USDA Feasibility Study for Solar and Renewable Energy (REAP) in South Dakota

    NAICS 221114

    South Dakota has no solar or renewable power plants with paid staff in the Census count, and SBA lenders have made no loans to solar or renewable generation in the state since fiscal 2010. Its solar activity happens elsewhere: on farms and rural businesses that install systems to cut their own power bills, financed with help from USDA's Rural Energy for America Program (REAP). USAspending records 78 REAP grants in South Dakota in fiscal 2024 to 2026, totalling $12,309,780, about $157,818 per award, plus one REAP guaranteed loan. Those projects now face a different rule. Under the REAP rule effective 16 October 2026, a grant pays at most 25% of cost, only after the system has run for 12 months, so the feasibility study's main job has moved from supporting a grant application to supporting the loan that builds the system.

    Data current as of November 2026.

    Which program fits a South Dakota solar project

    RouteFit in South DakotaWhat to check first
    REAP guaranteed loan (7 CFR 5001)Up-front financing for systems at farms and rural small businesses; 80% guarantee, 1.0% fee and 0.25% retention in fiscal 2026 (91 FR 11272)Grant plus guaranteed loan at most 75% of cost; site not on cropland for ground-mount
    REAP grantPaid after construction and 12 months of operating data; at most 25% of cost and $500,000 for renewable systemsOne application per fiscal year per highest-level owner; national competition
    USDA B&I guaranteeLarger commercial renewable projects that sell power, outside Sioux Falls and Rapid CityRural parcel (7 CFR 5001.3); offtake contract
    SBA 7(a) or 504Solar as part of an owner-occupied business projectNo South Dakota solar loans since fiscal 2010
    Conventional or equipment financeSmaller systems with strong ownersLender policy

    When a study is needed

    Under B&I and REAP guaranteed lending, both governed by 7 CFR 5001, an independent study is compulsory for a new business borrowing more than $1,000,000 (5001.306(a)(3)(i)) and at the Agency's discretion otherwise. For most South Dakota REAP projects, the more important tests are written into the REAP rule itself: the system's simple payback must not exceed its useful life, ground-mount systems must match historical energy use, and the grant application needs 12 months of actual production data. A feasibility study is the document that proves those points before the money is spent.

    The REAP rule effective 16 October 2026 (91 FR 62600)

    TopicRule effective 16 October 2026Effect on the feasibility study
    TimingProject Period must end 12 to 24 months before the application (12 to 36 months in the first window)The study now often supports the loan that builds the project, not the grant
    Data12 months of actual production or savings and 12 months of pre-installation dataProduction estimates must be reconciled with actual meter data
    Award sizeMinimum $1,500; maximum $500,000 for renewable systems and $250,000 for efficiencyGrants cover a smaller share of large projects
    Cost shareAt least 75% of project costGrant at most 25% of cost
    Combined REAP fundingGrant plus guaranteed loan at most 75% of project costCaps the loan when a grant is planned
    CroplandGround-mount solar or wind on Cropland (7 CFR 718.2) ineligible; no retrofits of such systemsSite screening first
    Foreign componentsSolar or wind systems with any component from a foreign adversary under 15 CFR 791.4 ineligible, except projects installed before publicationCountry-of-origin list for every component
    SizingGround-mount systems must show commensurate historical energy use; storage limited to 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifePayback calculation is an eligibility test
    LocationsProjects at more than one location ineligibleOne site per application
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsScope these out of the grant budget
    ApplicantNo more than one application per federal fiscal year from each highest-level owner and the entities its owners own; site owned or leased at least 12 months before the Project PeriodOwnership and site control evidence
    InstallersLicensed in the state with at least three similar installations; procurement under 2 CFR 200.318 to 200.327Key service provider qualifications
    CompetitionNo state competitions: one competition for requests of $20,000 or less and one national competition for all others, in annual application windowsScoring factors in the notice drive the case

    Solar and renewable generation in South Dakota: market evidence

    South Dakota: solar and other renewable power generation, supply and rural footprint

    MeasureSouth DakotaUnited States
    Establishments, 2019 → 20230 → 0 (n/a)405 → 942
    Per 100,000 residents (2023)0.00.3
    Share of state population in non-metro counties (2025)48.7%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The zero is real but needs explaining. County Business Patterns counts only establishments with paid employees, and covers solar, biomass and other non-wind renewable generation in this pack, not wind. Behind-the-meter systems on farms and businesses are not generators in Census terms; they belong to the business that owns them. So the absence of solar establishments says nothing about whether a South Dakota farm can use solar; it says there are no local operating companies to benchmark against. Nationally the count more than doubled, from 405 to 942. The evidence for South Dakota projects has to come from REAP awards, installers' records and the applicant's own meter data.

    Regional comparables (other states' figures)

    The useful regional comparison for solar is REAP activity, from USAspending for each state.

    StateREAP grant awards, fiscal 2024 to 2026REAP grant dollarsDollars per award (computed)REAP guaranteed loansB&I guaranteed loans
    South Dakota78$12,309,780$157,81813
    North Dakota55$11,261,321$204,75102
    Nebraska297$25,065,600$84,39607
    Minnesota544$59,174,068$108,77605
    Iowa586$62,662,488$106,93302
    Montana74$2,959,654$39,99501
    Wyoming37$2,881,629$77,88203
    All states and territories6,722n/an/a75643

    South Dakota's 78 REAP grants are small in count beside Iowa's 586 and Minnesota's 544 but larger per award: $157,818 against $106,933 in Iowa and $108,776 in Minnesota, and second only to North Dakota ($204,751) in this group. The single South Dakota REAP guaranteed loan is notable because the other six states recorded none in the same period. Census also shows Minnesota with 9 staffed solar or renewable generators and Iowa with 7, against none in South Dakota (pack figures for those states).

    National benchmarks

    Nationally, SBA made 138 7(a) loans to solar and other renewable generators in fiscal 2020 to 2026, averaging $478,591, and 17 504 loans averaging $638,588 (computed from the pack's national columns). Only 31 7(a) loans were approved in fiscal 2010 to 2016, of which 4 were charged off, too few to set a reliable loss rate. REAP nationally recorded 6,722 grants and 75 guaranteed loans in fiscal 2024 to 2026.

    Evidence the study must build when local comparables are thin

    1. Twelve months of pre-installation energy use from utility bills, and the load analysis the rule requires for ground-mount systems and storage.
    2. A production estimate from the installer's design, later reconciled with 12 months of actual meter data for the grant.
    3. Site screening: confirmation that a ground-mount site is not Cropland under 7 CFR 718.2, and site control for at least 12 months before the Project Period.
    4. A country-of-origin list for every system component.
    5. The installer's state licence and at least three similar installations, and procurement under 2 CFR 200.318 to 200.327.
    6. Utility interconnection terms and the value of each kilowatt-hour saved or sold.
    7. Simple payback against useful life, from the equipment warranty and the engineering report.

    Rural footprint and B&I eligibility in South Dakota

    The pack has no county counts for this asset. For any guaranteed loan under Part 5001, the location test in 7 CFR 5001.3 excludes places of more than 50,000 people and their contiguous urbanized areas, which in South Dakota means Sioux Falls (213,748) and Rapid City (80,589). With 48.7% of residents in non-metro counties and every other town well under the threshold, almost all farm and rural business sites pass. The South Dakota programs page carries the place list.

    Financing benchmarks: USDA B&I next to SBA

    There is no South Dakota SBA table for this asset; the SBA FOIA data show no 7(a) or 504 loans to solar or other renewable generation in the state from fiscal 2010 to 2026.

    B&I guaranteed loan terms for loans obligated in fiscal 2026

    TermRule and source
    Guarantee share85% for loans under $5 million; 80% from $5 million to $25 million; 80% on the reduced-fee path (91 FR 11272)
    Upfront guarantee fee3.0% of the guaranteed amount, or 1.0% on the reduced-fee path; plus 0.50% if the guarantee issues before construction is complete (91 FR 11272; 5001.454)
    Annual retention fee0.55% (0.50% on the reduced-fee path) of the guaranteed share of principal outstanding on 31 December; the rate is fixed at obligation (5001.455)
    Loan ceiling$25 million per borrower (5001.406(c))
    TermUseful life, at most 40 years; no balloon; first full payment within 3 years of the note if interest-only (5001.402)
    RateNegotiated; fixed, variable or combined; no higher than the lender charges on similar non-guaranteed loans; variable rates reset no more than quarterly (5001.401)
    Equity, existing business10% balance sheet equity (or debt to equity of 9:1), 10% of eligible project cost, or the contributed-capital test (5001.105(d)(1))
    Equity, new business20% balance sheet equity (or 4:1) or 25% of project cost; 10% with sales contracts that cover debt service; 25% (or 3:1) if the guarantee issues before construction ends (5001.105(d)(2) to (4))
    CollateralAppraisal for real estate over $250,000; as-is and prospective values for construction; going-concern value deducted before discounting; appraisals no older than one year (5001.203)
    GuarantorsOwners of 20% or more guarantee at least their share of the guaranteed amount for the full term (5001.204)
    Feasibility studyRequired from an independent qualified consultant for loans over $1,000,000 to a new business; at the Agency's discretion otherwise (5001.306(a)(3))

    For a REAP guaranteed loan, the fiscal 2026 notice sets an 80% guarantee, a 1.0% upfront fee and a 0.25% retention fee (91 FR 11272), cheaper than B&I's 3.0% and 0.55%. B&I fits only larger projects that sell power, where a power purchase agreement is the main evidence and the B&I equity and collateral rules above apply.

    Worked example (illustrative)

    The example uses two illustrative installed costs, $800,000 and $2,400,000, each financed with and without a planned REAP grant. The REAP guaranteed loan is the largest the 75% combined cap allows. Debt uses an illustrative 7.00% fixed rate over 20 years, not a quote and within 5001.401 and 5001.402, and fiscal 2026 REAP fee rates. No other debt is assumed.

    Line$800,000 project, no grant$800,000 project, grant planned$2,400,000 project, no grant$2,400,000 project, grant planned
    Illustrative installed project cost$800,000$800,000$2,400,000$2,400,000
    REAP grant at the new limits (at most 25% of cost and $500,000), paid after 12 months of operationnone assumed$200,000.00none assumed$500,000.00
    Largest REAP guaranteed loan under the 75% combined cap$600,000.00$400,000.00$1,800,000.00$1,300,000.00
    Owner cash and other funds (balance of cost)$200,000.00$200,000.00$600,000.00$600,000.00
    REAP guarantee share for fiscal 2026 loans (91 FR 11272)80%80%80%80%
    Guaranteed amount$480,000.00$320,000.00$1,440,000.00$1,040,000.00
    Upfront guarantee fee (1.0% of the guaranteed amount)$4,800.00$3,200.00$14,400.00$10,400.00
    First-year retention fee, upper bound (0.25% of the guaranteed share of the full balance)$1,200.00$800.00$3,600.00$2,600.00
    Retention fee on the balance left after 12 monthly payments$1,171.45$780.97$3,514.36$2,538.15
    Illustrative rate and amortization (not a quote)7.00% fixed, 20 years, monthly7.00% fixed, 20 years, monthly7.00% fixed, 20 years, monthly7.00% fixed, 20 years, monthly
    Annual debt service$55,821.52$37,214.35$167,464.57$120,946.63
    Annual energy savings plus sales needed for 1.25x coverage$69,776.90$46,517.94$209,330.71$151,183.29
    Simple payback at that level (cost divided by annual benefit)11.47 years17.20 years11.47 years15.87 years
    Annual debt service if the rate is 2.00 points higher$64,780.27$43,186.85$194,340.81$140,357.25
    Coverage at that higher rate on the same benefit1.08x1.08x1.08x1.08x
    Interest-only payment for a start-up year, if structured (5001.402)$42,000.00$28,000.00$126,000.00$91,000.00

    What the scenarios show. Without a grant, the $800,000 system can carry a $600,000 REAP guaranteed loan and needs $69,776.90 a year of savings and sales for 1.25x coverage. Planning a $200,000 grant cuts the loan to $400,000, but the grant is paid only after 12 months of operation, so at construction the owner must fund $400,000 (its $200,000 share plus a $200,000 bridge) instead of $200,000. For the $2,400,000 system the grant hits the $500,000 cap, only 20.8% of cost, and the bridge is $500,000. Because the grant is competitive and paid later, a lender should underwrite the no-grant case and treat any grant as a prepayment; the study should show coverage both ways.

    What a lender-grade solar feasibility study in South Dakota must prove

    1. Historical energy use and the system sized to it.
    2. Production, savings and any sales, valued at the applicable utility rates.
    3. Simple payback within useful life, as the REAP rule requires.
    4. Site eligibility: not cropland for ground-mount; site control for 12 months before the Project Period.
    5. Component origin and installer qualifications.
    6. Debt service coverage without the grant.
    7. The plan for applying a later grant within the 75% combined cap.
    8. Sensitivity to production, utility rates and interest rate.

    Risks and mitigants

    RiskWhy it bites in South DakotaHow the study tests or mitigates it
    Grant timingPaid only after 12 months of operationUnderwrite without the grant; bridge funding
    Cropland ruleMany farm sites are croplandRoof-mount or non-cropland siting
    Component originForeign adversary components disqualifySupplier certifications
    Production shortfallWeather and snow coverConservative production; actual meter data
    No local comparablesNo staffed generators or SBA loans in the stateREAP records; regional and national data

    Process and documents

    The sequence under the new rule runs in this order: design and site screening, lender approval of a REAP guaranteed loan or other financing, construction, 12 months of operation, then the grant application in an annual window. The lender submits a guaranteed loan application to the USDA Rural Development state office serving South Dakota. Applicants provide utility bills, the installer's design and quote, component origin documents, site control, financial statements and, later, 12 months of production data. Studies are returned for production estimates without load data and payback that ignores loan costs.

    Hiring a USDA solar feasibility study consultant in South Dakota

    For a new business borrowing over $1,000,000 under a Part 5001 guarantee, an independent solar feasibility study consultant acceptable to the Agency is required (5001.306(a)(3)(i)); for smaller REAP projects the study is the evidence for the rule's payback, sizing and siting tests. The site's REAP and B&I fee bands list REAP studies at $4,900 to $8,500 over 4 to 5 weeks where the loan is under $600,000, and $7,500 to $11,500 over 5 to 7 weeks for REAP guaranteed loans above $600,000. Grant application drafting and engineering are separate. A farm or business owner considering both the loan and a later grant can ask a USDA feasibility study consultant to model the bridge between them before signing with an installer.

    Request a proposal on the contact page with the site, system size, energy bills and financing plan; a senior analyst answers within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Do I need a feasibility study for a solar project in South Dakota?

    A new business borrowing over $1,000,000 under a Part 5001 guarantee must have one (7 CFR 5001.306(a)(3)(i)). Most South Dakota REAP projects are smaller, with grants averaging about $157,818 in fiscal 2024 to 2026, but the REAP rule effective 16 October 2026 still requires proof of payback within useful life, sizing to historical use and cropland screening, which a study provides. Lenders financing construction usually ask for one.

    What changed in REAP on 16 October 2026?

    The grant now pays at most 25% of cost and $500,000 for renewable systems, and only after the project has been built and has 12 months of operating data. Grant plus guaranteed loan may not exceed 75% of cost, ground-mount solar on cropland is ineligible, components from foreign adversaries disqualify a system, and competitions are national. The REAP guaranteed loan under 7 CFR 5001 now finances up-front costs.

    What does a solar feasibility study consultant cost?

    The site's cost page lists REAP studies at $4,900 to $8,500 when the loan is under $600,000 and $7,500 to $11,500 for REAP guaranteed loans above $600,000. A larger B&I renewable project would fall in the B&I bands. Grant writing and engineering are not included. A firm REAP study fee is quoted in writing before work begins.

    How long does a REAP study take?

    Four to five weeks for smaller REAP scopes and five to seven weeks for REAP guaranteed loans over $600,000, per the site's cost page. Gathering 12 months of utility bills and the installer's design are the usual pacing items, and a rush option is available at a premium when analysts are free.

    Can a South Dakota farm put ground-mount solar on cropland?

    Not with REAP support. The rule effective 16 October 2026 makes ground-mount solar or wind on Cropland, as defined in 7 CFR 718.2, ineligible, and bars retrofits of such systems. Roof-mounted systems and ground-mount systems on land that is not cropland remain possible, subject to the other tests, so the study should screen the site before any design work.

    Who can prepare the study, and how long is it valid?

    For compulsory studies, an independent consultant acceptable to the Agency with no stake in the project; the installer and the lender cannot be the author. No expiry is set by Part 5001; USDA's customary 18-month window for market data, noted in the site's fee guide, applies, and the grant application needs 12 months of actual production data, which will supersede the study's estimates.

    Should the loan be sized with or without the grant?

    Without it. Because the REAP grant is competitive and paid after 12 months of operation, a lender should be satisfied that the system carries its debt with no grant. In the worked example, the $800,000 system needs $69,776.90 a year of benefit to cover a $600,000 loan at 1.25x. If a grant later arrives, the 75% combined cap means the financing plan must show how it fits, for example by reducing the loan.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan statistical area delineation, July 2023 (Census delineation file): https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for fiscal year 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, 11 December 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 89 FR 79698, OneRD guarantee loan final rule, 30 September 2024 (govinfo): https://www.govinfo.gov/content/pkg/FR-2024-09-30/html/2024-21920.htm
    9. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition): https://www.ecfr.gov/current/title-13/chapter-I/part-120
    10. USAspending.gov prime award data for Assistance Listings 10.768, 10.766 and 10.868, place of performance South Dakota, fiscal 2024 to 2026: https://www.usaspending.gov/search
    11. USDA RBCS, Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    12. USDA Feasibility Study Consultants, USDA feasibility study cost and timeline (fee bands, phases, rush terms, data recency): https://usda-feasibility-study.com/usda-feasibility-study-cost
    13. USDA Feasibility Study Consultants, contact and proposal request page: https://usda-feasibility-study.com/contact
    14. USDA RBCS, Notice of Rescission of Funding Opportunity for the Rural Energy for America Program, 91 FR 20090 (15 Apr 2026): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    15. USAspending.gov REAP (10.868) and B&I (10.768) award counts and REAP grant dollars by state, fiscal 2024 to 2026, for North Dakota, Nebraska, Minnesota, Iowa, Montana and Wyoming: https://www.usaspending.gov/search

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.