North Dakota's wood products industry is two industries hiding in one number. Census counted 27 wood product manufacturers in 2023, averaging 88.0 employees, nearly three times the national 31.1, and paying $57,385 a year, exactly the national rate. But only 3 of those 27 are sawmills, with 5 employees between them; most of the industry's 2,376 jobs sit in a handful of large plants making finished wood products from purchased material. A sponsor proposing a sawmill, a pallet plant or a value-added wood shop here is entering a sector with almost no small-plant comparables and a raw-material question that must be answered before any market work: where the logs or lumber come from.
Data current as of November 2026.
Program fit and when a study is required
Wood product manufacturing is a core B&I activity: an eligible rural site, an 85% guarantee under $5 million or 80% from $5 million to $25 million, a 3.0% upfront fee and 0.55% annual retention for FY2026 (91 FR 11272), and terms up to the useful life of mill equipment and buildings (5001.402). SBA 7(a) and 504 serve smaller shops and equipment purchases. REAP can contribute up to a quarter of the cost of efficiency equipment or a renewable system at an operating plant, but only after 12 months of data under the rule effective 16 October 2026, and never ground-mounted solar on cropland.
A new wood products company borrowing more than $1,000,000 under B&I must, under 7 CFR 5001.306(a)(3)(i), file a study written by an independent consultant the Agency accepts, on a scope the Agency defines. Because North Dakota's plants average 88 employees, any project creating more than 50 jobs on a loan above $1,000,000 also needs Department of Labor concurrence (5001.306(a)(1)). If the guarantee is to issue before the plant is built, non-proven technology is not allowed (5001.205(e)(2)), which matters for novel engineered-wood or biomass processes.
Sawmills and wood products in North Dakota: market evidence
North Dakota: wood product manufacturing, supply and rural footprint
| Measure | North Dakota | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 26 → 27 (+3.8%) | 14,223 → 13,899 |
| Per 100,000 residents (2023) | 3.4 | 4.1 |
| Average employees per establishment | 88.0 | 31.1 |
| Average annual pay per employee | $57,385 | $57,420 |
| Share of establishments in non-metro counties | 15.0% (3 in 1 counties) | |
| Share of state population in non-metro counties (2025) | 38.5% |
Non-metro counties with the most wood product manufacturing (2023): Richland County (3).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
The count grew by one while the national count fell 2.3%, and employment grew 29.6%, from 1,833 to 2,376, with pay up 18.7%. That growth belongs to the large plants. The size classes show it: Census assigns 24 of the 27 plants to size bands, and even at the top of each band those 24 could employ no more than 711 people, so at least 1,665 jobs, 70% of the total, sit in the 3 plants withheld from the bands. A sawmill or small wood shop therefore has no meaningful in-state benchmark for output, staffing or margins; the state's averages describe large finished-product plants. The 3 sawmills in the file employ 5 people in total. A reviewer will ask for the log or lumber supply first, then for buyers, then for how a small mill competes with established regional producers.
What the size classes show (computed from the Census CBP state file, 2023)
| Employees | Plants | Maximum employment in the band |
|---|---|---|
| Fewer than 5 | 7 | 28 |
| 5 to 9 | 3 | 27 |
| 10 to 19 | 6 | 114 |
| 20 to 49 | 5 | 245 |
| 50 to 99 | 3 | 297 |
| Withheld from size classes | 3 | at least 1,665 (2,376 total less 711) |
Regional comparables (other states' figures, labelled)
| Measure | North Dakota | South Dakota | Montana | Minnesota |
|---|---|---|---|---|
| Plants, 2019 → 2023 | 26 → 27 (+3.8%) | 63 → 57 (-9.5%) | 136 → 149 (+9.6%) | 350 → 315 (-10.0%) |
| Per 100,000 residents | 3.4 | 6.2 | 13.2 | 5.5 |
| Average employees per plant | 88.0 | 31.3 | 19.8 | 46.4 |
| Average pay per employee | $57,385 | $59,840 | $56,480 | $70,736 |
| Non-metro share of county-placed plants | 15.0% | 33.3% | 60.6% | 33.8% |
| SBA 7(a) loans, FY2010 to FY2026 | 8 | 8 | 15 | 112 |
| Average 7(a) loan, FY2020 to FY2026 | $502,400 (2 loans) | $134,933 (3 loans) | $631,250 (4 loans) | $831,811 (38 loans) |
Source: each state's pack (Census CBP 2019 and 2023; SBA FOIA data as of 30 Sep 2026).
Montana and Minnesota are where the region's sawmilling happens: Montana has 13.2 wood plants per 100,000 residents, 60.6% of them in non-metro counties, and Minnesota's 38 recent 7(a) loans averaged $831,811. A North Dakota mill will probably buy logs or compete for buyers in those markets, so their plants are both the comparables and the competition. Minnesota's falling count (−10.0%) and higher pay ($70,736) are a warning about the labour and margin pressure in the regional industry.
National benchmarks
Wood products is one of the higher-loss SBA categories: 7.1% of 1,015 national 7(a) loans approved in FY2010 to FY2016 were charged off, on average 65 months after approval. In FY2020 to FY2026 SBA approved 806 national 7(a) loans averaging $766,800 and 160 504 loans averaging $1,263,938 (computed from the pack's aggregates). North Dakota's 5 seasoned 7(a) loans had no charge-offs, too few to offset the national signal.
Evidence the study must build when local comparables are thin
- Fibre supply: log, lumber or residue sources within an economic haul, with volumes, species, prices and supply agreements or letters of intent.
- Buyers: letters or contracts from lumber yards, builders, pallet users or manufacturers, with volumes, specifications and price.
- Mill economics from comparable plants in Montana or Minnesota, labelled as out of state: recovery rates, throughput per shift and labour per unit.
- Freight costs both ways, since raw material and product may both travel long distances.
- Residue handling: markets or uses for sawdust, chips and bark, which can make or break a small mill's margin.
- Labour availability for mill work at the state's $57,385 average pay.
Rural footprint and B&I eligibility in North Dakota
The county file places 20 of the 27 plants: 12 in Cass County, 5 in Burleigh County and 3 in non-metro Richland County, which is the only non-metro county in the pack. Plants inside Fargo or Bismarck cannot use B&I, because 7 CFR 5001.3 excludes cities of more than 50,000 people and their contiguous urbanized areas; Grand Forks (60,365) is the third excluded city. Industrial sites in the townships around those cities need a parcel check against the urbanized-area map. Wahpeton (8,141), Richland County's seat, passes on population, as do most small towns where a mill would locate. Minot (47,308) is below the line despite Ward County's metro label. The place list is on the North Dakota hub, and the B&I eligibility check explains how a specific address is judged.
Mill investors are screened under 5001.127(a): if the borrower, a controlling owner or a non-passive owner holding more than 20 percent has delinquent federal taxes or debt, an outstanding federal judgment or a debarment, the guarantee is unavailable until it is cleared.
Financing benchmarks: USDA B&I next to SBA
North Dakota: SBA lending to wood product manufacturing
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 5 | $2.0 million | 0 | $0 |
| FY2017 to FY2019 | 1 | $172,000 | 0 | $0 |
| FY2020 to FY2023 | 1 | $904,800 | 1 | $289,000 |
| FY2024 to FY2026 | 1 | $100,000 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $502,400. Average 504 loan: $289,000. North Dakota had fewer than 30 seasoned 7(a) loans for wood product manufacturing; nationally, 7.1% of 1,015 FY2010 to FY2016 loans were charged off, on average 65 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| Term | B&I rule (FY2026) | For a North Dakota wood plant |
|---|---|---|
| Guarantee and fees | 85% under $5 million, 80% from $5 million to $25 million; 3.0% upfront; 0.55% retention (91 FR 11272) | 0.50% more if the guarantee issues before completion |
| Term | Useful life up to 40 years; no balloon (5001.402) | Saws, kilns and planers shorter than the building |
| Equity, new plant with sales contracts covering debt service | 10% balance sheet equity or 10% of project cost (5001.105(d)(2)) | Contracts at least as long as the loan |
| Equity, other new plant | 20% balance sheet equity (4:1) or 25% of project cost (5001.105(d)(4)) | The usual start-up case |
| Equity, existing plant | 10% balance sheet equity, 10% of project cost, or contributed-capital test (5001.105(d)(1)) | Expansions |
| Collateral | Appraisal over $250,000; going-concern value deducted (5001.203) | Mill equipment discounted |
| Jobs | Labor concurrence above $1,000,000 and 50 jobs (5001.306(a)(1)) | Large plants only |
Worked example (illustrative)
Inputs. North Dakota had two wood products 7(a) loans in FY2020 to FY2026, so Loan A uses the national average of $766,800, rounded to $767,000, the scale of a small mill or shop. Loan B is $5,500,000, an illustrative new plant chosen to show the 80% tier. The illustrative rate is 7.125% fixed, not a quote, with monthly payments over 15 years for equipment-heavy assets (5001.401, 5001.402). For the equity rows the loan is taken to be the plant's only liability.
| Line | Loan A: national 7(a) average | Loan B: illustrative new plant |
|---|---|---|
| Loan amount | $767,000.00 | $5,500,000.00 |
| B&I guarantee, FY2026 | 85% | 80% |
| Guaranteed amount | $651,950.00 | $4,400,000.00 |
| Unguaranteed portion | $115,050.00 | $1,100,000.00 |
| Upfront fee (3.0% of guaranteed) | $19,558.50 | $132,000.00 |
| First-year retention fee, upper bound (0.55%) | $3,585.73 | $24,200.00 |
| Retention fee on the balance after 12 payments | $3,446.97 | $23,263.53 |
| Monthly principal and interest (7.125%, 15 years) | $6,947.72 | $49,820.71 |
| Annual debt service | $83,372.70 | $597,848.56 |
| Cash flow for 1.25x coverage | $104,215.87 | $747,310.71 |
| Cushion above 1.00x | $20,843.17 | $149,462.14 |
| Cushion in wages at the state average ($57,385) | 0.36 positions | 2.60 positions |
| Debt service at a rate 2 points higher | $94,038.74 | $674,332.58 |
| Coverage at that rate | 1.11x | 1.11x |
| Coverage with cash flow 10% below plan | 1.12x | 1.12x |
| New plant with qualifying sales contracts: 10% of project cost | $85,222.22 on $852,222.22 | $611,111.11 on $6,111,111.11 |
| Other new plant: 25% of project cost | $255,666.67 on $1,022,666.67 | $1,833,333.33 on $7,333,333.33 |
| Other new plant: 20% balance sheet equity | $191,750.00 | $1,375,000.00 |
| Study compulsory for a new business? | No (discretionary) | Yes, above $1,000,000 |
| SBA 7(a) alternative: 75% guaranteed and fee ceiling | $575,250.00 and $20,133.75 | $4,125,000.00 and $152,187.50 |
Reading the table. Loan B must generate $747,310.71 of cash flow for 1.25x on a 15-year schedule. For a wood plant the swing factors are log or lumber cost and product price, which move together only loosely, so the study should show coverage with input costs up and output prices flat, not just the uniform 10% case (1.12x). Signed sales contracts that satisfy 5001.105(d)(2) would lower Loan B's new-plant equity from $1,833,333.33 to $611,111.11.
What a lender-grade wood products feasibility study in North Dakota must prove
- A fibre supply within economic haul distance, with volumes, prices and commitments.
- Buyers and prices, backed by letters or contracts, net of freight.
- Mill recovery, throughput and labour per unit from comparable plants, labelled where out of state.
- A residue plan with markets or uses for chips, sawdust and bark.
- Staffing at the state's $57,385 average pay, with the labour pool identified.
- Construction and equipment budgets from quotes, and an independently confirmed timetable if the guarantee issues before completion.
- Coverage under higher input costs, lower prices and a slower ramp, with the parcel's eligibility confirmed.
Hiring a USDA sawmill and wood products feasibility study consultant in North Dakota
A new wood products company borrowing more than $1,000,000 under B&I must commission an independent study the Agency accepts; below that line, the 7.1% national loss rate gives lenders reason to ask anyway. A USDA feasibility study consultant on a North Dakota mill should start with fibre supply, since no in-state sawmill benchmark exists.
The site's cost and timeline page lists standard single-site B&I studies at $6,900 to $12,500 over six to seven weeks, and moves unusual asset classes and thin comparable data into a complex band of $10,500 to $14,500 over seven to nine weeks, where most North Dakota sawmill proposals will sit. Engineering and environmental work are outside the study on that page. The price is fixed before signing, the Excel model is delivered with the report, and revisions continue until USDA or the lender accepts it. With supply letters, a site and a lender in hand, schedule a free consultation; the site's form commits to a reply within 24 hours.
Program record, honestly labelled
The inputs contain no North Dakota sawmill or wood products plant financed under B&I, and none is named here. Federal award records for FY2024 through FY2026 show two B&I guarantees in North Dakota in total, without industry detail.