Manufacturing is where B&I and North Dakota fit most naturally. The state had 695 manufacturing establishments in 2023, 88.3 per 100,000 residents against 84.5 nationally, and 42.1% of the county-placed plants operate in non-metro counties, more than the 38.5% of residents who live there. Plants employ 42.1 people on average and paid $69,310 per worker in 2023. A lender-grade feasibility study for a North Dakota plant has to prove what every manufacturing credit turns on: contracted or demonstrable demand for the output, a process that works at the planned scale, and a workforce the site can actually hire.
North Dakota also has the deepest SBA manufacturing record of any asset on this site's state pages, 163 7(a) loans since FY2010 with only 2.9% of the seasoned ones charged off, and loans are getting larger: the 13 approved in FY2024 to FY2026 averaged $1,085,592. Once a manufacturing loan passes $1,000,000 for a new company, USDA requires an independent study.
Data current as of November 2026.
Program fit for a North Dakota manufacturer
| Route | Where it fits | First check |
|---|---|---|
| USDA B&I guarantee | New plants, expansions, equipment and working capital outside Fargo, Bismarck and Grand Forks; up to $25 million, or $40 million for a rural cooperative processing value-added products at the Secretary's discretion (5001.406(c)) | 85% guarantee under $5 million, 80% from $5 million to $25 million (91 FR 11272) |
| SBA 504 | Owner-occupied plant and long-life equipment: 23 loans in FY2020 to FY2026, 63.5% of SBA manufacturing dollars | Borrower 10%, or 15% to 20% for a new or single-purpose plant (13 CFR 120.910) |
| SBA 7(a) | Equipment, working capital, acquisitions; 32 loans in FY2020 to FY2026 averaging $644,434 | 75% guarantee above $150,000 (120.210) |
| REAP | Energy efficiency or renewable systems at an operating plant | Grant at most 25% of cost and applied for after 12 months of data under the rule effective 16 October 2026 |
| Conventional bank | Established manufacturers with strong balance sheets | Bank policy |
Three Part 5001 provisions bite harder on plants than on other assets. A guaranteed loan above $1,000,000 that creates more than 50 jobs needs Department of Labor concurrence (5001.306(a)(1)); 109 of North Dakota's 695 plants employ 50 or more people, so a new plant of that size should allow time for it. A loan note guarantee issued before construction is complete is not available for non-proven technology (5001.205(e)(2)). And where it is available, borrower equity goes in before any guaranteed loan funds, under a fixed-price construction contract with an independent general contractor.
When the study is required
Under 7 CFR 5001.306(a)(3)(i) a new business with a B&I-guaranteed loan above $1,000,000 must submit a feasibility study by an independent consultant the Agency accepts, scoped by the Agency. An established manufacturer expanding a line falls under 5001.306(a)(3)(ii), where the Agency may require one; it usually does when the expansion adds a new product, a new market or a new process. SBA lenders hold the same discretion under 13 CFR 120.160(b). The lender's own credit evaluation under 5001.202 must address the study, the market, construction complexity and the contractor's strength.
Manufacturing in North Dakota: market evidence
North Dakota: manufacturing establishments (all), supply and rural footprint
| Measure | North Dakota | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 705 → 695 (-1.4%) | 287,626 → 284,452 |
| Per 100,000 residents (2023) | 88.3 | 84.5 |
| Average employees per establishment | 42.1 | 43.4 |
| Average annual pay per employee | $69,310 | $73,202 |
| Share of establishments in non-metro counties | 42.1% (286 in 30 counties) | |
| Share of state population in non-metro counties (2025) | 38.5% |
Non-metro counties with the most manufacturing establishments (all) (2023): Richland County (38); Williams County (36); Stark County (31); Stutsman County (21); Barnes County (16); Pembina County (12).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The establishment count barely moved, down 10 plants (1.4%), in line with a 1.1% national decline. The employment record is the stronger signal: North Dakota manufacturing jobs rose 9.9% from 2019 to 2023 and average pay rose 26.7%, so existing plants grew while the count held. For a new plant that is good news on demand for industrial skills and bad news on cost: a sponsor competing for welders, machinists and maintenance technicians is bidding against expanding employers. Pay runs 5.3% below the national manufacturing average, a modest gap that should not be modelled as a lasting cost advantage. Density slightly above the nation, and a non-metro share above the population share, mean rural North Dakota already hosts industry; the reviewer's question is less whether a plant can operate in a small town than whether this plant can staff its shifts there. Expect challenge on hiring plans, wage rates, the ramp to full output and the evidence behind sales volumes.
