USDA Feasibility Study for Assisted Living and Senior Care in Montana

    NAICS 6233

    Montana has 198 assisted living, continuing care and nursing facilities with paid staff, 17.5 per 100,000 residents against 13.3 nationally, and they are smaller than the U.S. norm: 36.6 employees on average against 53.5. A third of them sit in counties too small to appear in the Census county file. That is the setting for a USDA assisted living feasibility study in Montana: small rural communities, small buildings, a care workforce that must be recruited locally, and a choice between B&I for a for-profit operator and Community Facilities for a non-profit or public owner.

    Assisted living in Montana: market evidence

    Montana: assisted living and nursing facilities, supply and rural footprint

    MeasureMontanaUnited States
    Establishments, 2019 → 2023193 → 198 (+2.6%)43,506 → 44,649
    Per 100,000 residents (2023)17.513.3
    Average employees per establishment36.653.5
    Average annual pay per employee$38,592$41,324
    Share of establishments in non-metro counties34.8% (46 in 7 counties)
    Share of state population in non-metro counties (2025)44.7%

    Non-metro counties with the most assisted living and nursing facilities (2023): Flathead County (18); Silver Bow County (8); Fergus County (5); Ravalli County (5); Custer County (4); Lake County (3).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading the senior care numbers. The state's facility count grew 2.6 percent from 2019 to 2023, in step with the national 2.6 percent, so Montana is not adding capacity faster than the country even though its density is 1.32 times higher. Payroll per facility is $1,413,864 against $2,212,615 nationally, and pay per employee is $38,592, 6.6 percent below the U.S. $41,324. Staffing is the line a reviewer will test first: care staff are the largest expense, the hardest to hire in small towns, and the item most often understated in senior housing pro formas. A projection that runs a 24-bed building with far fewer than the state's average staffing, or below Montana pay, must explain how. Note that the pack combines assisted living, continuing care communities and nursing homes; a study for an assisted living building should separate its own competitive set by licence type.

    Where the facilities are

    The county file places 132 of the 198 facilities. Yellowstone County has 39 (2.26 per 10,000 residents), Flathead and Cascade 18 each, Missoula 16 and Gallatin 10, against 1.73 statewide. Small non-metro counties carry high densities: Fergus County has 5 facilities (4.23 per 10,000) and Custer 4 (3.32). Lewis and Clark County, with 3 placed facilities for 75,331 residents (0.40 per 10,000), stands out as thinly served on the published count, though facilities in its smaller cells may be among the 66 unplaced. A study for any county should count competitors by name and licence rather than rely on the county file.

    Demand drivers and competition

    Demand is the age 75 and older population in the primary market area, adjusted for income and assets that make private pay possible, the share needing help with daily activities, and the in-migration of parents near adult children. Supply is every licensed unit and bed by type, plus projects under construction. Penetration and capture rates then show how many units the market can fill, and absorption shows how fast. Rural Montana markets are wide but thin, so the primary market area is drawn by drive time and family ties, not a fixed radius.

    Revenue model, costs and capital

    Revenue is units times occupancy times monthly rate by care level, plus care add-ons and community fees, split between private pay and public payers where the licence allows them. Costs are care and support staff, food, utilities, insurance, property tax, management and a replacement reserve. Capital items are land, a licensed building, common areas, kitchen, life-safety systems, furniture and equipment, and the operating deficit reserve that funds fill-up.

    Rural footprint and B&I eligibility in Montana

    Non-metro counties hold 46 of the 132 placed facilities (34.8 percent), below their 44.7 percent share of the population: 9.0 facilities per 100,000 non-metro residents against 13.6 in metro counties. But 66 facilities, a third of the total, are unplaced, and many are likely in the small counties where one or two facilities serve a town, so the rural share is understated. Both B&I and CF apply the 7 CFR 5001.3 place test, under which senior housing inside Billings, Missoula, Great Falls or Bozeman, or their attached urbanized areas, is ineligible, while Helena (35,138 residents), Butte-Silver Bow (36,118) and Kalispell (31,851) remain open. The Montana state guide lists the places and the parcel check.

    Regional comparison

    Neighbouring packs put Montana in the middle of the region on density: South Dakota 23.3 facilities per 100,000, North Dakota 19.3, Montana 17.5, Idaho 16.9 and Wyoming 11.8. North Dakota's facilities are twice as large (74.1 employees on average) and South Dakota's pay $36,232 per employee. Wyoming's thinner supply and 52.4 percent non-metro share make it the closest comparison for a small Montana town.

    Program fit: B&I or Community Facilities

    Ownership decides the program. The site's national healthcare page notes that senior care is often owned by non-profits that qualify for Community Facilities, while for-profit operators route to B&I. B&I offers 85 percent under $5 million and 80 percent above, a 3.0 percent fee and 0.55 percent retention fee in FY2026. The same notice sets CF guaranteed loans at 80 percent with a 1.25 percent fee and 0.50 percent annual retention; USAspending's Montana tally for FY2024 to FY2026 shows 8 CF loans and 24 CF grants spread over every kind of community facility (an incomplete count). SBA has financed Montana senior care 21 times through 7(a) and 13 times through 504 since FY2010. REAP is open to licensed nursing and assisted living facilities despite its general bar on residential systems, as the site's national renewable energy page reports.

    Financing benchmarks: USDA B&I next to SBA

    Montana: SBA lending to assisted living and nursing facilities

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20168$9.4 million2$1.1 million
    FY2017 to FY20195$8.4 million0$0
    FY2020 to FY20235$1.9 million9$13.5 million
    FY2024 to FY20263$2.6 million2$2.1 million

    Average 7(a) loan, FY2020 to FY2026: $562,325. Average 504 loan: $1.4 million. Montana had fewer than 30 seasoned 7(a) loans for assisted living and nursing facilities; nationally, 3.3% of 1,086 FY2010 to FY2016 loans were charged off, on average 85 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on December 3191 FR 11272; 7 CFR 5001.455
    Reduced-fee loans (criteria in 5001.454)1.0% fee, 0.50% retention, 80% guarantee91 FR 11272
    Guarantee issued before construction is completeadditional 0.50% fee91 FR 11272; 7 CFR 5001.454
    Maximum loan per borrower$25 million7 CFR 5001.406(c)
    Termuseful life of the collateral, 40 years at most, no balloon7 CFR 5001.402
    Interest ratenegotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete7 CFR 5001.105(d)(3), (d)(4)
    Independent feasibility studyrequired above $1,000,000 for a new business; at the Agency's discretion otherwise7 CFR 5001.306(a)(3)
    SBA 7(a), for comparison85% guarantee up to $150,000, 75% above13 CFR 120.210
    SBA 504, for comparisonborrower injection 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    What it means for a Montana senior care project. SBA 504, not 7(a), has carried the building loans: 11 Montana 504 loans averaging $1,418,364 in FY2020 to FY2026, against 8 7(a) loans averaging $562,325. The 7(a) average fell from $1,175,650 in FY2010 to FY2016 to $379,720 in FY2020 to FY2023, which suggests 7(a) is now used for acquisitions and equipment rather than buildings. None of Montana's eight senior care 7(a) loans from FY2010 to FY2016 was charged off; across the U.S., 3.3 percent of 1,086 loans were charged off, on average 85 months after approval, among the lowest rates on this site but with losses arriving late. A new building of 40 or more units will usually exceed $5 million and fall into B&I's 80 percent tier; a non-profit sponsor of the same building would look at CF.

    Worked example (illustrative)

    Montana's 7(a) average rests on 8 loans, so Loan A uses $1,400,000, close to Montana's $1,418,364 average SBA 504 loan and above the national 7(a) average of $1,219,305: a small residence or an expansion over 25 years. Loan B, $6,000,000, is an illustrative new 60-unit community over 30 years. Both use an illustrative 7.25 percent fixed rate.

    Input or resultLoan ALoan B
    Loan amount$1,400,000.00$6,000,000.00
    Guarantee percentage (fiscal 2026 tier)85%80%
    Guaranteed amount$1,190,000.00$4,800,000.00
    Upfront guarantee fee (3.0% of the guaranteed amount)$35,700.00$144,000.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$41,650.00$168,000.00
    First annual retention fee (0.55% of the guaranteed share of the balance after 12 payments)$6,448.66$26,144.49
    Interest rate (illustrative, fixed)7.25%7.25%
    Amortization (years, no balloon)2530
    Monthly payment$10,119.30$40,930.58
    Annual debt service (NOI for 1.00x, break-even on debt)$121,431.55$491,166.92
    NOI for 1.25x coverage$151,789.44$613,958.65
    Coverage at that NOI if the rate is 2 points higher1.06x1.04x
    Coverage at that NOI if the term is 5 years shorter1.14x1.18x
    Equity, new business, 25% of total project cost (5001.105(d)(4))$466,666.67$2,000,000.00
    Total project cost on that basis$1,866,666.67$8,000,000.00
    Equity, new business, 20% balance sheet route if this loan is the only liability$350,000.00$1,500,000.00
    Equity, existing business, 10% of project cost (5001.105(d)(1))$155,555.56$666,666.67
    Independent feasibility study (5001.306(a)(3))required for a new business (5001.306(a)(3)(i))required for a new business (5001.306(a)(3)(i))

    Per-bed test and the CF alternative. For an illustrative 24-bed residence, Loan A needs $151,789.44 of net operating income for 1.25x coverage, $6,324.56 per bed per year or $17.33 per bed per day after all costs. For 60 units, Loan B needs $10,232.64 per unit per year, $28.03 per unit per day. Fill-up is the danger: at 1.25x, Loan B can absorb only a 20 percent shortfall in net income before it reaches break-even, so the study needs an absorption schedule and an operating deficit reserve. Rate risk is also high on a 30-year loan: two points more cut coverage to 1.04x. If a non-profit borrowed Loan B as a CF guaranteed loan, the 80 percent guarantee would carry a $60,000.00 upfront fee at 1.25 percent instead of $144,000.00, and a first-year retention fee of about $23,767.71 at 0.50 percent.

    What a lender-grade assisted living feasibility study in Montana must prove

    1. A primary market area drawn by drive time and family ties, with the age 75 and older population and income-qualified households.
    2. An inventory of every licensed competitor by care level, beds and rates, including facilities in counties too small for the Census file.
    3. Penetration, capture and absorption rates that support the unit count and the fill-up schedule.
    4. Rates by care level against comparable Montana facilities, and the payer mix the licence allows.
    5. Staffing by shift at Montana pay ($38,592 per employee on average) and a recruitment plan for small-town labour markets.
    6. Licensing and life-safety requirements, with approvals scheduled before opening.
    7. An operating deficit reserve sized to the absorption period.
    8. Program fit (B&I for for-profit, CF for non-profit or public) and parcel eligibility under 5001.3.

    Risks and mitigants in Montana

    Staffing is the first risk in a small-town facility; mitigants are realistic wages, housing or scheduling support, and a staffing plan by shift. Slow fill-up is the second, worse where the market area is thin; the mitigant is pre-leasing evidence and a reserve. Payer changes affect any facility relying on public programs, so the study tests a private-pay-heavy and a public-payer-heavy case. Winter weather affects staff travel and family visits in remote areas. Collateral is single-purpose: an appraisal under 5001.203 deducts going-concern value before discounting, and the building has few alternative uses, so equity matters more.

    Process, documents and what gets a study returned

    For B&I, the lender sends the application and study to USDA's Rural Development state office for Montana; for CF, a non-profit or public applicant works with the same office. Sponsors assemble the site plan and unit mix, the licensing pathway, construction budget and schedule, management agreement, rate schedule, any operating history, personal or organisational financial statements, and owner guarantees where required (5001.204). Studies come back when demand rests on total senior population rather than qualified households, when competitors are missed, or when staffing and absorption are optimistic.

    Program example

    The Montana inputs name no USDA-financed senior care project, so none is cited here. The site's rural senior care case study from Texas is linked below and is outside Montana.

    Hiring a USDA assisted living feasibility study consultant in Montana

    If a newly formed operator's B&I loan for a senior care building exceeds $1,000,000, the study must be commissioned from an independent assisted living feasibility study consultant acceptable to USDA (5001.306(a)(3)(i)). CF applicants follow CF's own study requirements, which this page does not cover. Senior care fees on the cost page are $6,900 to $12,500 for a standard B&I study and $6,900 to $12,000 for a CF study taking six to eight weeks; either covers the market and licensed competition, a fill-up and operating model with downside cases, technical, management and economic chapters, the report files, the spreadsheet and one revision. Appraisals and architectural work are separate. The sponsor provides the site, unit mix, licence plan, budget and any history. Before signing, put one question to any USDA feasibility study consultant: how will it find licensed competitors in counties too small for the Census file, where a third of Montana's facilities sit?

    Ask for a proposal on the contact page: name the town, whether the borrower is for-profit or non-profit, the program, the cost range and the lender; the contact page states that a senior analyst answers within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for an assisted living facility in Montana?

    B&I makes it mandatory for a start-up operator borrowing more than $1,000,000, with the study written by an independent consultant USDA accepts (7 CFR 5001.306(a)(3)(i)). Montana's SBA 504 senior care loans averaged $1,418,364 in FY2020 to FY2026, so most new buildings cross the line. Non-profit and public projects under Community Facilities follow CF requirements, and lenders on both programs generally expect a market study for senior housing.

    What does an assisted living feasibility study consultant cost in Montana?

    Three bands on the site's cost page cover senior care: Community Facilities studies at $6,900 to $12,000, standard B&I at $6,900 to $12,500 and complex B&I at $10,500 to $14,500. A single-site residence in a town with clear competitors fits the standard band; a campus with several care levels and phases may be complex. The fee is fixed in the proposal.

    How long does it take?

    On the cost page, standard B&I studies take 6 to 7 weeks, complex ones 7 to 9, and CF studies 6 to 8. Montana senior care studies run longer when competitors in small counties must be contacted directly for rates and occupancy, since many do not publish them. Send the unit mix and licence plan with the first data request, because the absorption model and the deficit reserve are built from them.

    Who can prepare it?

    An independent, qualified consultant acceptable to USDA, with no stake in the land, the construction, the management contract or the loan (5001.306(a)(3)(i)). An operator's or developer's own market analysis is useful input but not independent. USDA keeps no approved list. In Montana, where a third of the 198 facilities sit in counties too small for the Census file, the author should also show how it found the competitors that public data miss.

    How long does a Montana senior care study remain usable?

    Part 5001 is silent on expiry. USDA normally accepts market data up to about 18 months old, says the cost page, and a senior housing appraisal more than a year old fails 5001.203. A new competitor or a change in public payment rates can alter a small market quickly, so update the study if either occurs before closing.

    Can one study serve SBA, B&I and Community Facilities?

    Largely yes, if the report names each lender or agency as an intended user and keeps one projection. SBA may require a study (13 CFR 120.160(b)), and a Part 5001 study covers it. Montana senior care has used SBA 504 13 times since FY2010, so some sponsors compare 504 with B&I; non-profits compare CF.

    Should a Montana non-profit use B&I or Community Facilities?

    Community Facilities is designed for non-profit and public facilities serving rural communities, and its FY2026 guaranteed loan fee is 1.25 percent with a 0.50 percent retention fee, against B&I's 3.0 percent and 0.55 percent. On a $6,000,000 loan the CF upfront fee is $60,000.00 and the B&I fee $144,000.00. The site's national healthcare page notes that for-profit operators route to B&I. The state office confirms eligibility.

    How should the study handle fill-up?

    With an absorption schedule month by month from opening, supported by pre-leasing, waiting lists or comparable openings, and an operating deficit reserve that covers losses until stabilisation. For the illustrative 60-unit Loan B, each unit must eventually produce $10,232.64 of net operating income a year for 1.25x coverage; the study shows when that happens and what funds the gap.

    Are facilities in Billings or Great Falls eligible?

    Not inside those cities or their contiguous urbanized areas, which 5001.3 excludes because each had more than 50,000 residents in 2025. Yellowstone and Cascade counties hold 57 of the state's placed facilities, and sites outside the urbanized areas can qualify. Helena, Butte-Silver Bow and Kalispell are below the threshold. SBA has no rural test, so a Billings project can still use 504, which has financed 13 Montana senior care projects since FY2010.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026, including Community Facilities (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. USAspending.gov prime award data, Assistance Listing 10.766 (Community Facilities), Montana, FY2024 to FY2026: https://www.usaspending.gov/search
    10. Site pages: /healthcare-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours