USDA Feasibility Study for Marinas in West Virginia

    NAICS 713930

    West Virginia has 11 marinas with paid employees, 0.6 for every 100,000 residents, roughly half the national rate of 1.1 and a quarter of Maryland's 2.7. The Census county file places six of them, three in Braxton County and three in Monongalia County, and the staffing and payroll figures are published with noise flags that make them unreliable. SBA has financed three marina projects in the state with 7(a) loans since FY2010, plus one 504 loan. A marina lender in West Virginia will therefore have almost nothing local to compare against, and every number that matters, from slip occupancy to rates to the length of the season, has to come from the feasibility study's own research.

    Data current as of November 2026.

    Program fit for a West Virginia marina

    RouteFit for a West Virginia marinaWhat to check first
    USDA B&I guaranteeNew marinas, expansions, dry storage, service buildings, acquisitions on rural lakes and rivers85% guarantee under $5 million (91 FR 11272); parcel or lease passes 7 CFR 5001.3; site control for the loan term
    SBA 7(a)Acquisitions, docks and equipment; 3 West Virginia loans since FY201075% guarantee above $150,000 (13 CFR 120.210)
    SBA 504Owner-occupied marina real estate; 1 West Virginia loan of $1.0 million in FY2020 to FY202315% borrower share for a single-purpose property, 20% if also new (120.910)
    REAPLighting, efficient pumps and solar at an operating marinaGrant at most 25% of cost after 12 months of data; retail fuel dispensing and EV charging excluded under the rule effective 16 October 2026
    Conventional bankEstablished marinas with long site leasesLease term often caps loan term

    Before the market work, 7 CFR 5001.127 sets three screens. Paragraph (a) asks about the marina company, its controller and every active owner above 20 percent: an outstanding federal court judgment (except from the Tax Court), unpaid federal income tax or other federal debt in arrears, or a suspension or debarment disqualifies, and a payment arrangement counts only when complete. Paragraph (b) limits gambling revenue, including leased gaming machines in a marina restaurant or store, to 15 percent of gross revenue. Paragraph (d) excludes income from illegal products.

    Rule, discretion and the threshold for marinas

    SituationWhat Part 5001 says
    New marina company, B&I-guaranteed loan above $1,000,000Independent study required; Agency accepts the consultant and sets the scope (5001.306(a)(3)(i))
    Existing operator, or loan of $1,000,000 or lessAgency may require a study (5001.306(a)(3)(ii))
    Loan of $600,000 or lessStreamlined application (5001.306(b))
    Seasonal borrowerLender's analysis must include quarterly cash flow (5001.202)

    At the national FY2020 to FY2026 marina average of $1,281,853, a new marina usually lands in the first row.

    Marinas in West Virginia: market evidence

    West Virginia: marinas, supply and rural footprint

    MeasureWest VirginiaUnited States
    Establishments, 2019 → 20239 → 11 (+22.2%)3,757 → 3,734
    Per 100,000 residents (2023)0.61.1
    Average employees per establishment2.48.7
    Average annual pay per employee$68,154$51,262
    Share of establishments in non-metro counties50.0% (3 in 1 counties)
    Share of state population in non-metro counties (2025)38.4%

    Non-metro counties with the most marinas (2023): Braxton County (3).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading this table needs caution. The count rose by two, from 9 to 11, while the national count slipped. The other lines rest on 26 employees statewide: an average of 2.4 per marina, against 8.7 nationally, and average pay of $68,154, 33.0% above the U.S. figure, a result that tiny, noise-adjusted cells can produce without any real wage premium. The county file shows Braxton County's three marinas with one employee between them and $241,000 of payroll, which cannot describe operating marinas accurately. What the data do say is that West Virginia's marinas are few and small, most are seasonal or owner-run, and the state's 50% non-metro share rests on six placed marinas. A reviewer will expect slip counts, occupancy and rates from a field survey, not from Census.

    West Virginia marina employment and pay, 2019 and 2023 (computed from the Census CBP state files; cells carry noise flags)

    Measure20192023Change
    Marinas911+22.2%
    Paid employees2326+13.0%
    Average pay per employee$50,913$68,154+33.9%
    Payroll per establishment$130,111$161,091+23.8%

    Regional comparison

    Marinas in West Virginia and neighbouring states (each state's own pack; Census CBP 2023 and SBA FOIA data)

    StateMarinas, 2023Per 100,000 residentsChange 2019 to 2023Employees eachAverage payNon-metro share (placed)SBA 7(a) loans since FY2010Average 7(a) loan FY2020 to FY2026
    West Virginia110.6+22.2%2.4$68,15450.0%3$125,000
    Virginia1051.2-1.9%8.4$39,90833.3%10$1,986,250
    Kentucky420.9-10.6%8.0$41,15873.3%1$195,500
    Ohio1120.9+0.0%6.8$46,3820.0%7$466,400
    Pennsylvania390.3-9.3%5.7$53,88836.0%3$79,450
    Maryland1662.7+1.2%8.9$53,72221.1%8$1,495,667

    Virginia and Maryland, with tidal water and the Chesapeake, are different markets; Kentucky and Ohio, with inland lakes and rivers, are the closer comparisons, at 0.9 marinas per 100,000 residents and 6.8 to 8.0 employees each. Their SBA records are almost as thin as West Virginia's: Kentucky has one marina 7(a) loan since FY2010 and Ohio seven. The national record is the benchmark: FY2020 to FY2026 marina 7(a) loans averaged $1,281,853, and 8 of 155 seasoned FY2010 to FY2016 loans, 5.2%, were charged off, after about 91 months on average.

    Evidence the study must build

    With no usable local data, the study has to produce it: a survey of every marina, boat launch and dry-storage operator on the lake or river reach, with wet slips, dry stack spaces, sizes, seasonal and transient rates, waiting lists and services; registered boats and their sizes in the surrounding counties, if the state registration data can be obtained; launch counts or visitor counts on the water body; water levels and channel depths through the season; the terms of any lease or concession from the owner of the shoreline or water body, including length, rent, renewal and approval rights; permits for docks and dredging; and interviews with operators on occupancy, service revenue and winter storage demand.

    Revenue model, costs and capital items

    Revenue is wet slips and dry spaces by size times occupancy times seasonal rate, plus transient dockage, winter storage, fuel margin, service and repair labour, ship store sales, boat rentals and, where present, food and beverage. Each line has its own season, and the model must show which months carry the year. Costs are labour (often seasonal), dock and equipment maintenance, insurance (high for waterfront assets), utilities, lease or concession rent, fuel cost of goods, property tax and marketing. Capital items are docks and slips, breakwaters where needed, dry stack building and forklift, service building and equipment, fuel system with environmental protections, parking and launch ramps, utilities to the docks, dredging, permits and working capital for the off-season.

    Rural footprint and B&I eligibility in West Virginia

    The county file places only Braxton County's 3 marinas (non-metro) and Monongalia County's 3 (metro, Morgantown area), so the 50% non-metro share is a two-county statement. B&I eligibility under 7 CFR 5001.3 fails only inside a city of more than 50,000 or the urbanized area that adjoins it. No West Virginia city is that big on the 2025 estimates; Morgantown has 30,293 residents, so a lake marina in metro Monongalia County is not excluded by its county's label; river sites near Charleston (46,117) or Huntington (44,815) need a map check. The West Virginia state hub shows the near-line places.

    Financing benchmarks: USDA B&I next to SBA

    West Virginia: SBA lending to marinas

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20161$100,5000$0
    FY2017 to FY20190$00$0
    FY2020 to FY20230$01$1.0 million
    FY2024 to FY20262$250,0000$0

    Average 7(a) loan, FY2020 to FY2026: $125,000. Average 504 loan: $1.0 million. West Virginia had fewer than 30 seasoned 7(a) loans for marinas; nationally, 5.2% of 155 FY2010 to FY2016 loans were charged off, on average 91 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Three 7(a) loans and one 504 loan in seventeen fiscal years give no state benchmark. The 504 loan of $1.0 million in FY2020 to FY2023 is the only one at the scale of a substantial marina project; the 7(a) loans, $100,500 and two totalling $250,000, are equipment or working-capital credits. A B&I lender will size a West Virginia marina against the national average of $1,281,853 and the national 5.2% loss rate, and against the term of the site lease.

    FY2026 B&I terms applied to a West Virginia marina

    TermRule and sourceReading for a West Virginia marina
    Guarantee85% under $5 million (91 FR 11272)Nearly every inland marina
    Upfront fee3.0% of the guaranteed amount; reduced-fee option 1.0% with 80% (91 FR 11272)Can be financed
    Annual retention fee0.55% of the guaranteed outstanding balance (91 FR 11272; 5001.455)Fixed at obligation
    TermUseful life up to 40 years; no balloon (5001.402)Docks and dry stack over 15 to 25 years, and never beyond the site lease
    Equity, new marina20% balance sheet or 25% of project cost (5001.105(d)(4))Slip leases are annual and do not qualify for the 10% contract tier
    Equity, existing operator10% under 5001.105(d)(1)Acquisitions and expansions
    CollateralAppraisal over $250,000; going-concern value deducted before discounting (5001.203)Leasehold improvements on public water discount heavily
    Seasonal cash flowQuarterly cash flow for seasonal borrowers (5001.202)Winter quarters show losses

    Worked example (illustrative)

    Inputs. With three state 7(a) loans, Loan A uses the national FY2020 to FY2026 marina average: $1,280,000, near $1,281,853, for a new or rebuilt marina of about 150 slips, amortized over 20 years. Loan B is $450,000, an illustrative dock replacement or dry-storage addition at an existing marina, amortized over 15 years. Both use an assumed 7.50% fixed rate, an illustration rather than a quote, allowed under 5001.401 and 5001.402, with FY2026 fees. Equity rows assume no other debt. Because the state's marina pay figure rests on noise-flagged cells, the wage line uses an illustrative $40,000 full-time position instead.

    LineLoan A: near the national marina 7(a) averageLoan B: illustrative dock or dry-storage project
    Illustrative rate and amortization7.50% fixed, 20 years, monthly7.50% fixed, 15 years, monthly
    Loan amount$1,280,000.00$450,000.00
    B&I guarantee, FY2026 (91 FR 11272)85%85%
    Guaranteed amount$1,088,000.00$382,500.00
    Unguaranteed portion held by the lender$192,000.00$67,500.00
    Upfront guarantee fee (3.0% of guaranteed)$32,640.00$11,475.00
    First-year retention fee (0.55% of the guaranteed share of the full balance; upper bound)$5,984.00$2,103.75
    Retention fee on the balance after 12 monthly payments$5,849.77$2,024.83
    Monthly principal and interest$10,311.59$4,171.56
    Annual debt service$123,739.11$50,058.67
    Net operating income for 1.25x coverage$154,673.89$62,573.33
    Cushion above 1.00x$30,934.78$12,514.67
    Cushion in full-time wages at an illustrative $40,000 position0.77 positions0.31 positions
    Interest-only year, if structured (5001.402)$96,000.00$33,750.00
    Annual debt service if the rate is 2 points higher$143,175.35$56,388.13
    Coverage at that rate on the same income1.08x1.11x
    Coverage if income lands 10% below plan1.12x1.12x
    New business: 25% of project cost (5001.105(d)(4))$426,666.67 on a $1,706,666.67 project$150,000.00 on a $600,000.00 project
    New business: 20% balance sheet equity (debt to equity 4:1)$320,000.00$112,500.00
    Existing business: 10% of project cost (5001.105(d)(1))$142,222.22 on a $1,422,222.22 project$50,000.00 on a $500,000.00 project
    Reduced-fee option: upfront fee (1.0% of an 80% guarantee)$10,240.00$3,600.00
    Study compulsory for a new business? (5001.306(a)(3)(i))Yes, above $1,000,000No; the Agency may require one (5001.306(a)(3)(ii))
    Application track (5001.306)Full application (over $600,000)Streamlined ($600,000 or less)
    SBA 7(a) comparison: guaranteed share, amount and fee ceiling (120.210, 120.220)75%, $960,000.00, $33,600.0075%, $337,500.00, $10,125.00

    What it shows. Loan A needs $154,673.89 of net operating income at 1.25x, or $1,031.16 per slip per year across an illustrative 150 slips, after every operating cost and the site rent. In a lake market that closes for winter, most of that income arrives between late spring and early autumn, so a wet summer or low water can take the $30,934.78 cushion. At $450,000, Loan B is processed on the streamlined track and sits below the study rule, yet a 15-year amortization still has to end before the site lease does.

    What a lender-grade marina feasibility study in West Virginia must prove

    1. A complete survey of competing marinas, launches and dry storage on the same water body, with slips, rates and waiting lists.
    2. Boating demand from registrations, launch counts and visitor data around the site.
    3. Occupancy and rates by season and slip size, with a ramp for new slips.
    4. Site control: lease or concession terms, rent, renewal and approval rights, and a term at least as long as the loan.
    5. Water levels, channel depth and flood exposure across the season, with their effect on revenue.
    6. Permits for docks, dredging and fuel, with environmental protections priced.
    7. Service, storage and store revenue built separately from slip revenue.
    8. Quarterly cash flow and coverage under a short season, lower occupancy, higher insurance and a higher rate.

    Marina risks in West Virginia

    RiskWhy it bites hereHow the study tests or mitigates it
    No usable local data11 marinas; staffing and pay cells carry noise flagsField survey and operator interviews
    SeasonalityInland boating concentrates in warm monthsQuarterly model; reserve for the off-season
    Site controlShoreline often held under lease or concessionLease term beyond loan term; consent to encumber
    Water levels and floodsReservoir drawdowns and river floods disrupt useHistorical level data; insurance; dock design
    Thin loan record3 SBA 7(a) loans since FY2010National benchmarks; conservative loan-to-cost
    EnvironmentalFuel docks and boat maintenance carry contamination riskFuel system design; Phase I ESA (separate scope)

    Steps in the file and frequent send-backs

    Choose the lender first and scope the study to it; for B&I, the lender then forwards the study with its application to the USDA Rural Development state office serving West Virginia. Marina sponsors should assemble the site lease or deed, permits and their status, engineering for docks and any dredging, contractor bids, slip lists and rate history for an acquisition, operator experience and financial statements. Marina studies come back for occupancy assumed rather than surveyed, a full-year season in a seasonal market, no mention of lease term, and service revenue with no labour behind it.

    Program record, honestly labelled

    The inputs contain no West Virginia marina financed under B&I, so none is cited. In FY2024 to FY2026 USAspending records eight B&I guarantees for West Virginia across every industry, and 643 across the country.

    Hiring a USDA marina feasibility study consultant in West Virginia

    A newly formed marina company borrowing more than $1,000,000 through B&I must provide the independent study; acquisitions and smaller dock projects are left to the Agency or lender, and with only three state loans on record a lender is likely to ask. A USDA feasibility study consultant is most valuable here for the field survey and the lease review, since neither slip occupancy nor site control can be read from published data.

    Engagement (site's cost and timeline page)Fee rangeDelivery
    SBA feasibility study$4,900 to $9,5009 to 15 business days
    B&I standard (single site, $1 million to $10 million)$6,900 to $12,5006 to 7 weeks
    B&I complex (unusual asset, limited comparables)$10,500 to $14,5007 to 9 weeks
    Rush20% to 35% added3 to 4 weeks

    With so few comparables, a West Virginia marina may price in the complex band. Each engagement includes the five Part 5001 components, seasonal projections with stress tests, a revision round and written acceptance terms; environmental assessments are a separate scope.

    The first conversation needs the water body, site control documents, slip plan, budget and lender; arrange it free, with a reply promised inside a day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Do marinas in West Virginia need a feasibility study for B&I financing?

    The requirement is automatic for a new marina company borrowing more than $1,000,000 under the guarantee (7 CFR 5001.306(a)(3)(i)), and the national FY2020 to FY2026 marina 7(a) average of $1,281,853 suggests most new marinas qualify. Otherwise the Agency decides. With 11 marinas statewide and only three SBA 7(a) loans since FY2010, a lender has little to go on without one, so even discretionary cases usually get a study.

    What does a marina feasibility study consultant charge?

    Marina engagements fall in the same bands as other assets: $4,900 to $9,500 in SBA format, $6,900 to $12,500 for one B&I site, and $10,500 to $14,500 where comparables are scarce. A West Virginia marina, with few comparables and a site lease to analyse, may fall in the complex band. The fee is fixed in the proposal, typically half at signing and half at draft.

    How long does a marina study take?

    Six to nine weeks for B&I work and about three weeks for an SBA-format study, by the cost page's schedule. Timing matters more than usual: a survey run in winter cannot observe occupancy, so operator interviews and rate sheets fill the gap. Paying for a rush, 20% to 35% on top, can cut B&I delivery to three or four weeks.

    Who can write a marina feasibility study?

    For the compulsory case, an independent consultant whom the Agency accepts, with no stake in the marina, the dock builder or the boat dealer on site. The author should be able to survey slips on a lake or river, read a concession or site lease, and model a seasonal business with winter storage. The lender files the finished study with its application.

    How current must a marina study be?

    The regulation is silent on study age; the cost page's 18-month guideline for USDA data and the one-year appraisal limit in 5001.203 are the working limits. A marina study should be refreshed after a season of unusual water levels, a change in the site lease, or a competing marina adding slips, because each changes occupancy or revenue.

    Is one study enough for both SBA and USDA?

    Usually. SBA lenders using 13 CFR 120.160(b) accept a report that meets USDA's five-part standard and comes from an independent author. An SBA-format study would need technical and economic chapters for USDA. West Virginia marinas have used both 7(a) and 504, so a study that serves both keeps the lender pool as wide as possible in a thin market.

    Can a marina on leased shoreline get a B&I guarantee?

    It can, but the lease has to support the loan. Part 5001 limits term to useful life and bans balloons (5001.402), and a lender will want the lease to run at least as long as the loan, allow the leasehold to be pledged, and give the lender cure rights. The study should set out the lease terms and show debt service within them. Leasehold improvements discount heavily as collateral, so equity and guarantees carry more weight.

    Why is West Virginia's marina pay figure so high?

    It probably is not, in reality. The pack shows $68,154 per employee, 33.0% above the national figure, but it rests on 26 employees statewide, and Census publishes those cells with noise flags. Braxton County's three marinas show one employee and $241,000 of payroll, which no operating marina matches. A pro forma should use quoted local wages for dock, service and store staff instead.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee, retention fee and guarantee percentage for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. USAspending.gov prime award counts for Assistance Listings 10.768, 10.766 and 10.868, place of performance West Virginia, FY2024 to FY2026: https://www.usaspending.gov/search
    11. USDA Feasibility Study Consultants, cost and timeline page (fees, phases, rush terms, data recency, exclusions): https://usda-feasibility-study.com/usda-feasibility-study-cost
    12. Marina packs for Virginia, Kentucky, Ohio, Pennsylvania and Maryland (Census CBP 2023 and SBA FOIA data), used for the labelled neighbour comparison.

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.