USDA Feasibility Study for Solar and Renewable Energy (REAP) in Tennessee

    NAICS 221114

    Tennessee businesses won 85 REAP grants worth $13,687,865 in FY2024 to FY2026, about $1.98 per resident against $3.10 nationally, and not a single REAP guaranteed loan. Those awards were made under rules that no longer apply. Under the REAP rule effective 16 October 2026, a solar grant pays at most 25 percent of cost, arrives only after the system has run for 12 months, and cannot be combined with a REAP guaranteed loan above 75 percent of cost. The hub adds that wind and solar have been ineligible for Business and Industry (B&I) loans since an August 2025 USDA letter. A solar feasibility study in Tennessee now mostly supports the loan that builds the system, with the grant treated as a possible later bonus.

    Solar and renewable energy in Tennessee: market evidence

    Tennessee: solar and other renewable power generation, supply and rural footprint

    MeasureTennesseeUnited States
    Establishments, 2019 → 20230 → 15 (n/a)405 → 942
    Per 100,000 residents (2023)0.20.3
    Average employees per establishment0.312.3
    Average annual pay per employee$841,400$138,631
    Share of establishments in non-metro counties0.0% (0 in 0 counties)
    Share of state population in non-metro counties (2025)21.1%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Why these numbers cannot be used as benchmarks. The Census table counts companies whose main business is selling power, not the farms, hotels and stores that install solar to cut their own bills, which is what REAP finances. Tennessee recorded no such generators in 2019 and 15 in 2023, too few for stable statistics. An average of 0.3 employees and pay of $841,400 per employee are artefacts of tiny and suppressed employment cells, not a wage benchmark, and the zero non-metro share reflects the county file's rule of publishing no cell under three establishments. The useful evidence for a Tennessee solar project is therefore elsewhere: the site's own utility bills, the installer's production model, the REAP award record and the SBA history below.

    Regional comparison

    StateSolar and renewable establishments 2023SBA 7(a) loans FY2010–26REAP grants FY2024–26REAP grant dollars FY2024–26REAP dollars per resident
    Tennessee15385$13,687,865$1.98
    Kentucky60136$20,997,356$4.66
    North Carolina356102$21,671,880$2.08
    Georgia265221$36,934,061$3.45
    Virginia27457$10,574,605$1.23
    Alabama4061$14,847,758$2.96

    Computed from each state's data pack (Census County Business Patterns 2023; SBA FOIA data as of 30 Sep 2026) and USAspending prime awards for REAP (10.868), FY2024 to FY2026, with USAspending's own population figures. Each row is that state's own data.

    Tennessee sits low in the region on REAP. Kentucky, with fewer than two-thirds of Tennessee's population, won 136 grants and $4.66 per resident; Georgia won 221; North Carolina 102. Tennessee's 85 grants and $1.98 per resident rank it 28th of 50 states by REAP dollars and 37th by dollars per resident. Only Virginia, among these neighbours, received less per resident. The SBA figures are small everywhere, three to six 7(a) loans per state since FY2010, which confirms that renewable systems for rural businesses are financed mainly through REAP and the owner's bank rather than through SBA.

    National benchmarks

    Nationally, 942 renewable generation establishments employed an average of 12.3 people in 2023. SBA lending to the sector is small and risky: of 31 seasoned FY2010 to FY2016 7(a) loans, 12.9 percent were charged off, on average 51 months after approval, the highest loss rate in any of this site's Tennessee packs, and 138 loans in FY2020 to FY2026 averaged $478,591. REAP grants across the 50 states totalled $1,024,856,615 in FY2024 to FY2026, or $3.10 per resident.

    The REAP rule effective 16 October 2026, applied to Tennessee

    TopicRule (91 FR 62600)What it means in Tennessee
    TimingProject must have finished 12 to 24 months before the application (12 to 36 in the first window)A Tennessee hotel or farm builds first, then applies; the loan carries construction
    Data12 months of actual production or savings and 12 months of pre-installation dataKeep the utility bills from before installation
    Award size$1,500 minimum; $500,000 maximum for renewable systems, $250,000 for efficiencyGrants cover a smaller share of large arrays
    Cost shareGrant at most 25% of project costA $500,000 grant needs a $2,000,000 project
    Combined fundingGrant plus REAP guaranteed loan at most 75% of costBorrowing more now leaves no room for a grant later
    CroplandGround-mount solar or wind on cropland (7 CFR 718.2) ineligible; no retrofits of such systemsRooftop or non-cropland sites only for farm projects
    Foreign componentsAny component from a foreign adversary under 15 CFR 791.4 makes the system ineligibleA country-of-origin list for every part
    SizingGround-mount systems must match historic energy use; storage at most 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifePayback is an eligibility test
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsKeep these out of the grant budget
    ApplicantOne application per federal fiscal year per highest-level owner group; site owned or leased 12 months before the projectOwnership charts and site-control evidence
    InstallersLicensed in the state, with at least three similar installations; procurement under 2 CFR 200.318 to 200.327Choose a qualified Tennessee installer early
    CompetitionOne competition for requests of $20,000 or less, one national competition for the rest; no state competitionsTennessee projects compete nationally

    Summarised from the REAP rule effective 16 October 2026 (91 FR 62600) as recorded on this site's national renewable energy page. As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register.

    Eligibility and program fit in Tennessee

    • REAP guaranteed loan. Under 7 CFR 5001, with the 5001.3 rural-area test (outside cities above 50,000 at the 2020 Census and their contiguous urbanized areas); FY2026 terms are an 80 percent guarantee, a 1.0 percent fee and 0.25 percent annual retention (91 FR 11272). USDA says this loan is available for up-front costs under the new rule.
    • REAP grant. At most 25 percent of cost and $500,000 for renewable systems, paid after 12 months of operation and won in a national competition.
    • B&I. The hub states that since an August 2025 USDA letter, wind and solar projects are ineligible for B&I. FACTS.md does not record that letter, so treat it as the hub's statement and confirm with the state office.
    • Gaming income. The hub states that under the rule effective 16 October 2026 any gambling income makes an applicant ineligible, which it applies to lottery retailers; that point is not in this page's rule summary and should be confirmed.
    • C-PACER. The hub notes Tennessee's 2021 Commercial PACE and Resiliency law, adopted locally, as another financing path for energy components.
    • SBA 7(a). Three Tennessee loans to renewable generators since FY2010, none since FY2019.

    The Tennessee hub lists the fifteen cities over 50,000 at the 2020 Census; a REAP guaranteed loan for a business inside one of them, or in its contiguous urbanized area, fails the 5001.3 test.

    Financing benchmarks: REAP next to SBA

    Tennessee: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20162$2.9 million0$0
    FY2017 to FY20191$1.6 million0$0
    FY2020 to FY20230$00$0
    FY2024 to FY20260$00$0
    Tennessee had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    Tennessee's three SBA solar loans averaged about $1.5 million, all before FY2020; the state has had none since. USAspending shows no REAP guaranteed loans in Tennessee in FY2024 to FY2026, so the loan structure the new rule favours has no recent Tennessee track record either. A lender will look to the national 12.9 percent loss rate, which arrived on average 51 months after approval, and to the study's production and savings evidence.

    Worked example (illustrative)

    Inputs: a $640,000 rooftop or non-cropland system for an operating rural business; a REAP guaranteed loan of $480,000, near the national FY2020 to FY2026 average SBA loan to renewable generators of $478,591; an illustrative 7.25% fixed rate over 20 years. Structure A borrows the maximum; Structure B borrows less and plans a grant after 12 months of operation.

    ItemStructure A: loan onlyStructure B: loan plus later grantBasis
    Total eligible project cost$640,000.00$640,000.00Illustrative system cost
    REAP guaranteed loan$480,000.00$320,000.00Grant plus guaranteed loan at most 75% of project cost (2026 rule)
    REAP grant, applied for after 12 months of operation$0.00 (no room under the 75% cap)$160,000.00At most 25% of cost and $500,000 for a renewable system
    Owner cash at construction$160,000.00$320,000.00Structure B: owner bridges the future grant
    Owner cash net of the grant, if awarded$160,000.00$160,000.00The grant is competitive and not assured
    FY2026 REAP guarantee (80%)$384,000.00$256,000.0091 FR 11272
    Upfront guarantee fee (1.0%)$3,840.00$2,560.0091 FR 11272
    First annual retention fee (0.25%)$937.82$625.21Guaranteed share of the balance after 12 payments
    Annual debt service (7.25%, 20 years)$45,525.66$30,350.44Illustrative fixed rate; level amortization (5001.401, 5001.402)
    Annual energy value for 1.25x coverage$56,907.07$37,938.05Savings plus sales, net of operation and maintenance
    Simple payback at that energy value11.2 years16.9 yearsMust not exceed useful life (illustrative 25 years) for a REAP grant

    Computed in Python from the inputs shown; REAP guarantee, fee and retention rates from 91 FR 11272; grant and combined-funding caps from the REAP rule effective 16 October 2026 (91 FR 62600). Illustrative, not a quote or a commitment.

    Reading the two structures. Structure A borrows 75 percent and uses up the combined cap, so no grant is possible later; the system must deliver $56,907.07 a year in savings and sales to cover debt 1.25 times, a simple payback of 11.2 years at that level. Structure B borrows $320,000, asks the owner to put up $320,000 at construction and recovers $160,000 only if a competitive grant is awarded. A lender should underwrite B on debt service alone. If the borrower is a new business, 5001.105(d)(4) separately asks for 20 percent balance-sheet equity or 25 percent of project cost; at 25 percent that is $160,000.00 here, the same owner share the 75 percent cap already forces in Structure A. At a rate two points higher, Structure A's debt service rises to $52,753.93 and coverage on its 1.25x energy value falls to 1.08x.

    What a lender-grade solar feasibility study in Tennessee must prove

    With almost no state data on the asset, the study must build the evidence:

    1. Twelve months of pre-installation energy use from utility bills, and the load profile the system will serve.
    2. A production model from the installer, reconciled with actual meter data once the system runs, as the rule requires for the grant.
    3. Savings and any sales priced from the utility's current tariff and buy-back terms.
    4. Site eligibility: not cropland under 7 CFR 718.2 for ground-mount, ownership or a lease held 12 months before the project, and the 5001.3 rural test for the loan.
    5. Component origin for every panel, inverter and racking part, against the foreign-adversary list in 15 CFR 791.4.
    6. Sizing matched to historic use, with any storage at or below 120 percent of prior annual use.
    7. Simple payback shorter than the system's useful life.
    8. Installer qualifications: a Tennessee licence and at least three similar installations, with procurement under 2 CFR 200.318 to 200.327.
    9. Debt coverage without the grant, since the grant is competitive and paid later.

    Risks and mitigants in Tennessee

    Rate design is the main risk: savings depend on the utility tariff, which the owner does not control. Grant risk is the second, since the new rule makes the grant smaller, later and competitive. Equipment risk is the third, with component-origin rules that can disqualify a system after it is built. Mitigants are a model based on the actual tariff, a structure that works without the grant, a component list checked before purchase and an installer with Tennessee projects behind it.

    Process, documents and why studies come back

    The lender applies for the REAP guarantee through the Rural Development state office serving Tennessee, which the hub places in Nashville; a later grant application goes to the national competition. The sponsor supplies 12 months of utility bills, the installer's proposal and production model, component specifications and origin, site plans and lease or deed, the business's financial statements and the ownership chart. Solar studies come back when production comes from a brochure, when savings ignore the tariff structure, when the grant is counted as construction funding, or when the site turns out to be cropland.

    Program examples: Tennessee REAP solar grants under the earlier rules

    The hub's precedent file lists a $480,497 REAP grant in 2025 to Shri Raj Hospitality LLC for solar at a Gatlinburg hotel, and a $48,098 REAP grant in 2024 to Sparta Self Storage LLC for rooftop solar. Both are public USDA awards reported on the hub, not engagements of this firm, and both were made before the rule effective 16 October 2026. Under the 25 percent cap, grants of those sizes would require projects of at least $1,921,988 and $192,392, and each system would need 12 months of operating data before the application.

    Hiring a USDA solar feasibility study consultant in Tennessee

    For REAP guaranteed loans, which fall under 7 CFR 5001, the study rule in 5001.306(a)(3)(i) applies: a new business borrowing more than $1,000,000 must provide a study by an independent, qualified consultant acceptable to the Agency. Most rooftop systems borrow far less, and the Agency or lender then decides whether to ask for one; the rule's payback, sizing and production tests make a technical and financial study useful even when it is not mandated.

    The site's cost page prices REAP studies for loans under $600,000 at $4,900 to $8,500 over four to five weeks, and REAP studies with a guaranteed loan above $600,000 at $7,500 to $11,500 over five to seven weeks; a three to four-week rush is available at a 20 to 35 percent premium. The fee includes the five Part 5001 components, the projection and Excel model with sensitivity tables, a debt service coverage analysis, one revision round and the written acceptance guarantee. Grant application drafting, engineering and energy audits are outside the fee.

    A solar feasibility study consultant should be able to tell you before you sign how the 2026 rule's payback, sizing and component tests will be documented. The homepage explains how a USDA feasibility study consultant supports owners and lenders, and the national renewable energy feasibility study for USDA financing page carries the full 2026 rule. Send the business, site, system size, 12 months of bills if you have them, project cost and lender status through the contact page; expect a scoped reply within one business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does a Tennessee solar project need a feasibility study for REAP?

    For a REAP guaranteed loan above $1,000,000 to a new business, Part 5001 requires an independent study (5001.306(a)(3)(i)). Most Tennessee rooftop projects borrow less, so the Agency or lender decides. The 2026 rule's tests, payback within useful life, sizing to historic use and 12 months of production data, mean a sound technical and financial analysis is needed either way.

    What does a solar feasibility study consultant cost in Tennessee?

    The site's cost page lists $4,900 to $8,500 for REAP studies with loans under $600,000 and $7,500 to $11,500 where the REAP guaranteed loan exceeds $600,000, each as a fixed fee. A single rooftop array is usually at the low end; a multi-building system with storage costs more. USDA's upfront REAP guarantee fee on the $480,000 example loan is $3,840.00.

    How long does a REAP solar study take?

    Four to five weeks for a smaller REAP study and five to seven where the guaranteed loan exceeds $600,000, per the cost page, with a three to four-week rush option. Collecting 12 months of utility bills and the installer's component list usually sets the pace, so gather both before kick-off.

    Who can prepare a REAP feasibility study?

    Any independent, qualified consultant the Agency will accept, with no stake in the system. The installer's proposal and production model are essential inputs, but the installer sells the system and cannot be the independent preparer. The rule separately requires the installer to be licensed in Tennessee with at least three similar installations. USDA publishes no approved list of consultants.

    How long is a solar feasibility study valid?

    There is no expiry date in Part 5001. The cost page treats data inside about 18 months as USDA's working standard. For REAP the timing is fixed by the rule: the project must have ended 12 to 24 months before the application, with 12 months of actual data, so the study is updated with real production before a grant application.

    Can one solar study support an SBA loan, a REAP loan and a later grant?

    Yes, if each use is named and modelled. On the $480,000 example, a REAP guarantee covers $384,000.00 (80 percent) for a 1.0 percent fee; a 7(a) loan would guarantee $360,000.00 (75 percent). The grant chapter must use the 2026 caps and show that the combined REAP loan and grant stay at or below 75 percent of project cost.

    Can a Tennessee farm put ground-mount solar on cropland with REAP?

    No. Under the rule effective 16 October 2026, ground-mounted solar or wind on cropland as defined in 7 CFR 718.2 is ineligible, and retrofits of such systems are excluded. A farm can still use a rooftop, a barn or non-cropland ground, sized to its historic energy use, and the study should document the land classification of the site.

    Can solar use B&I instead of REAP in Tennessee?

    According to the hub, no: it states that since an August 2025 USDA letter, wind and solar projects are ineligible for B&I. FACTS.md does not contain that letter, so confirm with the lender and state office. If B&I is closed to solar, the REAP guaranteed loan, with its 80 percent guarantee and 1.0 percent fee, is the USDA route for construction.

    Do lottery sales or other gaming income affect a REAP application?

    The hub says that under the rule effective 16 October 2026 any gambling income makes an applicant ineligible, and it applies this to Tennessee lottery retailers. The rule summary this page relies on does not list that condition, so a store, hotel or restaurant with lottery or gaming income should confirm with the state office before paying for a REAP study.

    Sources

    1. USDA RBCS, Rural Energy for America Program final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    2. USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    3. 91 FR 11272, OneRD FY2026 guarantee fee, retention fee and guarantee percentage notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    4. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    5. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    6. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    7. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    8. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    9. USAspending.gov prime award data by assistance listing 10.868 (REAP), FY2024 to FY2026, counts and dollars by state: https://www.usaspending.gov
    10. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    11. Regional figures: this site's data packs for Kentucky, North Carolina, Georgia, Virginia and Alabama
    12. Tennessee REAP precedents, the August 2025 B&I solar statement, the gambling-income statement and C-PACER, as cited on the Tennessee hub
    13. Site pages: /usda-feasibility-study-cost and /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.