payer mix and rate escalation.
    7. Staffing by shift, priced at Washington wages and benchmarked against $45,834 per worker.
    8. Capital budget, operating reserves, and coverage of at least 1.25x at stabilisation with occupancy and rate stresses.
    9. The operator's licensing history, management agreement and experience with communities of similar size.

    Hiring a USDA assisted living feasibility study consultant in Washington

    Under B&I, a new operator borrowing more than $1,000,000 needs an independent study scoped by the Agency; under 5001.304, a new entity or new activity in assisted living above $1,000,000 needs one too, and a financial feasibility report is required in all cases. Choose a USDA feasibility study consultant that holds no interest in the facility, the operator, the developer or the lender.

    Senior housing studies fall in three of the site's published bands: Community Facilities work at $6,900 to $12,000 (six to eight weeks), ordinary B&I work at $6,900 to $12,500 (six to seven weeks) and complex B&I work at $10,500 to $14,500 (seven to nine weeks). Each covers the five Part 5001 components, a five to ten year projection with occupancy and rate sensitivities, market and competitive analysis, operator benchmarks, a management assessment, PDF and Word reports with an Excel model, two scheduled calls, a revision round and the written acceptance guarantee. Appraisals, environmental work, engineering, legal work and grant or lender packaging are separate. Rush delivery in three to four weeks is quoted at a 20% to 35% premium.

    Bring the unit mix and care model, site and design information, the development budget, licensing status, the operator's résumé and any existing facility's statements, and the lender's or agency's term sheet. The national assisted living feasibility guide and the assisted living market report give the national method and context. For a Washington project, request a proposal through the contact page; a senior analyst responds within one business day.

    Washington precedent (program evidence, not the firm's work)

    The hub's precedent table lists a 2022 Community Facilities direct loan of $7,800,000 to The Mustard Seed Project for elder care on the Key Peninsula, compiled from USDA Rural Development releases. It shows CF direct money reaching senior care in a small Washington community; it is not a B&I loan and not the firm's engagement. The site's Texas assisted living case study is an out-of-state analysis comparing CF direct and B&I structures.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Washington assisted living project need a feasibility study?

    Usually. A start-up operator borrowing over $1,000,000 with a B&I guarantee triggers 5001.306(a)(3)(i), which demands an outside study on USDA's terms. Under 7 CFR 5001.304, assisted living always needs a financial feasibility report, and an independent study is required above $1,000,000 for a new entity or new activity. With Washington's senior care 7(a) loans averaging about $997,000 and new rural buildings costing several times that, most projects cross the line.

    What does an assisted living feasibility study consultant charge?

    The site's cost page lists Community Facilities studies at $6,900 to $12,000, standard B&I studies at $6,900 to $12,500 and complex B&I studies at $10,500 to $14,500, each fixed in a written proposal. A single-building community with usable comparables is standard; a campus with nursing and assisted living, a phased project or a market without comparable licensed communities is complex. Appraisals and engineering are separate.

    How long does an assisted living study take?

    Six to eight weeks for a Community Facilities study and six to seven for a standard B&I study, on the site's schedule, or seven to nine for complex work; a three to four week rush costs 20% to 35% more. Senior housing studies spend most of their time on the competitive survey, because rates and occupancy at small homes and licensed communities have to be gathered directly.

    Who can prepare a USDA assisted living feasibility study?

    Someone USDA judges competent and detached: no ownership in the community, no management contract, no development fee and no lending role. The preparer must model demand from age- and income-qualified households, survey competing licensed and small residential supply, apply the 90% occupancy ceiling in 5001.304, and show coverage under stress in a form USDA's reviewer can test.

    How long does an assisted living feasibility study remain valid?

    Part 5001 sets no fixed life, but reviewers look at the age of the evidence. Senior housing reviewers tend to question rate and occupancy surveys more than about eighteen months old, the cost page notes, and an appraisal over a year old fails 5001.203. In Washington, where assisted living establishments grew 13.8% in four years, a new competitor can open within a study's life, so refresh the competitive survey if the application slips.

    Can the same study support SBA, B&I and Community Facilities applications?

    Yes, if it is written to the USDA standard with the five components, the 90% occupancy cap and stressed projections. An SBA lender exercising its 13 CFR 120.160(b) option to request a study would find the same report sufficient. Washington operators used SBA 7(a) 301 times since FY2010, so lenders often compare structures; a study showing coverage under B&I, a CF guarantee and SBA lets the sponsor choose.

    Is assisted living eligible for a B&I loan in Washington?

    It can be, if the facility provides constant on-site medical care; 7 CFR 5001.105(b)(20) limits B&I to nursing homes and assisted living meeting that test and excludes independent living. The borrower must also pass the owner screens in 5001.127(a) and the site the 5001.3 rural test. A nonprofit sponsor may prefer Community Facilities, whose guarantee fee is 1.25% instead of 3.0% in fiscal 2026.

    Does Washington require a certificate of need for assisted living?

    According to the hub, no: assisted living facilities licensed under chapter 18.20 RCW need no certificate of need, while nursing homes do. That makes building easier but also lets competitors enter quickly, which is one reason Washington's assisted living count grew 13.8% between 2019 and 2023. The study should list projects in planning and permitting, not just open communities.

    Are rural Washington counties under-served for assisted living?

    Several are, on a per-resident basis. Washington averages 30.7 senior care facilities per 100,000 residents, but Kittitas and Jefferson counties have under 9, Island 12.8 and Grays Harbor 16.6. That gap supports a demand case only after the study converts it into age- and income-qualified households and penetration rates, because the statewide average is inflated by small homes concentrated in metropolitan counties.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files (NAICS 623110, 623311, 623312): https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001 (including 5001.105(b)(20), 5001.116(b), 5001.304), CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 7 CFR 1942.17 (Community Facilities direct loans) and 7 CFR part 3570 (Community Facilities grants), CFR 2026 edition (govinfo): https://www.govinfo.gov/app/collection/cfr
    7. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    8. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. USDA Feasibility Study Consultants, Washington state page (certificate-of-need rule, CF role, eligibility screens, precedent table): https://usda-feasibility-study.com/washington
    11. USDA Feasibility Study Consultants, cost page and contact page: https://usda-feasibility-study.com/usda-feasibility-study-cost ; https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours