West Virginia has 11 marinas with paid employees, 0.6 for every 100,000 residents, roughly half the national rate of 1.1 and a quarter of Maryland's 2.7. The Census county file places six of them, three in Braxton County and three in Monongalia County, and the staffing and payroll figures are published with noise flags that make them unreliable. SBA has financed three marina projects in the state with 7(a) loans since FY2010, plus one 504 loan. A marina lender in West Virginia will therefore have almost nothing local to compare against, and every number that matters, from slip occupancy to rates to the length of the season, has to come from the feasibility study's own research.
Data current as of November 2026.
Program fit for a West Virginia marina
| Route | Fit for a West Virginia marina | What to check first |
|---|---|---|
| USDA B&I guarantee | New marinas, expansions, dry storage, service buildings, acquisitions on rural lakes and rivers | 85% guarantee under $5 million (91 FR 11272); parcel or lease passes 7 CFR 5001.3; site control for the loan term |
| SBA 7(a) | Acquisitions, docks and equipment; 3 West Virginia loans since FY2010 | 75% guarantee above $150,000 (13 CFR 120.210) |
| SBA 504 | Owner-occupied marina real estate; 1 West Virginia loan of $1.0 million in FY2020 to FY2023 | 15% borrower share for a single-purpose property, 20% if also new (120.910) |
| REAP | Lighting, efficient pumps and solar at an operating marina | Grant at most 25% of cost after 12 months of data; retail fuel dispensing and EV charging excluded under the rule effective 16 October 2026 |
| Conventional bank | Established marinas with long site leases | Lease term often caps loan term |
Before the market work, 7 CFR 5001.127 sets three screens. Paragraph (a) asks about the marina company, its controller and every active owner above 20 percent: an outstanding federal court judgment (except from the Tax Court), unpaid federal income tax or other federal debt in arrears, or a suspension or debarment disqualifies, and a payment arrangement counts only when complete. Paragraph (b) limits gambling revenue, including leased gaming machines in a marina restaurant or store, to 15 percent of gross revenue. Paragraph (d) excludes income from illegal products.
Rule, discretion and the threshold for marinas
| Situation | What Part 5001 says |
|---|---|
| New marina company, B&I-guaranteed loan above $1,000,000 | Independent study required; Agency accepts the consultant and sets the scope (5001.306(a)(3)(i)) |
| Existing operator, or loan of $1,000,000 or less | Agency may require a study (5001.306(a)(3)(ii)) |
| Loan of $600,000 or less | Streamlined application (5001.306(b)) |
| Seasonal borrower | Lender's analysis must include quarterly cash flow (5001.202) |
At the national FY2020 to FY2026 marina average of $1,281,853, a new marina usually lands in the first row.
Marinas in West Virginia: market evidence
West Virginia: marinas, supply and rural footprint
| Measure | West Virginia | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 9 → 11 (+22.2%) | 3,757 → 3,734 |
| Per 100,000 residents (2023) | 0.6 | 1.1 |
| Average employees per establishment | 2.4 | 8.7 |
| Average annual pay per employee | $68,154 | $51,262 |
| Share of establishments in non-metro counties | 50.0% (3 in 1 counties) | |
| Share of state population in non-metro counties (2025) | 38.4% |
Non-metro counties with the most marinas (2023): Braxton County (3).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Reading this table needs caution. The count rose by two, from 9 to 11, while the national count slipped. The other lines rest on 26 employees statewide: an average of 2.4 per marina, against 8.7 nationally, and average pay of $68,154, 33.0% above the U.S. figure, a result that tiny, noise-adjusted cells can produce without any real wage premium. The county file shows Braxton County's three marinas with one employee between them and $241,000 of payroll, which cannot describe operating marinas accurately. What the data do say is that West Virginia's marinas are few and small, most are seasonal or owner-run, and the state's 50% non-metro share rests on six placed marinas. A reviewer will expect slip counts, occupancy and rates from a field survey, not from Census.
West Virginia marina employment and pay, 2019 and 2023 (computed from the Census CBP state files; cells carry noise flags)
| Measure | 2019 | 2023 | Change |
|---|---|---|---|
| Marinas | 9 | 11 | +22.2% |
| Paid employees | 23 | 26 | +13.0% |
| Average pay per employee | $50,913 | $68,154 | +33.9% |
| Payroll per establishment | $130,111 | $161,091 | +23.8% |
Regional comparison
Marinas in West Virginia and neighbouring states (each state's own pack; Census CBP 2023 and SBA FOIA data)
| State | Marinas, 2023 | Per 100,000 residents | Change 2019 to 2023 | Employees each | Average pay | Non-metro share (placed) | SBA 7(a) loans since FY2010 | Average 7(a) loan FY2020 to FY2026 |
|---|---|---|---|---|---|---|---|---|
| West Virginia | 11 | 0.6 | +22.2% | 2.4 | $68,154 | 50.0% | 3 | $125,000 |
| Virginia | 105 | 1.2 | -1.9% | 8.4 | $39,908 | 33.3% | 10 | $1,986,250 |
| Kentucky | 42 | 0.9 | -10.6% | 8.0 | $41,158 | 73.3% | 1 | $195,500 |
| Ohio | 112 | 0.9 | +0.0% | 6.8 | $46,382 | 0.0% | 7 | $466,400 |
| Pennsylvania | 39 | 0.3 | -9.3% | 5.7 | $53,888 | 36.0% | 3 | $79,450 |
| Maryland | 166 | 2.7 | +1.2% | 8.9 | $53,722 | 21.1% | 8 | $1,495,667 |
Virginia and Maryland, with tidal water and the Chesapeake, are different markets; Kentucky and Ohio, with inland lakes and rivers, are the closer comparisons, at 0.9 marinas per 100,000 residents and 6.8 to 8.0 employees each. Their SBA records are almost as thin as West Virginia's: Kentucky has one marina 7(a) loan since FY2010 and Ohio seven. The national record is the benchmark: FY2020 to FY2026 marina 7(a) loans averaged $1,281,853, and 8 of 155 seasoned FY2010 to FY2016 loans, 5.2%, were charged off, after about 91 months on average.
Evidence the study must build
With no usable local data, the study has to produce it: a survey of every marina, boat launch and dry-storage operator on the lake or river reach, with wet slips, dry stack spaces, sizes, seasonal and transient rates, waiting lists and services; registered boats and their sizes in the surrounding counties, if the state registration data can be obtained; launch counts or visitor counts on the water body; water levels and channel depths through the season; the terms of any lease or concession from the owner of the shoreline or water body, including length, rent, renewal and approval rights; permits for docks and dredging; and interviews with operators on occupancy, service revenue and winter storage demand.
Revenue model, costs and capital items
Revenue is wet slips and dry spaces by size times occupancy times seasonal rate, plus transient dockage, winter storage, fuel margin, service and repair labour, ship store sales, boat rentals and, where present, food and beverage. Each line has its own season, and the model must show which months carry the year. Costs are labour (often seasonal), dock and equipment maintenance, insurance (high for waterfront assets), utilities, lease or concession rent, fuel cost of goods, property tax and marketing. Capital items are docks and slips, breakwaters where needed, dry stack building and forklift, service building and equipment, fuel system with environmental protections, parking and launch ramps, utilities to the docks, dredging, permits and working capital for the off-season.
Rural footprint and B&I eligibility in West Virginia
The county file places only Braxton County's 3 marinas (non-metro) and Monongalia County's 3 (metro, Morgantown area), so the 50% non-metro share is a two-county statement. B&I eligibility under 7 CFR 5001.3 fails only inside a city of more than 50,000 or the urbanized area that adjoins it. No West Virginia city is that big on the 2025 estimates; Morgantown has 30,293 residents, so a lake marina in metro Monongalia County is not excluded by its county's label; river sites near Charleston (46,117) or Huntington (44,815) need a map check. The West Virginia state hub shows the near-line places.
Financing benchmarks: USDA B&I next to SBA
West Virginia: SBA lending to marinas
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 1 | $100,500 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 1 | $1.0 million |
| FY2024 to FY2026 | 2 | $250,000 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $125,000. Average 504 loan: $1.0 million. West Virginia had fewer than 30 seasoned 7(a) loans for marinas; nationally, 5.2% of 155 FY2010 to FY2016 loans were charged off, on average 91 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Three 7(a) loans and one 504 loan in seventeen fiscal years give no state benchmark. The 504 loan of $1.0 million in FY2020 to FY2023 is the only one at the scale of a substantial marina project; the 7(a) loans, $100,500 and two totalling $250,000, are equipment or working-capital credits. A B&I lender will size a West Virginia marina against the national average of $1,281,853 and the national 5.2% loss rate, and against the term of the site lease.
FY2026 B&I terms applied to a West Virginia marina
| Term | Rule and source | Reading for a West Virginia marina |
|---|---|---|
| Guarantee | 85% under $5 million (91 FR 11272) | Nearly every inland marina |
| Upfront fee | 3.0% of the guaranteed amount; reduced-fee option 1.0% with 80% (91 FR 11272) | Can be financed |
| Annual retention fee | 0.55% of the guaranteed outstanding balance (91 FR 11272; 5001.455) | Fixed at obligation |
| Term | Useful life up to 40 years; no balloon (5001.402) | Docks and dry stack over 15 to 25 years, and never beyond the site lease |
| Equity, new marina | 20% balance sheet or 25% of project cost (5001.105(d)(4)) | Slip leases are annual and do not qualify for the 10% contract tier |
| Equity, existing operator | 10% under 5001.105(d)(1) | Acquisitions and expansions |
| Collateral | Appraisal over $250,000; going-concern value deducted before discounting (5001.203) | Leasehold improvements on public water discount heavily |
| Seasonal cash flow | Quarterly cash flow for seasonal borrowers (5001.202) | Winter quarters show losses |
Worked example (illustrative)
Inputs. With three state 7(a) loans, Loan A uses the national FY2020 to FY2026 marina average: $1,280,000, near $1,281,853, for a new or rebuilt marina of about 150 slips, amortized over 20 years. Loan B is $450,000, an illustrative dock replacement or dry-storage addition at an existing marina, amortized over 15 years. Both use an assumed 7.50% fixed rate, an illustration rather than a quote, allowed under 5001.401 and 5001.402, with FY2026 fees. Equity rows assume no other debt. Because the state's marina pay figure rests on noise-flagged cells, the wage line uses an illustrative $40,000 full-time position instead.
| Line | Loan A: near the national marina 7(a) average | Loan B: illustrative dock or dry-storage project |
|---|---|---|
| Illustrative rate and amortization | 7.50% fixed, 20 years, monthly | 7.50% fixed, 15 years, monthly |
| Loan amount | $1,280,000.00 | $450,000.00 |
| B&I guarantee, FY2026 (91 FR 11272) | 85% | 85% |
| Guaranteed amount | $1,088,000.00 | $382,500.00 |
| Unguaranteed portion held by the lender | $192,000.00 | $67,500.00 |
| Upfront guarantee fee (3.0% of guaranteed) | $32,640.00 | $11,475.00 |
| First-year retention fee (0.55% of the guaranteed share of the full balance; upper bound) | $5,984.00 | $2,103.75 |
| Retention fee on the balance after 12 monthly payments | $5,849.77 | $2,024.83 |
| Monthly principal and interest | $10,311.59 | $4,171.56 |
| Annual debt service | $123,739.11 | $50,058.67 |
| Net operating income for 1.25x coverage | $154,673.89 | $62,573.33 |
| Cushion above 1.00x | $30,934.78 | $12,514.67 |
| Cushion in full-time wages at an illustrative $40,000 position | 0.77 positions | 0.31 positions |
| Interest-only year, if structured (5001.402) | $96,000.00 | $33,750.00 |
| Annual debt service if the rate is 2 points higher | $143,175.35 | $56,388.13 |
| Coverage at that rate on the same income | 1.08x | 1.11x |
| Coverage if income lands 10% below plan | 1.12x | 1.12x |
| New business: 25% of project cost (5001.105(d)(4)) | $426,666.67 on a $1,706,666.67 project | $150,000.00 on a $600,000.00 project |
| New business: 20% balance sheet equity (debt to equity 4:1) | $320,000.00 | $112,500.00 |
| Existing business: 10% of project cost (5001.105(d)(1)) | $142,222.22 on a $1,422,222.22 project | $50,000.00 on a $500,000.00 project |
| Reduced-fee option: upfront fee (1.0% of an 80% guarantee) | $10,240.00 | $3,600.00 |
| Study compulsory for a new business? (5001.306(a)(3)(i)) | Yes, above $1,000,000 | No; the Agency may require one (5001.306(a)(3)(ii)) |
| Application track (5001.306) | Full application (over $600,000) | Streamlined ($600,000 or less) |
| SBA 7(a) comparison: guaranteed share, amount and fee ceiling (120.210, 120.220) | 75%, $960,000.00, $33,600.00 | 75%, $337,500.00, $10,125.00 |
What it shows. Loan A needs $154,673.89 of net operating income at 1.25x, or $1,031.16 per slip per year across an illustrative 150 slips, after every operating cost and the site rent. In a lake market that closes for winter, most of that income arrives between late spring and early autumn, so a wet summer or low water can take the $30,934.78 cushion. At $450,000, Loan B is processed on the streamlined track and sits below the study rule, yet a 15-year amortization still has to end before the site lease does.
What a lender-grade marina feasibility study in West Virginia must prove
- A complete survey of competing marinas, launches and dry storage on the same water body, with slips, rates and waiting lists.
- Boating demand from registrations, launch counts and visitor data around the site.
- Occupancy and rates by season and slip size, with a ramp for new slips.
- Site control: lease or concession terms, rent, renewal and approval rights, and a term at least as long as the loan.
- Water levels, channel depth and flood exposure across the season, with their effect on revenue.
- Permits for docks, dredging and fuel, with environmental protections priced.
- Service, storage and store revenue built separately from slip revenue.
- Quarterly cash flow and coverage under a short season, lower occupancy, higher insurance and a higher rate.
Marina risks in West Virginia
| Risk | Why it bites here | How the study tests or mitigates it |
|---|---|---|
| No usable local data | 11 marinas; staffing and pay cells carry noise flags | Field survey and operator interviews |
| Seasonality | Inland boating concentrates in warm months | Quarterly model; reserve for the off-season |
| Site control | Shoreline often held under lease or concession | Lease term beyond loan term; consent to encumber |
| Water levels and floods | Reservoir drawdowns and river floods disrupt use | Historical level data; insurance; dock design |
| Thin loan record | 3 SBA 7(a) loans since FY2010 | National benchmarks; conservative loan-to-cost |
| Environmental | Fuel docks and boat maintenance carry contamination risk | Fuel system design; Phase I ESA (separate scope) |
Steps in the file and frequent send-backs
Choose the lender first and scope the study to it; for B&I, the lender then forwards the study with its application to the USDA Rural Development state office serving West Virginia. Marina sponsors should assemble the site lease or deed, permits and their status, engineering for docks and any dredging, contractor bids, slip lists and rate history for an acquisition, operator experience and financial statements. Marina studies come back for occupancy assumed rather than surveyed, a full-year season in a seasonal market, no mention of lease term, and service revenue with no labour behind it.
Program record, honestly labelled
The inputs contain no West Virginia marina financed under B&I, so none is cited. In FY2024 to FY2026 USAspending records eight B&I guarantees for West Virginia across every industry, and 643 across the country.
Hiring a USDA marina feasibility study consultant in West Virginia
A newly formed marina company borrowing more than $1,000,000 through B&I must provide the independent study; acquisitions and smaller dock projects are left to the Agency or lender, and with only three state loans on record a lender is likely to ask. A USDA feasibility study consultant is most valuable here for the field survey and the lease review, since neither slip occupancy nor site control can be read from published data.
| Engagement (site's cost and timeline page) | Fee range | Delivery |
|---|---|---|
| SBA feasibility study | $4,900 to $9,500 | 9 to 15 business days |
| B&I standard (single site, $1 million to $10 million) | $6,900 to $12,500 | 6 to 7 weeks |
| B&I complex (unusual asset, limited comparables) | $10,500 to $14,500 | 7 to 9 weeks |
| Rush | 20% to 35% added | 3 to 4 weeks |
With so few comparables, a West Virginia marina may price in the complex band. Each engagement includes the five Part 5001 components, seasonal projections with stress tests, a revision round and written acceptance terms; environmental assessments are a separate scope.
The first conversation needs the water body, site control documents, slip plan, budget and lender; arrange it free, with a reply promised inside a day.
Last updated 2026-11-08
USDA Feasibility, Inc.