Montana's public data show no businesses whose main activity is solar or other renewable power generation: Census counts none with paid employees in 2019 or 2023, and the SBA FOIA file has no Montana loans for the asset. Yet USAspending records 74 REAP grants in Montana for FY2024 to FY2026, about 6.5 per 100,000 residents. Solar in Montana is overwhelmingly a project that a farm, ranch or rural business installs to cut its own energy bill, not a stand-alone power business. A USDA solar feasibility study in Montana is built around that fact and around the REAP rule that took effect on 16 October 2026, which now pays the grant only after the system has been built and has run for 12 months. The study's main job has moved from supporting a grant application to supporting the loan that builds the system.
Solar in Montana: what the data show
Montana: solar and other renewable power generation, supply and rural footprint
| Measure | Montana | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 0 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.0 | 0.3 |
| Share of state population in non-metro counties (2025) | 44.7% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The zero, read correctly. Nationally, solar and other renewable generation establishments more than doubled, from 405 to 942 (+132.6 percent), but Montana's count stayed at zero, and so did Wyoming's, North Dakota's and South Dakota's in their packs; Idaho reports 5. Installers in Montana are classified as contractors, and farm and business owners who install systems are classified by their main activity, so the Census table cannot measure the market. The REAP award count can: 74 grants in three fiscal years, with no REAP guaranteed loans recorded in the same period (USAspending counts may be incomplete). For underwriting, that means local evidence comes from the sponsor's own utility bills and the installer's track record, not from comparable solar businesses.
REAP and the regional picture
Each column below combines that state's own pack with its USAspending REAP counts.
| Measure | Montana | Idaho | North Dakota | South Dakota | Wyoming |
|---|---|---|---|---|---|
| Renewable generation businesses with paid staff, 2023 | 0 | 5 | 0 | 0 | 0 |
| REAP grants, fiscal 2024 to 2026 (USAspending) | 74 | 93 | 55 | 78 | 37 |
| REAP grants per 100k residents (2025 population) | 6.46 | 4.58 | 6.88 | 8.34 | 6.28 |
| REAP guaranteed loans, fiscal 2024 to 2026 | 0 | 0 | 0 | 1 | 0 |
| SBA 7(a) loans for the asset, fiscal 2010 to 2026 | 0 | 2 | 1 | 0 | 1 |
Montana's REAP grant rate sits in the middle of the region, above Idaho and Wyoming and below the Dakotas. None of the five states used REAP guaranteed loans in meaningful numbers, which matters now that the 2026 rule makes the loan, not the grant, the source of construction money. Idaho's two SBA solar loans were large ($3.5 million and $3.6 million in its pack), the region's only sign of utility-scale or commercial projects financed through SBA.
National benchmarks
Nationally, SBA made 198 7(a) loans to solar and other renewable generation businesses from FY2010 to FY2026. In FY2020 to FY2026, 138 7(a) loans averaged $478,591 and 17 504 loans averaged $638,588. Of 31 FY2010 to FY2016 7(a) loans, 4 (12.9 percent) were charged off, on average 51 months after approval, a small sample but the highest rate and earliest timing of any asset on these Montana pages, which supports underwriting the project on its own energy savings rather than on optimistic production.
The REAP rule effective 16 October 2026
USDA published the final rule with comment period on 1 October 2026 (91 FR 62600), effective 16 October 2026; it followed the April 2026 rescission of the FY2025 to FY2027 REAP funding notice. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.
| Topic | Rule effective 16 October 2026 | Effect on the feasibility study |
|---|---|---|
| Timing | Project Period must end 12 to 24 months before the application (12 to 36 months in the first window) | The study now often supports the loan that builds the project, not the grant |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Production estimates must be reconciled with actual meter data |
| Award size | Minimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiency | Grants cover a smaller share of large projects |
| Cost share | At least 75% of project cost | Grant at most 25% of cost |
| Combined REAP funding | Grant plus guaranteed loan at most 75% of project cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systems | Site screening first |
| Foreign components | Solar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publication | Country-of-origin list for every component |
| Sizing | Ground-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual use | Load analysis is mandatory |
| Economics | Simple payback must not exceed useful life | Payback calculation is an eligibility test |
| Locations | Projects at more than one location ineligible | One site per application |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Scope these out of the grant budget |
| Applicant | No more than one application per federal fiscal year from each highest-level owner and the entities its owners own; site owned or leased at least 12 months before the Project Period | Ownership and site control evidence |
| Installers | Licensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Key service provider qualifications |
| Competition | No state competitions: one competition for requests of $20,000 or less and one national competition for all others, in annual application windows | Scoring factors in the notice drive the case |
For a Montana farm or rural business, three rows decide most projects. The cropland row rules out ground-mounted arrays on cropland, so the study screens the site first and favours rooftops, farmstead lots and non-crop ground. The timing and data rows mean the grant is paid on actual results, at most 25 percent of cost and $500,000, after 12 months of operation, so the system must be financed without it. And the combined-funding row caps the REAP guaranteed loan plus any grant at 75 percent of project cost, so a sponsor who plans a later grant must borrow less.
Rural footprint and eligibility in Montana
REAP serves agricultural producers and rural small businesses; the site's national renewable energy page defines an agricultural producer as earning at least 50 percent of gross income from agricultural operations, and the 2026 grant rule requires a rural location. B&I's rural test in 7 CFR 5001.3 removes only Billings, Missoula, Great Falls and Bozeman, the state's four places above 50,000 in 2025, and the urbanized land around them; with 44.7 percent of Montanans in non-metro counties, nearly every farm and ranch system sits far from those lines. The Montana state guide has the place list.
Program fit
The REAP guaranteed loan, administered under 7 CFR 5001, carries an 80 percent guarantee, a 1.0 percent fee and a 0.25 percent annual retention fee in FY2026 under 91 FR 11272, and USDA says it is available for up-front costs. The REAP grant now arrives after completion and is competitive, with one national competition for requests above $20,000. B&I lists renewable systems as an eligible purpose in the 2026 CFR text (5001.105(b)(21)), but the site's national renewable energy page reports that other state pages cite an August 2025 USDA policy limiting wind and solar under B&I, so any B&I solar request should be confirmed with the state office. SBA 7(a) and 504 finance systems for small businesses anywhere. Community Facilities can fund a system serving an essential community facility. The rule excludes EV chargers, retail energy dispensing and stand-alone storage from REAP.
Financing benchmarks: REAP guaranteed loan terms
Montana has no SBA solar lending to tabulate. The B&I terms below apply only if the state office confirms B&I for a solar project; the REAP terms are in the paragraph above.
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on December 31 | 91 FR 11272; 7 CFR 5001.455 |
| Reduced-fee loans (criteria in 5001.454) | 1.0% fee, 0.50% retention, 80% guarantee | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% fee | 91 FR 11272; 7 CFR 5001.454 |
| Maximum loan per borrower | $25 million | 7 CFR 5001.406(c) |
| Term | useful life of the collateral, 40 years at most, no balloon | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans | 7 CFR 5001.401 |
| Equity, existing business | 10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new business | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete | 7 CFR 5001.105(d)(3), (d)(4) |
| Independent feasibility study | required above $1,000,000 for a new business; at the Agency's discretion otherwise | 7 CFR 5001.306(a)(3) |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
| SBA 504, for comparison | borrower injection 10%; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
Worked example (illustrative)
The loan in Structure A is $480,000, near the national FY2020 to FY2026 SBA average of $478,591, and is 75 percent of an illustrative $640,000 project, the most REAP allows. Structure B borrows $320,000, 50 percent, leaving room for a later grant of up to $160,000 (25 percent). Both use REAP's FY2026 guaranteed loan terms and an illustrative 7.00 percent fixed rate over 20 years.
| Input or result | Structure A: loan only | Structure B: loan plus a later grant |
|---|---|---|
| Loan amount | $480,000.00 | $320,000.00 |
| Guarantee percentage (REAP, fiscal 2026) | 80% | 80% |
| Guaranteed amount | $384,000.00 | $256,000.00 |
| Upfront guarantee fee (1.0% of the guaranteed amount) | $3,840.00 | $2,560.00 |
| Upfront fee if the guarantee issues before construction is complete (+0.50%) | $5,760.00 | $3,840.00 |
| First annual retention fee (0.25% of the guaranteed share of the balance after 12 payments) | $937.16 | $624.77 |
| Interest rate (illustrative, fixed) | 7.00% | 7.00% |
| Amortization (years, no balloon) | 20 | 20 |
| Monthly payment | $3,721.43 | $2,480.96 |
| Annual debt service (NOI for 1.00x, break-even on debt) | $44,657.22 | $29,771.48 |
| NOI for 1.25x coverage | $55,821.52 | $37,214.35 |
| Coverage at that NOI if the rate is 2 points higher | 1.08x | 1.08x |
| Coverage at that NOI if the term is 5 years shorter | 1.08x | 1.08x |
| Capital stack (illustrative $640,000 project) | Structure A: loan only | Structure B: loan plus a later grant |
|---|---|---|
| REAP guaranteed loan | $480,000.00 (75%) | $320,000.00 (50%) |
| REAP grant, applied for after 12 months of operation | $0.00 (no room under the 75% cap) | up to $160,000.00 (25%), not assured |
| Owner cash at construction | $160,000.00 | $320,000.00 |
| Owner cash net of the grant, if awarded | $160,000.00 | $160,000.00 |
| Annual energy savings or sales needed for 1.25x coverage | $55,821.52 | $37,214.35 |
| Simple payback at that annual value | 11.47 years | 17.20 years |
Payback and coverage tests. Structure A needs $55,821.52 a year of energy savings and sales, net of operating costs, for 1.25x coverage; at that value the $640,000 system pays back in 11.47 years, and at break-even on debt ($44,657.22) in 14.33 years. Structure B needs only $37,214.35 for coverage, but at that minimum the payback is 17.20 years, and the rule requires simple payback within the system's useful life for a grant, so the study must show the system's actual expected savings and life, not just the coverage floor. Both structures ask the owner to fund the system first; Structure B asks for twice as much cash until a grant that may not come. For a new business, the 5001.105(d)(4) test of 25 percent of project cost gives the same $160,000.00 of equity as Structure A's owner share; the 20 percent balance sheet route would need $120,000.00 if the loan were the only liability. A two-point rate rise cuts coverage to 1.08x in both, as does a 15-year term.
Evidence the study must build when local comparables are thin
- Twelve months or more of utility bills and interval data, with the load profile the system will serve; the rule requires commensurate historical use for ground-mount systems.
- A production estimate from the site's resource data and design, reconciled after installation with 12 months of meter data.
- The utility's current tariff and the compensation for exported energy, with a sensitivity to changes.
- A site screen against the cropland definition and the one-location rule.
- A country-of-origin list for every component, against the foreign-adversary bar.
- The installer's state licence and at least three similar installations, and procurement under 2 CFR 200.318 to 200.327.
- Ownership and site control for at least 12 months before the Project Period, and one application per fiscal year per highest-level owner.
Risks and mitigants in Montana
The grant is no longer construction money and may never arrive, so the lender should underwrite on the loan alone. Export compensation and tariffs can change, so the study tests savings with lower credits. Winter snow cover and short days reduce output, so production should be modelled by month, not as an annual average. Components that fail the foreign-adversary test make the project ineligible, so the bill of materials is checked before ordering. Installer failure is mitigated by the rule's licensing and experience requirements and by warranties. Interconnection delays and upgrade costs need the utility's agreement in hand.
Process, documents and what gets a study returned
The lender applies for the REAP guarantee through USDA Rural Development's state office for Montana; a grant application follows after 12 to 24 months of operation in an annual national window. The sponsor provides utility history, the design and production estimate, quotes and the installer's credentials, the component origin list, site control documents, financial statements, and guarantees from owners of 20 percent or more (5001.204). Reviewers reject solar studies when production is overstated, when the site is cropland, when payback exceeds useful life, or when the loan depends on a grant.
National program example (outside Montana)
The site's national renewable energy page cites a $781,897 REAP grant for a 1 MW ground-mounted array at The Chef's Garden in Huron, Ohio, and a $4,275,000 REAP loan guarantee for the 3.991 MW RP Napa Solar 1 facility in California. Both are outside Montana and were made under the earlier rules; ground-mounted or export-oriented projects of that kind may not qualify for a grant under the 2026 rule. The site's Pennsylvania rooftop solar case study, labelled illustrative, is linked below.
Hiring a USDA solar feasibility study consultant in Montana
Part 5001 requires an independent study for guaranteed loans over $1,000,000 to a new business (5001.306(a)(3)(i)); most Montana farm and business systems are smaller and fall under the Agency's or lender's discretion, with REAP's technical requirements applying regardless. Because the 2026 rule pays the grant only on actual results, a USDA feasibility study consultant should be able to show how its production estimate will be reconciled with meter data. The site's cost page lists REAP studies for loans under $600,000 at $4,900 to $8,500 over 4 to 5 weeks and for larger guaranteed loans at $7,500 to $11,500 over 5 to 7 weeks; those ranges were published before the 2026 rule, so confirm them in the proposal. Engineering, interconnection and grant drafting are separate.
Describe the system on the contact page: location, owner type (producer or rural small business), cost range and lender status. A senior analyst replies within one business day, by the contact page's own account.
Last updated 2026-11-08