Solar in North Dakota is a REAP story, and REAP changed on 16 October 2026. Census records no solar or other renewable generation business with paid employees in the state in 2019 or 2023, and SBA has made one loan to the sector here since FY2010, $40,000 in FY2010 to FY2016. What North Dakota does have is a REAP grant record: 55 grants totalling $11,261,321 in FY2024 to FY2026, an average of $204,751, and no REAP guaranteed loans at all. Under the new rule a grant can cover at most 25% of a project and is applied for only after the system has run for twelve months, so the farm or rural business installing solar must finance construction first. The feasibility study now supports that financing, usually a REAP guaranteed loan, and must prove the system pays for itself without counting on the grant.
Data current as of November 2026.
The REAP rule effective 16 October 2026, as it applies to a North Dakota solar project
| Topic | Rule (91 FR 62600) | What it means here |
|---|---|---|
| Timing | Project Period must end 12 to 24 months before the application (12 to 36 months in the first window) | The array is built and running before the grant application |
| Data | 12 months of actual production and 12 months of pre-installation data | Meter data replaces modelled output in the application |
| Award size | Minimum $1,500; maximum $500,000 for renewable systems ($250,000 for efficiency) | A North Dakota grant near the recent average of $204,751 fits easily |
| Cost share | Grant at most 25% of project cost | The owner finances at least 75% |
| Combined REAP funding | Grant plus REAP guaranteed loan at most 75% of cost | Caps the loan when a grant is planned |
| Cropland | Ground-mount solar or wind on Cropland (7 CFR 718.2) ineligible, including retrofits | Site screening first on a farm |
| Foreign components | Systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publication | Country-of-origin list for every component |
| Sizing | Ground-mount systems must show commensurate historical energy use; storage at most 120% of prior annual use | Load analysis is mandatory |
| Economics | Simple payback must not exceed useful life | Payback is an eligibility test |
| Locations and exclusions | One location per application; EV chargers, retail energy dispensing, stand-alone storage, storage retrofits and distribution-only projects excluded | Scope these out of the budget |
| Applicant | One application per federal fiscal year per highest-level owner; site owned or leased at least 12 months before the Project Period | Ownership and site-control evidence |
| Installers | Licensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Installer qualifications in the file |
| Competition | No state competitions: one for requests of $20,000 or less, one national competition for the rest, in annual windows | North Dakota projects compete nationally |
As of 7 November 2026 no REAP funding notice under the new rule had appeared in the Federal Register, so a sponsor cannot yet know the next window's dates.
Program fit and when a study is required
The REAP guaranteed loan under 7 CFR 5001 is the program USDA points to for up-front costs. Its FY2026 terms are an 80% guarantee, a 1.0% upfront fee and a 0.25% annual retention fee, plus 0.50% if the guarantee issues before construction ends (91 FR 11272). A larger renewable project at a rural business can also use B&I (85% under $5 million, 3.0% fee, 0.55% retention), and SBA lending is possible but thin here. Because the grant arrives after a year of operation, a lender should underwrite the loan as if the grant never comes.
The compulsory study rule in 7 CFR 5001.306(a)(3)(i) applies to guaranteed loans above $1,000,000 to a new business; most farm and small-business arrays are smaller and existing businesses, so the study is then at the Agency's or lender's discretion. In practice the REAP application's payback, sizing and production tests need the same technical and financial analysis whether or not the rule compels it. A farm or business taking a REAP loan is also checked owner by owner: 5001.127(a) shuts out an applicant whose entity, controlling owner or larger non-passive owner (over a fifth of the business) is behind on federal taxes or federal debt, owes on a federal court judgment, or is barred from federal programs. Paragraph (b) also matters for rural businesses with gaming: more than 15 percent of gross revenue from gambling disqualifies the borrower.
Solar energy in North Dakota: market evidence
North Dakota: solar and other renewable power generation, supply and rural footprint
| Measure | North Dakota | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 0 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.0 | 0.3 |
| Share of state population in non-metro counties (2025) | 38.5% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The national count of solar and other renewable generation establishments more than doubled, from 405 to 942, while North Dakota stayed at zero. This table counts companies whose main business is selling power, so it says nothing about the solar a farm, shop or plant installs to cut its own bills, which is what REAP finances. For underwriting it means two things: there are no in-state generation businesses to benchmark, and the study must rely on the site's own utility bills, metered production from comparable systems and installer data.
REAP activity in North Dakota and its neighbours (USAspending, FY2024 to FY2026; other states labelled)
| Measure | North Dakota | South Dakota | Montana | Minnesota |
|---|---|---|---|---|
| REAP grants (count) | 55 | 78 | 74 | 544 |
| REAP grant dollars | $11,261,321 | $12,309,780 | $2,959,654 | $59,174,068 |
| Average grant | $204,751 | $157,818 | $39,995 | $108,776 |
| Grant dollars per resident (USAspending's population base) | $14.45 | $13.88 | $2.73 | $10.37 |
| REAP guaranteed loans (count) | 0 | 1 | 0 | 0 |
Source: agg/usaspending_all.json (USAspending spending by geography and award counts, Assistance Listing 10.868, 1 October 2023 to 30 September 2026).
North Dakota's REAP grants are few but large: an average of $204,751, almost twice Minnesota's, and the highest grant dollars per resident of the four states. The count ranks 39th of 51 states and DC. Nationally, 6,722 REAP grants and only 75 REAP guaranteed loans were recorded in the period, so the loan program the new rule leans on has been little used everywhere, not just here. North Dakota grants of that size, under the old rules, financed projects large enough that the new 25% cap and the build-first sequence will change their financing most.
National SBA benchmarks
SBA's national record for renewable generation is the riskiest of any asset on this site's North Dakota pages: 12.9% of 31 FY2010 to FY2016 7(a) loans were charged off, on average 51 months after approval. In FY2020 to FY2026 SBA approved 138 national 7(a) loans averaging $478,591 and 17 504 loans averaging $638,588 (computed from the pack's aggregates). Those figures cover power-selling businesses, but they warn a lender that production and revenue projections in this sector have failed often.
North Dakota: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 1 | $40,000 | 0 | $0 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
| North Dakota had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval. |
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Evidence the study must build when local comparables are thin
- Twelve months or more of the site's utility bills and interval data, and the tariff, net-metering or buy-back terms that set the value of each kilowatt-hour.
- A load analysis showing the system is sized to historical use, as the rule requires for ground-mount systems, with any storage within 120% of prior annual use.
- A production estimate from a recognised model, cross-checked against metered output from comparable systems in the region, with winter snow and cold-weather performance addressed.
- A site screen: roof condition and structure, or for ground mounts, proof the land is not Cropland under 7 CFR 718.2.
- A component list with country of origin for each part, against the foreign-adversary exclusion.
- Installer licence, three similar installations, and procurement under 2 CFR 200.318 to 200.327.
- The simple payback calculation, shown to fall within the system's documented useful life.
Rural footprint and eligibility in North Dakota
With no generation businesses, the pack has no rural footprint to report; eligibility turns on the project site and the applicant. For a B&I or REAP guaranteed loan, the rural test in 7 CFR 5001.3 excludes cities and towns of more than 50,000 people and their contiguous urbanized areas: Fargo (136,275), Bismarck (77,963) and Grand Forks (60,365). Most farms and small-town businesses pass easily; a business on the edge of those cities needs the urbanized-area check, and Minot (47,308) and West Fargo (41,175) are near the line. REAP's own applicant and site rules (one application per highest-level owner per fiscal year, site control for 12 months before the Project Period, no cropland ground mounts) apply on top. The North Dakota hub lists places by size, and the site's REAP feasibility study page covers the program.
Financing benchmarks: REAP guaranteed loan next to B&I
| Term | REAP guaranteed loan, FY2026 | B&I, FY2026 |
|---|---|---|
| Guarantee | 80% | 85% under $5 million |
| Upfront fee | 1.0% of guaranteed amount | 3.0% of guaranteed amount |
| Annual retention fee | 0.25% | 0.55% |
| Fee if the guarantee issues before completion | 0.50% | 0.50% |
| Combined cap with a REAP grant | Grant plus loan at most 75% of cost | Not a REAP cap |
| Term and rate | Useful life, up to 40 years; negotiated rate (5001.401, 5001.402) | Same |
| Equity | Owner funds at least 25% of cost under the REAP cap; Part 5001 equity tests also apply (5001.105(d)) | 5001.105(d) tests |
Worked example (illustrative)
Inputs. The project is an illustrative $960,000 rooftop or non-cropland solar array at an existing rural business. The grant is set at the 25% maximum, $240,000, which is below the $500,000 cap. The 75% combined cap then limits the REAP guaranteed loan to $480,000, which is also the national SBA renewable 7(a) average of $478,591, rounded. The owner funds the remaining $240,000 and, because the grant arrives only after a year of operation, must also carry the grant's $240,000 share during construction. Debt service assumes a 7.0% fixed rate chosen purely for illustration, paid monthly over 20 years, both within 5001.401 and 5001.402.
| Line | REAP guaranteed loan with planned grant | Same loan under B&I (comparison) | REAP loan at the 75% cap with no grant |
|---|---|---|---|
| Project cost | $960,000.00 | $960,000.00 | $960,000.00 |
| Grant (25% of cost, paid after 12 months of data) | $240,000.00 | not applicable | $0.00 |
| Loan | $480,000.00 | $480,000.00 | $720,000.00 |
| Owner's funds at closing (including the grant's share until paid) | $480,000.00 | $480,000.00 | $240,000.00 |
| Guarantee | 80% | 85% | 80% |
| Guaranteed amount | $384,000.00 | $408,000.00 | $576,000.00 |
| Unguaranteed portion | $96,000.00 | $72,000.00 | $144,000.00 |
| Upfront guarantee fee | $3,840.00 (1.0%) | $12,240.00 (3.0%) | $5,760.00 (1.0%) |
| First-year retention fee, upper bound | $960.00 (0.25%) | $2,244.00 (0.55%) | $1,440.00 (0.25%) |
| Retention fee on the balance after 12 payments | $937.16 | $2,190.62 | |
| Monthly principal and interest (7.0%, 20 years) | $3,721.43 | $3,721.43 | |
| Annual debt service | $44,657.22 | $44,657.22 | $66,985.83 |
| Annual savings or revenue for 1.25x | $55,821.52 | $55,821.52 | $83,732.29 |
| Cushion above 1.00x | $11,164.30 | $11,164.30 | |
| Debt service at a rate 2 points higher | $51,824.22 | $51,824.22 | |
| Coverage at that rate | 1.08x | 1.08x | |
| Coverage with savings 10% below plan | 1.12x | 1.12x | |
| Simple payback on $960,000 at $55,821.52 a year | 17.2 years | 17.2 years | |
| Study compulsory under 5001.306(a)(3)(i)? | No (existing business, under $1,000,000) | No | No |
Reading the table. The REAP loan is cheaper to guarantee than B&I, $3,840.00 upfront against $12,240.00, but the grant structure asks the owner to fund half the project at closing, $480,000.00, until the grant is paid. If the business cannot carry that, the third column shows the alternative: a larger REAP loan at the 75% cap and no grant, which needs $83,732.29 a year of savings or sales for 1.25x. The payback line is now an eligibility test: at $55,821.52 a year, simple payback is 17.2 years, so the system's documented useful life must exceed that or the grant application fails.
What a lender-grade REAP solar feasibility study in North Dakota must prove
- Energy value: twelve months of bills, the tariff and buy-back terms, and the savings per kilowatt-hour.
- Production: a modelled estimate reconciled with metered output from comparable regional systems.
- Sizing: load commensurate with historical use for ground mounts; storage within 120% of prior use.
- Site: roof or non-cropland ground, site control for 12 months, one location.
- Components and installer: country-of-origin list; licensed installer with three similar installations; compliant procurement.
- Economics: simple payback within useful life, and debt coverage with no grant.
- Financing: the bridge for the grant's share, the 75% combined cap, and coverage under lower production and a higher rate.
Hiring a USDA solar energy feasibility study consultant in North Dakota
The Part 5001 rule compels an independent study only when a new business borrows more than $1,000,000; most farm and small-business arrays fall below that, but the REAP application's payback, sizing and production tests need the same analysis, and the lender financing construction will want it. A USDA feasibility study consultant on a North Dakota REAP project works mostly from the applicant's own meters and bills, because there are no in-state generation businesses to compare.
The site's cost and timeline page lists REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks and REAP studies supporting a guaranteed loan over $600,000 at $7,500 to $11,500 over five to seven weeks, including utility rate and interconnection modelling. Engineering design and energy audits by others are separate. Each quote is fixed before the engagement starts, and if USDA or the lender asks for changes the revisions are covered. Twelve months of utility bills, the installer's proposal, the site and a lender are what the first conversation needs; request a free consultation and the site's form commits to an answer inside a day.
Program record, honestly labelled
USAspending shows 55 REAP grants and no REAP guaranteed loans in North Dakota in FY2024 to FY2026; those grants were made under the rules in force before 16 October 2026, and the inputs do not show how many were for solar. No individual North Dakota project is named here.