North Dakota manufacturing employment and pay, 2019 and 2023 (computed from the Census CBP state files)
| Measure | 2019 | 2023 | Change |
|---|---|---|---|
| Establishments | 705 | 695 | -1.4% |
| Paid employees | 26,627 | 29,264 | +9.9% |
| Average pay per employee | $54,717 | $69,310 | +26.7% |
| Payroll per establishment | $2,918,380 |
North Dakota manufacturing establishments by employment size, 2023 (computed from the Census CBP state file; 1 withheld)
| Employees | Establishments | Share of 695 |
|---|---|---|
| Fewer than 5 | 241 | 34.7% |
| 5 to 9 | 124 | 17.8% |
| 10 to 19 | 120 | 17.3% |
| 20 to 49 | 100 | 14.4% |
| 50 to 99 | 47 | 6.8% |
| 100 to 249 | 35 | 5.0% |
| 250 to 499 | 20 | 2.9% |
| 500 to 999 | 7 | 1.0% |
Manufacturing per 100,000 residents in leading non-metro and metro counties (CBP county counts; Vintage 2025 population)
| County | Status | Establishments | Residents, 2025 | Per 100,000 |
|---|---|---|---|---|
| Richland County | Non-metro | 38 | 16,731 | 227.1 |
| Pembina County | Non-metro | 12 | 6,568 | 182.7 |
| Barnes County | Non-metro | 16 | 10,573 | 151.3 |
| Stutsman County | Non-metro | 21 | 21,414 | 98.1 |
| Stark County | Non-metro | 31 | 34,013 | 91.1 |
| Williams County | Non-metro | 36 | 41,767 | 86.2 |
| Cass County | Metro | 193 | 201,794 | 95.6 |
| Grand Forks County | Metro | 55 | 74,501 | 73.8 |
| Burleigh County | Metro | 69 | 103,251 | 66.8 |
| Ward County | Metro | 42 | 68,233 | 61.6 |
Demand drivers and how competing capacity is analysed
Manufacturing demand is not local, so the market chapter looks at customers rather than residents: who buys the output, under what contracts, at what price, and how much of their need the plant will supply. For a new company the strongest evidence is a signed offtake or supply agreement, which 5001.105(d)(2) rewards directly: a new business with sales contracts adequate for debt service, for a term at least as long as the loan, can close with 10% equity instead of 20% or 25%. Competing capacity is measured by product, not by county: named competitors, their capacity and location, freight costs to the customer base, and any import competition.
The county table locates the existing industrial base. Richland County, home of Wahpeton, runs 227.1 plants per 100,000 residents, two and a half times the state rate, and Pembina and Barnes Counties also exceed 150. A plant in one of those counties joins a labour market that already knows shift work; a plant in a county with no manufacturing has to show where its first 40 workers come from. The size table shows the scale most sponsors plan for: 241 of the state's plants employ fewer than five people, while 62 employ 100 or more.
Revenue model, costs and capital items
Revenue is units times price by product line and customer, with capacity utilisation ramping over two to three years for a new plant. Costs are raw materials and freight (often the largest lines), direct labour by shift, utilities, maintenance, insurance, selling and administrative cost, and working capital tied up in inventory and receivables. North Dakota payroll averaged $2,918,380 per manufacturing establishment in 2023. Capital items are land, site work and utility extensions, the building, process equipment and installation, engineering, commissioning and start-up losses, spare parts and working capital. Quarterly cash flow through start-up is required where a guarantee issues before completion (5001.202), and the timetable and budget must be confirmed by a qualified independent consultant (5001.205(e)(2)).
Rural footprint and B&I eligibility in North Dakota
Of the 680 plants the county file places, 286 (42.1%) operate in 30 non-metro counties, a computed 93.0 per 100,000 non-metro residents against 80.1 in metro counties. The non-metro leaders are Richland County (38), Williams County (36), Stark County (31), Stutsman County (21), Barnes County (16) and Pembina County (12).
The county label is a proxy for the real test. 7 CFR 5001.3 treats as rural any site outside a city or town of more than 50,000 people and the urbanized area contiguous to it. Fargo (136,275), Bismarck (77,963) and Grand Forks (60,365) are excluded, and Cass County alone holds 193 of the placed plants, the largest concentration in the state; many of those are inside Fargo or its urbanized area and cannot use B&I. Industrial parks on the edge of an excluded city need the closest look, because the urbanized-area boundary, not the city limit, decides. Minot (47,308) and West Fargo (41,175) are under the population line; Minot's metro county label does not exclude it, while West Fargo's position next to Fargo must be checked on the map. Smaller industrial towns such as Wahpeton (8,141), Valley City (6,430), Jamestown (15,688) and Dickinson (25,870) pass on population. See the North Dakota hub and the B&I eligibility check.
The ownership test in 5001.127(a) applies to plant investors as well as operators: any owner with more than 20 percent (passive investors aside) or with control must be clear of federal court judgments, delinquent federal taxes and debts, and debarment or suspension.
Financing benchmarks: USDA B&I next to SBA
North Dakota: SBA lending to manufacturing establishments (all)
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 103 | $42.0 million | 24 | $15.8 million |
| FY2017 to FY2019 | 28 | $6.2 million | 8 | $6.8 million |
| FY2020 to FY2023 | 19 | $6.5 million | 17 | $31.0 million |
| FY2024 to FY2026 | 13 | $14.1 million | 6 | $4.8 million |
Average 7(a) loan, FY2020 to FY2026: $644,434. Average 504 loan: $1.6 million. Of the 103 7(a) loans approved in FY2010 to FY2016 for North Dakota manufacturing establishments (all), 2.9% were charged off (national: 6.4% of 27,078), on average 44 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
North Dakota manufacturers have repaid SBA loans better than the national average: 3 charge-offs among 103 seasoned 7(a) loans, under half the national rate, and the pack's aggregates show 1 of 24 FY2010 to FY2016 504 loans charged off. The losses that did occur came early, about 44 months after approval, which is the start-up and ramp period a feasibility study is meant to stress. Volume fell after FY2016, from 103 7(a) loans in FY2010 to FY2016 to 47 in the seven fiscal years that followed, but size rose: the FY2024 to FY2026 average of $1,085,592 is more than three times the FY2020 to FY2023 average of $342,589. Larger loans now sit near the line where a B&I guarantee, with its longer terms and $25 million ceiling, becomes the better tool. The FY2020 to FY2026 7(a) average of $644,434 is 7.0% below the national manufacturing figure of $693,181.
FY2026 B&I terms for a North Dakota plant
| Term | Rule and source | Reading for a plant here |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million (91 FR 11272) | Most expansions at 85%; new plants above $5 million at 80% |
| Upfront fee | 3.0% of the guaranteed amount; reduced-fee option 1.0% at 80% (91 FR 11272) | Plus 0.50% if the guarantee issues before construction ends |
| Retention fee | 0.55% of the guaranteed share outstanding at 31 December (91 FR 11272; 5001.455) | Fixed for the life of the loan |
| Maximum | $25 million; up to $40 million for a rural value-added cooperative (5001.406(c)) | Covers nearly any rural plant |
| Term | Useful life up to 40 years; no balloon (5001.402) | Machinery 10 to 15 years, buildings longer |
| Rate | Negotiated, fixed or variable; variable adjusts no more than quarterly (5001.401) | Swap hedges: guarantee covers principal and interest only |
| Equity, new plant with offtake contracts | 10% balance sheet equity or 10% of project cost (5001.105(d)(2)) | Contracts must cover debt service for the loan term |
| Equity, new plant, construction-stage guarantee | 25% balance sheet equity (3:1) or 25% of project cost (5001.105(d)(3)) | Equity goes in before guaranteed funds (5001.205(e)(2)) |
| Equity, other new plants | 20% balance sheet equity (4:1) or 25% of project cost (5001.105(d)(4)) | The default case |
| Equity, existing manufacturer | 10% balance sheet equity, 10% of project cost, or contributed-capital test (5001.105(d)(1)) | Expansions by operating companies |
| Collateral | Appraisal over $250,000; as-is and prospective values (5001.203) | Special-purpose equipment discounted heavily |
| Jobs | Labor concurrence above $1,000,000 and 50 jobs (5001.306(a)(1)) | Large new plants |
The equity table is where a North Dakota manufacturer gains most from a good study. A new company that can show contracted sales covering debt service for the life of the loan closes at 10% under 5001.105(d)(2); the same company without contracts needs 20% or 25%.
Worked example (illustrative)
Inputs. Loan A is $645,000, the pack's FY2020 to FY2026 North Dakota manufacturing 7(a) average of $644,434, rounded. Loan B is $4,500,000, an illustrative new plant with building and equipment, kept under $5 million so it stays in the 85% tier. The illustrative rate is 7.0% fixed, not a quote, amortized monthly over 15 years, a blend weighted to machinery lives (5001.401, 5001.402). Fees use 91 FR 11272; the loan is the only debt in the equity lines.
| Line | Loan A: state manufacturing 7(a) average | Loan B: illustrative new plant |
|---|---|---|
| Loan amount | $645,000.00 | $4,500,000.00 |
| B&I guarantee, FY2026 | 85% | 85% |
| Guaranteed amount | $548,250.00 | $3,825,000.00 |
| Unguaranteed portion | $96,750.00 | $675,000.00 |
| Upfront fee (3.0% of guaranteed) | $16,447.50 | $114,750.00 |
| Added fee if the guarantee issues before completion (0.50%) | not applicable | $19,125.00 |
| First-year retention fee, upper bound (0.55%) | $3,015.38 | $21,037.50 |
| Retention fee on the balance after 12 payments | $2,897.48 | $20,214.98 |
| Monthly principal and interest (7.0%, 15 years) | $5,797.44 | $40,447.27 |
| Annual debt service | $69,569.31 | $485,367.27 |
| Cash flow available for debt service at 1.25x | $86,961.64 | $606,709.08 |
| Cushion above 1.00x | $17,392.33 | $121,341.82 |
| Cushion in wages at the state average ($69,310) | 0.25 positions | 1.75 positions |
| Annual debt service at a rate 2 points higher | $78,504.23 | $547,703.96 |
| Coverage at that rate | 1.11x | 1.11x |
| Coverage with cash flow 10% below plan | 1.12x | 1.12x |
| New plant with offtake contracts: 10% of project cost (5001.105(d)(2)) | $71,666.67 on $716,666.67 | $500,000.00 on $5,000,000.00 |
| New plant, construction-stage guarantee or other new plant: 25% of project cost | $215,000.00 on $860,000.00 | $1,500,000.00 on $6,000,000.00 |
| Other new plant: 20% balance sheet equity (4:1) | $161,250.00 | $1,125,000.00 |
| Study compulsory for a new business? | No (discretionary at $1,000,000 or less) | Yes |
| SBA 7(a) alternative: 75% guaranteed and fee ceiling | $483,750.00 and $14,512.50 | $3,375,000.00 and $124,062.50 |
Reading the table. The contracted-sales line is the one to notice: on Loan B, signed offtake agreements that meet 5001.105(d)(2) cut required equity from $1,500,000.00 to $500,000.00, a difference of $1,000,000.00 that a feasibility study earns by documenting the contracts and testing their counterparties. Loan B's coverage cushion equals fewer than two manufacturing wages at the state average, so a ramp that runs six months late can consume it; the study should show the cash or interest reserve that carries the plant through that case. The 0.50% construction-stage fee, $19,125.00 on Loan B, applies only if the guarantee is issued before the plant is complete.
What a lender-grade manufacturing feasibility study in North Dakota must prove
- Customers and contracts: named buyers, volumes, prices and terms, with offtake agreements tested against the 5001.105(d)(2) standard.
- Competing capacity by product and freight cost, not by county.
- A process proven at the planned scale; non-proven technology cannot have a pre-completion guarantee (5001.205(e)(2)).
- A hiring plan by shift at current wages, tested against the 26.7% pay rise from 2019 to 2023 and the local industrial labour pool.
- Raw material supply: sources, contracts, price history and freight.
- A construction budget and timetable confirmed by a qualified independent consultant, with contingency and a fixed-price contract.
- Ramp-up and working capital: quarterly cash flow through start-up and the reserve that funds the slow months.
- Eligibility: the parcel passes 5001.3, and Labor concurrence is scheduled if more than 50 jobs are created on a loan above $1,000,000.
- Sensitivity: coverage under lower volume, lower price, higher input cost, higher wages and a later start.
Risks and mitigants specific to North Dakota
| Risk | Why it bites here | How the study tests or mitigates it |
|---|---|---|
| Labour supply | Manufacturing jobs up 9.9% in four years; pay up 26.7% | Hiring plan, wage survey, training costs |
| Distance to markets | Plants ship out of state for most products | Freight model by customer; delivered-price comparison |
| Early-stage losses | State 7(a) charge-offs came about 44 months after approval | Ramp reserves; downside case for a late start |
| Construction season | Winter limits site work | Schedule with weather allowance; interest reserve |
| Eligibility edge | Industrial land beside Fargo, Bismarck and Grand Forks | Urbanized-area map check per parcel |
| Customer concentration | One offtaker often carries a new plant | Counterparty credit review; contract term at least the loan term |
Process, documents and why studies come back
The sponsor and lender agree the program and structure first, then commission the study. For B&I the lender files the application, with the study, at the USDA Rural Development state office serving North Dakota, and the Agency may set the scope of a compulsory study before work begins. The sponsor provides the business plan, customer contracts or letters of intent, supplier quotes, process and equipment specifications, engineering and construction estimates, site control, environmental reports, management résumés and financial statements. Manufacturing studies come back for unsupported sales volumes, ramp-up periods that are too short, labour plans with no evidence of local supply, equipment budgets without vendor quotes, and projections that depart from history without explanation, which 5001.202 specifically flags.
Program record, honestly labelled
The inputs include no North Dakota manufacturing project financed under B&I, and this page names none. USAspending shows 2 B&I guaranteed loans in North Dakota in FY2024 to FY2026, 41st of 51 states and DC by count, with industries not broken out; SBA's 163 manufacturing 7(a) loans since FY2010 are the state's documented record.
Hiring a USDA manufacturing feasibility study consultant in North Dakota
The rule leaves no choice for a new manufacturing company borrowing over $1,000,000 under B&I: an independent consultant acceptable to the Agency must prepare the study, and the Agency sets its scope. Expansions by established plants fall under Agency and lender discretion, and lenders tend to require studies for new products and new processes. For a North Dakota plant, the useful test of a USDA feasibility study consultant is whether the firm can read offtake contracts and process data as closely as it reads market data.
The site's cost and timeline page prices a standard single-site B&I study at $6,900 to $12,500 over 6 to 7 weeks and complex work, such as loans above $10 million, phased plants, unusual products or thin comparable data, at $10,500 to $14,500 over 7 to 9 weeks. Engineering, environmental assessments, appraisals and legal work are outside the study's scope on that page and run as separate engagements. The fee is fixed before signing and includes the financial workbook and one revision round, with a written commitment to revise until USDA or the lender accepts the report. Bring the product, customers, process, site and lender; request a free consultation and the site promises a reply within 24 hours.
Last updated 2026-11-08
USDA Feasibility, Inc.