USDA Feasibility Study for Sawmills and Wood Products in Maine

    NAICS 321

    Wood products are the most rural industry this site covers in Maine. The state had 174 wood product manufacturers in 2023, 12.4 for every 100,000 residents, three times the national rate, and 55.6 percent of them sit in non-metro counties that hold 39.8 percent of the population. The raw material is not the constraint: the Maine state guide reports that the forest grows 1.66 times what is harvested and that sawmills processed 883 million board feet in 2023, 48 percent more than in 2009. Markets are the constraint, especially for chips, bark and other residuals after pulp mill and biomass plant closures. A feasibility study for a Maine sawmill or wood plant must show where every product and by-product goes, at what price, within what haul distance.

    This page covers the state data, the eligibility test, B&I, Timber Production Expansion and SBA benchmarks, a worked example expressed per thousand board feet, and the file of evidence a mill study has to put in front of the lender.

    Wood products manufacturing in Maine: market evidence

    Maine: wood product manufacturing, supply and rural footprint

    MeasureMaineUnited States
    Establishments, 2019 → 2023169 → 174 (+3.0%)14,223 → 13,899
    Per 100,000 residents (2023)12.44.1
    Average employees per establishment29.531.1
    Average annual pay per employee$53,965$57,420
    Share of establishments in non-metro counties55.6% (94 in 9 counties)
    Share of state population in non-metro counties (2025)39.8%

    Non-metro counties with the most wood product manufacturing (2023): Aroostook County (24); Somerset County (16); Kennebec County (11); Oxford County (10); Waldo County (9); Piscataquis County (8).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    What the wood plant numbers say. Maine gained five wood product plants between 2019 and 2023 while the national count fell by 324, so the state is holding capacity that other regions are losing. Plants are close to national size, 29.5 employees against 31.1, with payroll of $1,593,523 per plant against about $1,785,760, and pay per employee of $53,965 is 6.0 percent below the U.S. $57,420. Total employment was 5,138 in March 2023. The category covers sawmills, wood preservation, veneer and plywood, engineered wood, millwork, containers and pallets, and prefabricated buildings, so a study for one plant draws benchmarks from its own product line rather than the state average.

    The resource figures in the Maine guide frame the market. Maine harvested 10.0 million green tons of wood in 2023, 26 percent less than in 2011, and pulpwood processing fell 14 percent in a single year, while sawlog processing climbed. The Androscoggin Mill in Jay closed in 2023 with about 230 jobs lost, and four of Maine's six biomass plants closed between 2018 and 2020. For a sawmill, those closures matter because roughly every log produces chips, sawdust and bark that need a buyer.

    Where Maine's wood plants are

    CountyOMB 2023 statusCount, 2023Residents, 2025Per 10,000 residents
    Aroostook Countynot metro2466,6093.60
    Penobscot Countymetro24157,9671.52
    Cumberland Countymetro21317,2220.66
    York Countymetro18222,4340.81
    Somerset Countynot metro1651,6203.10
    Androscoggin Countymetro12116,4871.03
    Kennebec Countynot metro11129,0670.85
    Oxford Countynot metro1060,3461.66
    Waldo Countynot metro940,6932.21
    Piscataquis Countynot metro817,4094.60
    Knox Countynot metro741,1171.70
    Franklin Countynot metro530,8241.62
    Lincoln Countynot metro436,5951.09

    Counts are 2023 Census county figures; densities use Vintage 2025 populations. The rows place 169 of the 174 plants. Piscataquis County has the highest density, 4.60 plants per 10,000 residents, followed by Aroostook (3.60), Somerset (3.10) and Waldo (2.21). Aroostook and Penobscot tie for the largest count, 24 each, but Penobscot's density is 1.52 because of its larger population. Cumberland (21) and York (18) host plants closer to population centres, more likely millwork, truss and secondary manufacturing than primary sawmilling.

    Supply, markets and the operating model

    A wood plant's revenue is lumber or product volume times price by grade, plus by-product income from chips, sawdust, shavings and bark. Its key metrics are log intake (tons or thousand board feet), recovery (lumber out per log in), grade mix, mill uptime, and residual volume and price. Costs are delivered logs, labour, energy for kilns and machinery, maintenance, trucking and residual disposal if no buyer exists. Capital items are the mill building, saw lines and scanners, kilns, planers, log yard and handling equipment, and working capital for log and lumber inventory, which swings with the harvest season and road restrictions. The Maine guide's reviewer tests for this sector are wood supply and price within haul distance, offtake or market evidence, a residuals outlet for chips and bark, and power cost.

    Rural footprint and B&I eligibility in Maine

    The pack places 94 of the 174 plants in nine non-metro counties: Aroostook (24), Somerset (16), Kennebec (11), Oxford (10), Waldo (9) and Piscataquis (8) lead. Per head, that is 16.7 plants per 100,000 non-metro residents against 8.8 in metro counties, a rural concentration of 1.90, the highest of any Maine asset class on these pages.

    Eligibility follows 7 CFR 5001.3, which counts population at the latest decennial census and excludes only cities and towns above 50,000 and the urbanized area that adjoins them. With Portland (68,408 in 2020) the state's only city above that size, nearly every mill site in the state, including those in metro Penobscot and Androscoggin counties, screens as eligible; only a plant inside Portland or its excluded urbanized area fails. The Maine guide explains the screen.

    Program fit for a Maine wood plant

    Three USDA guarantees are relevant. B&I covers mills and wood plants up to $25 million, with an 85 percent guarantee under $5 million. The Timber Production Expansion program, a separate USDA guarantee for forest-products capacity, financed Maine Plywood's conversion in Bingham in 2026 and is now a proven Maine route, in the guide's words. REAP grants can fund efficiency or on-site generation at an operating plant, though the October 2026 rule moved payment to after a year of results and is capped at 25 percent of cost and $500,000 for renewable systems.

    Grant and fee layers help the equity case. Local ownership plus a natural-resource value-added product, a fair description of most Maine mills, is one route to B&I's reduced fee (1.0 percent, 0.50 percent retention, 80 percent guarantee), subject to USDA's annual cap. The Northern Border Regional Commission designates the main wood counties, Aroostook, Somerset, Piscataquis, Oxford, Franklin, Waldo and Penobscot among them, as distressed with a 20 percent match. SBA 7(a) and 504 serve smaller equipment and building needs.

    Financing benchmarks: USDA B&I next to SBA

    Maine: SBA lending to wood product manufacturing

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY201617$3.3 million3$575,000
    FY2017 to FY20194$275,0002$2.6 million
    FY2020 to FY20234$773,2003$812,000
    FY2024 to FY20267$9.4 million1$1.6 million

    Average 7(a) loan, FY2020 to FY2026: $922,564. Average 504 loan: $597,750. Maine had fewer than 30 seasoned 7(a) loans for wood product manufacturing; nationally, 7.1% of 1,015 FY2010 to FY2016 loans were charged off, on average 65 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount (plus 0.50% if the guarantee issues before construction is complete)91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on 31 December91 FR 11272; 7 CFR 5001.455
    Reduced-fee tier (5001.454 criteria, annual cap)1.0% fee, 0.50% retention, 80% guarantee91 FR 11272
    Loan limit$25 million per borrower7 CFR 5001.406(c)
    Termuseful life of the collateral, 40 years at most, no balloon7 CFR 5001.402
    Ratenegotiated, fixed or variable, no higher than the lender's similar unguaranteed loans7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or 9:1 debt to equity), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) if the guarantee issues before completion; 10% with qualifying sales contracts7 CFR 5001.105(d)(2)-(4)
    Independent feasibility studyrequired above $1,000,000 for a new business; discretionary otherwise7 CFR 5001.306(a)(3)
    SBA 7(a), for comparison85% guarantee up to $150,000, 75% above13 CFR 120.210
    SBA 504, for comparisonborrower injection 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    What the loss history tells a lender. The pack text reports fewer than 30 seasoned Maine loans and points to the national rate, 7.1 percent of 1,015 charged off, on average 65 months after approval. The pack JSON is more pointed: 4 of the 17 Maine wood products 7(a) loans approved in FY2010 to FY2016 were charged off, $1,571,396 of $3,281,100 lent. The sample is small, but it is the reason a Maine lender will read a wood plant study's market section closely. Lending has since recovered in size: 7 7(a) loans worth $9.4 million in FY2024 to FY2026, about $1.34 million each, against 4 loans worth $773,200 in FY2020 to FY2023. Since FY2020 Maine holds 1.36 percent of national wood products 7(a) loans and 2.50 percent of 504 loans, both well above its 0.42 percent population share. A modernization in the $1 million to $5 million range sits in the 85 percent tier; an operating mill needs 10 percent equity, a new one 25 percent of project cost.

    Worked example (illustrative)

    Inputs: Loan A, $920,000, rounds Maine's 7(a) average of $922,564 and finances mill equipment over an illustrative 12-year life. Loan B, an illustrative $4,500,000, modernizes an existing mill over 20 years. Both carry an illustrative 7.25 percent fixed rate (5001.401); terms follow useful life (5001.402). Annual throughput of 12 and 20 million board feet is illustrative. The reduced-fee row assumes USDA grants that tier. The retention fee is figured on the guaranteed share of the balance left after 12 payments. Computed in Python.

    Input or resultLoan A: equipment (Maine 7(a) average)Loan B: mill modernization
    Loan amount$920,000.00$4,500,000.00
    Rate and amortization (illustrative)7.25%, 12 years7.25%, 20 years
    Guaranteed amount at 85%$782,000.00$3,825,000.00
    Upfront fee (3.0%)$23,460.00$114,750.00
    Upfront fee in the reduced-fee tier (1.0% of an 80% guarantee)$7,360.00$36,000.00
    First retention fee (0.55%)$4,067.49$20,551.48
    Annual debt service$115,009.84$426,803.03
    Cash flow for 1.25x coverage$143,762.30$533,503.79
    Cash flow per thousand board feet at 12 MMBF a year (illustrative)$11.98$44.46
    Cash flow per thousand board feet at 20 MMBF a year (illustrative)$7.19$26.68
    Coverage if the residuals outlet closes and cash flow falls 15%1.06x1.06x
    Existing-business equity, 10% of project cost$102,222.22$500,000.00
    New-business equity, 25% of project cost$306,666.67$1,500,000.00

    Per thousand board feet. Loan A needs $143,762.30 of cash flow for 1.25x coverage, or $11.98 per thousand board feet at 12 million board feet a year. Loan B needs $533,503.79: $44.46 per thousand at 12 million, falling to $26.68 at 20 million. Twenty million board feet would be about 2.3 percent of the 883 million Maine mills processed in 2023, which gives the reviewer a scale check on the log supply the study must document. If the residuals outlet closes and cash flow falls 15 percent, coverage drops to 1.06x on either loan. In the reduced-fee tier the upfront fee on Loan B falls from $114,750 to $36,000, with an 80 percent instead of 85 percent guarantee. Equity for Loan B is $500,000 for an operating mill at 10 percent of project cost, or $1,500,000 for a new business at 25 percent.

    What a lender-grade sawmill feasibility study in Maine must prove

    1. Log supply by species and grade within an economic haul distance, with landowner, contractor or supply agreements.
    2. Delivered log price history and a high-price case.
    3. Product offtake: buyers, contracts or letters for lumber or products by grade, and the price assumptions behind each.
    4. A residuals plan: who takes chips, sawdust and bark after the Jay and biomass closures, at what price or disposal cost.
    5. Recovery and uptime assumptions benchmarked to comparable mills and the new equipment's specifications.
    6. Power cost and capacity at the site, which the Maine guide names as a review test.
    7. Inventory and working capital through mud season and winter log decking.
    8. Labour within commuting range of the mill at Maine wage levels.
    9. The program choice among B&I, Timber Production Expansion and REAP, and any NBRC or reduced-fee layer.
    10. Management with mill operating experience and a maintenance plan for the new line.

    Risks and mitigants in Maine

    Residual markets are the distinctive Maine risk, since chip and biomass outlets have shrunk while sawlog volumes rose. Mitigants are a signed residual contract, on-site use for kiln heat, or a value-added product such as pellets or bedding. Lumber price cycles call for a downside case at trough prices. Fire, equipment failure and weather can halt production, so insurance and a maintenance reserve belong in the model. Machinery collateral is specialized; any real estate appraisal under 5001.203 excludes going-concern value and must be under a year old at closing.

    Process and documents

    USDA Rural Development's Maine state office in Bangor reviews the lender's B&I application with the study attached. The sponsor provides log supply agreements or a wood procurement plan, product and residual sales contracts, equipment quotes, the mill layout and budget, three years of operating history for an existing mill, permits, financial statements and personal guarantees from each owner above 20 percent. Studies come back when log supply is asserted rather than documented, when residuals are assumed to have a buyer, or when lumber prices are taken from a peak year.

    Program example

    Maine precedents in the state guide, labelled by program. Timber Production Expansion guarantee (not B&I): Maine Plywood USA, LLC, Bingham, 2026, $11,900,000 for turning a Bingham sawmill into a plywood underlayment plant expected to employ 95. REAP grant: Gerrity Company Inc., Leeds, 2024, $867,763 for 578.2 kW of solar at its pallet plant; that grant predates the October 2026 rule, which now caps renewable grants at $500,000. National program example (outside Maine): the site's Pennsylvania Wilds case study of a hardwood mill modernization under B&I.

    Hiring a USDA sawmill feasibility study consultant in Maine

    When a start-up wood business seeks a B&I guarantee on more than $1,000,000, it must file an independent study by a qualified consultant USDA accepts (5001.306(a)(3)(i)). For an operating mill, USDA may require one when the project significantly affects the borrower's operations and historic cash flow, which a new saw line or a conversion usually does. A USDA feasibility study consultant for a mill must be independent of the equipment maker, the landowner supplying logs and the lender, and must be able to test supply, product and residual markets, not just demand.

    The site's cost page prices standard B&I studies at $6,900 to $12,500 delivered in six to seven weeks, and complex studies, including those for loans above $10 million or phased plants, at $10,500 to $14,500 over seven to nine weeks. Combined programs, such as a B&I loan with REAP and an NBRC grant, can be priced as OneRD complex engagements at $9,500 to $18,000. Engineering, environmental assessments and appraisals are separate.

    Request a proposal for a Maine mill study. Include the location, products, log volume and lender; a senior analyst gets back to you within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Maine sawmill need a USDA feasibility study?

    Yes, if the mill is a new business and its B&I-guaranteed loan exceeds $1,000,000; 5001.306(a)(3)(i) is mandatory. For an existing mill, the Agency can require one when a project significantly changes operations and historic cash flow. With four of Maine's 17 seasoned wood products SBA loans charged off in the pack data, lenders are likely to ask for a study on any sizable mill loan.

    What does a sawmill feasibility study consultant cost?

    According to the site's cost page, standard B&I studies are a fixed $6,900 to $12,500 and complex ones $10,500 to $14,500; combined-program structures can reach $9,500 to $18,000. A single-site Maine mill modernization with documented supply and buyers usually prices as standard. A conversion to a new product, or a stack of B&I, Timber Production Expansion and grants, moves up.

    How long does a mill study take?

    The cost page schedules mill studies at six to seven weeks when standard and seven to nine when complex; faster delivery costs a premium. Mill studies run longer when log supply must be surveyed across several landowners or when residual buyers are uncertain after closures, so starting the supply work early protects the schedule.

    Who is allowed to prepare the study?

    An independent consultant, qualified for wood products work and acceptable to USDA, with no interest in the borrower, project or loan. Equipment manufacturers, log suppliers and the lender are not independent. USDA keeps no approved roster; Rural Development's Maine state office in Bangor decides whether the author and scope are acceptable for each application.

    How long is a sawmill feasibility study valid?

    No expiry date is set in Part 5001. USDA generally looks for market data under 18 months old, according to the cost page, and appraisals must be less than one year old at closing. Lumber and residual prices move quickly, so a study should be refreshed with current prices and contracts if closing is delayed.

    Can one study be used for SBA and USDA lenders?

    Usually, yes. SBA can require a feasibility study, and a report organised around USDA's five components covers what an SBA lender reviews. Maine wood plants used 7(a) for 32 loans and 504 for 9 since FY2010, so the same model can help a sponsor compare an SBA equipment loan with a larger B&I or Timber Production Expansion guarantee.

    Is Timber Production Expansion a better fit than B&I for a Maine mill?

    It depends on the project. Timber Production Expansion is a USDA guarantee aimed at forest-products capacity, and Maine Plywood's $11,900,000 conversion in Bingham shows it working in Maine. B&I is broader and covers any eligible business. A study can test both; its supply, offtake and residual sections serve either program.

    Why do residual markets matter so much in Maine?

    Because the outlets have shrunk. The Androscoggin Mill in Jay shut in 2023 and two-thirds of Maine's biomass plants (four of six) shut between 2018 and 2020, by the Maine guide's account, while pulpwood processing fell 14 percent in a year. A sawmill produces chips, sawdust and bark with every log. In the worked example, losing that income cuts coverage from 1.25x to 1.06x.

    Is a sawmill in Penobscot or Androscoggin County eligible for B&I?

    Almost certainly, despite the metro label. B&I excludes only cities over 50,000 at the last decennial census and their adjoining urbanized areas, and Portland is the only Maine city over that size. Bangor and Lewiston-Auburn screen as eligible in the Maine guide. Penobscot has 24 wood plants and Androscoggin 12, all on that basis outside the exclusion.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD technical amendments, 11 December 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. REAP final rule with comment period, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    10. Maine state guide on this site, citing the Maine Forest Service Wood Processor Report and State of the Forest review, USDA RD releases and the TPEP project list, the Boston Globe and NBRC 2026 designations: /maine
    11. Site cost and timeline page /usda-feasibility-study-cost and contact page /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours