USDA Feasibility Study for Solar and Renewable Energy (REAP) in Montana

    NAICS 221114

    Montana's public data show no businesses whose main activity is solar or other renewable power generation: Census counts none with paid employees in 2019 or 2023, and the SBA FOIA file has no Montana loans for the asset. Yet USAspending records 74 REAP grants in Montana for FY2024 to FY2026, about 6.5 per 100,000 residents. Solar in Montana is overwhelmingly a project that a farm, ranch or rural business installs to cut its own energy bill, not a stand-alone power business. A USDA solar feasibility study in Montana is built around that fact and around the REAP rule that took effect on 16 October 2026, which now pays the grant only after the system has been built and has run for 12 months. The study's main job has moved from supporting a grant application to supporting the loan that builds the system.

    Solar in Montana: what the data show

    Montana: solar and other renewable power generation, supply and rural footprint

    MeasureMontanaUnited States
    Establishments, 2019 → 20230 → 0 (n/a)405 → 942
    Per 100,000 residents (2023)0.00.3
    Share of state population in non-metro counties (2025)44.7%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The zero, read correctly. Nationally, solar and other renewable generation establishments more than doubled, from 405 to 942 (+132.6 percent), but Montana's count stayed at zero, and so did Wyoming's, North Dakota's and South Dakota's in their packs; Idaho reports 5. Installers in Montana are classified as contractors, and farm and business owners who install systems are classified by their main activity, so the Census table cannot measure the market. The REAP award count can: 74 grants in three fiscal years, with no REAP guaranteed loans recorded in the same period (USAspending counts may be incomplete). For underwriting, that means local evidence comes from the sponsor's own utility bills and the installer's track record, not from comparable solar businesses.

    REAP and the regional picture

    Each column below combines that state's own pack with its USAspending REAP counts.

    MeasureMontanaIdahoNorth DakotaSouth DakotaWyoming
    Renewable generation businesses with paid staff, 202305000
    REAP grants, fiscal 2024 to 2026 (USAspending)7493557837
    REAP grants per 100k residents (2025 population)6.464.586.888.346.28
    REAP guaranteed loans, fiscal 2024 to 202600010
    SBA 7(a) loans for the asset, fiscal 2010 to 202602101

    Montana's REAP grant rate sits in the middle of the region, above Idaho and Wyoming and below the Dakotas. None of the five states used REAP guaranteed loans in meaningful numbers, which matters now that the 2026 rule makes the loan, not the grant, the source of construction money. Idaho's two SBA solar loans were large ($3.5 million and $3.6 million in its pack), the region's only sign of utility-scale or commercial projects financed through SBA.

    National benchmarks

    Nationally, SBA made 198 7(a) loans to solar and other renewable generation businesses from FY2010 to FY2026. In FY2020 to FY2026, 138 7(a) loans averaged $478,591 and 17 504 loans averaged $638,588. Of 31 FY2010 to FY2016 7(a) loans, 4 (12.9 percent) were charged off, on average 51 months after approval, a small sample but the highest rate and earliest timing of any asset on these Montana pages, which supports underwriting the project on its own energy savings rather than on optimistic production.

    The REAP rule effective 16 October 2026

    USDA published the final rule with comment period on 1 October 2026 (91 FR 62600), effective 16 October 2026; it followed the April 2026 rescission of the FY2025 to FY2027 REAP funding notice. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.

    TopicRule effective 16 October 2026Effect on the feasibility study
    TimingProject Period must end 12 to 24 months before the application (12 to 36 months in the first window)The study now often supports the loan that builds the project, not the grant
    Data12 months of actual production or savings and 12 months of pre-installation dataProduction estimates must be reconciled with actual meter data
    Award sizeMinimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiencyGrants cover a smaller share of large projects
    Cost shareAt least 75% of project costGrant at most 25% of cost
    Combined REAP fundingGrant plus guaranteed loan at most 75% of project costCaps the loan when a grant is planned
    CroplandGround-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systemsSite screening first
    Foreign componentsSolar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publicationCountry-of-origin list for every component
    SizingGround-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifePayback calculation is an eligibility test
    LocationsProjects at more than one location ineligibleOne site per application
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsScope these out of the grant budget
    ApplicantNo more than one application per federal fiscal year from each highest-level owner and the entities its owners own; site owned or leased at least 12 months before the Project PeriodOwnership and site control evidence
    InstallersLicensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327Key service provider qualifications
    CompetitionNo state competitions: one competition for requests of $20,000 or less and one national competition for all others, in annual application windowsScoring factors in the notice drive the case

    For a Montana farm or rural business, three rows decide most projects. The cropland row rules out ground-mounted arrays on cropland, so the study screens the site first and favours rooftops, farmstead lots and non-crop ground. The timing and data rows mean the grant is paid on actual results, at most 25 percent of cost and $500,000, after 12 months of operation, so the system must be financed without it. And the combined-funding row caps the REAP guaranteed loan plus any grant at 75 percent of project cost, so a sponsor who plans a later grant must borrow less.

    Rural footprint and eligibility in Montana

    REAP serves agricultural producers and rural small businesses; the site's national renewable energy page defines an agricultural producer as earning at least 50 percent of gross income from agricultural operations, and the 2026 grant rule requires a rural location. B&I's rural test in 7 CFR 5001.3 removes only Billings, Missoula, Great Falls and Bozeman, the state's four places above 50,000 in 2025, and the urbanized land around them; with 44.7 percent of Montanans in non-metro counties, nearly every farm and ranch system sits far from those lines. The Montana state guide has the place list.

    Program fit

    The REAP guaranteed loan, administered under 7 CFR 5001, carries an 80 percent guarantee, a 1.0 percent fee and a 0.25 percent annual retention fee in FY2026 under 91 FR 11272, and USDA says it is available for up-front costs. The REAP grant now arrives after completion and is competitive, with one national competition for requests above $20,000. B&I lists renewable systems as an eligible purpose in the 2026 CFR text (5001.105(b)(21)), but the site's national renewable energy page reports that other state pages cite an August 2025 USDA policy limiting wind and solar under B&I, so any B&I solar request should be confirmed with the state office. SBA 7(a) and 504 finance systems for small businesses anywhere. Community Facilities can fund a system serving an essential community facility. The rule excludes EV chargers, retail energy dispensing and stand-alone storage from REAP.

    Financing benchmarks: REAP guaranteed loan terms

    Montana has no SBA solar lending to tabulate. The B&I terms below apply only if the state office confirms B&I for a solar project; the REAP terms are in the paragraph above.

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on December 3191 FR 11272; 7 CFR 5001.455
    Reduced-fee loans (criteria in 5001.454)1.0% fee, 0.50% retention, 80% guarantee91 FR 11272
    Guarantee issued before construction is completeadditional 0.50% fee91 FR 11272; 7 CFR 5001.454
    Maximum loan per borrower$25 million7 CFR 5001.406(c)
    Termuseful life of the collateral, 40 years at most, no balloon7 CFR 5001.402
    Interest ratenegotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete7 CFR 5001.105(d)(3), (d)(4)
    Independent feasibility studyrequired above $1,000,000 for a new business; at the Agency's discretion otherwise7 CFR 5001.306(a)(3)
    SBA 7(a), for comparison85% guarantee up to $150,000, 75% above13 CFR 120.210
    SBA 504, for comparisonborrower injection 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    Worked example (illustrative)

    The loan in Structure A is $480,000, near the national FY2020 to FY2026 SBA average of $478,591, and is 75 percent of an illustrative $640,000 project, the most REAP allows. Structure B borrows $320,000, 50 percent, leaving room for a later grant of up to $160,000 (25 percent). Both use REAP's FY2026 guaranteed loan terms and an illustrative 7.00 percent fixed rate over 20 years.

