USDA Feasibility Study for Gas Stations and C-Stores in Maine

    NAICS 457110

    Maine lost 70 gas stations and fuel-convenience stores between 2019 and 2023, falling from 746 to 676, a 9.4 percent drop that was three times the national decline. Even so, the state still has 48.2 stations per 100,000 residents against 32.4 nationally, and half of them, 333, are in non-metro counties. In Aroostook County there is one station for every 1,110 residents. Rural Maine depends on these stores for fuel and groceries over long distances, and the closures leave gaps a new or rebuilt store can fill. A feasibility study for a Maine station has to prove traffic, winter volume and inside sales at a specific corner, and show how the store fares as Canadian traffic and fuel demand change.

    Covered here: Maine's station count and where it fell, county densities, where B&I applies, the loan record, a financing example in daily dollars and gallons, and the proof a reviewer wants.

    Gas stations and c-stores in Maine: market evidence

    Maine: gas stations and fuel-convenience stores, supply and rural footprint

    MeasureMaineUnited States
    Establishments, 2019 → 2023746 → 676 (-9.4%)112,630 → 109,174
    Per 100,000 residents (2023)48.232.4
    Average employees per establishment10.19.3
    Average annual pay per employee$30,261$29,193
    Share of establishments in non-metro counties49.9% (333 in 11 counties)
    Share of state population in non-metro counties (2025)39.8%

    Non-metro counties with the most gas stations and fuel-convenience stores (2023): Aroostook County (60); Kennebec County (58); Hancock County (35); Somerset County (34); Oxford County (33); Washington County (24).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    What the station numbers say. A loss of 70 stations in four years, while the U.S. lost 3.1 percent, points to consolidation and closures of small independent sites, likely concentrated where volume is thin. The survivors are slightly larger than the national average, 10.1 employees against 9.3, with payroll of $306,775 per station against about $271,933, and pay per employee of $30,261, 3.7 percent above the U.S. $29,193. Statewide the sector employed 6,853 people in March 2023. For a pro forma, the key point is that Maine stations carry store-level staffing, which suits a model weighted to inside sales and food service. The study should identify which nearby stations closed and why, because a closure can mean freed-up volume or a market too thin to support fuel.

    Where Maine's stations are

    CountyOMB 2023 statusCount, 2023Residents, 2025Per 10,000 residents
    Cumberland Countymetro103317,2223.25
    Penobscot Countymetro88157,9675.57
    York Countymetro80222,4343.60
    Aroostook Countynot metro6066,6099.01
    Kennebec Countynot metro58129,0674.49
    Androscoggin Countymetro42116,4873.61
    Hancock Countynot metro3557,1716.12
    Somerset Countynot metro3451,6206.59
    Oxford Countynot metro3360,3465.47
    Washington Countynot metro2431,3347.66
    Franklin Countynot metro2330,8247.46
    Knox Countynot metro2141,1175.11
    Sagadahoc Countymetro2137,9795.53
    Lincoln Countynot metro1636,5954.37
    Piscataquis Countynot metro1517,4098.62
    Waldo Countynot metro1440,6933.44

    The rows place 667 of the 676 stations (2023 counts over 2025 populations). Aroostook has the highest density, 9.01 per 10,000 residents, followed by Piscataquis (8.62), Washington (7.66), Franklin (7.46), Somerset (6.59) and Hancock (6.12). Those are long-distance, low-population counties where each store serves a wide area. Cumberland (3.25), Waldo (3.44), York (3.60) and Androscoggin (3.61) have the lowest densities, consistent with larger stores serving denser traffic. The numbers frame two different site types: a rural store whose market is everyone within a long drive, and a corridor store whose market is the traffic passing it.

    Demand, revenue and costs

    Four items top the Maine guide's list of what reviewers test at a station: site traffic counts, the Canadian traffic decline at border ports, winter volume, and EV charging modelled without future grants. The Canadian figure matters on the border routes: Canadian crossings into Maine in July dropped by 108,000 between 2024 and 2025, to 275,000, and stayed 17 percent below the prior year into early 2026. On the EV side, the guide reports Maine expects about $19.3 million in NEVI formula funds, and its first NEVI station opened in Rockland with $473,591 in support.

    Revenue has three streams: fuel gallons times margin per gallon, inside sales times gross margin, and food service, car wash or other services. Key metrics are traffic count and capture rate, gallons per day, inside sales per customer, and margin by category. Costs are wages, card fees, utilities, insurance, maintenance, environmental compliance and property tax. Capital items are land, the building and canopy, tanks, dispensers and environmental systems, coolers and food equipment, and any EV chargers.

    Rural footprint and B&I eligibility in Maine

    Fuel retail is one of Maine's most rural businesses. The pack places 333 of 676 stations, 49.9 percent, in 11 non-metro counties with 39.8 percent of the population: 59.2 stations per 100,000 non-metro residents against 39.2 in metro counties, a rural concentration of 1.51. Aroostook (60), Kennebec (58), Hancock (35), Somerset (34), Oxford (33) and Washington (24) lead.

    B&I's rural test, 7 CFR 5001.3, works on the latest decennial census: a city or town of more than 50,000 is out, and so is the urbanized area adjoining it; everything else qualifies. Portland had 68,408 people in 2020 and is the only Maine city over the threshold. Rural-route stores and those in Bangor, Lewiston or Augusta pass; one on the Portland ring's commercial corridors, in South Portland or Westbrook for instance, needs a map determination before the lender applies. See the Maine guide for the screen.

    Program fit for a Maine fuel and convenience store

    B&I covers acquisition, rebuild or new construction of a station and store, including tanks and environmental systems, with amortization by useful life. SBA 7(a) is the common route for smaller acquisitions (65 Maine loans since FY2010) and 504 for owner-occupied real estate (17 loans). Two program screens are specific to this asset. First, the REAP rule effective 16 October 2026 excludes EV chargers and retail energy dispensing from REAP, and the Maine guide notes that any applicant deriving income from gambling is now ineligible for REAP; a store selling lottery tickets should assume no REAP grant until that question is settled. Second, B&I's 7 CFR 5001.127(b) makes a borrower ineligible if more than 15 percent of gross revenue, including lease income from space or machines, comes from gambling; lottery commissions and any gaming machines should be measured against that limit.

    FAME insurance (up to 90 percent on traditional term loans with a $7,500,000 relationship cap) is available for smaller Maine deals, and the guide notes FAME excludes gambling businesses. EV chargers, if included, should be modelled without assuming future NEVI or other grants, as the guide advises.

    Financing benchmarks: USDA B&I next to SBA

    Maine: SBA lending to gas stations and fuel-convenience stores

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201642$9.0 million6$1.8 million
    FY2017 to FY20199$4.9 million2$451,000
    FY2020 to FY20239$1.2 million7$2.9 million
    FY2024 to FY20265$6.9 million2$537,000

    Average 7(a) loan, FY2020 to FY2026: $581,286. Average 504 loan: $379,222. Of the 42 7(a) loans approved in FY2010 to FY2016 for Maine gas stations and fuel-convenience stores, 4.8% were charged off (national: 4.0% of 4,095), on average 50 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount (plus 0.50% if the guarantee issues before construction is complete)91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on 31 December91 FR 11272; 7 CFR 5001.455
    Reduced-fee tier (5001.454 criteria, annual cap)1.0% fee, 0.50% retention, 80% guarantee91 FR 11272
    Loan limit$25 million per borrower7 CFR 5001.406(c)
    Termuseful life of the collateral, 40 years at most, no balloon7 CFR 5001.402
    Ratenegotiated, fixed or variable, no higher than the lender's similar unguaranteed loans7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or 9:1 debt to equity), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) if the guarantee issues before completion; 10% with qualifying sales contracts7 CFR 5001.105(d)(2)-(4)
    Independent feasibility studyrequired above $1,000,000 for a new business; discretionary otherwise7 CFR 5001.306(a)(3)
    SBA 7(a), for comparison85% guarantee up to $150,000, 75% above13 CFR 120.210
    SBA 504, for comparisonborrower injection 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    Reading the station loan record. Maine fuel-retail lending has shifted from many small loans to fewer large ones: 42 7(a) loans worth $9.0 million in FY2010 to FY2016, then 5 worth $6.9 million in FY2024 to FY2026, about $1.38 million each. Maine's seasoned loss rate is the one figure on this page above the national: 4.8 percent of 42 loans against 4.0 percent of 4,095, with charge-offs on average 50 months after approval, earlier than most asset classes. Since FY2020 Maine holds 1.99 percent of national 504 loans for the sector but only 0.39 percent of 7(a) loans. Nationally the average 7(a) station loan since FY2020 was $1,603,159, against Maine's $581,286. A new-build travel center of $3 million to $4 million falls in the 85 percent tier and, for a new business, requires the independent study.

    Worked example (illustrative)

    Inputs: Loan A, $580,000 (Maine's 7(a) average of $581,286, rounded), buys an existing station at an illustrative 8.00 percent over 15 years. Loan B, an illustrative $3,200,000, builds a new fuel and convenience store at 7.50 percent over 20 years. Both are fixed-rate loans priced inside 5001.401, with terms inside the useful-life limit of 5001.402. The gallons rows translate the cash-flow target into fuel volume at illustrative net margins of 10 and 20 cents a gallon, as if fuel alone carried the debt. Retention computed on the guaranteed balance after the first year's payments. Computed in Python.

    Input or resultLoan A: station acquisition (Maine 7(a) average)Loan B: new fuel and convenience build
    Loan amount$580,000.00$3,200,000.00
    Rate and amortization (illustrative)8.00%, 15 years7.50%, 20 years
    Guaranteed amount at 85%$493,000.00$2,720,000.00
    Upfront fee (3.0%)$14,790.00$81,600.00
    First retention fee (0.55%)$2,613.94$14,624.42
    Annual debt service$66,513.39$309,347.79
    Cash flow for 1.25x coverage$83,141.73$386,684.73
    Cash flow needed per day (365 days)$227.79$1,059.41
    Gallons a day if all of it came from fuel at 10 cents net per gallon2,27810,594
    Gallons a day at 20 cents net per gallon1,1395,297
    Coverage if winter volume cuts annual cash flow 12%1.10x1.10x
    Coverage at 2 points more interest1.11x1.08x
    New-business equity, 25% of project cost$193,333.33$1,066,666.67
    Existing-business equity, 10% of project cost$64,444.44$355,555.56

    Daily cash flow and gallons. Loan A needs $83,141.73 a year for 1.25x coverage, or $227.79 every day. If fuel alone had to carry it, that would take 2,278 gallons a day at 10 cents of net margin or 1,139 at 20 cents. Loan B needs $386,684.73, $1,059.41 a day, which would take 10,594 gallons a day at 10 cents or 5,297 at 20 cents. No study should rely on fuel alone; the point of the table is to show how much the store, food service and other income must contribute. A winter that cuts annual cash flow 12 percent leaves 1.10x on either loan, and two points more interest leaves 1.11x on Loan A and 1.08x on Loan B. Loan B's equity for a new business is $1,066,666.67 at 25 percent of project cost; an existing operator rebuilding would need $355,555.56 at 10 percent.

    What a lender-grade gas station feasibility study in Maine must prove

    1. Traffic counts at the site and its access, with turning movements and seasonal variation.
    2. Capture: the share of passing traffic and local residents the store will win, against named competitors.
    3. Winter volume by month, since the Maine guide lists it among the reviewer tests.
    4. Canadian traffic exposure for stores on border routes, with the 2025 decline built in.
    5. Inside sales per customer and margin by category, from comparable Maine stores.
    6. Fuel volume and margin assumptions, with a low-margin case.
    7. Closures among the 70 stations Maine lost since 2019 in the trade area, and what they mean for demand.
    8. Environmental condition of an existing site, and tank and system compliance.
    9. EV charging modelled without assumed future grants, and REAP excluded for chargers and fuel dispensing.
    10. Revenue from lottery and any gaming tested against the 15 percent gambling limit.

    Risks and mitigants in Maine

    Volume risk on rural routes and Canadian border corridors is the first concern; mitigants are documented traffic counts, local customer surveys and strong inside sales. Margin volatility in fuel calls for a low-margin case. Environmental liability on existing sites requires assessments before closing. Long-run fuel demand may soften as vehicles change, which favours stores whose inside sales and food service carry more of the debt. Station real estate is special-purpose; the 5001.203 appraisal must strip going-concern value before USDA discounts it.

    Process and documents

    Bangor's USDA Rural Development staff review the study with the lender's B&I application. The sponsor provides site control, traffic data, the site plan and budget, environmental reports, fuel supply and branding agreements, trading history for an acquisition (gallons, inside sales and margins by month), financial statements and the guarantees of owners above 20 percent. Studies return when traffic is estimated rather than counted, when inside sales come from national averages, or when EV revenue depends on grants not yet awarded.

    Program example

    Nothing in the Maine guide's list of USDA financings, or elsewhere in this page's inputs, involves a station or convenience store, so this page names no Maine precedent. National program example (outside Maine): the site's Mississippi case study of a c-store and travel center financed with a B&I guarantee.

    Hiring a USDA gas station feasibility study consultant in Maine

    Loan B shows when the study stops being optional: a start-up store borrowing over $1,000,000 under B&I must deliver an outside study, scoped by USDA, from a consultant USDA accepts (5001.306(a)(3)(i)). Seasoned operators buying a store, and smaller loans, leave the decision to USDA and the bank. A USDA feasibility study consultant for a station should be independent of the fuel supplier, the seller and the lender, and should build demand from traffic counts and competitor surveys.

    The site's cost page names gas stations among the asset classes with deep comparable data, which usually keeps a station in the standard B&I band of $6,900 to $12,500 over six to seven weeks. Complex projects, such as a multi-site acquisition or a travel center with limited comparables, run $10,500 to $14,500 over seven to nine weeks. Environmental assessments and engineering are separate.

    Ask for a station study proposal. Give the location, traffic data you have, the program and lender, and a senior analyst will be in touch within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Maine gas station need a feasibility study for a USDA loan?

    Only a start-up whose B&I loan tops $1,000,000 is required to file one. Many Maine station deals are smaller (the 7(a) average since FY2020 is $581,286), but new-build stores and travel centers usually exceed the threshold. For acquisitions and smaller loans, USDA may still ask, especially where traffic has changed, as on Canadian border routes.

    What does a gas station feasibility study consultant cost?

    Gas stations are one of the asset classes the cost page describes as rich in comparable data, and its standard B&I band is a fixed $6,900 to $12,500, which keeps most single-site studies in that band. Multi-site deals, unusual formats or limited comparables move to the complex band at $10,500 to $14,500. Environmental work is priced separately by other professionals.

    How long does a station study take?

    The cost page allows six to seven weeks for standard work and seven to nine for complex, or three to four on a rush at 20 to 35 percent extra. Traffic counts can add time if none exist for the site; Maine's winter volume also means a count taken in summer must be adjusted, which the study should explain.

    Who can prepare a gas station feasibility study for USDA?

    A consultant USDA accepts as qualified who has nothing riding on the deal. Fuel suppliers, brand representatives, the seller's broker and the lender all gain at closing, so none can author it. The Bangor office judges acceptability for each application, and USDA does not publish any list of approved consultants, so the report should explain its author's independence.

    How long is a gas station study valid?

    No expiry is written into Part 5001, but USDA generally wants market data under 18 months old, per the cost page. Fuel margins and traffic can change quickly in Maine, as the 2025 drop in Canadian crossings showed, so a study on a border-route site should be updated if closing is delayed past one season.

    Can one study serve an SBA 504 lender and USDA?

    Yes. SBA may require a study, and a report built for USDA covers what a 504 or 7(a) lender needs. Maine station owners took 9 504 loans and 14 7(a) loans since FY2020, so comparing a 504 structure (10 to 20 percent injection) with B&I (10 percent existing, 25 percent new) in one model is useful.

    Can a Maine c-store get a REAP grant for EV chargers or solar?

    Not for chargers. The REAP rule effective 16 October 2026 excludes EV chargers and retail energy dispensing, and the Maine guide notes the rule makes applicants with any gambling income ineligible, which may affect a store selling lottery tickets. Solar or efficiency work could qualify only after 12 months of operating data, and a store should confirm its eligibility first.

    Do lottery sales affect B&I eligibility?

    They have to be measured. Section 5001.127(b) disqualifies a borrower whose gambling income passes 15 percent of annual gross revenue, including lease income from space or machines; the exception covers only state lottery or tribal gaming proceeds raised for the approved project, as the Agency approves. A study should report lottery commissions and any machine income as a share of revenue.

    Why are there so many stations per resident in northern Maine?

    Distance. Aroostook has 9.01 stations per 10,000 residents, Piscataquis 8.62 and Washington 7.66, against 3.25 in Cumberland, on 2023 counts and 2025 populations. In counties with few people spread over long distances, each store serves a small population across a wide area. A study there must show enough local and through traffic per store.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo), including 5001.127: https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD technical amendments, 11 December 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. Maine state guide on this site, citing the Joint Office of Energy and Transportation and MaineDOT on NEVI, U.S. Customs and Border Protection crossing data and Finance Authority of Maine terms: /maine
    11. Site cost and timeline page /usda-feasibility-study-cost and contact page /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours