Wyoming added 20 manufacturing establishments between 2019 and 2023, reaching 600, while the national count fell 1.1 percent, and its manufacturers paid an average of $87,572 per employee, 19.6 percent above the U.S. figure. For a sponsor seeking a USDA B&I guarantee for a plant in Wyoming, that combination is both the opportunity and the question a reviewer will ask: the state supports manufacturing at above-average wages, but most of its plants are very small, and a new one has to show where its customers, workers and inputs will come from. Below are the Census and SBA records, rural eligibility, the fiscal 2026 B&I terms with two worked loans, and the contents of a lender-grade study.
Manufacturing in Wyoming: market evidence
Wyoming: manufacturing establishments (all), supply and rural footprint
| Measure | Wyoming | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 580 → 600 (+3.4%) | 287,626 → 284,452 |
| Per 100,000 residents (2023) | 102.6 | 84.5 |
| Average employees per establishment | 17.0 | 43.4 |
| Average annual pay per employee | $87,572 | $73,202 |
| Share of establishments in non-metro counties | 71.6% (428 in 20 counties) | |
| Share of state population in non-metro counties (2025) | 68.8% |
Non-metro counties with the most manufacturing establishments (all) (2023): Sheridan County (49); Teton County (45); Park County (40); Campbell County (39); Albany County (37); Fremont County (29).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Reading the manufacturing numbers. Wyoming has 102.6 manufacturers per 100,000 residents, 21 percent above the national 84.5, and the count grew 3.4 percent while the nation's shrank. Size tells the rest. The average Wyoming plant employs 17.0 people against 43.4 nationally, and payroll per plant is $1,484,492 against $3,174,395. In the Census size-class file, 304 of 599 classified plants (50.8 percent) have fewer than five employees, against 36.1 percent nationally, while 19 employ 100 or more. Wyoming manufacturing is therefore two populations: hundreds of micro shops (fabrication, food, wood, printing, crafts) and a small number of large, high-wage plants that pull the average pay to $87,572. For underwriting, the state average wage is a poor benchmark for a 20-person shop; the study should take pay from the plant's own sub-industry and the local labour market, and explain any figure above or below the state number. A reviewer will also ask how a new plant recruits skilled workers in counties of 10,000 to 40,000 people, since that is where most Wyoming plants sit.
Where Wyoming manufacturing is located
The county file places 598 of the 600. Natrona County, a metro county, has the largest base with 97 plants (12.05 per 10,000 residents), and Laramie County has 73 (7.09). Among non-metro counties, Teton County's 45 plants give it the highest density at 19.29 per 10,000, followed by Johnson (16.84), Washakie (15.80), Platte (15.06), Sheridan (49 plants, 14.74) and Sublette (14.56). Campbell County, the largest non-metro county by population, has 39 plants at 8.10 per 10,000, and Sweetwater 27 at 6.54. The spread matters for a feasibility study because suppliers, machine shops, trucking and skilled trades cluster where other plants already operate; a site in Sheridan or Natrona County has more of that support than one in a county with five plants.
Demand drivers and competitive position
A manufacturing study starts from the customer, not the town. It identifies who buys the product, under what contracts, at what price and volume, and how far the product travels. For Wyoming plants, freight distance to markets in Denver, Salt Lake City, Billings and the Midwest is often the decisive cost, and the study must show delivered cost against competitors closer to those markets. Demand evidence is strongest when it is contractual: purchase orders, offtake agreements or letters of intent with volumes. Supply analysis covers raw material sources and their reliability, and competitive analysis covers other producers selling into the same customers, wherever they are located.
Revenue model, costs and capital
Revenue is units sold times price by product line, ramped from start-up to capacity over a stated period. Costs are materials, labour (benchmarked to sub-industry pay, not only the $87,572 state average), energy, freight in and out, maintenance, insurance and overhead. Capital items are land, building, process equipment, installation, utility connections, and start-up working capital to carry inventory and receivables through the ramp. Each piece of equipment has its own useful life, and 5001.402 ties the loan term to that life, so a plant financed largely with machinery will carry shorter amortization and higher annual debt service than one financed with real estate.
Rural footprint and B&I eligibility in Wyoming
Of the 598 placed plants, 428 (71.6 percent) are in non-metro counties, slightly above their 68.8 percent share of residents: 105.6 plants per 100,000 non-metro residents against 92.7 in the two metro counties. Eligibility under 7 CFR 5001.3 is decided for the site, not the county: the project must lie outside any city or town of more than 50,000 and its contiguous urbanized area. In Wyoming that rules out Cheyenne (66,507) and Casper (58,771) and their urbanized areas, but the industrial parks and rural sites elsewhere in Laramie and Natrona counties can still qualify after a parcel check. No Wyoming place is between 40,000 and 49,999; The biggest towns that clear the threshold are Laramie (32,284), Gillette (34,024), Sheridan (20,015) and Rock Springs (22,936). For the place list and Wyoming's USDA award counts, see the Wyoming state guide.
Program fit
B&I is built for this asset: it guarantees loans for real estate, machinery, equipment and working capital for rural manufacturers, up to $25 million per borrower (5001.406(c)), and lets each asset class amortize over its own life. Borrower eligibility is checked first: under 5001.127(a) a company is ineligible if it, or any owner of more than 20 percent, has an outstanding federal court judgment, delinquent federal taxes or debt, or a debarment, and the lender confirms this on SAM.gov. When a guaranteed loan exceeds $1,000,000 and the project will create more than 50 jobs, 5001.306(a)(1) adds a Department of Labor concurrence step, which a Wyoming plant at scale should plan for in its timeline. SBA 7(a) has been the most frequent route for Wyoming manufacturers (80 loans since FY2010), and SBA 504 finances owner-occupied plants and long-life equipment with a 10 percent injection, or 15 percent for a business in its first two years or a special-purpose building (13 CFR 120.910). Once a plant has a year of energy bills, REAP becomes an option for efficiency upgrades or on-site generation, and its guaranteed loan carries a 1.0 percent fee and 80 percent guarantee in fiscal 2026. Community Facilities does not fund private manufacturing. Price a conventional loan first; the guarantee earns its fee only if it lengthens the term or raises the advance.
Financing benchmarks: USDA B&I next to SBA
Wyoming: SBA lending to manufacturing establishments (all)
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 39 | $11.0 million | 1 | $95,000 |
| FY2017 to FY2019 | 17 | $6.1 million | 4 | $2.3 million |
| FY2020 to FY2023 | 13 | $7.3 million | 4 | $4.2 million |
| FY2024 to FY2026 | 11 | $8.1 million | 5 | $4.5 million |
Average 7(a) loan, FY2020 to FY2026: $643,267. Average 504 loan: $957,667. Of the 39 7(a) loans approved in FY2010 to FY2016 for Wyoming manufacturing establishments (all), 2.6% were charged off (national: 6.4% of 27,078), on average 97 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| Term | B&I rule, fiscal 2026 | Applied to a Wyoming plant |
|---|---|---|
| Guarantee | 85% under $5 million; 80% from $5 million to $25 million (91 FR 11272) | Both example loans are in the 85% tier |
| Upfront fee | 3.0% of the guaranteed amount; 1.0% if reduced-fee criteria are met (5001.454) | $89,250.00 on a $3,500,000 loan |
| Pre-completion guarantee | Extra 0.50% fee; 25% equity; independent cost confirmation (5001.205(e)(2)) | Common for new plant construction |
| Retention fee | 0.55% a year of the guaranteed share outstanding (5001.455) | $16,006.18 in year one on Loan B |
| Term | Useful life, up to 40 years, no balloon (5001.402) | Equipment 10 to 15 years; buildings 20 years or more |
| Maximum | $25 million per borrower (5001.406(c)) | Above any Wyoming SBA manufacturing loan in the file |
| Equity, new business | 20% balance sheet equity or 25% of project cost (5001.105(d)(4)); 10% with debt-service-adequate sales contracts (5001.105(d)(2)) | Contracts can cut the equity requirement |
| Equity, existing business | 10% (5001.105(d)(1)) | $388,888.89 on a $3,888,888.89 expansion |
| Jobs over 50, loan over $1 million | Department of Labor concurrence (5001.306(a)(1)) | Plan time for it |
| Feasibility study | Required over $1,000,000 for a new business (5001.306(a)(3)(i)) | Loan B needs one |
What it means for a Wyoming plant. Wyoming's manufacturing loss record is better than the nation's: among the 39 manufacturing 7(a) loans of FY2010 to FY2016, one was charged off (2.6 percent, 97 months after approval) against 6.4 percent of 27,078 loans nationally. Lending volume is modest: 24 7(a) loans in FY2020 to FY2026 averaged $643,267, close to the U.S. average of $693,181, and Wyoming's share of national manufacturing 7(a) loans (0.12 percent) is below its 0.17 percent population share. Loan sizes have nearly tripled, from $281,905 on average in FY2010 to FY2016 to $736,036 in FY2024 to FY2026. The SBA files record 687 jobs supported by Wyoming manufacturing 7(a) loans and 182 by 504 loans. For B&I the most useful rule for a new manufacturer is 5001.105(d)(2): a new business whose sales contracts cover debt service for the full loan term needs 10 percent equity instead of 20 to 25 percent, which makes signed offtake agreements worth more than any market survey.
Worked example (illustrative)
Loan A is $645,000, rounding Wyoming's FY2020 to FY2026 average manufacturing 7(a) loan of $643,267, amortized over 15 years as an equipment-and-building loan. Loan B is an illustrative $3,500,000 new plant over 20 years. For both, the 7.75 percent fixed rate is illustrative.
| Input or result | Loan A: Wyoming average | Loan B: new plant (illustrative) |
|---|---|---|
| Loan amount | $645,000.00 | $3,500,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 85% |
| Guaranteed amount | $548,250.00 | $2,975,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $16,447.50 | $89,250.00 |
| Upfront fee with the guarantee issued before construction is complete (3.5%) | $19,188.75 | $104,125.00 |
| Balance after 12 monthly payments | $621,302.75 | $3,423,782.04 |
| First annual retention fee (0.55% of the guaranteed share of that balance) | $2,904.59 | $16,006.18 |
| Interest rate (illustrative, fixed) | 7.75% | 7.75% |
| Amortization, years (no balloon) | 15 | 20 |
| Monthly payment | $6,071.23 | $28,733.20 |
| Annual debt service (NOI for 1.00x) | $72,854.74 | $344,798.40 |
| NOI for 1.25x coverage | $91,068.43 | $430,998.00 |
| Coverage at that NOI if the rate is 2 points higher | 1.11x | 1.08x |
| Coverage at that NOI if the term is 5 years shorter | 0.98x | 1.09x |
| Coverage if NOI comes in 10% below plan | 1.125x | 1.125x |
| Equity, new business, 25% of project cost (5001.105(d)(4)) | $215,000.00 | $1,166,666.67 |
| Total project cost on that basis | $860,000.00 | $4,666,666.67 |
| Equity, new business, 20% balance sheet route if this loan is the only debt | $161,250.00 | $875,000.00 |
| Equity, existing business, 10% of project cost (5001.105(d)(1)) | $71,666.67 | $388,888.89 |
| Independent feasibility study, new business (5001.306(a)(3)) | Agency discretion | required |
| Debt service as a share of the average Wyoming plant payroll ($1,484,492) | 4.9% | 23.2% |
| NOI per production day for 1.25x (250 days) | $364.27 | $1,723.99 |
Reading the example. Debt service on Loan A equals 4.9 percent of the payroll of an average Wyoming plant ($1,484,492); on Loan B it is 23.2 percent, which is why a new plant's labour and debt must be modelled together. The most important line is the short-term test: if Loan A has to amortize over 10 years because the lender treats it as equipment, the net income that gave 1.25x coverage over 15 years gives only 0.98x. Matching the term to the useful life of each asset class, as 5001.402 allows, is often the difference between a plant that cash-flows and one that does not. Loan B needs $430,998.00 of net operating income, $1,723.99 per production day over 250 days, and $1,166,666.67 of equity under the 25 percent route, or $466,666.67 under 5001.105(d)(2) if signed contracts cover the debt service.
What a lender-grade manufacturing feasibility study in Wyoming must prove
- Customers, contracts and volumes, with offtake agreements or letters of intent attached; these can also reduce the equity requirement under 5001.105(d)(2).
- Delivered cost against competitors, including freight from Wyoming to the main markets.
- Raw material supply: sources, distances, contracts and alternatives.
- A staffing plan in a county of 10,000 to 40,000 people, with recruitment, training and wages benchmarked to the sub-industry and to Wyoming's $87,572 average.
- A production ramp from start-up to capacity, with working capital to carry it.
- Equipment specifications, vendor quotes, installation and useful lives that match the loan terms.
- Utilities: power, natural gas, water and wastewater capacity confirmed by the provider.
- Environmental permits and the time to obtain them.
- Sensitivity of coverage to price, volume, input cost and a shorter amortization.
- Management depth: who has run a plant like this before.
Risks and mitigants in Wyoming
Labour is the constraint most Wyoming manufacturing projects meet first, since a 50-person plant may need to recruit from several counties; mitigants include training partnerships, wage premiums priced into the model, and phased hiring. Freight distance squeezes margins on heavy, low-value products, so the study should test fuel and freight increases. Energy-sector cycles affect demand for metal fabrication and equipment repair. Severe winters affect construction schedules and logistics. Customer concentration is common in small plants; a study should show coverage if the largest customer leaves. Process equipment and purpose-built plants rarely appraise at cost; under 5001.203 any going-concern value comes out before the lender discounts collateral, and that shortfall is what the equity has to cover.
From kickoff to conditional commitment
A lender confirms eligibility and loan size, the consultant is engaged, and the finished study goes with the application to USDA, where the Wyoming state office reviews it alongside the lender's credit analysis. The sponsor provides the business plan, customer letters or contracts, equipment quotes, construction budget and schedule, site control, environmental reports, historical statements for an existing business, and guarantees from 20 percent owners. Manufacturing studies are most often returned for unsupported sales volumes, ramp schedules that are too fast, labour assumptions that ignore local supply, and equipment lives that do not match the loan term.
Program example
No Wyoming manufacturing project financed by USDA is named in the inputs, so none is described here. The three Wyoming B&I guarantees recorded by USAspending for FY2024 to FY2026 are not broken down by industry. SBA's record is the documented precedent: 80 7(a) loans and 14 504 loans to Wyoming manufacturers since FY2010, $43.6 million in total.
Hiring a USDA manufacturing feasibility study consultant in Wyoming
Part 5001 makes the study mandatory in one case. Under 5001.306(a)(3)(i), once a start-up company's guaranteed loan passes $1,000,000, the Agency requires an outside report from a qualified, independent preparer it accepts, and USDA decides the scope. Expansions by existing manufacturers and smaller loans fall to the Agency's discretion, and lenders often ask anyway when a project depends on new customers. The site's national industrial page quotes $12,500 to $18,500 or more for industrial studies, over 7 to 9 weeks. Work runs in four phases on the cost page: data request in week one, market and supply analysis in weeks two to four, the financial model and draft in weeks four to six, and lender review through week eight, with a fixed fee, one revision round and a written acceptance guarantee. The fee leaves out engineering, environmental reports and the appraisal.
A manufacturing feasibility study consultant earns the fee on the contract and supply evidence, and that is what to ask about first. Whoever is hired as your USDA feasibility study consultant should explain how the report will show delivered cost from a Wyoming site against competitors closer to the market.
To scope a Wyoming plant, use the contact page: list the product, site, jobs, program and estimated cost. Plants get the same one-business-day senior analyst reply the page offers every inquiry.
Last updated 2026-11-08
USDA Feasibility, Inc.