South Dakota's wood products industry is shrinking in count and splitting in two. Census counted 57 wood product manufacturers in 2023, down from 63 in 2019 (-9.5%), at 6.2 per 100,000 residents, half again the national 4.1. More than half of those placed by county sit in the four counties around the Black Hills, where sawmills depend on timber supply, while most of the rest are in the Sioux Falls area, where wood plants typically make building components for construction. A feasibility study for a South Dakota sawmill or wood products plant has to say which business it is in, because the two face different risks: log supply and lumber prices in the west, housing demand and competition in the east. With only eight SBA 7(a) loans to the sector in the state since fiscal 2010, lenders have little local history to lean on.
Data current as of November 2026.
Which program fits a South Dakota wood products project
| Route | Fit in South Dakota | What to check first |
|---|---|---|
| USDA B&I guarantee | Sawmills, kilns, truss and component plants, pallet and post plants, and biomass-linked operations outside Sioux Falls and Rapid City | Rural parcel (7 CFR 5001.3); log supply and offtake |
| SBA 504 | Owner-occupied plants; 5 South Dakota loans since fiscal 2010, averaging $2.1 million in fiscal 2020 to 2026 | Single-purpose plant raises the injection (13 CFR 120.910) |
| SBA 7(a) | Equipment and working capital; 8 South Dakota loans since fiscal 2010 | 75% guarantee above $150,000; fee ceilings (120.210, 120.220) |
| REAP | Efficiency, kiln upgrades and biomass or solar systems at an operating plant | Rule effective 16 October 2026; load and payback tests |
| Conventional | Established mills with strong balance sheets | Lender policy |
When the study is compulsory
Under B&I, a new wood products company borrowing more than $1,000,000 must provide an independent study acceptable to the Agency (7 CFR 5001.306(a)(3)(i)). South Dakota's recent 504 loans in the sector, averaging $2,109,250, show that plant-sized projects cross that line. Equipment loans for operating mills, like the state's three recent 7(a) loans averaging $134,933, are far below it and the study is discretionary (5001.306(a)(3)(ii)). A new plant with more than 50 jobs on a loan over $1,000,000 also needs Department of Labor concurrence (5001.306(a)(1)); at the state average of 31.3 employees per plant, most projects stay under that.
Wood product manufacturing in South Dakota: market evidence
South Dakota: wood product manufacturing, supply and rural footprint
| Measure | South Dakota | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 63 → 57 (-9.5%) | 14,223 → 13,899 |
| Per 100,000 residents (2023) | 6.2 | 4.1 |
| Average employees per establishment | 31.3 | 31.1 |
| Average annual pay per employee | $59,840 | $57,420 |
| Share of establishments in non-metro counties | 33.3% (14 in 3 counties) | |
| Share of state population in non-metro counties (2025) | 48.7% |
Non-metro counties with the most wood product manufacturing (2023): Lawrence County (6); Butte County (4); Codington County (4).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Plant size and pay sit close to national: 31.3 employees against 31.1, and $59,840 per employee, 4.2% above the national $57,420. Payroll grew 26.4% between 2019 and 2023 while employment slipped from 1,818 to 1,782, so the remaining plants pay more to keep workers. Payroll per plant averaged $1,870,789.
South Dakota wood product plants by employment size, 2023 (CBP state file)
| Employees per plant | Plants |
|---|---|
| Fewer than 5 | 18 |
| 5 to 9 | 8 |
| 10 to 19 | 10 |
| 20 to 49 | 11 |
| 50 to 99 | 6 |
| 100 to 249 | 3 |
Wood product plants by county, 2023 (CBP county file; Vintage 2025 population)
| County (largest town) | OMB status | Plants, 2023 | Residents, 2025 | Plants per 100k residents |
|---|---|---|---|---|
| Butte (Belle Fourche) | Non-metro | 4 | 10,856 | 36.8 |
| Lawrence (Spearfish) | Non-metro | 6 | 29,459 | 20.4 |
| Codington (Watertown) | Non-metro | 4 | 29,562 | 13.5 |
| Meade (Sturgis) | Metro (Rapid City area) | 3 | 30,711 | 9.8 |
| Lincoln (Harrisburg) | Metro | 7 | 77,145 | 9.1 |
| Pennington (Rapid City) | Metro | 10 | 116,792 | 8.6 |
| Minnehaha (Sioux Falls) | Metro | 8 | 212,691 | 3.8 |
Pennington, Lawrence, Meade and Butte counties hold 23 of the 42 county-placed plants (54.8%), the western cluster. Minnehaha and Lincoln hold 15, the eastern one. Only nine plants employ 50 or more people, so the competitive set for a new mill or component plant can be named plant by plant.
Regional comparables (other states' figures)
The comparison uses the neighbouring states' own packs.
| State | Census count, 2019 → 2023 | Rate per 100k residents, 2023 | Average staff per site | Average annual pay | SBA 7(a) loans, fiscal 2010 to 2026 | SBA 504 loans, fiscal 2010 to 2026 |
|---|---|---|---|---|---|---|
| South Dakota | 63 → 57 (-9.5%) | 6.2 | 31.3 | $59,840 | 8 ($2.9 million) | 5 ($9.3 million) |
| Montana | 136 → 149 (+9.6%) | 13.2 | 19.8 | $56,480 | 15 ($5.7 million) | 1 ($259,000) |
| Wyoming | 33 → 32 (-3.0%) | 5.5 | 16.5 | $55,676 | 1 ($826,000) | 0 ($0) |
| North Dakota | 26 → 27 (+3.8%) | 3.4 | 88.0 | $57,385 | 8 ($3.1 million) | 1 ($289,000) |
| Minnesota | 350 → 315 (-10.0%) | 5.5 | 46.4 | $70,736 | 112 ($61.4 million) | 30 ($17.7 million) |
| United States | 13,899 in 2023 | 4.1 | 31.1 | $57,420 | 2,271 ($1.38 billion) | 388 ($382.0 million) |
Montana, a timber state, has 149 plants at 13.2 per 100k residents, more than double South Dakota's rate, with smaller plants (19.8 employees) and a growing count (+9.6%). Wyoming's 32 plants average 16.5 employees. North Dakota's few plants are large (88.0 employees), which suggests component or engineered products rather than sawmilling. South Dakota sits between these models. Pay is close across the region, from $55,676 in Wyoming to $59,840 in South Dakota, with Minnesota higher at $70,736, so regional wage benchmarks are usable.
National benchmarks
SBA made 806 7(a) loans to wood product manufacturers nationally in fiscal 2020 to 2026, averaging $766,800, 5.7 times South Dakota's recent 7(a) average. Of 1,015 loans approved in fiscal 2010 to 2016, 7.1% were charged off, on average 65 months after approval, one of the higher sector loss rates in this site's South Dakota data and a reflection of how lumber price cycles reach small mills.
Evidence the study must build when local comparables are thin
- Log supply: volumes available within haul distance by ownership (public timber sales, private land), with recent sale history and the mill's share; supply agreements where possible.
- Delivered log cost and its sensitivity, since logs are the largest cost for a sawmill.
- Offtake: buyers for lumber, ties, posts, pallets or components, with letters or contracts and pricing terms.
- Residuals: markets for chips, sawdust, shavings and bark, or their use as kiln fuel.
- For component plants, construction demand in the sales area and competing suppliers.
- Recovery and throughput from equipment specifications, with the ramp to design capacity.
- Fire, insurance and environmental permits for the site.
Rural footprint and B&I eligibility in South Dakota
The pack places 14 of 42 county-located plants (33.3%) in three non-metro counties: Lawrence (6), Butte (4) and Codington (4). That understates rural eligibility, because Meade and Pennington counties, metro by OMB classification, contain rural mill sites well outside Rapid City. Under 7 CFR 5001.3 the excluded areas are places above 50,000 people and their contiguous urbanized areas: Sioux Falls (213,748) and Rapid City (80,589). An eastern component plant in an industrial park at the Sioux Falls edge needs a parcel check; a mill near Spearfish, Belle Fourche or Sturgis passes on population. South Dakota's places over and under the line are listed on the state hub.
Financing benchmarks: USDA B&I next to SBA
South Dakota: SBA lending to wood product manufacturing
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 5 | $2.5 million | 1 | $818,000 |
| FY2017 to FY2019 | 0 | $0 | 0 | $0 |
| FY2020 to FY2023 | 3 | $404,800 | 4 | $8.4 million |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $134,933. Average 504 loan: $2.1 million. South Dakota had fewer than 30 seasoned 7(a) loans for wood product manufacturing; nationally, 7.1% of 1,015 FY2010 to FY2016 loans were charged off, on average 65 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
SBA's South Dakota record for the sector is eight 7(a) loans and five 504 loans in 17 years, none of the five seasoned 7(a) loans charged off. The four 504 loans in fiscal 2020 to 2023 totalled $8.4 million, so plant-scale lending has happened, but rarely.
B&I guaranteed loan terms for loans obligated in fiscal 2026
| Term | Rule and source |
|---|---|
| Guarantee share | 85% for loans under $5 million; 80% from $5 million to $25 million; 80% on the reduced-fee path (91 FR 11272) |
| Upfront guarantee fee | 3.0% of the guaranteed amount, or 1.0% on the reduced-fee path; plus 0.50% if the guarantee issues before construction is complete (91 FR 11272; 5001.454) |
| Annual retention fee | 0.55% (0.50% on the reduced-fee path) of the guaranteed share of principal outstanding on 31 December; the rate is fixed at obligation (5001.455) |
| Loan ceiling | $25 million per borrower (5001.406(c)) |
| Term | Useful life, at most 40 years; no balloon; first full payment within 3 years of the note if interest-only (5001.402) |
| Rate | Negotiated; fixed, variable or combined; no higher than the lender charges on similar non-guaranteed loans; variable rates reset no more than quarterly (5001.401) |
| Equity, existing business | 10% balance sheet equity (or debt to equity of 9:1), 10% of eligible project cost, or the contributed-capital test (5001.105(d)(1)) |
| Equity, new business | 20% balance sheet equity (or 4:1) or 25% of project cost; 10% with sales contracts that cover debt service; 25% (or 3:1) if the guarantee issues before construction ends (5001.105(d)(2) to (4)) |
| Collateral | Appraisal for real estate over $250,000; as-is and prospective values for construction; going-concern value deducted before discounting; appraisals no older than one year (5001.203) |
| Guarantors | Owners of 20% or more guarantee at least their share of the guaranteed amount for the full term (5001.204) |
| Feasibility study | Required from an independent qualified consultant for loans over $1,000,000 to a new business; at the Agency's discretion otherwise (5001.306(a)(3)) |
For a mill, B&I's long amortization suits buildings and heavy equipment, but the lender will discount specialized equipment as collateral. A new company with signed offtake contracts covering debt service qualifies for 10% equity under 5001.105(d)(2); otherwise 25% of cost or 20% balance sheet equity applies.
Worked example (illustrative)
South Dakota's three recent 7(a) loans are too few and too small to model a plant, so Loan A uses the national fiscal 2020 to 2026 average of $766,800, rounded to $765,000, as an equipment loan over 12 years. Loan B, $2,100,000, rounds the state's fiscal 2020 to 2026 504 average of $2,109,250 and models a plant over 20 years. For both, the rate is an assumed 7.25% fixed (illustration only), within the limits of 5001.401 and 5001.402; the fees are the fiscal 2026 schedule and the mill carries no other debt in the model.
| Line | Loan A: near the national SBA average | Loan B: near the South Dakota 504 average |
|---|---|---|
| Loan amount | $765,000 | $2,100,000 |
| B&I guarantee share for fiscal 2026 loans (91 FR 11272) | 85% | 85% |
| Guaranteed amount | $650,250.00 | $1,785,000.00 |
| Unguaranteed portion held by the lender | $114,750.00 | $315,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $19,507.50 | $53,550.00 |
| First-year retention fee, upper bound (0.55% of the guaranteed share of the full balance) | $3,576.38 | $9,817.50 |
| Retention fee on the balance left after 12 monthly payments | $3,382.21 | $9,590.69 |
| Illustrative rate and amortization (not a quote) | 7.25% fixed, 12 years, monthly | 7.25% fixed, 20 years, monthly |
| Monthly principal and interest | $7,969.43 | $16,597.90 |
| Annual debt service | $95,633.18 | $199,174.75 |
| Net operating income needed for 1.25x coverage | $119,541.48 | $248,968.44 |
| Cushion above 1.00x coverage | $23,908.30 | $49,793.69 |
| Cushion in wages at the South Dakota wood-products average pay ($59,840) | 0.40 positions | 0.83 positions |
| Interest-only payment for a start-up year, if structured (5001.402) | $55,462.50 | $152,250.00 |
| Annual debt service if the rate is 2.00 points higher | $105,767.95 | $230,798.44 |
| Coverage at that higher rate on the same income | 1.13x | 1.08x |
| Coverage if income lands 10% below plan | 1.125x | 1.125x |
| New business: equity at 25% of project cost (5001.105(d)(4)) | $255,000.00 on a $1,020,000.00 project | $700,000.00 on a $2,800,000.00 project |
| New business: 20% balance sheet equity test (debt to equity 4:1, loan as the only debt) | $191,250.00 | $525,000.00 |
| Existing business: 10% of project cost (5001.105(d)(1)) | $85,000.00 on a $850,000.00 project | $233,333.33 on a $2,333,333.33 project |
| Reduced-fee path (1.0% fee, 0.50% retention, 80% guarantee): upfront fee | $6,120.00 | $16,800.00 |
| Independent study compulsory for a new business? (5001.306(a)(3)(i)) | No; the Agency may still require one (5001.306(a)(3)(ii)) | Yes, above $1,000,000 |
| Application track (5001.306) | Full 5001.306(a) processing | Full 5001.306(a) processing |
| SBA 7(a) comparison: guaranteed share and guaranty fee ceiling (13 CFR 120.210, 120.220) | 75%: $573,750.00 guaranteed, fee ceiling $20,081.25 | 75%: $1,575,000.00 guaranteed, fee ceiling $56,562.50 |
Reading the table. Loan B needs $248,968.44 of net operating income for 1.25x; its cushion of $49,793.69 is less than one employee's pay at the state's wood products average, and a lumber price drop of a few percent can exceed it. A new company would put in $700,000 at 25% of cost, or $233,333.33 with qualifying offtake contracts at the 10% level. Loan A, an equipment loan for an operating mill, needs full processing because it exceeds $600,000, but no compulsory study.
What a lender-grade sawmill or wood products feasibility study in South Dakota must prove
- Log supply volumes and delivered cost, with agreements or a documented sale history.
- Product mix and buyers, with offtake evidence.
- Recovery, throughput and the ramp to design capacity.
- Residual markets or internal use.
- For component plants, the construction demand and competitor set.
- Labour at wages near the $59,840 state average.
- Fire risk, insurance and permits.
- Sensitivity to log cost, lumber or product prices, volume and interest rate.
Risks and mitigants
| Risk | Why it bites in South Dakota | How the study tests or mitigates it |
|---|---|---|
| Log supply | Western mills depend on timber availability | Supply agreements; diversified sources |
| Price cycles | National charge-offs 7.1%, average 65 months after approval | Price sensitivity; conservative amortization |
| Shrinking base | 63 to 57 plants since 2019 | Explain closures; competitive position |
| Fire | Wood yards and kilns | Insurance quotes; fire protection in the budget |
| Thin lending history | 8 SBA 7(a) loans since fiscal 2010 | Regional and national benchmarks; primary evidence |
Process and documents
For B&I, the lender must hold current OneRD approval and submits the study with the application to the USDA Rural Development state office serving South Dakota. Sponsors provide log supply evidence, buyer letters, equipment quotes, the site plan and budget, operating history for an existing mill, and financial statements. Wood products studies come back for supply assumed from forest totals, prices taken from a peak year, and no plan for residuals.
Hiring a USDA sawmill feasibility study consultant in South Dakota
A new wood products company borrowing above $1,000,000 under B&I must engage an independent sawmill feasibility study consultant acceptable to the Agency (5001.306(a)(3)(i)). The site's study fee page lists standard B&I studies at $6,900 to $12,500 over 6 to 7 weeks and complex ones at $10,500 to $14,500 over 7 to 9 weeks; thin local comparables can place a South Dakota mill in the complex band. Mill engineering and environmental permitting are separate engagements. A USDA feasibility study consultant brought in before log supply agreements are signed can test their volumes and terms while they can still be changed.
Send the product, supply plan, site and loan size through the contact page to request a proposal; the page says replies come within one business day.
Last updated 2026-11-08
USDA Feasibility, Inc.