    Input or resultStructure A: loan onlyStructure B: loan plus a later grant
    Loan amount$480,000.00$320,000.00
    Guarantee percentage (REAP, fiscal 2026)80%80%
    Guaranteed amount$384,000.00$256,000.00
    Upfront guarantee fee (1.0% of the guaranteed amount)$3,840.00$2,560.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$5,760.00$3,840.00
    First annual retention fee (0.25% of the guaranteed share of the balance after 12 payments)$937.16$624.77
    Interest rate (illustrative, fixed)7.00%7.00%
    Amortization (years, no balloon)2020
    Monthly payment$3,721.43$2,480.96
    Annual debt service (NOI for 1.00x, break-even on debt)$44,657.22$29,771.48
    NOI for 1.25x coverage$55,821.52$37,214.35
    Coverage at that NOI if the rate is 2 points higher1.08x1.08x
    Coverage at that NOI if the term is 5 years shorter1.08x1.08x
    Capital stack (illustrative $640,000 project)Structure A: loan onlyStructure B: loan plus a later grant
    REAP guaranteed loan$480,000.00 (75%)$320,000.00 (50%)
    REAP grant, applied for after 12 months of operation$0.00 (no room under the 75% cap)up to $160,000.00 (25%), not assured
    Owner cash at construction$160,000.00$320,000.00
    Owner cash net of the grant, if awarded$160,000.00$160,000.00
    Annual energy savings or sales needed for 1.25x coverage$55,821.52$37,214.35
    Simple payback at that annual value11.47 years17.20 years

    Payback and coverage tests. Structure A needs $55,821.52 a year of energy savings and sales, net of operating costs, for 1.25x coverage; at that value the $640,000 system pays back in 11.47 years, and at break-even on debt ($44,657.22) in 14.33 years. Structure B needs only $37,214.35 for coverage, but at that minimum the payback is 17.20 years, and the rule requires simple payback within the system's useful life for a grant, so the study must show the system's actual expected savings and life, not just the coverage floor. Both structures ask the owner to fund the system first; Structure B asks for twice as much cash until a grant that may not come. For a new business, the 5001.105(d)(4) test of 25 percent of project cost gives the same $160,000.00 of equity as Structure A's owner share; the 20 percent balance sheet route would need $120,000.00 if the loan were the only liability. A two-point rate rise cuts coverage to 1.08x in both, as does a 15-year term.

    Evidence the study must build when local comparables are thin

    1. Twelve months or more of utility bills and interval data, with the load profile the system will serve; the rule requires commensurate historical use for ground-mount systems.
    2. A production estimate from the site's resource data and design, reconciled after installation with 12 months of meter data.
    3. The utility's current tariff and the compensation for exported energy, with a sensitivity to changes.
    4. A site screen against the cropland definition and the one-location rule.
    5. A country-of-origin list for every component, against the foreign-adversary bar.
    6. The installer's state licence and at least three similar installations, and procurement under 2 CFR 200.318 to 200.327.
    7. Ownership and site control for at least 12 months before the Project Period, and one application per fiscal year per highest-level owner.

    Risks and mitigants in Montana

    The grant is no longer construction money and may never arrive, so the lender should underwrite on the loan alone. Export compensation and tariffs can change, so the study tests savings with lower credits. Winter snow cover and short days reduce output, so production should be modelled by month, not as an annual average. Components that fail the foreign-adversary test make the project ineligible, so the bill of materials is checked before ordering. Installer failure is mitigated by the rule's licensing and experience requirements and by warranties. Interconnection delays and upgrade costs need the utility's agreement in hand.

    Process, documents and what gets a study returned

    The lender applies for the REAP guarantee through USDA Rural Development's state office for Montana; a grant application follows after 12 to 24 months of operation in an annual national window. The sponsor provides utility history, the design and production estimate, quotes and the installer's credentials, the component origin list, site control documents, financial statements, and guarantees from owners of 20 percent or more (5001.204). Reviewers reject solar studies when production is overstated, when the site is cropland, when payback exceeds useful life, or when the loan depends on a grant.

    National program example (outside Montana)

    The site's national renewable energy page cites a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California. Both are outside Montana and were made under the earlier rules; ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule. The site's Pennsylvania rooftop solar case study, labelled illustrative, is linked below.

    Hiring a USDA solar feasibility study consultant in Montana

    Part 5001 requires an independent study for guaranteed loans over $1,000,000 to a new business (5001.306(a)(3)(i)); most Montana farm and business systems are smaller and fall under the Agency's or lender's discretion, with REAP's technical requirements applying regardless. Because the 2026 rule pays the grant only on actual results, a USDA feasibility study consultant should be able to show how its production estimate will be reconciled with meter data. The site's cost page lists REAP studies for loans under $600,000 at $4,900 to $8,500 over 4 to 5 weeks and for larger guaranteed loans at $7,500 to $11,500 over 5 to 7 weeks; those ranges were published before the 2026 rule, so confirm them in the proposal. Engineering, interconnection and grant drafting are separate.

    Describe the system on the contact page: location, owner type (producer or rural small business), cost range and lender status. A senior analyst replies within one business day, by the contact page's own account.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a solar project in Montana?

    For a guaranteed loan over $1,000,000 to a new business, 7 CFR 5001.306(a)(3)(i) requires an independent study. Most Montana REAP systems are smaller: the illustrative loan here is $480,000, within the streamlined range of $600,000 or less, where the Agency or lender decides. REAP's own technical requirements, including the payback test and production data, apply to every project.

    What changed for REAP on 16 October 2026?

    The final rule (91 FR 62600) pays grants only after the project has been built and operated, with 12 months of actual data; caps grants at 25 percent of cost and $500,000 for renewable systems; limits grant plus guaranteed loan to 75 percent of cost; bars ground-mounted solar or wind on cropland and systems with foreign-adversary components; and moves all competitions to national level. No new funding notice had appeared as of 7 November 2026.

    What does a solar feasibility study consultant cost in Montana?

    The site's cost page lists REAP studies at $4,900 to $8,500 for loans under $600,000 and $7,500 to $11,500 for larger guaranteed loans, with timelines of 4 to 7 weeks. Those ranges predate the 2026 rule, which adds a meter-data reconciliation and stricter eligibility screens, so the scope and fee are fixed in the written proposal.

    Who can prepare it?

    A qualified, independent consultant acceptable to USDA where the Part 5001 study rule applies, with no stake in the installation contract, the equipment or the loan. The installer's production estimate is technical input; under the 2026 rule the installer must itself be licensed in the state with at least three similar installations.

    How long is a solar study valid?

    Nothing in Part 5001 sets a validity period, and USDA typically wants data under about 18 months old, according to the site's cost page. Under the 2026 rule the grant application uses 12 months of actual production and 12 months of pre-installation data, so the study's estimates will be checked against meter data when the grant is sought.

    Can the same study serve SBA and USDA?

    Yes, if it names both lenders and uses one projection. SBA can ask for a study as well (13 CFR 120.160(b)). Nationally SBA made 138 7(a) loans to renewable generation businesses in FY2020 to FY2026; for a farm or business installing its own system, the choice is usually between a REAP guaranteed loan, SBA and a conventional lender.

    Can a Montana farm put a ground-mounted array on cropland and get REAP?

    Not under the 2026 rule: ground-mounted solar or wind on cropland, as defined in 7 CFR 718.2, is ineligible, and so are retrofits of such systems. Rooftops, farmstead ground that is not cropland, and other non-crop sites remain possible, but ground-mounted systems must also show historical energy use that matches their size.

    Should a Montana project borrow the full 75 percent or plan for a grant?

    It depends on the owner's cash. Borrowing 75 percent, $480,000 on a $640,000 system, leaves no room for a grant under the combined cap but needs only $160,000 of owner cash. Borrowing 50 percent leaves room for a grant of up to 25 percent, but the owner must fund $320,000 at construction and the grant is competitive and not assured.

    Does Montana have any REAP loan track record?

    USAspending shows 74 REAP grants and no REAP guaranteed loans in Montana for FY2024 to FY2026, and the neighbouring states show only one REAP loan among them, in South Dakota. With the 2026 rule moving construction funding to the loan side, Montana lenders have little recent REAP loan experience, which is why a study that ties savings to utility data carries weight.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state files (NAICS 221114, 221117, 221118): https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (national figures from the Montana pack's U.S. columns): https://data.sba.gov/dataset/7-a-504-foia
    5. USAspending.gov prime award data, Assistance Listing 10.868 (REAP), Montana, Idaho, North Dakota, South Dakota and Wyoming, FY2024 to FY2026: https://www.usaspending.gov/search
    6. [R1] USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    7. [R2] USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    8. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    9. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026, including REAP (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    10. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    11. Site pages: /renewable-energy-feasibility-study-usda (producer definition, B&I policy note and national examples as reported on the site's national renewable energy page), /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours