USDA Feasibility Study for Self-Storage in Iowa

    NAICS 531130

    Self-storage projects in rural Iowa require supply-per-capita analysis, growth at metro edges and eligibility checks for fringe towns. An independent feasibility study consultant benchmarks rates and occupancy against the local competitive set.

    Census counted 82 Iowa self-storage businesses with paid employees in 2023, 2.6 per 100,000 residents against 5.5 nationally, 48th of 51 on a computed ranking, and every one of the 50 that Census can place by county is in a metro county. Iowa SBA lenders have nonetheless financed 32 storage projects since FY2010, most of them through 504. The study's work is to separate real undersupply in an eligible town from a statistical gap created by unstaffed rural facilities that Census never sees.

    Program Fit

    B&I covers self-storage as a commercial facility; eligibility at urbanized-area edges must be confirmed by address.

    RouteFit for an Iowa self-storage projectCondition
    USDA B&I guaranteeNew facilities, expansions, conversions, purchases with improvementsRural parcel under 7 CFR 5001.3; FY2026 guarantee 85% below $5 million
    SBA 504Owner-occupied storage real estateIowa's most-used SBA storage product: 22 loans since FY2010
    SBA 7(a)Purchases and smaller builds10 Iowa loans since FY2010, six since FY2020 averaging $1,140,583
    REAPRooftop solar or efficient lighting at an operating facility2026 rule: 12 months of operating data before a grant
    Conventional bankStabilised facilities with occupancy historyLower loan-to-value and shorter amortisation for lease-up projects

    Storage units rented to households and businesses are commercial income, so Community Facilities has no role. Units are not dwellings, but a project that adds apartments or rental homes on the same site keeps them out of the guaranteed loan, because 7 CFR 5001.118(a) excludes apartments and other independent housing. The borrower's owners of more than 20% must have no outstanding federal judgment, delinquent federal tax or debt, or debarment, and gambling may supply no more than 15% of gross revenue (5001.127); each 20% owner guarantees the loan in proportion to its stake for the full term (5001.204).

    Required by rule or requested by the lender

    The hard trigger in 7 CFR 5001.306(a)(3)(i) catches an Iowa storage developer forming a new company and asking for more than $1,000,000 of B&I-guaranteed debt: the file must then include an independent study, prepared by a consultant USDA accepts and scoped by USDA. Iowa's six SBA 7(a) storage loans since FY2020 averaged $1,140,583, just over that line. Expansions of an operating facility, and loans of $1,000,000 or less, are studied at USDA's discretion (5001.306(a)(3)(ii)); loans up to $600,000 can use the streamlined path (5001.306(b)). A new facility has no rent roll, so lenders usually want the study regardless.

    What the Study Covers

    Framed to the scope required by 7 CFR Part 5001 Appendix A for OneRD guaranteed loan submissions.

    • Market demand and competitive supply analysis
    • Technical and site feasibility, including environmental considerations
    • Five to ten year financial projections with DSCR, DCF, and sensitivity analysis
    • Management and operational capacity assessment
    • Economic feasibility and rural community impact

    For self-storage the market chapter is a trade-area supply and demand balance: households, renters, businesses and farms within a set drive time, every competing facility and its rentable square feet and unit mix, rates by unit size and climate control, and occupancy. The technical review covers site access and visibility, drainage, zoning, building type (drive-up, climate-controlled, boat and RV), security systems and phasing.

    Iowa Market Evidence

    Iowa's metro-fringe towns around Des Moines, Cedar Rapids and the Quad Cities need address-level eligibility checks; the study must show absorption without relying on metro spillover.

    Self-storage in Iowa: market evidence

    Iowa: self-storage facilities, supply and rural footprint

    MeasureIowaUnited States
    Establishments, 2019 → 202372 → 82 (+13.9%)16,904 → 18,564
    Per 100,000 residents (2023)2.65.5
    Average employees per establishment2.72.6
    Average annual pay per employee$36,744$40,550
    Share of establishments in non-metro counties0.0% (0 in 0 counties)
    Share of state population in non-metro counties (2025)37.6%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The staffed count rose by 10 facilities (13.9%) between 2019 and 2023, faster than the national 9.8%, and employment grew 50.0% to 219 while payroll rose 87.9%. Facilities are as small as everywhere else (2.7 employees; 78 of 82 have fewer than five), and pay of $36,744 is 9.4% below the U.S. average despite a 25.3% rise since 2019. Density is the striking figure: 46.3% of the national rate.

    A reviewer will not accept that density as proof of undersupply. Census counts only establishments with paid employees; many rural Iowa facilities are unstaffed, run by a farmer or a contractor from a phone, and never appear. Multi-site operators may also report several sites as one establishment. The low figure is therefore a prompt for a full inventory, not a conclusion. What the data do show is that Iowa's staffed, professionally run storage sits in its metro counties, and that rural towns on the hub's eligible list may have older, unstaffed supply that a modern facility can compete with on product, not just quantity.

    Regional comparables

    Computed from each state's pack (Census County Business Patterns 2023; SBA FOIA data as of 30 Sep 2026). Other states' figures are theirs.

    StateFacilities with payroll, 2019 → 2023Per 100,000 residentsAverage paySBA 7(a) loans, FY2020 to FY2026SBA 504 loans, FY2020 to FY2026
    Iowa72 → 822.6$36,7446 (average $1,140,583)6 (average $1,176,000)
    Minnesota150 → 1763.1$46,08618 (average $661,694)18
    Wisconsin130 → 1432.4$37,81826 (average $559,038)52
    Illinois510 → 5724.5$43,66328 (average $1,599,246)15
    Missouri264 → 2854.6$32,05942 (average $1,464,426)13
    Nebraska62 → 723.6$36,5469 (average $1,296,067)2
    South Dakota39 → 485.2$40,011015

    Iowa's density is the second lowest among its neighbours, above only Wisconsin, and both South Dakota (5.2) and Missouri (4.6) carry about twice Iowa's staffed supply per resident. Loan sizes vary in the other direction: Iowa's recent 7(a) average ($1,140,583) is close to Nebraska's and well above Minnesota's and Wisconsin's, which suggests Iowa's few recent projects were sizeable. Wisconsin's 52 and Minnesota's 18 recent 504 loans show how central 504 is to storage in the region, and Iowa follows the same pattern over the longer run.

    Demand drivers and competition

    Storage demand comes from households moving or downsizing, renters with little space, small businesses and contractors storing inventory and tools, and in rural Iowa, farms and lake-home owners storing vehicles, boats and equipment. Population and household growth in the eligible town, new housing, and employers drive it; plant closures reverse it, as the hub's account of Tyson's Perry closure (1,276 jobs in a town of 7,836) shows. Competition is every facility within the drive time, including unstaffed and farm-based storage, and the analysis measures rentable square feet per resident against the trade area's own history rather than a national rule of thumb.

    Revenue model, costs and capital

    Income is unit rent by size and type (drive-up, climate-controlled, parking for boats and RVs), less vacancy, concessions and bad debt, plus fees, insurance or protection-plan commissions, retail of boxes and locks, and truck rental where offered. Lenders track how many units are let and how much rent is actually collected, rent per square foot for each unit type, the number of months to reach a stable fill, and expenses as a share of income. Costs are on-site or remote management, property tax, insurance, utilities for climate control and lighting, software, marketing and repairs. Capital covers land, site work and paving, buildings, doors and partitions, climate control, gates, cameras and access systems, an office, and a lease-up reserve.

    Rural footprint and B&I eligibility in Iowa

    Census places 50 of the 82 staffed facilities by county: Polk 18 (about 3.5 per 100,000 residents), Linn 8, Scott 7, Story 5, Woodbury 5, Pottawattamie 4 and Black Hawk 3, all metro. The remaining 32 are in counties with one or two each, where Census does not publish, and those are most likely to be the rural ones. Non-metro counties hold 37.6% of Iowans.

    County type does not decide eligibility; 7 CFR 5001.3 does. Each of the seven counties above contains one of Iowa's 11 excluded cities (Des Moines and its neighbours, Cedar Rapids, Davenport, Ames, Sioux City, Council Bluffs, Waterloo), so most of their storage sits outside B&I's reach. The Iowa hub's check-the-map list (Altoona, Pleasant Hill, Norwalk, Waukee, Grimes, Polk City, Bondurant, Bettendorf, Le Claire, Walcott, Cedar Falls, Marion, Coralville, North Liberty, Tiffin, Asbury, Peosta, Gilbert, Carter Lake) is exactly where storage developers look for growth, which is why the live page insists on address-level checks. Indianola, Winterset, Adel, Pella, Fort Dodge, Marshalltown and Spencer screen as likely eligible.

    Financing benchmarks: USDA B&I next to SBA

    Iowa: SBA lending to self-storage facilities

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20161$315,00013$3.7 million
    FY2017 to FY20193$4.5 million3$2.3 million
    FY2020 to FY20234$6.1 million4$6.4 million
    FY2024 to FY20262$760,0002$607,000

    Average 7(a) loan, FY2020 to FY2026: $1.1 million. Average 504 loan: $1.2 million. Iowa had fewer than 30 seasoned 7(a) loans for self-storage facilities; nationally, 0.7% of 574 FY2010 to FY2016 loans were charged off, on average 49 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Iowa's SBA record is real but small: 10 7(a) and 22 504 loans since FY2010, including six of each since FY2020. The 7(a) loans averaged $1,140,583 in FY2020 to FY2026, 79.1% of the national average of $1,441,053, and the 504 loans $1,176,000 against $1,136,224 nationally. Storage is among SBA's safest categories: only 0.7% of 574 seasoned national 7(a) loans were charged off, at an average of 49 months, and Iowa's single seasoned 7(a) loan did not fail. USAspending counts 2 Iowa B&I loans across all industries in FY2024 to FY2026, so B&I storage financing in Iowa would be new ground for many lenders.

    B&I term (FY2026)Loan under $5 millionLoan of $5 million to $25 million
    Guarantee percentage85%80%
    Upfront guarantee fee, on the guaranteed amount3.0%3.0%
    Annual retention fee, on the guaranteed share of principal outstanding at 31 December0.55%0.55%
    Reduced-fee path, where the 7 CFR 5001.454 criteria are met1.0% upfront, 0.50% annual, 80% guarantee1.0% upfront, 0.50% annual, 80% guarantee
    Added fee if the Loan Note Guarantee issues before construction is complete0.50%0.50%
    Term (7 CFR 5001.402)Useful life, 40 years at most, no balloonUseful life, 40 years at most, no balloon
    Interest rate (7 CFR 5001.401)Negotiated; fixed, variable or both; no higher than the lender's similar unguaranteed loansSame
    Loan cap (7 CFR 5001.406(c))$25 million per borrower$25 million per borrower

    Fee and guarantee rates: USDA notice for loans obligated in FY2026 (91 FR 11272, effective October 1, 2025). Term, rate and cap: 7 CFR Part 5001.

    For a typical Iowa storage loan below $5 million, B&I offers a higher guarantee than SBA 7(a) (85% against 75%) and a term up to the useful life of the buildings within 40 years (5001.402), against which the lender weighs the 3.0% upfront and 0.55% annual fees. A new facility company needs 20% balance sheet equity or 25% of project cost (5001.105(d)(4)), 25% if the guarantee is to issue before construction ends (5001.105(d)(3)); an operator adding buildings to its own facility needs 10% (5001.105(d)(1)). An interest-only period through lease-up is allowed if full payments start within three years (5001.402). For collateral, 5001.203 has the appraiser value the facility as it stands and as completed, then strip out going-concern value before the lender discounts it.

    Worked example (illustrative)

    Iowa's FY2020 to FY2026 7(a) average gives Example A: $1,140,000, rounded from $1,140,583. Example B is a $3,600,000 new facility with drive-up, climate-controlled and boat and RV parking, built in an eligible town. Both assume a fixed 7.00% and 25-year amortisation.

    Computed for this page in Python from 91 FR 11272 and 7 CFR Part 5001; the rate, term and loan sizes are assumptions, not quotes.

    Input or resultExample AExample B
    Loan amount$1,140,000$3,600,000
    FY2026 guarantee percentage for this loan size85%85%
    Guaranteed amount$969,000.00$3,060,000.00
    Lender's unguaranteed exposure$171,000.00$540,000.00
    Upfront guarantee fee (3.0% of the guaranteed amount)$29,070.00$91,800.00
    First-year retention fee (0.55% of the guaranteed share, on the full opening principal)$5,329.50$16,830.00
    Same fee on the balance left after 12 monthly payments$5,247.97$16,572.53
    Illustrative fixed rate and amortization7.00%, 25 years, monthly7.00%, 25 years, monthly
    Monthly payment$8,057.28$25,444.05
    Annual debt service$96,687.39$305,328.61
    Net operating income needed for 1.25x coverage$120,859.24$381,660.77
    Cushion between 1.25x and break-even (1.00x)$24,171.85$76,332.15
    Coverage if that income falls 10%1.125x1.125x
    Coverage if that income falls 20%1.000x1.000x
    Coverage if the rate is 2 points higher, same income1.05x1.05x
    Interest-only year at the same rate (first full payment due within three years, 5001.402)$79,800.00$252,000.00
    New business, 25% of project cost: total project cost$1,520,000.00$4,800,000.00
    New business, 25% of project cost: equity$380,000.00$1,200,000.00
    New business, 20% balance sheet equity (debt to equity 4:1), loan as the only debt$285,000.00$900,000.00
    Existing business, or new business with qualifying sales contracts: 10% of project cost$126,666.67$400,000.00
    Extra 0.50% if the guarantee issues before construction ends$4,845.00$15,300.00
    Reduced-fee path (80% guarantee, 1.0% upfront, 0.50% annual): year-one fees$9,120.00 and $4,560.00$28,800.00 and $14,400.00
    SBA 7(a) comparison: 75% guaranteed share and the 13 CFR 120.220 fee ceiling$855,000.00; fee up to $29,925.00$2,700,000.00; fee up to $98,750.00

    If Example B had 450 units (an illustrative input, not data), stabilised 1.25x coverage would require $70.68 of net operating income per unit per month, before vacancy. The study sets that against surveyed Iowa rents by unit size, after operating costs, and shows the occupancy at which the facility only breaks even. Lease-up is the risk window: interest-only in year one would cost $252,000.00 against $305,328.61 of amortising debt service, and a 20% income shortfall at stabilisation takes coverage to 1.000x.

    What a lender-grade self-storage feasibility study in Iowa must prove

    1. Eligibility. A dated 5001.3 determination, essential on the metro fringe.
    2. Complete supply. Every facility in the drive time, staffed or not, with rentable square feet and unit mix.
    3. Local demand. Households, renters, businesses and farms in the eligible trade area, without counting metro spillover.
    4. Rates. Surveyed rents by unit size and type, with concessions.
    5. Lease-up. Monthly occupancy to stabilisation, with an interest reserve.
    6. Operating model. Staffed or remote management, and expenses at Iowa wages and tax rates.
    7. Site. Access, visibility, drainage and zoning.
    8. Coverage and break-even. 1.25x at stabilisation, break-even occupancy and a rate-cut scenario.

    Risks and mitigants in Iowa

    RiskIowa evidenceStudy response
    Hidden supplyCensus counts only staffed facilities; 32 Iowa facilities sit in counties too small to publishDrive-time inventory of every facility, staffed or not
    Metro spilloverAll 50 county-coded facilities are in seven metro countiesAbsorption from the eligible town's own households and businesses
    Plant-town demandTyson's Perry closure cut 1,276 jobs in 2024 (hub)Employer concentration and population trend in the trade area
    Lease-upNew facilities fill over several yearsMonthly lease-up curve and interest reserve
    Rate competitionNeighbouring facilities can cut rates during lease-upRate sensitivity and break-even occupancy
    EligibilityFringe towns around Des Moines, Cedar Rapids, the Quad CitiesDated map determination

    Process, documents and why studies are sent back

    The lender files the storage study inside its guaranteed loan application to USDA Rural Development in Iowa, whose State Director the hub names as Mike Sexton. Storage studies come back when supply counts only staffed facilities, when demand is borrowed from the neighbouring metro the site is meant to be outside, when lease-up is assumed in a single year, or when the site turns out to sit inside an urbanized area.

    Program examples

    The Iowa hub lists no USDA-financed storage facility; its card for self-storage and car wash projects names the tests a reviewer applies (supply per capita, growth at metro edges, fringe-town eligibility), which this page follows.

    National program example (outside Iowa)

    The Greater Minnesota self-storage study linked below is a B&I feasibility case study ($1M to $8M range) through a rate reset, the closest regional parallel but not an Iowa financing. Also linked below, the Iowa critical access hospital study is a Community Facilities engagement, listed for its Iowa context rather than as storage evidence.

    Hiring a USDA self-storage feasibility study consultant in Iowa

    For a start-up storage company borrowing more than $1,000,000 under B&I, an independent self-storage feasibility study consultant acceptable to USDA is a rule, not an option; below that, or for an expansion, the lender or Agency decides. Engage before closing on land, because eligibility and the supply inventory can each rule a site out. Developers comparing B&I with SBA 504 and a conventional construction loan often begin with a USDA feasibility study consultant to see which a lease-up project can support.

    The engagement covers the five Part 5001 components: trade-area supply and demand, site review, a monthly lease-up and five to ten year projection with coverage and sensitivity tables, an operator assessment and local economic effects. The firm's cost page describes the package as a PDF and Word report with its Excel workbook, a kickoff call and a midpoint call, a revision round and a written acceptance guarantee. Civil engineering, environmental site assessments, the appraisal and legal work are outside the fee.

    The sponsor provides the site and its survey, the building and unit-mix plan, cost estimates, any rent roll and occupancy history, the management plan, résumés, financial statements for each 20% owner and the lender's term sheet.

    Engagement (published schedule)Typical feeTypical timeline
    B&I loan guarantee, standard: loans of $1 million to $10 million, established asset class, single site$6,900 to $12,5006 to 7 weeks
    B&I loan guarantee, complex: loans over $10 million, unusual asset class, multi-site or phased, limited comparable data$10,500 to $14,5007 to 9 weeks
    SBA feasibility study$4,900 to $9,5009 to 15 business days
    Rush option, subject to analyst capacity20% to 35% above the standard fee3 to 4 weeks

    Source: USDA feasibility study cost and timeline.

    A single facility is a standard engagement; a phased or multi-site storage portfolio is complex. The firm's data request follows signing within 48 hours, with half the fixed fee usually invoiced then. Send the town, planned rentable square feet and loan amount through the free consultation form at the bottom of this page; the reply comes within 24 hours.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a self-storage project in Iowa?

    For an Iowa storage start-up whose B&I-guaranteed loan passes $1,000,000, the answer is yes by regulation (7 CFR 5001.306(a)(3)(i)). Iowa's recent SBA 7(a) storage loans averaged $1,140,583, right at that line. Smaller loans and expansions are discretionary, but with no rent roll and Census data that miss unstaffed facilities, Iowa lenders generally want one for any new build.

    What does 7 CFR Part 5001 require the study to contain?

    USDA scopes a five-part report covering market, technical, financial, management and economic feasibility. In Iowa that means a full storage inventory in the drive time, local household and business demand without metro spillover, the site and building plan, a lease-up and long-term projection with coverage tests, the operator's capacity, and the facility's local economic effect.

    How is a self-storage project evaluated in a USDA feasibility study?

    Rentable square feet per resident is compared with the trade area's history, rents are surveyed by unit type, and a monthly lease-up curve is built to a stabilised occupancy, then tested against debt service. Example B here, $3,600,000 at 7.00% over 25 years, needs $381,660.77 of stabilised net operating income for 1.25x, about $70.68 per unit per month at 450 units.

    How long does a USDA feasibility study take in Iowa?

    A single-site storage study runs six to seven weeks on the firm's standard B&I schedule, and a phased or multi-site project seven to nine. Storage developers racing a construction season can pay 20% to 35% extra for three-to-four-week delivery when analysts are available. Finding unstaffed rural facilities that no database lists is usually the slowest step.

    How does the FY2026 85 percent guarantee affect self-storage projects under $5 million?

    Almost every Iowa storage loan is below $5,000,000, where FY2026 obligations are 85% guaranteed. On Example A's $1,140,000, USDA guarantees $969,000.00 against $855,000.00 under a 75% SBA 7(a) guarantee, and the upfront B&I fee is $29,070.00. That ten-point gap in coverage is the main reason a lender weighs B&I against Iowa's usual 504 route; the FY2027 percentage will be set by a new notice.

    Who prepares a self-storage feasibility study in Iowa?

    A qualified consultant independent of the developer, the land seller, the building supplier, any management company and the lender, and acceptable to USDA. A building manufacturer's market report does not qualify. USDA Feasibility Study Consultants prepares storage studies to the five Part 5001 components in the form an Iowa lender files with USDA Rural Development.

    What does a self-storage feasibility study consultant cost in Iowa?

    Storage studies for a single Iowa site are quoted within $6,900 to $12,500 on the firm's B&I schedule; portfolios or phased builds sit at $10,500 to $14,500, and a study for an SBA lender alone at $4,900 to $9,500. Developers see the fixed number in writing before the competitor inventory begins. For scale, USDA's upfront fee on Example B is $91,800.00.

    How long is an Iowa self-storage feasibility study valid?

    The regulation gives a storage study no fixed lifespan. The firm keeps USDA market data under about 18 months old, and the closing appraisal must be less than a year old (5001.203). Storage markets can change quickly when a competitor opens nearby, so update the inventory and rate survey if a new facility appears before closing.

    Can the same self-storage study serve SBA and USDA lenders?

    Yes, usually. SBA may require a feasibility study under 13 CFR 120.160(b), and the supply, demand, lease-up and management chapters serve both; the firm refreshes data older than about 12 months for SBA. Iowa has used SBA 504 for 22 storage projects since FY2010, so a study comparing 504 with B&I is often the most useful result.

    Is Iowa undersupplied with self-storage?

    Not on Census evidence alone. Iowa's 2.6 staffed facilities per 100,000 residents is 48th of 51 and about half the U.S. rate, but Census skips facilities without paid employees, common in rural Iowa. A town may still be undersupplied with modern, climate-controlled space, and a study shows that by inventorying every facility and its occupancy in the drive time.

    Can a storage facility in Waukee, Bettendorf or North Liberty get a B&I guarantee?

    Possibly, but only after a USDA map determination. Those towns sit beside Des Moines, Davenport and Iowa City, and the Iowa hub lists them among fringe places that may fall inside an urbanized area. The live page's warning applies: the study must show the facility can fill from its own eligible trade area, not from metro spillover.

    Other project types in Iowa

    Hotels and Resorts · RV Parks and Campgrounds · Restaurants and Food Service · Event Venues and Banquet Facilities · Manufacturing · Food Processing · Back to all Iowa project types

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www.census.gov/programs-surveys/cbp.html
    2. U.S. Census Bureau, Vintage 2025 county population estimates: https://www.census.gov/programs-surveys/popest.html
    3. Office of Management and Budget, metropolitan statistical area delineation, July 2023 (Census delineation files): https://www.census.gov/geographies/reference-files/time-series/demo/metro-micro/delineation-files.html
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD guarantee fee, retention fee and guarantee percentage notice for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loans (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov award counts, Assistance Listings 10.768 (B&I), 10.766 (Community Facilities) and 10.868 (REAP), FY2024 to FY2026: https://www.usaspending.gov/search
    10. Iowa hub sources reused here (U.S. Census Bureau 2020 Census and V2025 estimates for the 50,000 test, fringe-town and likely-eligible lists; Food Dive / DTN on the Tyson Perry closure; project cards): /iowa
    11. USDA Feasibility Study Consultants, fee and timeline schedule: /usda-feasibility-study-cost

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours