USDA Feasibility Study for Solar and Renewable Energy (REAP) in Wyoming

    NAICS 221114

    Wyoming received 37 REAP grants and no REAP guaranteed loans in fiscal 2024 to 2026, according to USAspending, totalling $2,881,628.86, an average of $77,882 per grant. Census counts no solar or other renewable power businesses with paid staff in the state, and SBA shows one $100,000 loan to the sector. So a solar project in Wyoming is almost always a REAP project at a ranch, farm or rural business rather than a utility-scale generator, and since 16 October 2026 the rules for those projects have changed sharply. The grant now comes after the system has operated for at least a year, it covers at most 25 percent of cost, and grant plus guaranteed loan cannot exceed 75 percent. A USDA solar feasibility study in Wyoming must therefore support the loan that builds the system, prove the energy savings or sales that repay it, and pass the rule's payback and siting tests.

    Solar and renewable energy in Wyoming: market evidence

    Wyoming: solar and other renewable power generation, supply and rural footprint

    MeasureWyomingUnited States
    Establishments, 2019 → 20230 → 0 (n/a)405 → 942
    Per 100,000 residents (2023)0.00.3
    Share of state population in non-metro counties (2025)68.8%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    What the zero means. The Census codes here cover solar, biomass and other non-wind renewable generation businesses (NAICS 221114, 221117 and 221118). Nationally they more than doubled, from 405 to 942, between 2019 and 2023; Wyoming had none in either year. That does not mean Wyoming has no solar. Systems owned by farms, ranches, schools and businesses to cut their own power bills belong to those owners' industries, and wind generation is classified separately. The finding for a lender is that a Wyoming solar project will rarely be a stand-alone power company with sales contracts; it will be an energy-cost project inside an existing business, and the study must measure that business's actual energy use and savings.

    REAP activity in Wyoming and nearby

    USAspending records, for FY2024 to FY2026, labelled by state:

    StateREAP grantsREAP guaranteed loansGrant dollarsAverage grant
    Wyoming370$2,881,629$77,882
    Montana740$2,959,654$39,995
    South Dakota781$12,309,780$157,818
    Nebraska2970$25,065,600$84,396
    Colorado681$9,325,807$137,144
    Utah800$11,971,606$149,645
    Idaho930$21,643,985$232,731

    Wyoming had the fewest REAP grants of the seven, and the REAP guaranteed loan has been almost unused across the region, two loans in seven states. Those awards were made under the rules in force before 16 October 2026; they show demand, not what the new rule will fund. Under the new rule the guaranteed loan becomes the main construction tool, so a Wyoming REAP project is likely to need a lender comfortable with a program it has rarely used, and the feasibility study is what gives that lender comfort.

    SBA record

    SBA shows one Wyoming loan to renewable generation, a $100,000 7(a) loan in FY2024 to FY2026. Across the U.S., the sector's 138 FY2020 to FY2026 7(a) loans came to $478,591 on average and its 17 504 loans to $638,588. Of 31 FY2010 to FY2016 7(a) loans, 12.9 percent were charged off, on average 51 months after approval, the highest seasoned loss rate among the asset types on this site, a warning that generation projects sold on optimistic output have failed.

    The REAP rule effective 16 October 2026, applied in Wyoming

    The final rule with comment period appeared on 1 October 2026 (91 FR 62600) and took effect on 16 October 2026. These terms are the ones a Wyoming project now faces:

    TopicRule effective 16 October 2026What it means for a Wyoming project
    TimingProject Period must end 12 to 24 months before the application (12 to 36 in the first window)Build first, apply for the grant later; finance construction with a loan
    Data12 months of actual production or savings and 12 months of pre-installation dataKeep utility bills from before installation
    Award size$1,500 minimum; $500,000 maximum for renewable systems; $250,000 for efficiencyWyoming's $77,882 average grant sits well inside the cap
    Cost shareAt least 75% of project costGrant at most 25%
    Combined fundingGrant plus REAP guaranteed loan at most 75% of costCaps the loan when a grant is planned
    CroplandGround-mount solar or wind on Cropland (7 CFR 718.2) ineligibleRoof, carport or non-cropland sites on ranches
    Foreign componentsSystems with components from a foreign adversary (15 CFR 791.4) ineligibleCountry-of-origin list for each component
    SizingGround-mount must match historical energy use; storage up to 120% of prior annual useLoad analysis is mandatory
    EconomicsSimple payback must not exceed useful lifeAn eligibility test, not just a metric
    LocationsOne site per applicationSeparate applications for separate sites
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsKeep them out of the budget
    ApplicantOne application per fiscal year per highest-level owner group; site owned or leased 12 months before the Project PeriodOwnership and site control evidence
    InstallersLicensed in the state, at least three similar installations; procurement under 2 CFR 200.318 to 200.327Installer qualifications documented
    CompetitionOne competition for $20,000 or less and one national competition; no state competitionsWyoming applicants compete nationally

    No REAP funding notice under the new rule had been published in the Federal Register by 7 November 2026. A lender should underwrite the project without the grant.

    Rural footprint and eligibility in Wyoming

    With no generation businesses counted, the eligibility question is the site. REAP guaranteed loans are made under 7 CFR Part 5001, whose rural definition in 5001.3 excludes cities and towns over 50,000 and their contiguous urbanized areas; in Wyoming that means Cheyenne (66,507) and Casper (58,771). Ranches, farms and businesses across the rest of the state pass that test, but REAP has its own applicant rules (agricultural producers and rural small businesses), and the site must not be Cropland for a ground-mounted system. Excluded places are set out in the Wyoming state guide.

    Program fit

    For a Wyoming ranch or rural business, the REAP guaranteed loan under Part 5001 now finances construction: in fiscal 2026 it carries an 80 percent guarantee, a 1.0 percent upfront fee and 0.25 percent annual retention, with an extra 0.50 percent if the guarantee issues before construction is complete. The grant, if awarded, arrives after a year of operation and must fit under the 75 percent combined cap. B&I can finance a larger solar or renewable project, or one that sells power, with its 3.0 percent fee and 85 percent guarantee below $5 million, and the lender checks 5001.127(a) for every owner above 20 percent. SBA 7(a) and 504 can finance systems for small businesses. Projects that are mainly EV charging, stand-alone storage or retail energy sales are outside REAP under the new rule.

    Financing benchmarks: REAP and B&I next to SBA

    Wyoming: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20190$00$0
    FY2020 to FY20230$00$0
    FY2024 to FY20261$100,0000$0

    Average 7(a) loan, FY2020 to FY2026: $100,000. Wyoming had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermFiscal 2026 ruleFor a Wyoming solar project
    REAP guaranteed loan80% guarantee; 1.0% fee; 0.25% retention; +0.50% before completion (91 FR 11272)Construction financing under the new rule
    B&I85% under $5 million; 3.0% fee; 0.55% retention (91 FR 11272)Larger or power-selling projects
    Combined REAP capGrant plus guaranteed loan at most 75% of cost (91 FR 62600)Borrower funds at least 25%
    TermUseful life, 40 years maximum, no balloon (5001.402)20 years used in the example
    RateNegotiated, no higher than the lender's similar loans (5001.401)Lender's pricing
    StudyRequired for a new business over $1,000,000 (5001.306(a)(3)(i))Most farm-scale REAP loans are smaller

    Worked example (illustrative)

    A Wyoming ranch or rural business installs a system costing an illustrative $640,000. Scenario A borrows the maximum REAP guaranteed loan, 75 percent of cost, or $480,000, which happens to sit next to the $478,591 national renewable 7(a) average; that leaves no room for a grant later. Scenario B borrows 50 percent and plans to apply for a 25 percent grant after a year of operation. Rate (7.25 percent, fixed) and term (20 years) are illustrative; guarantee and fees follow the fiscal 2026 REAP terms.

    Input or resultScenario A: maximum REAP loan, no grantScenario B: smaller loan, grant sought later
    Total project cost (illustrative)$640,000.00$640,000.00
    REAP guaranteed loan$480,000.00$320,000.00
    Loan as a share of project cost75%50%
    Grant applied for after 12 months of operation (at most 25% of cost)$0.00$160,000.00
    Grant plus guaranteed loan as a share of cost (cap 75%)75%75%
    Borrower cash at construction$160,000.00$320,000.00
    Guarantee percentage (REAP, fiscal 2026)80%80%
    Guaranteed amount$384,000.00$256,000.00
    Upfront guarantee fee (1.0% of the guaranteed amount)$3,840.00$2,560.00
    Upfront fee if the guarantee issues before construction is complete (1.5%)$5,760.00$3,840.00
    Balance after 12 monthly payments$468,910.66$312,607.11
    First annual retention fee (0.25% of the guaranteed share)$937.82$625.21
    Interest rate (illustrative, fixed)7.25%7.25%
    Amortization, years (no balloon)2020
    Monthly payment$3,793.80$2,529.20
    Annual debt service$45,525.66$30,350.44
    Annual energy savings or sales needed for 1.25x coverage$56,907.07$37,938.05
    Coverage at that level if the rate is 2 points higher1.08x1.08x
    Coverage if savings come in 10% below plan1.125x1.125x
    Simple payback at that savings level, years (must not exceed useful life)11.216.9

    Reading the example. Scenario A needs $56,907.07 a year of verified energy savings or sales for 1.25x coverage and asks the owner for $160,000.00 in cash; Scenario B needs only $37,938.05 but asks for $320,000.00 at construction, part of which a grant may return a year or more later if it is awarded in a national competition. A borrower who cannot wait for a grant, or cannot count on winning one, is better served by Scenario A and should not plan on REAP grant money at all. Either way, the simple payback on the full $640,000 cost (11.2 and 16.9 years at those savings levels) must stay within the system's useful life, which the study states with its basis; a 25-year life is common for solar modules but should be supported by the equipment warranty. Fees are small: $3,840.00 upfront and $937.82 in first-year retention under Scenario A.

    Evidence a Wyoming solar study must build

    1. Twelve months of pre-installation utility bills and a load profile for the site.
    2. Production modelling for the site's latitude, orientation, shading, snow and wind loads, reconciled later with 12 months of metered output.
    3. The utility's interconnection terms and the value of exported power, which set the savings.
    4. Site eligibility: not Cropland for ground-mount, single location, owned or leased for 12 months before the Project Period.
    5. Equipment list with country of origin for each component, excluding foreign-adversary sources.
    6. Installer licence and three similar installations; procurement documents.
    7. Sizing against historical use, and storage no more than 120 percent of prior annual use.
    8. Simple payback against useful life, with the useful-life basis stated.
    9. Coverage without the grant, and with savings 10 percent below plan.

    Risks and mitigants in Wyoming

    Output risk is real: snow, wind, hail and dust affect production, so the model should use site-specific data and conservative degradation. Utility rate or net-metering changes can cut the value of savings. Foreign-component rules can disqualify a system after purchase if the country-of-origin list is wrong. The national loss record for renewable generation businesses, 12.9 percent of 31 seasoned loans, shows what happens when projections are optimistic. Mitigants are a system sized to the owner's own load, a warranty-backed equipment package, an installer with a documented record, insurance against weather damage, and a loan sized to be repaid from savings without the grant.

    Process and documents

    The lender confirms eligibility of the applicant and site, the study is prepared, and the REAP guaranteed loan application is filed by the lender for review in Wyoming by Rural Development; under the new rule the later grant competes nationally. The owner provides utility bills, site control documents, the installer's proposal and qualifications, equipment specifications with country of origin, interconnection agreement, financial statements, and personal guarantees from owners holding 20 percent or more. Studies and applications come back for production estimates without site data, payback calculations that exceed useful life, Cropland sites, and excluded components such as EV chargers in the budget.

    Program example

    The inputs name no specific Wyoming solar project financed by USDA. USAspending's 37 Wyoming REAP grants in FY2024 to FY2026, $2,881,629 in total, show that Wyoming producers and businesses have used the program; they were awarded under the earlier rules and are reported here as counts.

    Hiring a USDA solar energy feasibility study consultant in Wyoming

    The independent-study mandate in 5001.306(a)(3)(i) covers start-ups whose guaranteed loans exceed $1,000,000; most farm-scale REAP loans are smaller, and for them the lender and USDA decide what analysis they need, guided by the rule's data, sizing and payback tests. A solar energy feasibility study consultant must not be the installer or the equipment vendor. The site's national renewable energy page quotes $6,500 to $15,000 over 4 to 8 weeks depending on technology and resource assessment, and the cost page lists REAP studies at $4,900 to $8,500 (4 to 5 weeks) for loans under $600,000 and $7,500 to $11,500 (5 to 7 weeks) for guaranteed loans above $600,000. The fee is fixed in a written proposal; grant application drafting is not included, per the cost page.

    To test a USDA feasibility study consultant on REAP work, ask how the study will show the loan repaid without the grant and how the payback test will be documented.

    Describe the site, system size, current energy use and financing plan on the contact page. Expect a reply from a senior analyst within a business day.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Is a feasibility study required for a Wyoming REAP solar loan?

    Strictly, only when a newly formed borrower's guaranteed loan passes $1,000,000 (5001.306(a)(3)(i)). Most ranch and small-business systems are smaller; Wyoming's REAP grants averaged $77,882. Even so, the 16 October 2026 rule's sizing, data and payback tests mean the lender will want documented analysis.

    What does a solar energy feasibility study consultant cost?

    REAP studies are priced on the cost page at $4,900 to $8,500 for loans under $600,000 and $7,500 to $11,500 for guaranteed loans above $600,000; the national renewable energy page gives $6,500 to $15,000 across technologies. The price is fixed before work begins. Scenario A's upfront REAP fee is $3,840.00, for scale.

    How long does a REAP solar study take?

    Four to five weeks for smaller REAP loans and five to seven for larger ones on the cost page, or 4 to 8 weeks on the national renewable energy page depending on the resource assessment.

    Who can prepare it?

    Someone qualified who is not the installer, equipment seller, owner or bank. An installer's production estimate is required input but is not independent.

    Can I still get a 50 percent REAP grant?

    No. Under the rule effective 16 October 2026 the grant is at most 25 percent of project cost and $500,000 for renewable systems, and grant plus guaranteed loan cannot exceed 75 percent. Pages that still describe a 50 percent share or a $1 million cap describe the old rule.

    Can a Wyoming ranch put ground-mounted solar on a hay field?

    Not with REAP if the land is Cropland under 7 CFR 718.2: ground-mounted solar or wind on Cropland is ineligible under the new rule, and so are retrofits of such systems. Roof-mounted, carport or non-cropland ground systems remain possible, sized to the ranch's historical energy use.

    Does the grant pay for construction?

    No. The Project Period must end 12 to 24 months before the grant application (12 to 36 months in the first window), with 12 months of operating data. Construction is financed by the owner and, where used, a REAP guaranteed loan, which is why the example shows the loan repaid without the grant.

    Can the same study serve an SBA lender?

    A single study can work for both if each lender is an intended user; 13 CFR 120.160(b) separately lets SBA require analysis. SBA has made only one Wyoming renewable generation loan, $100,000, so SBA is more likely to finance a small business's system than a stand-alone generator.

    How long is a solar study valid?

    The guarantee regulation sets no end date, and the cost page's 18-month data guideline applies; under the REAP rule the grant application must rely on 12 months of actual production, so the pre-construction study will be followed by a reconciliation with metered results.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. USAspending.gov prime award data by assistance listing 10.868 (REAP), counts and grant amounts by state, FY2024 to FY2026: https://www.usaspending.gov
    6. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    7. USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026) (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    8. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    9. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for fiscal 2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    10. 13 CFR Part 120, SBA business loan programs (CFR 2026 edition on govinfo)
    11. Site pages: /renewable-energy-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours