No federal statistic counts Washington's wedding barns, orchard pavilions and winery event halls, and that gap shapes every venue loan in the state. Census reports venues under several industry codes, so the nearest measures are 86 Washington promoters that operate their own facilities in 2023 (up from 75 in 2019, +14.7%) and 304 caterers. SBA data under the same two codes show 83 Washington 7(a) loans since FY2010. The hub describes the demand: wedding and corporate events tied to orchard, vineyard and farm tourism in the Yakima Valley, Walla Walla wine country and the Wenatchee and Chelan fruit districts. For a Business and Industry (B&I) guarantee, the feasibility study has to create the local evidence that public data cannot supply.
Data current as of November 2026.
When a venue needs a USDA feasibility study, and which program fits
Under 7 CFR 5001.306(a)(3)(i), USDA requires an independent study, scoped by the Agency and written by a consultant it accepts as qualified, whenever a new business seeks a guaranteed loan above $1,000,000. Most venues are new businesses, and a purpose-built hall with parking, kitchen and septic often passes $1,000,000. Below that line the Agency may still ask (5001.306(a)(3)(ii)); loans above $600,000 use the full application and smaller ones may be streamlined (5001.306(b)).
B&I is the USDA path for a for-profit venue on eligible ground, with an 85% guarantee below $5 million in fiscal 2026 (91 FR 11272). SBA 7(a) has carried most Washington lending in the proxy codes, and SBA can also require a study under 13 CFR 120.160(b). A venue that is part of a farm raises a structural question: B&I treats agricultural production under its own eligibility provisions in 5001.105(b)(7), revised by the December 2025 technical amendments, so the venue business and the farm should be separate operations with separate statements. REAP applies only to efficiency or renewable projects after twelve months of operation and at most 25% of cost under the rule effective 16 October 2026. Community Facilities financing suits a public fairground or community hall, not a private wedding business. The 15% gambling limit in 5001.127(b) and the owner screens in 5001.127(a) apply as they do to any B&I borrower.
Event venues in Washington: market evidence
Census has no single industry code for event and wedding venues; they report under several codes.
The pack therefore carries only SBA data, and the supply picture has to be assembled from the two Census codes closest to a venue business. Neither is a clean count: promoters with facilities include arenas and performance halls, and caterers include businesses with no venue at all. They are signals, not an inventory.
Computed: the nearest Census codes to event venues, Washington and neighbours (Census CBP 2019 and 2023 state files)
| State | Promoters with facilities (711310), 2019 → 2023 | Caterers (722320), 2019 → 2023 | 711310 Q1 share of annual payroll | 722320 Q1 share of annual payroll |
|---|---|---|---|---|
| Washington | 75 → 86 (+14.7%) | 292 → 304 (+4.1%) | 19.5% | 20.6% |
| Oregon | 56 → 58 (+3.6%) | 151 → 143 (-5.3%) | 19.9% | 19.5% |
| Idaho | 26 → 28 (+7.7%) | 41 → 55 (+34.1%) | 24.8% | 20.4% |
Two readings matter for underwriting. Washington's venue-owning promoters grew 14.7% in four years, faster than Oregon (+3.6%) or Idaho (+7.7%), so the category is attracting capital and a new venue will meet newer competitors. And first-quarter payroll is just 19.5% of the year for promoters and 20.6% for caterers, among the strongest seasonal signals in the Washington data: events concentrate from May to October, and a study that spreads bookings evenly across twelve months will not survive review. Washington's 86 promoters employ 2,288 people at about $39,256 each.
Computed: Washington promoters with facilities by number of employees, 2023 (NAICS 711310)
| Employees at the site | Promoters with facilities | Share of sized sites |
|---|---|---|
| 1 to 4 | 38 | 45.8% |
| 5 to 9 | 18 | 21.7% |
| 10 to 19 | 13 | 15.7% |
| 20 to 49 | 10 | 12.0% |
| 50 to 99 | 4 | 4.8% |
Almost half of the sized operators have fewer than five employees, the profile of an owner-run venue that hires event staff by the day. The study should therefore show staffing per event rather than an annual headcount.
Rural footprint and B&I eligibility in Washington
Without a venue code there is no county breakdown, so rural share has to be argued from the hub and the site. The hub places event and agritourism demand in the Yakima Valley, the Walla Walla wine country and the Wenatchee and Chelan fruit districts, and its eligibility screen helps: Wapato, Toppenish, Zillah, Granger, Sunnyside and Grandview screen as eligible while Yakima, Union Gap, Selah, Moxee and Naches sit inside the Yakima urbanized area; Walla Walla (34,060 in 2020), Wenatchee (35,575), Leavenworth and Chelan screen as eligible. Formally, 7 CFR 5001.3 governs: a venue parcel inside a 2020 Census city of more than 50,000, or inside the urbanized land joined to one, fails, and USDA settles the question before it approves anything. Statewide, 10.2% of residents live in non-metro counties, and the Washington state page estimates that only 28% to 31% of Washingtonians live in B&I-eligible areas. Farm venues near Puget Sound cities may fail that test even when they look rural.
Financing benchmarks: USDA B&I next to SBA
Washington: SBA lending to promoters with facilities and caterers (NAICS 711310 and 722320, the nearest SBA codes to event venues)
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 30 | $6.1 million | 2 | $903,000 |
| FY2017 to FY2019 | 12 | $8.0 million | 4 | $5.2 million |
| FY2020 to FY2023 | 17 | $11.8 million | 3 | $3.3 million |
| FY2024 to FY2026 | 24 | $13.3 million | 1 | $278,000 |
Average 7(a) loan, FY2020 to FY2026: $611,483. Average 504 loan: $897,000. Of the 30 7(a) loans approved in FY2010 to FY2016 for Washington promoters with facilities and caterers (NAICS 711310 and 722320, the nearest SBA codes to event venues), 0.0% were charged off (national: 7.6% of 1,311).
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Washington's proxy loans are larger and have performed better than the national set: the recent average of $611,483 compares with $523,963 nationally, and none of the 30 seasoned Washington loans was charged off against 7.6% nationally. Thirty loans are too few to call that a Washington advantage, and they mix caterers with venue owners. The regional packs show the spread: Oregon's 21 recent proxy loans averaged $236,810 and Idaho's seven $447,329. A lender will read the national loss rate, one in thirteen, as the realistic risk for a single-purpose events property.
| Term | B&I rule | What it means for a Washington venue |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million (91 FR 11272) | A barn venue or pavilion is almost always in the 85% tier |
| Fees | 3.0% of the guaranteed share at closing, 3.5% if the guarantee issues before construction is complete; 0.55% annual retention | Budget the fee in the project cost, not working capital |
| Term and rate | Useful life to 40 years, no balloon (5001.402); negotiated rate (5001.401) | The building can carry a long term; furnishings and tents cannot |
| Equity, new venue | 20% balance sheet equity (4:1) or 25% of cost; 25% when the guarantee issues before completion (5001.105(d)(3) and (4)) | Most venue owners are new businesses and fall here |
| Equity adjustments | The Agency may raise equity for industry risk, weak collateral or a weak study (5001.105(d)(5)) | A single-purpose events building invites that review |
| Collateral | Appraisal above $250,000; going-concern value deducted (5001.203) | A specialised hall may appraise below cost |
Worked example (illustrative)
Inputs. Loan A is $610,000, the Washington FY2020 to FY2026 average in the proxy codes ($611,483) rounded. Because those codes include caterers, Loan B is an illustrative $1,500,000 purpose-built venue that crosses the $1,000,000 study line. Both assume 7.75% fixed for 25 years, monthly, inside 5001.401 and 5001.402; neither is a quote. Booking counts of 45 and 70 events a year are illustrative. The retention fee uses the balance after twelve payments; equity rows treat the loan as the only debt.
Computed: B&I terms on two Washington venue loans (Python, exact to the cent)
| Line | Loan A: near the SBA proxy average | Loan B: illustrative purpose-built venue |
|---|---|---|
| Loan amount | $610,000.00 | $1,500,000.00 |
| Guarantee (fiscal 2026 notice) | 85% | 85% |
| Guaranteed amount | $518,500.00 | $1,275,000.00 |
| Lender's unguaranteed share | $91,500.00 | $225,000.00 |
| Upfront guarantee fee | $15,555.00 (3.0%) | $38,250.00 (3.0%) |
| Balance after 12 payments | $601,694.01 | $1,479,575.44 |
| First annual retention fee | $2,812.92 (0.55%) | $6,917.02 (0.55%) |
| Monthly principal and interest | $4,607.51 | $11,329.93 |
| Annual debt service | $55,290.07 | $135,959.18 |
| NOI for 1.00x (break-even) | $55,290.07 | $135,959.18 |
| NOI for 1.25x | $69,112.58 | $169,948.97 |
| Coverage if NOI falls 25% | 0.94x | 0.94x |
| Coverage if the rate is 2 points higher | 1.06x | 1.06x |
| NOI per booked event for 1.25x (illustrative bookings) | $1,535.84 (45 events) | $2,427.84 (70 events) |
| Independent study compulsory for a new business | No; USDA may require one | Yes (over $1,000,000) |
| New business, 5001.105(d)(4): 25% of project cost | $203,333.33 on $813,333.33 | $500,000.00 on $2,000,000.00 |
| New business, 5001.105(d)(4): 20% balance sheet equity (4:1) | $152,500.00 | $375,000.00 |
| Existing business, 5001.105(d)(1): 10% of project cost | $67,777.78 on $677,777.78 | $166,666.67 on $1,666,666.67 |
| SBA 7(a) on the same loan: guaranteed / fee ceiling | $457,500.00 / $13,725.00 | $1,125,000.00 / $39,687.50 |
Loan A needs $69,112.58 of NOI for 1.25x, which is $1,535.84 of net income from each of 45 events; Loan B needs $169,948.97, or $2,427.84 per event at 70 bookings. Because weather, cancellations and the loss of a single planner relationship can remove a quarter of a season, the stress test uses a 25% drop, which leaves either loan at 0.94x.
Computed: stress test for the two venue loans
| Scenario | Loan A | Loan B |
|---|---|---|
| Base case: NOI at 1.25x | $69,112.58 / 1.25x | $169,948.97 / 1.25x |
| NOI down 15% | $58,745.69 / 1.06x | $144,456.63 / 1.06x |
| NOI down 25% | $51,834.44 / 0.94x | $127,461.73 / 0.94x |
| NOI down 35% | $44,923.18 / 0.81x | $110,466.83 / 0.81x |
| Rate 1 point higher, re-amortised | 1.15x (debt service $60,180.91) | 1.15x (debt service $147,985.85) |
| Rate 2 points higher, re-amortised | 1.06x (debt service $65,231.26) | 1.06x (debt service $160,404.74) |
The table explains why lenders ask venue sponsors for a debt service reserve or a larger equity share: a season 15% below plan already brings coverage to 1.06x.
Evidence a Washington venue study must build where public data is thin
- A booking inventory of competing venues within the drive market: capacity, season, published packages and, where operators will share them, booked dates.
- Demand from named sources: inquiry logs, signed deposits, planner and caterer letters of intent, and corporate or winery retreat commitments.
- Drive-time demand: households and event-age population within 60 and 90 minutes, including the Puget Sound and Tri-Cities markets that supply many destination weddings.
- Seasonal operations: bookings and staffing by month, reflecting a first-quarter payroll share near 19.5%.
- Permits and site capacity: zoning or agritourism approvals, occupancy limits, septic and water, parking and road access, with documents.
- Revenue lines separated: rental fee, food and beverage, lodging, and any farm sales, so a reviewer can see what the venue earns on its own.
- Operator experience: past events managed, staff plan and the hand-off between owner and coordinator.
- Coverage at 1.25x and the stresses above, with the reserve or equity that keeps the loan current through a lost season.
Washington risks a venue study has to carry
- Zoning on farmland. The hub notes that under the Growth Management Act many rural commercial uses must sit inside a small-town urban growth area; county rules for events on agricultural land decide what is buildable.
- Weather and smoke. Outdoor ceremonies are exposed to weather; the cancellation and refund policy belongs in the revenue model.
- Alcohol service and gaming. Bar revenue is normal; raffles, pull-tabs or gaming machines count toward the 15% limit in 5001.127(b).
- Tenant screens. The hub reads 5001.127(d) as barring a borrower that leases space to a cannabis retailer; leases for vendors or shops on site need restrictions.
- Program timing. The hub reports a B&I application platform change on 20 November 2026 and USDA funding under a continuing resolution to 11 December 2026.
Hiring a USDA event venue feasibility study consultant in Washington
A new venue company seeking more than $1,000,000 under B&I must supply an independent study scoped by USDA; below that, the Agency or the lender may still ask, and for a single-purpose events building they usually do. The venue's USDA feasibility study consultant should earn nothing from the site purchase, the barn or hall construction, the catering contract or the loan.
The site's cost page lists what is included: all five Part 5001 components, a five to ten year projection with sensitivities, primary market and competitive analysis, operator benchmarks, a management assessment, PDF and Word reports and the Excel model, a kickoff and a midpoint call, one revision round, and a written acceptance guarantee. Appraisal, environmental, engineering and legal work are separate. The cost page names agritourism among the asset classes that need primary research because secondary data is sparse, which usually places a venue study toward the upper part of the standard B&I band ($6,900 to $12,500, six to seven weeks) or in the complex band ($10,500 to $14,500, seven to nine weeks). Compressed delivery in three to four weeks is quoted at 20% to 35% above standard.
Prepare the site plan and capacity, zoning or permit status, the construction budget, any booking history, letters from planners or caterers, owner résumés and the lender's term sheet. The site's national guides to wedding venue and agritourism studies explain the method. To start a Washington venue study, describe the project on the contact page; a senior analyst replies within one business day.
National program example (outside Washington)
None of this lane's sources records a Washington wedding or event venue financed through USDA. Elsewhere, this site's national pages report a $10 million B&I loan for an RV resort and venue expansion at Twin Eagle Lake Estates and Hideout in Potosi, Missouri, as public program evidence rather than the firm's work; it shows B&I funding a venue as part of a larger recreation property, which is a common structure for rural Washington event sites as well.
Last updated 2026-11-08
USDA Feasibility, Inc.