USDA Feasibility Study for Gas Stations and C-Stores in Washington

    NAICS 457110

    Fuel and convenience is the Washington asset where SBA lenders have been most active and least often wrong. Washington lenders made 802 SBA 7(a) loans to gas stations and fuel-convenience stores from FY2010 to FY2026, recent loans averaged $2.35 million, half again the national average, and only 1.0% of the seasoned loans were charged off against 4.0% nationally. The station count is shrinking, 1,806 in 2023 against 1,880 in 2019, and density, 23.0 per 100,000 residents, is well below the national 32.4. But stations lean rural: 16.2% are in non-metro counties, against 10.2% of residents. The hub reports USDA Business and Industry (B&I) guarantees for fuel and convenience projects in Whatcom and King counties. A feasibility study for a Washington station has to prove traffic, fuel margin and inside sales, and clear two state-specific screens: lottery and gaming income, and tenants.

    Data current as of November 2026.

    When a fuel and c-store loan needs a USDA feasibility study, and which program fits

    Section 5001.306(a)(3)(i) of 7 CFR is the line: if a newly formed company asks for a B&I guarantee on more than $1,000,000, the study must come from an independent consultant USDA accepts, on terms USDA sets. Washington's typical station loan is more than twice that size, so a new-build or a purchase by a new entity almost always crosses it. An operator acquiring another station is an existing business for the equity rules, but USDA can still require a study under 5001.306(a)(3)(ii), and lenders often do when the site's fuel volumes are not documented.

    B&I terms in fiscal 2026 are an 85% guarantee under $5 million and 80% from $5 million to $25 million (91 FR 11272), with a term matched to the useful life of the building, canopy and tanks, up to 40 years (5001.402). SBA 7(a) has carried the bulk of Washington station lending, and 504 carried 39 loans; the SBA guarantee on loans above $150,000 is 75% (13 CFR 120.210). REAP is of limited use: the rule effective 16 October 2026 excludes retail energy dispensing and EV chargers, and efficiency projects such as refrigeration or lighting qualify only after twelve months of operation, for at most 25% of cost. The hub adds that lottery or pull-tab income bars REAP outright. Community Facilities does not fund commercial fuel retail.

    For a Washington c-store, eligibility screens can sink a file faster than weak traffic. Under 5001.127(b), a borrower whose gambling income, including lease income from machines, exceeds 15% of gross revenue is ineligible; the regulation excludes State-authorized lottery proceeds only as the Agency approves them for fundraising for the project, so a station's ordinary lottery commission should be reported and the Agency's reading obtained. On the hub's figures, a Washington Lottery retailer keeps 5% of ticket sales as commission. The hub also reads 5001.127(d) as barring a borrower that leases space to a cannabis retailer, so a station with a retail strip needs tenant restrictions, and the store's own product mix should exclude intoxicating hemp products.

    Gas stations and c-stores in Washington: market evidence

    Washington: gas stations and fuel-convenience stores, supply and rural footprint

    MeasureWashingtonUnited States
    Establishments, 2019 → 20231,880 → 1,806 (-3.9%)112,630 → 109,174
    Per 100,000 residents (2023)23.032.4
    Average employees per establishment8.09.3
    Average annual pay per employee$34,305$29,193
    Share of establishments in non-metro counties16.2% (289 in 18 counties)
    Share of state population in non-metro counties (2025)10.2%

    Non-metro counties with the most gas stations and fuel-convenience stores (2023): Grant County (47); Grays Harbor County (35); Lewis County (35); Kittitas County (24); Okanogan County (21); Mason County (19).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Washington has 28.9% fewer stations per resident than the nation, and lost 3.9% of them in four years, slightly faster than the national -3.1%. Fewer, larger stations is the pattern, and the SBA data agree: lenders are financing bigger sites. For a feasibility study, low density is not proof of opportunity; it reflects urban driving patterns and consolidation, and the case has to be made for one corridor or town.

    Labour is more expensive than elsewhere. Pay averages $34,305, 17.5% above the national figure, and the typical station has 8.0 employees, so payroll runs about $274,323 a year. A new store with food service will need more staff than that average, priced at Washington wages.

    Computed: Washington fuel retail segments, 2019 and 2023 (Census CBP state files)

    NAICSSegmentWashington 2019Washington 2023ChangeUS changeEmployees, 2023Q1 share of annual payroll
    447110Gasoline stations with convenience stores1,6981,617-4.8%-3.3%12,27123.9%
    447190Other gasoline stations182189+3.8%-1.2%2,17126.1%

    Stations with convenience stores, 1,617 of the 1,806, fell 4.8%, while other gasoline stations rose 3.8%. The convenience format is consolidating rather than expanding; a new c-store must take share from an existing one or serve traffic that no current site captures.

    Rural footprint and B&I eligibility in Washington

    Stations follow highways, so rural counties carry far more stations per resident than the state's 23.0. Kittitas County has 24 (49.2 per 100,000), Okanogan 21 (46.4), Grant 47 (44.5), Grays Harbor 35 (44.8) and Lewis 35 (39.7); small counties on through routes are higher still, with Adams at 79.1 and Ferry at 79.8. The hub names I-90, I-82, US-2 and US-97 as the corridors that matter.

    Computed: non-metro Washington counties with the most gas stations and c-stores, 2023 (Census CBP county file; Vintage 2025 population)

    CountyOMB 2023 statusStations, 2023Residents, 2025Stations per 100k residents
    Grant CountyNonmetropolitan47105,72744.5
    Grays Harbor CountyNonmetropolitan3578,14444.8
    Lewis CountyNonmetropolitan3588,06239.7
    Kittitas CountyNonmetropolitan2448,80349.2
    Okanogan CountyNonmetropolitan2145,23046.4
    Mason CountyNonmetropolitan1971,16526.7
    Adams CountyNonmetropolitan1721,48879.1
    Clallam CountyNonmetropolitan1478,20217.9
    Island CountyNonmetropolitan1485,65716.3
    Whitman CountyNonmetropolitan1448,51228.9

    Eligibility is a parcel question under 7 CFR 5001.3: no city above 50,000 at the 2020 Census and no land in the urbanized area contiguous to it, and no approval on the expectation of future eligibility. Corridor towns screened as eligible on the Washington USDA page include Ellensburg, Moses Lake, Quincy, Wenatchee, Leavenworth and the Yakima Valley towns of Zillah, Sunnyside, Grandview, Granger, Toppenish and Wapato; Union Gap, Selah and Moxee, all near I-82 at Yakima, are excluded. The hub's King County precedent shows that a metropolitan county can still hold an eligible fuel site, which is why the map determination, not the county, decides.

    Financing benchmarks: USDA B&I next to SBA

    Washington: SBA lending to gas stations and fuel-convenience stores

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY2016294$347.5 million14$8.2 million
    FY2017 to FY2019152$247.5 million8$4.4 million
    FY2020 to FY2023199$431.4 million9$9.7 million
    FY2024 to FY2026157$406.7 million8$18.2 million

    Average 7(a) loan, FY2020 to FY2026: $2.4 million. Average 504 loan: $1.6 million. Of the 294 7(a) loans approved in FY2010 to FY2016 for Washington gas stations and fuel-convenience stores, 1.0% were charged off (national: 4.0% of 4,095), on average 67 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Computed: average fuel and convenience loan size by period (SBA FOIA, pack JSON)

    PeriodWashington average 7(a) loanUS average 7(a) loanWashington average 504 loan
    Fiscal 2010 to 2016$1,181,908$885,843$588,000
    Fiscal 2017 to 2019$1,627,976$1,161,166$545,875
    Fiscal 2020 to 2023$2,167,651$1,545,458$1,073,222
    Fiscal 2024 to 2026$2,590,195$1,697,599$2,271,625

    The table tells a clear story: Washington station loans more than doubled in size, from $1,181,908 in fiscal 2010 to 2016 to $2,590,195 in 2024 to 2026, against a national $1,697,599, and Washington's seasoned charge-off rate was a quarter of the national one. That record helps a B&I application; it does not replace site evidence. At $2,353,998, the typical Washington station loan sits comfortably in the 85% B&I tier and well above the $1,000,000 study threshold for a new business.

    TermB&I ruleWhat it means for a Washington station
    Guarantee85% under $5 million; 80% from $5 million to $25 million (91 FR 11272)Single-site stores in the 85% tier; travel centers can cross $5 million
    Fees3.0% of the guaranteed share at closing (3.5% if the guarantee precedes construction completion); 0.55% annual retention$59,925 at closing on a $2.35 million loan
    TermUseful life up to 40 years, no balloon (5001.402)Building and canopy longer; pumps, tanks and equipment shorter
    Equity, new owner20% balance sheet equity (4:1) or 25% of cost; 25% if the guarantee precedes completion (5001.105(d)(3) and (4))New builds and first stations
    Equity, operating company10% under 5001.105(d)(1)Multi-site operators adding a location
    CollateralAppraisal over $250,000; going-concern value deducted before discounting (5001.203)Fuel brand and business value are not collateral
    GamblingIneligible above 15% of gross from gambling (5001.127(b))Lottery and machine income reported as its own line

    Worked example (illustrative)

    Inputs. Loan A is $2,350,000, the Washington FY2020 to FY2026 7(a) average for gas stations and fuel-convenience stores ($2,353,998) rounded. Loan B is $4,000,000, close to the hub's 2022 B&I guarantee for a gas station and grocery in Whatcom County; the terms here are assumptions, not that loan's. Each carries a 7.50% fixed rate over 20 years, monthly, an illustration within 5001.401 and 5001.402. The 0.55% retention charge is figured on the principal owed after twelve instalments. Equity rows assume no other debt on the balance sheet.

    Computed: B&I terms on two Washington fuel and convenience loans (Python, exact to the cent)

    LineLoan A: Washington 7(a) averageLoan B: sized like the Whatcom precedent
    Loan amount$2,350,000.00$4,000,000.00
    Guarantee (fiscal 2026 notice)85%85%
    Guaranteed amount$1,997,500.00$3,400,000.00
    Lender's unguaranteed share$352,500.00$600,000.00
    Upfront guarantee fee$59,925.00 (3.0%)$102,000.00 (3.0%)
    Balance after 12 payments$2,297,285.10$3,910,272.52
    First annual retention fee$10,739.81 (0.55%)$18,280.52 (0.55%)
    Monthly principal and interest$18,931.44$32,223.73
    Annual debt service$227,177.28$386,684.73
    NOI for 1.00x (break-even)$227,177.28$386,684.73
    NOI for 1.25x$283,971.60$483,355.92
    Coverage if NOI falls 15%1.06x1.06x
    Coverage if the rate is 2 points higher1.08x1.08x
    Debt service as a share of average Washington station payroll82.8%141.0%
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$69,912.50$119,000.00
    New business, 5001.105(d)(4): 25% of project cost$783,333.33 on $3,133,333.33$1,333,333.33 on $5,333,333.33
    New business, 5001.105(d)(4): 20% balance sheet equity (4:1)$587,500.00$1,000,000.00
    Existing business, 5001.105(d)(1): 10% of project cost$261,111.11 on $2,611,111.11$444,444.44 on $4,444,444.44
    SBA 7(a) on the same loan: guaranteed / fee ceiling$1,762,500.00 / $63,593.75$3,000,000.00 / $110,000.00

    Loan A needs $283,971.60 of net operating income for 1.25x, and its debt service equals 82.8% of what the average Washington station pays its staff in a year; on Loan B, debt service is 141.0% of that payroll. Fuel retail is capital-heavy, so the loan is large next to the labour bill, and fuel margin per gallon and inside-sales margin carry the coverage. Any mix of thinner fuel margins and lower volume that removes 15% of NOI leaves 1.06x. On Loan A, SBA 7(a) would guarantee $1,762,500 with a fee ceiling of $63,593.75 (13 CFR 120.210 and 120.220), against B&I's $1,997,500 guaranteed for $59,925.00.

    Washington risks a fuel and convenience study has to carry

    • Gaming and lottery income. Report lottery commissions, pull-tabs and machine income separately; the 15% limit in 5001.127(b) and the hub's REAP bar both turn on them.
    • Tenants and products. The hub's cannabis screen under 5001.127(d) affects strip tenants and the store's own hemp products.
    • Environmental. Underground tanks and past fuel releases make the Phase I environmental assessment a gating document; it is outside the study's scope but its results feed the capital budget.
    • Fuel margin volatility. Margins move with wholesale prices; the projection needs a low-margin year.
    • EV transition. Chargers are excluded from REAP under the October 2026 rule; any charger revenue in the model needs its own financing.
    • Program timing. According to the hub, USDA's B&I system closes to new applications on 20 November 2026 ahead of a new portal, and USDA runs under a continuing resolution to 11 December 2026.

    What a lender-grade gas station and c-store feasibility study in Washington must prove

    1. Parcel eligibility under 5001.3 with a dated determination, and zoning and access permits for fuel retail.
    2. Traffic counts on the adjacent road, turning movements and ingress and egress, and the share of traffic the site can capture.
    3. A competitive inventory of stations within the trade area: brands, pump counts, prices, store size and food service.
    4. Fuel volume by grade, margin per gallon and the supply agreement terms.
    5. Inside sales by category, margins, and food service if planned, with Washington staffing costs.
    6. Payroll benchmarked against $34,305 per worker and about $274,323 per station.
    7. Gambling, lottery and tenant income reported separately, with the 15% test computed.
    8. Capital budget for building, canopy, tanks, dispensers and equipment, with the environmental findings reflected.
    9. Coverage of at least 1.25x with stresses for fuel margin, volume, inside sales and rate.

    Hiring a USDA gas station feasibility study consultant in Washington

    New owners borrowing more than $1,000,000 under B&I must deliver an independent study whose scope USDA sets; established operators and smaller loans face the Agency's and lender's discretion. Hire a USDA feasibility study consultant with no share in the fuel supply contract, the real estate, the construction or the loan.

    For fuel retail the site's cost page describes deep comparable data, which usually keeps a single station in the standard B&I band of $6,900 to $12,500 and a six-to-seven-week schedule; travel centers, multi-site packages and loans over $10 million move to $10,500 to $14,500 over seven to nine weeks. The deliverable covers the five Part 5001 components, a five to ten year projection with fuel-margin and sales sensitivities, trade-area and competitor analysis, operator benchmarks and a management review, in PDF and Word with an Excel model, with two scheduled calls, one round of revisions and the written acceptance guarantee. Phase I and II environmental work, engineering, appraisal and legal or lender packaging are outside it. A compressed three-to-four-week timetable costs 20% to 35% extra.

    Prepare the site plan, traffic data if available, fuel supply proposals, the store and food-service concept, three years of statements for any existing station, the capital budget, owner résumés and the lender's term sheet. The national gas station feasibility guide covers the method. For a Washington site, request a proposal from the contact page; a senior analyst replies within one business day.

    Washington precedents (program evidence, not the firm's work)

    The hub's precedent table, compiled from USDA Rural Development charts and releases, lists two 2022 B&I guarantees for fuel and convenience in Washington: $4,003,000 to PM Ventures II Inc. for a gas station and grocery in Whatcom County, and $3,600,000 to SLK Investment Property / Moon & Sun LLC for a c-store, fuel and retail project in King County. The hub's text refers to three projects totalling $10,374,000 in those counties; the table shows two. The Mississippi gas station case study is an out-of-state analysis.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Washington gas station need a feasibility study for a USDA loan?

    If the borrower is a new business and the B&I loan exceeds $1,000,000, the study is mandatory under 7 CFR 5001.306(a)(3)(i), with USDA setting its scope. Washington station loans averaged about $2.35 million in FY2020 to FY2026, so a new owner almost always needs one. An operating company buying or building another location may be asked at the Agency's discretion, and lenders usually want one where fuel volumes are projected rather than documented.

    How much does a gas station feasibility study consultant charge?

    Two published price bands apply, $6,900 to $12,500 for ordinary B&I work and $10,500 to $14,500 for complex projects, and the written proposal fixes the number. The cost page lists gas stations among the asset classes with deep comparable data, so a single Washington station usually prices in the standard band; a travel center with food service and truck diesel, or a multi-site package, moves up. Environmental and engineering work are separate.

    How long does a gas station study take?

    Most single-station studies run six to seven weeks on the site's schedule, with complex projects at seven to nine and a three-to-four-week rush at a 20% to 35% premium. Traffic and competitor data come quickly for fuel retail; the slower inputs are usually the fuel supply terms and the Phase I environmental findings, which the study needs before it can close the capital budget.

    Who is qualified to write a B&I fuel and c-store study?

    An independent consultant USDA accepts: no ownership in the station, no fee from the fuel supplier, the seller, the builder or the lender. Brand image programs and supplier volume estimates are inputs to be tested, not the study itself. The preparer must build fuel volumes from traffic and capture, inside sales from comparable stores, and coverage under a low-margin year that a reviewer can verify.

    How long is a gas station feasibility study usable?

    Part 5001 sets no expiry, so age is judged from the evidence. The site's cost page says USDA reviewers generally expect market data inside about 18 months (12 for SBA), and the appraisal must be under a year old (5001.203). A new competing station, a road project or a change in fuel supply terms can date a study within months, so refresh it if the application slips.

    Can the same station study be used for SBA and B&I?

    It can if it meets the USDA standard, since that covers anything an SBA lender may request under 13 CFR 120.160(b). That flexibility matters in Washington, where lenders made 802 SBA 7(a) station loans since FY2010. Presenting coverage under a B&I term and an SBA amortisation side by side lets the lender compare the 85% B&I guarantee with SBA's 75% on the same loan.

    Does lottery or pull-tab income affect a Washington station's USDA eligibility?

    It can. Under 7 CFR 5001.127(b), a B&I borrower is ineligible when gambling income, including lease income from machines, exceeds 15% of gross revenue; State-authorized lottery proceeds are excluded only as the Agency approves for fundraising for the project, so ask how ordinary lottery commissions will be treated. Fuel sales keep most stations far below 15%. Separately, the hub says a store earning anything from lottery sales or pull-tabs, its 5% retailer commission included, is shut out of REAP.

    Can REAP pay for EV chargers or solar at a Washington station?

    Chargers are out: the October 2026 REAP rule lists vehicle charging and any retail sale of energy among its exclusions. Solar or refrigeration efficiency can qualify after twelve months of operation, for at most 25% of cost, but the hub reports that any lottery or pull-tab income disqualifies the applicant, and many stations sell lottery tickets. Underwrite the station without REAP and treat any grant as later upside.

    Are fuel sites on I-90 and I-82 in Washington eligible for B&I?

    Many are. The hub screens Ellensburg, Moses Lake, Quincy and the lower Yakima Valley towns as eligible and places Union Gap, Selah and Moxee inside the Yakima urbanized area. Kittitas and Grant counties, which carry 24 and 47 stations, are non-metro. Eligibility under 7 CFR 5001.3 is decided for the parcel, so an interchange site needs a dated USDA determination before the application.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files (NAICS 447110 and 447190 as reported): https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice: https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. USDA Feasibility Study Consultants, Washington state page (corridors, fuel and c-store precedents, lottery, pull-tab and cannabis screens, eligibility, program timing): https://usda-feasibility-study.com/washington
    10. USDA Feasibility Study Consultants, cost page and contact page: https://usda-feasibility-study.com/usda-feasibility-study-cost ; https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours