USDA Feasibility Study for Gas Stations and C-Stores in South Dakota

    NAICS 457110

    South Dakota has almost twice as many fuel stations per resident as the nation: 580 in 2023, or 63.2 per 100,000 residents against 32.4. Yet the count is falling, down from 609 in 2019 (-4.8%). That combination tells a lender what a c-store study must address. Long distances and farm traffic keep demand for fuel spread across many small towns, while older stations close and newer, larger stores with food service take their customers. A new or rebuilt store succeeds by capturing that shift, and the feasibility study has to show, with traffic counts and a list of competing stations, that this site is where the shift lands.

    Data current as of November 2026.

    Which program fits a South Dakota fuel and convenience project

    RouteFit in South DakotaWhat to check first
    USDA B&I guaranteeNew stores, rebuilds, travel centers and acquisitions in towns outside Sioux Falls and Rapid City; terms up to useful lifeRural parcel (7 CFR 5001.3); environmental review of tank sites
    SBA 7(a)Acquisitions and rebuilds; 21 South Dakota loans since fiscal 201075% guarantee above $150,000; guaranty fee ceilings (13 CFR 120.210, 120.220)
    SBA 504Owner-occupied store real estate; 22 South Dakota loans since fiscal 2010Single-purpose property raises the borrower's injection (120.910)
    REAPLighting, refrigeration and HVAC efficiency at an operating storeRule effective 16 October 2026 excludes EV chargers and retail energy dispensing from the grant
    Community FacilitiesNot for a private fuel retailerPublic bodies and nonprofits only
    Conventional or supplier financingBranded fuel supply programs and bank loans for strong operatorsSupply agreement terms and incentives

    When an independent study is required

    A newly formed c-store company that borrows more than $1,000,000 under a B&I guarantee must submit a study by an independent consultant acceptable to the Agency, which sets the scope (7 CFR 5001.306(a)(3)(i)). South Dakota's average SBA 7(a) fuel-station loan over fiscal 2020 to 2026 was $1,164,633, just past that threshold, so a typical new store by a new owner is a compulsory case. An existing operator adding a site is assessed at the Agency's discretion under (a)(3)(ii), and loans of $600,000 or less use the streamlined process. SBA lenders also may require a study (13 CFR 120.160(b)).

    Gas stations and c-stores in South Dakota: market evidence

    South Dakota: gas stations and fuel-convenience stores, supply and rural footprint

    MeasureSouth DakotaUnited States
    Establishments, 2019 → 2023609 → 580 (-4.8%)112,630 → 109,174
    Per 100,000 residents (2023)63.232.4
    Average employees per establishment11.69.3
    Average annual pay per employee$28,627$29,193
    Share of establishments in non-metro counties54.6% (273 in 36 counties)
    Share of state population in non-metro counties (2025)48.7%

    Non-metro counties with the most gas stations and fuel-convenience stores (2023): Brown County (22); Codington County (21); Brookings County (17); Beadle County (15); Yankton County (15); Charles Mix County (14).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Density is the starting fact: 1.95 times the national rate, second of 51 states and DC in this site's data. Stations are also bigger than average, with 11.6 employees against 9.3 nationally, which fits stores that combine fuel, groceries and prepared food in towns without many other retailers. Pay sits within 2% of the national figure at $28,627, and payroll per station averaged $332,810. The decline of 29 stations since 2019 is the number a reviewer will ask about: which nearby stations closed, why, and whether their customers can be won.

    South Dakota fuel stations by type, 2019 and 2023 (CBP state files)

    Station type (NAICS)2019 count2023 countEmployees, 2023Pay per employee, 2023
    Gas stations with convenience stores (447110)5064895,521$26,872
    Other gasoline stations (447190)103911,222$36,557

    Fuel stations in selected South Dakota counties (CBP county file; Vintage 2025 population)

    County (largest town)OMB statusStations, 2023Residents, 2025Stations per 100k residents
    Charles Mix (Wagner)Non-metro149,303150.5
    Beadle (Huron)Non-metro1519,62476.4
    Codington (Watertown)Non-metro2129,56271.0
    Davison (Mitchell)Non-metro1420,06969.8
    Yankton (Yankton)Non-metro1523,63563.5
    Brown (Aberdeen)Non-metro2237,56158.6
    Pennington (Rapid City)Metro66116,79256.5
    Minnehaha (Sioux Falls)Metro101212,69147.5

    Demand drivers and the competing stations

    Rural counties carry more stations per resident than the two metro counties: Charles Mix has 150.5 per 100,000 and Beadle 76.4, against 47.5 in Minnehaha. Each small-town store serves residents, farm and ranch operations, commuters and through traffic, so the trade area is wider than the town. Of the 489 convenience-store stations, 216 (44.2%) employ fewer than ten people, the profile of older single-site stores most exposed to new competition. The study should quantify traffic on the adjacent roads, the share of traffic that stops for fuel, the competing stations within the relevant drive-time with their pump count, brand, store size, food service and price, and local demand from farm fuel accounts and fleets.

    Revenue model, costs and capital

    Fuel revenue is gallons times the margin per gallon, by grade, with diesel volume shown separately because farm and truck traffic weigh heavily in South Dakota. Inside sales come next (groceries, beverages, tobacco, prepared food), each at its own margin, followed by car wash, lottery commissions and other income. Operating costs are labour, card fees (which rise with fuel prices), utilities, repairs, insurance, property tax, environmental compliance and franchise or brand fees. Capital items are land, underground tanks and piping, dispensers and canopy, the store building, kitchen equipment, coolers, a car wash if planned, site work and working capital for fuel and merchandise inventory.

    Rural footprint and B&I eligibility in South Dakota

    The pack places 273 of 500 county-located stations (54.6%) in 36 non-metro counties, more than the 48.7% of residents there. Brown (22), Codington (21), Brookings (17), Beadle (15), Yankton (15) and Charles Mix (14) lead. Stations operate in 44 of the state's 66 counties.

    B&I eligibility is decided by the address, not by the county list. Under 7 CFR 5001.3 the program excludes places of more than 50,000 residents and their contiguous urbanized areas, which in South Dakota means Sioux Falls (213,748) and Rapid City (80,589). A highway store a few miles outside either city will usually be eligible, and every regional town from Aberdeen down qualifies on population; growth corridors on the Sioux Falls edge are where a map check matters. The South Dakota state hub has the place list.

    Financing benchmarks: USDA B&I next to SBA

    South Dakota: SBA lending to gas stations and fuel-convenience stores

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20167$3.9 million10$3.0 million
    FY2017 to FY20198$8.2 million3$959,000
    FY2020 to FY20233$4.4 million8$3.3 million
    FY2024 to FY20263$2.6 million1$230,000

    Average 7(a) loan, FY2020 to FY2026: $1.2 million. Average 504 loan: $389,889. South Dakota had fewer than 30 seasoned 7(a) loans for gas stations and fuel-convenience stores; nationally, 4.0% of 4,095 FY2010 to FY2016 loans were charged off, on average 74 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    South Dakota fuel-station loans are smaller than the nation's: the fiscal 2020 to 2026 7(a) average of $1,164,633 is 27.4% below the national figure of $1,603,159. 504 loans, averaging $389,889, carry the smaller real estate deals. The state's own seasoned sample is too small to rate but worth knowing: of seven 7(a) loans approved in fiscal 2010 to 2016, two were charged off, on average about 77 months after approval, against 4.0% of 4,095 nationally. Lender-reported jobs attributed to the state's SBA fuel-station loans total 553.

    B&I guaranteed loan terms for loans obligated in fiscal 2026

    TermRule and source
    Guarantee share85% for loans under $5 million; 80% from $5 million to $25 million; 80% on the reduced-fee path (91 FR 11272)
    Upfront guarantee fee3.0% of the guaranteed amount, or 1.0% on the reduced-fee path; plus 0.50% if the guarantee issues before construction is complete (91 FR 11272; 5001.454)
    Annual retention fee0.55% (0.50% on the reduced-fee path) of the guaranteed share of principal outstanding on 31 December; the rate is fixed at obligation (5001.455)
    Loan ceiling$25 million per borrower (5001.406(c))
    TermUseful life, at most 40 years; no balloon; first full payment within 3 years of the note if interest-only (5001.402)
    RateNegotiated; fixed, variable or combined; no higher than the lender charges on similar non-guaranteed loans; variable rates reset no more than quarterly (5001.401)
    Equity, existing business10% balance sheet equity (or debt to equity of 9:1), 10% of eligible project cost, or the contributed-capital test (5001.105(d)(1))
    Equity, new business20% balance sheet equity (or 4:1) or 25% of project cost; 10% with sales contracts that cover debt service; 25% (or 3:1) if the guarantee issues before construction ends (5001.105(d)(2) to (4))
    CollateralAppraisal for real estate over $250,000; as-is and prospective values for construction; going-concern value deducted before discounting; appraisals no older than one year (5001.203)
    GuarantorsOwners of 20% or more guarantee at least their share of the guaranteed amount for the full term (5001.204)
    Feasibility studyRequired from an independent qualified consultant for loans over $1,000,000 to a new business; at the Agency's discretion otherwise (5001.306(a)(3))

    At South Dakota's typical loan size a c-store sits in the 85% tier. The rules that matter most for this asset are environmental and collateral: tank sites carry contamination risk that affects appraisal and lender appetite, and a store's appraised value includes business value that 5001.203 removes before the lender discounts collateral. A new owner should plan on 25% of project cost or 20% balance sheet equity; an operator buying another store, 10%.

    Worked example (illustrative)

    The example uses two sizes. The first, $1,200,000, rounds the state's fiscal 2020 to 2026 SBA 7(a) average for fuel stations ($1,164,633) and is amortized over 20 years. The second, $2,800,000, illustrates a larger travel-center build over 25 years. An illustrative fixed rate of 7.50% applies to both; it is not a quote, and both structures respect 5001.401 and 5001.402. Fee rates come from the fiscal 2026 notice, and the equity lines assume no other debt.

    LineLoan A: near the South Dakota SBA averageLoan B: illustrative travel-center new-build
    Loan amount$1,200,000$2,800,000
    B&I guarantee share for fiscal 2026 loans (91 FR 11272)85%85%
    Guaranteed amount$1,020,000.00$2,380,000.00
    Unguaranteed portion held by the lender$180,000.00$420,000.00
    Upfront guarantee fee (3.0% of the guaranteed amount)$30,600.00$71,400.00
    First-year retention fee, upper bound (0.55% of the guaranteed share of the full balance)$5,610.00$13,090.00
    Retention fee on the balance left after 12 monthly payments$5,484.16$12,904.66
    Illustrative rate and amortization (not a quote)7.50% fixed, 20 years, monthly7.50% fixed, 25 years, monthly
    Monthly principal and interest$9,667.12$20,691.75
    Annual debt service$116,005.42$248,301.04
    Net operating income needed for 1.25x coverage$145,006.77$310,376.29
    Cushion above 1.00x coverage$29,001.35$62,075.26
    Cushion in wages at the South Dakota fuel-retail average pay ($28,627)1.01 positions2.17 positions
    Interest-only payment for a start-up year, if structured (5001.402)$90,000.00$210,000.00
    Annual debt service if the rate is 2.00 points higher$134,226.89$293,562.08
    Coverage at that higher rate on the same income1.08x1.06x
    Coverage if income lands 10% below plan1.125x1.125x
    New business: equity at 25% of project cost (5001.105(d)(4))$400,000.00 on a $1,600,000.00 project$933,333.33 on a $3,733,333.33 project
    New business: 20% balance sheet equity test (debt to equity 4:1, loan as the only debt)$300,000.00$700,000.00
    Existing business: 10% of project cost (5001.105(d)(1))$133,333.33 on a $1,333,333.33 project$311,111.11 on a $3,111,111.11 project
    Reduced-fee path (1.0% fee, 0.50% retention, 80% guarantee): upfront fee$9,600.00$22,400.00
    Independent study compulsory for a new business? (5001.306(a)(3)(i))Yes, above $1,000,000Yes, above $1,000,000
    Application track (5001.306)Full 5001.306(a) processingFull 5001.306(a) processing
    SBA 7(a) comparison: guaranteed share and guaranty fee ceiling (13 CFR 120.210, 120.220)75%: $900,000.00 guaranteed, fee ceiling $31,500.0075%: $2,100,000.00 guaranteed, fee ceiling $76,250.00

    What the numbers say. The $1.2 million store must produce $145,006.77 of net operating income for 1.25x coverage, after fuel and merchandise margins and every operating cost. Its cushion above 1.00x, $29,001.35, is about one employee at the state's average station pay, so a new competitor that takes a few hundred gallons a day can erase it. The travel center needs $310,376.29 and, for a new company, $933,333.33 of equity at 25% of cost. A two-point rate increase pushes the larger loan to 1.06x.

    What a lender-grade c-store feasibility study in South Dakota must prove

    1. Traffic counts on the adjacent roads, by direction and season, with a stated capture rate.
    2. Every competing station in the drive-time, with pumps, brand, store size, food service and pricing.
    3. Fuel gallons by grade and diesel separately, with margin per gallon supported by the fuel supply agreement.
    4. Inside sales by category, tested against comparable stores in similar South Dakota towns.
    5. Environmental status: Phase I assessment and tank system records for an existing site.
    6. Staffing at local wages, checked against $26,872 for convenience-store stations.
    7. Parcel eligibility under 7 CFR 5001.3.
    8. Sensitivity to gallons, margin, inside sales and interest rate, with break-even gallons stated.

    Risks and mitigants

    RiskWhy it bites in South DakotaHow the study tests or mitigates it
    Consolidation609 to 580 stations since 2019Name closures and new stores; test capture under a new competitor
    Fuel margin swingsMargin per gallon moves with wholesale pricesMargin sensitivity, supply agreement terms
    EnvironmentalUnderground tanks on old sitesPhase I and, if needed, Phase II before the study is final
    Farm-economy exposureRural stores depend on agricultural trafficCustomer mix analysis, fleet and farm accounts
    LabourSmall-town staffing for long hoursStaffing model with wage sensitivity

    Process and documents

    Most fuel projects start with a lender conversation and a fuel supplier's offer. For B&I, check that the lender still holds approved status under OneRD, agree the scope, and expect the lender to file the study with its application to the USDA Rural Development state office serving South Dakota. Bring the site survey, the supply agreement or offer, store plans, the construction or acquisition budget, any sales and gallon history, environmental reports and financial statements. Studies are sent back for capture rates without traffic data, missing competitors, margins above the supply agreement, and no environmental evidence.

    Program context, honestly labelled

    No South Dakota c-store financed under B&I appears in this page's inputs, so none is described. Across all industries, USAspending shows three B&I guaranteed loans placed in South Dakota in fiscal 2024 to 2026. The national gas station guide linked below is general and not a South Dakota project.

    Hiring a USDA gas station feasibility study consultant in South Dakota

    Under 5001.306(a)(3)(i), a new c-store company borrowing more than $1,000,000 with a B&I guarantee needs a gas station feasibility study consultant who is independent and acceptable to the Agency. That covers most new South Dakota stores at the state's average loan size. The study addresses the five components (economic, market, technical, financial and management), with traffic and capture analysis, a competing-station inventory and a five to ten year projection.

    Pricing on the site's study fees page: a single-site B&I study between $1 million and $10 million is standard scope, quoted between $6,900 and $12,500 with delivery in six to seven weeks. Environmental site assessments are not included and must be ordered separately, which matters for tank sites. The written acceptance guarantee and one revision round are part of the fee; a rush option compresses delivery to three or four weeks for 20% to 35% more.

    Ordering the Phase I assessment and engaging the USDA feasibility study consultant at the same time keeps the environmental findings and the market work on one schedule. To begin, send the site address, traffic information, store concept and loan size through the contact page; a senior analyst answers within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a new gas station in South Dakota need a USDA feasibility study?

    If the owner is a new business and the B&I-guaranteed loan exceeds $1,000,000, yes, under 7 CFR 5001.306(a)(3)(i). South Dakota's average SBA fuel-station loan, $1,164,633, sits just above that line, so most new stores qualify. An existing operator's second store, or a smaller loan, is at the Agency's or lender's discretion, and many lenders still require a study because rural fuel markets are consolidating.

    What does a gas station feasibility study consultant charge for a South Dakota project?

    A single-site store financed with a B&I loan of $1 million to $10 million falls in the standard band on the site's cost page, $6,900 to $12,500. Travel centers with several profit centers, multi-site packages or loans above $10 million move to complex scope at $10,500 to $14,500. The Phase I environmental assessment is a separate cost. Fees are fixed in a written proposal, roughly half at signing.

    How long does a c-store feasibility study take?

    Six to seven weeks for standard B&I scope and seven to nine for complex work, from signing, per the site's cost page. Traffic counts and the fuel supplier's offer are the usual pacing items, so assembling them early shortens the schedule. Rush delivery of three to four weeks is available at a premium when analysts are free.

    How does the study estimate fuel gallons for a rural store?

    From traffic and competition. It starts with traffic counts on the adjacent roads, applies a capture rate supported by comparable stores, adds local farm, fleet and resident demand, and subtracts what competing stations already take. South Dakota's 580 stations and 63.2 per 100,000 residents mean most towns already have fuel; the subject has to win gallons through location, access, pumps, diesel lanes and food service.

    Who can prepare a gas station study for a B&I loan?

    For the compulsory case, an independent consultant with no stake in the store and acceptable to the Agency. The fuel supplier, the jobber, the equipment vendor, the broker and the lender are not independent. A supplier's volume estimate can be cited as evidence, but the study must test it against traffic and competition rather than adopt it.

    How long is a c-store feasibility study valid?

    Part 5001 sets no expiry. For c-store studies, USDA's usual limit on market data age is 18 months, according to the site's study fees page, and appraisals must be no older than one year (5001.203). A new competitor on the same corridor, a road project that changes access, or a new supply agreement are reasons to update the study before the lender submits it.

    Can the same study be used for SBA and USDA financing?

    Yes, if it was written to USDA's five-component scope by an independent author; SBA lenders accept that standard. A study prepared only for an SBA lender may lack the technical and economic sections B&I expects. With 21 7(a) and 22 504 fuel-station loans in South Dakota since fiscal 2010, many sponsors weigh both routes.

    Can REAP pay for fuel pumps or EV chargers at a South Dakota store?

    No. The REAP rule effective 16 October 2026 excludes EV chargers and retail energy dispensing from eligible projects. REAP can still support efficiency work at an operating store, such as refrigeration, lighting or HVAC, after 12 months of operating data, and the grant is capped at 25% of cost. Fuel equipment belongs in the B&I or SBA loan instead.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan statistical area delineation, July 2023 (Census delineation file): https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for fiscal year 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, 11 December 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 89 FR 79698, OneRD guarantee loan final rule, 30 September 2024 (govinfo): https://www.govinfo.gov/content/pkg/FR-2024-09-30/html/2024-21920.htm
    9. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    10. USAspending.gov prime award data for Assistance Listings 10.768, 10.766 and 10.868, place of performance South Dakota, fiscal 2024 to 2026: https://www.usaspending.gov/search
    11. USDA RBCS, Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    12. USDA Feasibility Study Consultants, USDA feasibility study cost and timeline (fee bands, phases, rush terms, data recency): https://usda-feasibility-study.com/usda-feasibility-study-cost
    13. USDA Feasibility Study Consultants, contact and proposal request page: https://usda-feasibility-study.com/contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours