Tennessee businesses won 85 REAP grants worth $13,687,865 in FY2024 to FY2026, about $1.98 per resident against $3.10 nationally, and not a single REAP guaranteed loan. Those awards were made under rules that no longer apply. Under the REAP rule effective 16 October 2026, a solar grant pays at most 25 percent of cost, arrives only after the system has run for 12 months, and cannot be combined with a REAP guaranteed loan above 75 percent of cost. The hub adds that wind and solar have been ineligible for Business and Industry (B&I) loans since an August 2025 USDA letter. A solar feasibility study in Tennessee now mostly supports the loan that builds the system, with the grant treated as a possible later bonus.
Solar and renewable energy in Tennessee: market evidence
Tennessee: solar and other renewable power generation, supply and rural footprint
| Measure | Tennessee | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 0 → 15 (n/a) | 405 → 942 |
| Per 100,000 residents (2023) | 0.2 | 0.3 |
| Average employees per establishment | 0.3 | 12.3 |
| Average annual pay per employee | $841,400 | $138,631 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 21.1% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Why these numbers cannot be used as benchmarks. The Census table counts companies whose main business is selling power, not the farms, hotels and stores that install solar to cut their own bills, which is what REAP finances. Tennessee recorded no such generators in 2019 and 15 in 2023, too few for stable statistics. An average of 0.3 employees and pay of $841,400 per employee are artefacts of tiny and suppressed employment cells, not a wage benchmark, and the zero non-metro share reflects the county file's rule of publishing no cell under three establishments. The useful evidence for a Tennessee solar project is therefore elsewhere: the site's own utility bills, the installer's production model, the REAP award record and the SBA history below.
Regional comparison
| State | Solar and renewable establishments 2023 | SBA 7(a) loans FY2010–26 | REAP grants FY2024–26 | REAP grant dollars FY2024–26 | REAP dollars per resident |
|---|---|---|---|---|---|
| Tennessee | 15 | 3 | 85 | $13,687,865 | $1.98 |
| Kentucky | 6 | 0 | 136 | $20,997,356 | $4.66 |
| North Carolina | 35 | 6 | 102 | $21,671,880 | $2.08 |
| Georgia | 26 | 5 | 221 | $36,934,061 | $3.45 |
| Virginia | 27 | 4 | 57 | $10,574,605 | $1.23 |
| Alabama | 4 | 0 | 61 | $14,847,758 | $2.96 |
Computed from each state's data pack (Census County Business Patterns 2023; SBA FOIA data as of 30 Sep 2026) and USAspending prime awards for REAP (10.868), FY2024 to FY2026, with USAspending's own population figures. Each row is that state's own data.
Tennessee sits low in the region on REAP. Kentucky, with fewer than two-thirds of Tennessee's population, won 136 grants and $4.66 per resident; Georgia won 221; North Carolina 102. Tennessee's 85 grants and $1.98 per resident rank it 28th of 50 states by REAP dollars and 37th by dollars per resident. Only Virginia, among these neighbours, received less per resident. The SBA figures are small everywhere, three to six 7(a) loans per state since FY2010, which confirms that renewable systems for rural businesses are financed mainly through REAP and the owner's bank rather than through SBA.
National benchmarks
Nationally, 942 renewable generation establishments employed an average of 12.3 people in 2023. SBA lending to the sector is small and risky: of 31 seasoned FY2010 to FY2016 7(a) loans, 12.9 percent were charged off, on average 51 months after approval, the highest loss rate in any of this site's Tennessee packs, and 138 loans in FY2020 to FY2026 averaged $478,591. REAP grants across the 50 states totalled $1,024,856,615 in FY2024 to FY2026, or $3.10 per resident.
The REAP rule effective 16 October 2026, applied to Tennessee
| Topic | Rule (91 FR 62600) | What it means in Tennessee |
|---|---|---|
| Timing | Project must have finished 12 to 24 months before the application (12 to 36 in the first window) | A Tennessee hotel or farm builds first, then applies; the loan carries construction |
| Data | 12 months of actual production or savings and 12 months of pre-installation data | Keep the utility bills from before installation |
| Award size | $1,500 minimum; $500,000 maximum for renewable systems, $250,000 for efficiency | Grants cover a smaller share of large arrays |
| Cost share | Grant at most 25% of project cost | A $500,000 grant needs a $2,000,000 project |
| Combined funding | Grant plus REAP guaranteed loan at most 75% of cost | Borrowing more now leaves no room for a grant later |
| Cropland | Ground-mount solar or wind on cropland (7 CFR 718.2) ineligible; no retrofits of such systems | Rooftop or non-cropland sites only for farm projects |
| Foreign components | Any component from a foreign adversary under 15 CFR 791.4 makes the system ineligible | A country-of-origin list for every part |
| Sizing | Ground-mount systems must match historic energy use; storage at most 120% of prior annual use | Load analysis is mandatory |
| Economics | Simple payback must not exceed useful life | Payback is an eligibility test |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects | Keep these out of the grant budget |
| Applicant | One application per federal fiscal year per highest-level owner group; site owned or leased 12 months before the project | Ownership charts and site-control evidence |
| Installers | Licensed in the state, with at least three similar installations; procurement under 2 CFR 200.318 to 200.327 | Choose a qualified Tennessee installer early |
| Competition | One competition for requests of $20,000 or less, one national competition for the rest; no state competitions | Tennessee projects compete nationally |
Summarised from the REAP rule effective 16 October 2026 (91 FR 62600) as recorded on this site's national renewable energy page. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.
Eligibility and program fit in Tennessee
- REAP guaranteed loan. Under 7 CFR 5001, with the 5001.3 rural-area test (outside cities above 50,000 at the 2020 Census and their contiguous urbanized areas); FY2026 terms are an 80 percent guarantee, a 1.0 percent fee and 0.25 percent annual retention (91 FR 11272). USDA says this loan is available for up-front costs under the new rule.
- REAP grant. At most 25 percent of cost and $500,000 for renewable systems, paid after 12 months of operation and won in a national competition.
- B&I. The hub states that since an August 2025 USDA letter, wind and solar projects are ineligible for B&I. FACTS.md does not record that letter, so treat it as the hub's statement and confirm with the state office.
- Gaming income. The hub states that under the rule effective 16 October 2026 any gambling income makes an applicant ineligible, which it applies to lottery retailers; that point is not in this page's rule summary and should be confirmed.
- C-PACER. The hub notes Tennessee's 2021 Commercial PACE and Resiliency law, adopted locally, as another financing path for energy components.
- SBA 7(a). Three Tennessee loans to renewable generators since FY2010, none since FY2019.
The Tennessee hub lists the fifteen cities over 50,000 at the 2020 Census; a REAP guaranteed loan for a business inside one of them, or in its contiguous urbanized area, fails the 5001.3 test.
Financing benchmarks: REAP next to SBA
Tennessee: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 2 | $2.9 million | 0 | $0 |
| FY2017 to FY2019 | 1 | $1.6 million | 0 | $0 |
| FY2020 to FY2023 | 0 | $0 | 0 | $0 |
| FY2024 to FY2026 | 0 | $0 | 0 | $0 |
| Tennessee had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval. |
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
Tennessee's three SBA solar loans averaged about $1.5 million, all before FY2020; the state has had none since. USAspending shows no REAP guaranteed loans in Tennessee in FY2024 to FY2026, so the loan structure the new rule favours has no recent Tennessee track record either. A lender will look to the national 12.9 percent loss rate, which arrived on average 51 months after approval, and to the study's production and savings evidence.
Worked example (illustrative)
Inputs: a $640,000 rooftop or non-cropland system for an operating rural business; a REAP guaranteed loan of $480,000, near the national FY2020 to FY2026 average SBA loan to renewable generators of $478,591; an illustrative 7.25% fixed rate over 20 years. Structure A borrows the maximum; Structure B borrows less and plans a grant after 12 months of operation.
| Item | Structure A: loan only | Structure B: loan plus later grant | Basis |
|---|---|---|---|
| Total eligible project cost | $640,000.00 | $640,000.00 | Illustrative system cost |
| REAP guaranteed loan | $480,000.00 | $320,000.00 | Grant plus guaranteed loan at most 75% of project cost (2026 rule) |
| REAP grant, applied for after 12 months of operation | $0.00 (no room under the 75% cap) | $160,000.00 | At most 25% of cost and $500,000 for a renewable system |
| Owner cash at construction | $160,000.00 | $320,000.00 | Structure B: owner bridges the future grant |
| Owner cash net of the grant, if awarded | $160,000.00 | $160,000.00 | The grant is competitive and not assured |
| FY2026 REAP guarantee (80%) | $384,000.00 | $256,000.00 | 91 FR 11272 |
| Upfront guarantee fee (1.0%) | $3,840.00 | $2,560.00 | 91 FR 11272 |
| First annual retention fee (0.25%) | $937.82 | $625.21 | Guaranteed share of the balance after 12 payments |
| Annual debt service (7.25%, 20 years) | $45,525.66 | $30,350.44 | Illustrative fixed rate; level amortization (5001.401, 5001.402) |
| Annual energy value for 1.25x coverage | $56,907.07 | $37,938.05 | Savings plus sales, net of operation and maintenance |
| Simple payback at that energy value | 11.2 years | 16.9 years | Must not exceed useful life (illustrative 25 years) for a REAP grant |
Computed in Python from the inputs shown; REAP guarantee, fee and retention rates from 91 FR 11272; grant and combined-funding caps from the REAP rule effective 16 October 2026 (91 FR 62600). Illustrative, not a quote or a commitment.
Reading the two structures. Structure A borrows 75 percent and uses up the combined cap, so no grant is possible later; the system must deliver $56,907.07 a year in savings and sales to cover debt 1.25 times, a simple payback of 11.2 years at that level. Structure B borrows $320,000, asks the owner to put up $320,000 at construction and recovers $160,000 only if a competitive grant is awarded. A lender should underwrite B on debt service alone. If the borrower is a new business, 5001.105(d)(4) separately asks for 20 percent balance-sheet equity or 25 percent of project cost; at 25 percent that is $160,000.00 here, the same owner share the 75 percent cap already forces in Structure A. At a rate two points higher, Structure A's debt service rises to $52,753.93 and coverage on its 1.25x energy value falls to 1.08x.
What a lender-grade solar feasibility study in Tennessee must prove
With almost no state data on the asset, the study must build the evidence:
- Twelve months of pre-installation energy use from utility bills, and the load profile the system will serve.
- A production model from the installer, reconciled with actual meter data once the system runs, as the rule requires for the grant.
- Savings and any sales priced from the utility's current tariff and buy-back terms.
- Site eligibility: not cropland under 7 CFR 718.2 for ground-mount, ownership or a lease held 12 months before the project, and the 5001.3 rural test for the loan.
- Component origin for every panel, inverter and racking part, against the foreign-adversary list in 15 CFR 791.4.
- Sizing matched to historic use, with any storage at or below 120 percent of prior annual use.
- Simple payback shorter than the system's useful life.
- Installer qualifications: a Tennessee licence and at least three similar installations, with procurement under 2 CFR 200.318 to 200.327.
- Debt coverage without the grant, since the grant is competitive and paid later.
Risks and mitigants in Tennessee
Rate design is the main risk: savings depend on the utility tariff, which the owner does not control. Grant risk is the second, since the new rule makes the grant smaller, later and competitive. Equipment risk is the third, with component-origin rules that can disqualify a system after it is built. Mitigants are a model based on the actual tariff, a structure that works without the grant, a component list checked before purchase and an installer with Tennessee projects behind it.
Process, documents and why studies come back
The lender applies for the REAP guarantee through the Rural Development state office serving Tennessee, which the hub places in Nashville; a later grant application goes to the national competition. The sponsor supplies 12 months of utility bills, the installer's proposal and production model, component specifications and origin, site plans and lease or deed, the business's financial statements and the ownership chart. Solar studies come back when production comes from a brochure, when savings ignore the tariff structure, when the grant is counted as construction funding, or when the site turns out to be cropland.
Program examples: Tennessee REAP solar grants under the earlier rules
The hub's precedent file lists a $480,497 REAP grant in 2025 to Shri Raj Hospitality LLC for solar at a Gatlinburg hotel, and a $48,098 REAP grant in 2024 to Sparta Self Storage LLC for rooftop solar. Both are public USDA awards reported on the hub, not engagements of this firm, and both were made before the rule effective 16 October 2026. Under the 25 percent cap, grants of those sizes would require projects of at least $1,921,988 and $192,392, and each system would need 12 months of operating data before the application.
Hiring a USDA solar feasibility study consultant in Tennessee
For REAP guaranteed loans, which fall under 7 CFR 5001, the study rule in 5001.306(a)(3)(i) applies: a new business borrowing more than $1,000,000 must provide a study by an independent, qualified consultant acceptable to the Agency. Most rooftop systems borrow far less, and the Agency or lender then decides whether to ask for one; the rule's payback, sizing and production tests make a technical and financial study useful even when it is not mandated.
The site's cost page prices REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks, and REAP studies with a guaranteed loan above $600,000 at $7,500 to $11,500 over five to seven weeks; a three to four-week rush is available at a 20 to 35 percent premium. The fee includes the five Part 5001 components, the projection and Excel model with sensitivity tables, a debt service coverage analysis, one revision round and the written acceptance guarantee. Grant application drafting, engineering and energy audits are outside the fee.
A solar feasibility study consultant should be able to tell you before you sign how the 2026 rule's payback, sizing and component tests will be documented. The homepage explains how a USDA feasibility study consultant supports owners and lenders, and the national renewable energy feasibility study for USDA financing page carries the full 2026 rule. Send the business, site, system size, 12 months of bills if you have them, project cost and lender status through the contact page; expect a scoped reply within one business day.
Last updated 2026-11-08