Maine's renewable energy activity runs through REAP, not through solar companies. USAspending records 188 REAP grants and 10 REAP loans in Maine for FY2024 to FY2026, while Census County Business Patterns counts just five solar, biomass and other renewable generating businesses with paid staff, down from seven in 2019. Most Maine solar arrays belong to farms and rural businesses whose main activity is something else, which is exactly who REAP serves. The rules changed on 16 October 2026. Under the new REAP rule a grant covers at most 25 percent of cost and $500,000 for a renewable system, and it is paid only after the project has 12 months of operating data, so the grant no longer pays for construction. A feasibility study for a Maine solar project now has to show the project works on its own energy economics with a guaranteed loan and owner cash, then treat any grant as a later bonus.
This page sets out what the thin Census and SBA data show, the new REAP terms, a worked example with and without a grant, and the evidence a lender-grade study must include.
Solar and renewable generation in Maine: market evidence
Maine: solar and other renewable power generation, supply and rural footprint
| Measure | Maine | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 7 → 5 (-28.6%) | 405 → 942 |
| Per 100,000 residents (2023) | 0.4 | 0.3 |
| Average employees per establishment | 23.0 | 12.3 |
| Average annual pay per employee | $66,991 | $138,631 |
| Share of state population in non-metro counties (2025) | 39.8% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Why the Census count is small. The five establishments are businesses whose main activity is generating electricity from solar, biomass or other renewable sources and that have paid staff; they averaged 23.0 employees, 115 in all, with pay of $66,991, about half the national $138,631. Their number fell from seven to five while the national count more than doubled, from 405 to 942. On the biomass side, the Maine guide's forest products section records that only two of Maine's six biomass plants survived the 2018 to 2020 closures. A rooftop array on a dairy barn or a ground-mount array behind a pallet plant is counted under the farm or the plant, not here. The county file publishes none of the five, so the pack has no rural share; the 188 REAP grants are the better measure of where rural solar activity is.
Regional comparison (neighbouring states' figures)
The comparison compiles Maine's solar pack with those of its neighbours; other states' rows describe those states.
| State | Count 2019 → 2023 | Density per 100k residents (2023) | Avg. employees | Avg. pay | SBA 7(a) loans, fiscal 2010-26 | SBA 504 loans, fiscal 2010-26 | 7(a) loans fiscal 2020-26 (avg.) |
|---|---|---|---|---|---|---|---|
| Maine | 7 → 5 | 0.4 | 23.0 | $66,991 | 1 | 1 | 1 ($200,000) |
| New Hampshire | 9 → 3 | 0.2 | 9.3 | $83,107 | 1 | 3 | 0 |
| Vermont | 0 → 0 | 0.0 | n/a | n/a | 0 | 5 | 0 |
| Massachusetts | 12 → 22 | 0.3 | 33.0 | $164,497 | 7 | 8 | 5 ($217,000) |
New Hampshire's count fell from nine to three and Vermont shows none with paid staff in either year, while Massachusetts grew from 12 to 22, averaging 33.0 employees and $164,497 in pay. SBA solar lending is minimal across all four states, with Vermont's five 504 loans and Massachusetts's 15 combined loans the largest records. For a Maine REAP study, regional generators are of limited use as comparables; installer quotes, utility tariffs and the owner's own meter data matter more.
National benchmarks
Nationally, 138 SBA 7(a) loans to renewable generators from FY2020 to FY2026 averaged $478,591, and 17 504 loans averaged $638,588. The seasoned national record is poor and small: 12.9 percent of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval. That loss rate is a reason lenders want production verified, which the new REAP rule now requires in any case.
The evidence a study must build under the new rule
- Load history: at least 12 months of pre-installation energy use, since ground-mount systems must be sized to commensurate historical use and storage cannot exceed 120 percent of prior annual use.
- Production estimate reconciled with actual meter data once the system runs; the grant application needs 12 months of actual production or savings.
- Site screening: ground-mount solar on cropland as defined in 7 CFR 718.2 is ineligible, and projects at more than one location are ineligible.
- Component origin: a country-of-origin list for every component, since systems with parts from a foreign adversary under 15 CFR 791.4 are ineligible.
- Installer qualifications: licensed in Maine with at least three similar installations, and procurement under 2 CFR 200.318 to 200.327.
- Simple payback no longer than the system's useful life, now an eligibility test.
- Tariff and billing terms: the economics under Maine's net energy billing terms, which the Maine guide names as a review item.
Rural footprint and eligibility in Maine
Census places none of the five generators by county, so eligibility is a site question. REAP guaranteed loans and B&I use the Part 5001 rural definition in 7 CFR 5001.3: outside any city or town of more than 50,000 people at the latest decennial census and its contiguous urbanized area. In Maine only Portland (68,408 in 2020) is above the line; farms and businesses elsewhere, including Bowdoin and Leeds where the Maine guide's REAP precedents sit, screen as eligible. Whether a particular applicant qualifies as a rural small business or an agricultural producer under REAP's own rules is a separate check the study should record. Non-metro counties account for 39.8 percent of Maine's population. See the Maine guide.
Program fit: REAP after 16 October 2026
The new REAP rule changes the structure of a Maine solar deal. Grants range from $1,500 to $500,000 for renewable systems ($250,000 for efficiency), cover at most 25 percent of cost, and are awarded through national competitions (one for requests of $20,000 or less and one for all others) in annual windows. The project period must end 12 to 24 months before the application, so the grant reimburses a built, operating system. Grant plus REAP guaranteed loan cannot exceed 75 percent of project cost. USDA says the REAP guaranteed loan under 7 CFR 5001 is available for up-front costs; its FY2026 terms are an 80 percent guarantee, a 1.0 percent fee and 0.25 percent annual retention. The rule also limits each highest-level owner to one application per federal fiscal year and requires site control for at least 12 months before the project period. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.
Exclusions matter in Maine too: EV chargers, retail energy dispensing, stand-alone storage, storage retrofits and distribution-only projects are out. The Maine guide adds that any applicant deriving income from gambling is ineligible for REAP. B&I remains available for a for-profit energy project at 85 percent under $5 million and a 3.0 percent fee. C-PACE through the Efficiency Maine Green Bank and FAME insurance are the state layers the guide names.
Financing benchmarks: USDA B&I next to SBA
Maine: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 1 | $200,000 | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 1 | $404,000 |
Average 7(a) loan, FY2020 to FY2026: $200,000. Average 504 loan: $404,000. Maine had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount (plus 0.50% if the guarantee issues before construction is complete) | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on 31 December | 91 FR 11272; 7 CFR 5001.455 |
| Reduced-fee tier (5001.454 criteria, annual cap) | 1.0% fee, 0.50% retention, 80% guarantee | 91 FR 11272 |
| Loan limit | $25 million per borrower | 7 CFR 5001.406(c) |
| Term | useful life of the collateral, 40 years at most, no balloon | 7 CFR 5001.402 |
| Rate | negotiated, fixed or variable, no higher than the lender's similar unguaranteed loans | 7 CFR 5001.401 |
| Equity, existing business | 10% balance sheet equity (or 9:1 debt to equity), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new business | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) if the guarantee issues before completion; 10% with qualifying sales contracts | 7 CFR 5001.105(d)(2)-(4) |
| Independent feasibility study | required above $1,000,000 for a new business; discretionary otherwise | 7 CFR 5001.306(a)(3) |
| REAP guaranteed loan (comparison) | 80% guarantee, 1.0% fee, 0.25% retention | 91 FR 11272 |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
| SBA 504, for comparison | borrower injection 10%; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
Reading two loans. Maine's SBA solar record is one 7(a) loan of $200,000 in FY2020 to FY2023 and one 504 loan of $404,000 in FY2024 to FY2026. Neither tells a lender much. USDA's own record in Maine is fuller: 10 REAP loans and 188 REAP grants in FY2024 to FY2026, across all REAP project types, and the Bowdoin guaranteed loan described below. For a farm or rural business system, the realistic structure is a REAP guaranteed loan with owner cash, and possibly a later grant.
Worked example (illustrative)
Inputs: an illustrative $1,000,000 solar project. The base case uses no grant: a REAP guaranteed loan of 75 percent of cost, $750,000. The second column assumes a full grant later (25 percent of cost, $250,000, under the $500,000 cap), which under the 75 percent combined limit reduces the loan to $500,000. The third column finances the same $750,000 under B&I instead. All use an illustrative 7.00 percent fixed rate (5001.401) over 20 years (5001.402). The first retention fee uses the guaranteed share of the year-end balance. Computed in Python.
| Input or result | REAP loan, no grant (base case) | REAP loan with a full grant | B&I instead of REAP, same loan |
|---|---|---|---|
| Project cost (illustrative) | $1,000,000.00 | $1,000,000.00 | $1,000,000.00 |
| REAP grant (at most 25% of cost, $500,000 cap) | none | $250,000.00 | none |
| Guaranteed loan (grant plus loan at most 75% of cost) | $750,000.00 | $500,000.00 | $750,000.00 |
| Owner cash, at least 25% of cost | $250,000.00 | $250,000.00 | $250,000.00 |
| Guarantee | 80% | 80% | 85% |
| Guaranteed amount | $600,000.00 | $400,000.00 | $637,500.00 |
| Upfront fee | 1.0%: $6,000.00 | 1.0%: $4,000.00 | 3.0%: $19,125.00 |
| First retention fee (balance after 12 payments) | 0.25%: $1,464.32 | 0.25%: $976.21 | 0.55%: $3,422.84 |
| Rate and amortization (illustrative) | 7.00%, 20 years | 7.00%, 20 years | 7.00%, 20 years |
| Annual debt service | $69,776.90 | $46,517.94 | $69,776.90 |
| Annual savings or sales for 1.25x coverage | $87,221.13 | $58,147.42 | $87,221.13 |
| Simple payback at that annual benefit (cost / benefit) | 11.47 years | 12.90 years on net cost | 11.47 years |
| Coverage if output runs 15% below the estimate | 1.06x | 1.06x | 1.06x |
What the base case shows. Without a grant, the $750,000 REAP loan costs $69,776.90 a year and needs $87,221.13 of annual energy savings or sales for 1.25x coverage. At that benefit, simple payback is 11.47 years, which passes the rule's test only if the system's documented useful life is longer. With a full grant the loan falls to $500,000 and the benefit needed to $58,147.42, but owner cash stays at $250,000, because grant and loan together cannot exceed 75 percent. The grant also arrives after 12 months of operation, so the $250,000 it will eventually cover has to be bridged during construction, which is why the Maine guide asks for bridge financing to be shown. If output runs 15 percent below the estimate, coverage drops to 1.06x in every column. REAP's fees are lower than B&I's: $6,000 against $19,125 up front, a $13,125 difference, and 0.25 percent retention against 0.55 percent.
What a lender-grade solar feasibility study in Maine must prove
- Twelve months or more of pre-installation energy use and a system sized to it.
- A production estimate from an independent model, with a downside case.
- The value of each kilowatt-hour under the applicable Maine net energy billing terms or tariff.
- Debt service coverage with no grant, as the Maine guide requires.
- Simple payback against documented useful life.
- Site eligibility: not cropland for ground mounts, single location, site control for 12 months before the project period.
- Component origin and installer qualifications under the rule.
- Bridge financing if a grant is planned, with its cost.
- The owner's other income and credit, since a farm or business, not the array, usually repays the loan.
Risks and mitigants
Production risk is addressed by conservative estimates and, after the first year, actual meter data. Tariff risk turns on billing terms that can change over a 20-year loan; the study should test a lower credit value. Grant risk is now structural: the grant is competitive, paid late, and in no notice yet under the new rule, so lenders should underwrite without it. Equipment risk is mitigated by warranties and an inverter replacement reserve. Collateral is mostly equipment, so the borrower's wider balance sheet carries the credit.
Process and documents
REAP guaranteed loan and B&I applications go through the lender to USDA Rural Development's Bangor office; the grant, when a notice opens, is a separate competitive application after 12 months of operation. The sponsor provides utility bills and interval data, the installer's proposal and qualifications, component origin documents, site control, an energy assessment where required, financial statements and owner guarantees. Solar studies are returned when they assume a grant in the base case, size a ground-mount array beyond historical use, or omit the payback test.
Program example
Maine REAP precedents in the state guide, labelled by program and rule era. REAP guaranteed loan: Augusta Road Bowdoin Solar LLC, Bowdoin, 2021, $7,385,000 for a 5.415 MWdc ground-mount array, guaranteed through Crestmark. REAP grant: Gerrity Company Inc., 2024, $867,763 toward a 578.2 kW solar array at the company's Leeds pallet plant. Both predate the October 2026 rule; Gerrity's grant exceeds today's $500,000 renewable cap, and a ground-mount array today must also clear the cropland and sizing tests. National program example (outside Maine): the site's Pennsylvania case study of commercial rooftop solar financed through REAP.
Hiring a USDA solar feasibility study consultant in Maine
REAP's own rules set the documents a solar application needs, and for REAP guaranteed loans and B&I, Part 5001 applies: an independent study by a consultant USDA accepts is mandatory for a new business borrowing more than $1,000,000 (5001.306(a)(3)(i)), and the Agency may require one below that. A USDA feasibility study consultant for a Maine solar project should be independent of the installer and the equipment supplier, test production and tariff assumptions, and model the project without the grant.
The site's cost page prices REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks and REAP guaranteed loans over $600,000 at $7,500 to $11,500 over five to seven weeks. Combined REAP loan and grant packages can fall under OneRD complex engagements at $9,500 to $18,000. Engineering, interconnection studies and grant application drafting are separate.
Request a REAP solar study proposal. Include the site, system size, load data and lender, for a senior analyst's reply within one business day.
Last updated 2026-11-08