    Manufacturing is where USDA's rural business guarantee and Arkansas fit most naturally. The state has 2,526 manufacturing establishments, and 45.1 percent of them sit in non-metro counties, a larger share than the 38.0 percent of Arkansans who live there. The typical plant is also big, at 65.0 employees against 43.4 nationally. A USDA manufacturing feasibility study in Arkansas therefore usually concerns a rural plant with real payroll, customers outside the county and equipment with a defined useful life, and the lender's questions centre on contracts, labour and the capital budget rather than on local retail demand.

    General and advanced manufacturing in Arkansas: market evidence

    Arkansas: manufacturing establishments (all), supply and rural footprint

    MeasureArkansasUnited States
    Establishments, 2019 → 20232,519 → 2,526 (+0.3%)287,626 → 284,452
    Per 100,000 residents (2023)82.384.5
    Average employees per establishment65.043.4
    Average annual pay per employee$59,550$73,202
    Share of establishments in non-metro counties45.1% (1,136 in 55 counties)
    Share of state population in non-metro counties (2025)38.0%

    Non-metro counties with the most manufacturing establishments (all) (2023): Pope County (63); White County (63); Mississippi County (49); Baxter County (47); Greene County (47); Jefferson County (46).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading the totals. The plant count was flat, 2,519 in 2019 and 2,526 in 2023, while the national count fell 1.1 percent, and Arkansas employment rose 1.6 percent to 164,240. Size is the striking figure: 26 Arkansas plants employ 1,000 or more and 51 employ 500 to 999, so a handful of large food, steel, paper and equipment plants pull the average up; 800 establishments (31.7 percent) still have fewer than five employees. Average pay of $59,550 is 81.3 percent of the U.S. figure but rose 23.9 percent from $48,067 in 2019. A reviewer will compare a project's wage plan with that figure and with the county figure, ask who buys the output and on what terms, and test how a plant of the proposed size competes for workers in its labour shed.

    Where the plants are and what they pay (computed)

    CountyMetro status (OMB 2023)Plants, 2023EmployeesAnnual payroll per employeePlants per 10,000 residents
    Pulaskimetro28513,369$67,0917.04
    Sebastianmetro15113,645$66,17011.56
    Popeoutside metro areas634,769$53,8489.70
    Mississippioutside metro areas496,348$108,04712.95
    Independenceoutside metro areas435,185$62,76911.09
    Unionoutside metro areas433,262$74,61211.64
    Ouachitaoutside metro areas293,372$75,58613.34
    Polkoutside metro areas311,230$42,80415.91

    Computed from the Census County Business Patterns 2023 county file and Vintage 2025 county estimates; county employment and payroll carry Census noise and are indicative only.

    Mississippi County stands apart: its 6,348 manufacturing workers earned an average of $108,047, nearly twice the state figure, which reflects steel. Two projects on the hub extend that base: a U.S. Steel direct reduced iron plant in Osceola costing $1.9 billion (roughly 200 permanent and 2,000 peak construction jobs) and a $37 million MISA steel processing plant with 35 jobs. Ouachita County, around Camden, pays $75,586 per manufacturing worker; the hub lists R2S's $63 million plant, General Dynamics-OTS's $110 million 155 mm munitions plant and Lockheed Martin's 620 PAC-3 MSE missiles delivered in 2025. Union County, with El Dorado, sits near the Smackover lithium play. For a supplier or component maker, these clusters are the demand drivers; for any plant, they are also competitors for skilled labour.

    Revenue model, costs and capital

    Revenue is units shipped times contract or market price, by customer and product line, with a ramp-up curve for a new line. The critical metrics are capacity utilisation, gross margin per unit, customer concentration and contract tenor. Costs are materials, labour at county wages, energy, freight, maintenance, insurance and overhead. Capital items are land, building, process equipment, installation and commissioning, utilities (power, gas, water, wastewater), rail or truck access, start-up losses and working capital for inventory and receivables.

    Rural footprint and B&I eligibility in Arkansas

    Manufacturing tilts rural: 96.1 plants per 100,000 non-metro residents against 71.7 in metro counties. That makes most Arkansas plant sites outside Pulaski, Benton, Washington and Sebastian likely to be B&I-eligible, but likelihood is not the test. Under 7 CFR 5001.3 the Agency uses the latest decennial census and excludes towns above 50,000 and their contiguous urbanized areas; in 2020 that meant Little Rock, North Little Rock, Conway, Fort Smith, Jonesboro, Fayetteville, Springdale, Rogers and Bentonville. Industrial parks on the edge of Fort Smith (Van Buren, Alma) or Jonesboro need a parcel check. The Arkansas state page lists the watch list and the area offices; Mississippi, Greene and Independence counties fall under the Jonesboro office, Pope under Fort Smith, Ouachita and Union under Monticello.

    On ownership, a manufacturer is ineligible if the company or a 20-percent or controlling owner carries a federal court judgment, past-due federal taxes or other federal debt, or a debarment (7 CFR 5001.127(a)); income from illegal products is also disqualifying under (d). Each owner of 20 percent or more guarantees the loan in proportion to ownership (5001.204).

    Program fit

    B&I is the main USDA tool for a rural plant: land, building, equipment, working capital and acquisitions up to $25 million. Where a guaranteed loan exceeds $1,000,000 and the project creates more than 50 jobs, Part 5001 adds a Department of Labor concurrence step (5001.306(a)(1)), which belongs in the timetable. SBA 7(a) carried 252 Arkansas manufacturing loans since FY2010, and 504 suits owner-occupied plants with a 10 percent injection, or 15 percent for a single-purpose building (13 CFR 120.910). REAP finances energy efficiency and renewable systems at rural plants under the October 2026 rule, after the project has run for 12 months. Under the reduced-fee criteria the hub lists, a locally owned plant making a natural-resource value-added product, or one that creates a new market for existing local businesses, may qualify for the 1.0 percent fee. Community Facilities does not finance private manufacturing.

    Financing benchmarks: USDA B&I next to SBA

    Arkansas: SBA lending to manufacturing establishments (all)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY2016112$76.3 million8$9.0 million
    FY2017 to FY201950$32.0 million4$8.9 million
    FY2020 to FY202355$36.1 million6$3.3 million
    FY2024 to FY202635$32.0 million1$200,000

    Average 7(a) loan, FY2020 to FY2026: $756,763. Average 504 loan: $504,714. Of the 112 7(a) loans approved in FY2010 to FY2016 for Arkansas manufacturing establishments (all), 5.4% were charged off (national: 6.4% of 27,078), on average 89 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    B&I elementFiscal 2026 positionRule
    Guarantee85% below $5 million; 80% at $5 million to $25 million91 FR 11272
    Upfront and annual fees3.0% and 0.55% of the guaranteed amount; 1.0% and 0.50% on reduced-fee loans91 FR 11272
    Termuseful life of the collateral, 40 years maximum, no balloon7 CFR 5001.402
    Equity, existing plant10% balance sheet or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new plant with offtake contracts10% when sales contracts cover debt service for the loan term7 CFR 5001.105(d)(2)
    Equity, other new plants20% balance sheet or 25% of cost; 25% if the guarantee issues before completion7 CFR 5001.105(d)(3), (d)(4)
    Labour concurrenceDepartment of Labor, above $1,000,000 and 50 jobs7 CFR 5001.306(a)(1)
    Studyindependent study required above $1,000,000 for a new business7 CFR 5001.306(a)(3)(i)

    B&I terms summarised from the FY2026 notice and Part 5001.

    What it means for an Arkansas plant. Ninety Arkansas manufacturing 7(a) loans in FY2020 to FY2026 averaged $756,763, so SBA covers small shops and equipment; a new rural plant with buildings and process lines usually needs B&I's size. Those 90 loans were 0.44 percent of the national manufacturing count, half Arkansas's 0.91 percent share of U.S. residents, which leaves room for USDA. The seasoned record is better than the national one: 5.4 percent of 112 FY2010 to FY2016 loans were charged off against 6.4 percent nationally, but the failures came on average 89 months after approval, so a projection that stops at year five misses the risk window. The equity rule rewards contracts: a new plant whose sales contracts cover debt service for the loan term needs 10 percent instead of 25 percent of project cost.

    Worked example (illustrative)

    Loan A is $760,000, the Arkansas FY2020 to FY2026 manufacturing 7(a) average ($756,763) rounded, over 15 years for equipment. Loan B is $6,000,000, an illustrative new supplier plant with building and lines, over 20 years, which puts it in the 80 percent tier. The rate on both is an illustrative fixed 7.25 percent.

    Input or resultLoan ALoan B
    Loan amount$760,000.00$6,000,000.00
    Program and fee scheduleB&I, fiscal 2026B&I, fiscal 2026
    Guarantee percentage85%80%
    Guaranteed amount$646,000.00$4,800,000.00
    Upfront guarantee fee rate3.00%3.00%
    Upfront guarantee fee$19,380.00$144,000.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$22,610.00$168,000.00
    Annual retention fee rate0.55%0.55%
    First annual retention fee (on the guaranteed share of the balance after 12 payments)$3,416.92$25,790.09
    Interest rate (illustrative, fixed)7.25%7.25%
    Amortization in years (no balloon)1520
    Monthly payment$6,937.76$47,422.56
    Annual debt service (NOI for 1.00x)$83,253.09$569,070.71
    NOI for 1.25x coverage$104,066.37$711,338.39
    Quarterly debt service$20,813.27$142,267.68
    Coverage at that NOI if the rate is 2 points higher1.11x1.08x
    Coverage at that NOI if NOI falls 15%1.06x1.06x
    Equity, new business, 25% of total project cost (5001.105(d)(4))$253,333.33$2,000,000.00
    Total project cost on that basis$1,013,333.33$8,000,000.00
    Equity, new business, 20% balance sheet route if this loan is the only liability$190,000.00$1,500,000.00
    Equity, existing business, 10% of project cost (5001.105(d)(1))$84,444.44$666,666.67

    Computed in Python from the inputs shown; fee and guarantee rates from 91 FR 11272.

    Payroll test. A 40-person shop at the Arkansas average manufacturing wage of $59,550 has a payroll of $2,382,000; Loan A's debt service of $83,253.09 equals 3.5 percent of it. A 120-person plant on Loan B carries a $7,146,000 payroll and debt service of $569,070.71, 8.0 percent. The comparison tells a reviewer how much margin the plant must earn on each dollar of labour, and how sensitive coverage is to a wage rise like the 23.9 percent seen since 2019.

    Contract-equity test. If Loan B's borrower is new and has no qualifying contracts, equity under 5001.105(d)(4) is $2,000,000.00 on a project of $8,000,000.00. With sales contracts covering debt service for the 20-year term, (d)(2) allows 10 percent of project cost, about $666,666.67 on a project of $6,666,666.67, which shows why the study should document offtake terms carefully.

    What a lender-grade manufacturing feasibility study in Arkansas must prove

    1. Customers by name, volume, price and contract tenor, and the share of capacity each takes; concentration on one buyer is the first credit question.
    2. For suppliers to the Osceola steel, Camden defense or Smackover lithium projects, a delay case: the hub notes the lithium project had not taken a final investment decision as of May 2026.
    3. Workforce availability within the commuting area, at county pay rather than the state average, and the cost of training and turnover.
    4. Housing for workers where large construction projects compete for it; the hub flags this for Mississippi and Ouachita counties.
    5. A capital budget from vendor quotes, with installation, utilities and contingency, and a ramp-up schedule.
    6. Margins benchmarked against industry ratios, as 5001.202 asks lenders to compare projections with RMA or similar data.
    7. Raw material supply and freight, including rail or highway access.
    8. Environmental permits for air, water and waste, with status and dates.
    9. The Department of Labor concurrence where the loan exceeds $1,000,000 and creates more than 50 jobs.
    10. Sponsor and management depth for the specific process.

    Risks and mitigants in Arkansas

    Customer concentration and contract expiry come first; mitigants are multi-year contracts, diversified buyers and cash reserves. Large-project timing risk applies to suppliers whose demand depends on announced plants. Labour competition near the steel and defense clusters can raise wages faster than the pro forma, so the study runs a wage sensitivity. Commodity and energy prices move margins; the study shows a margin squeeze case. Specialised equipment has limited resale value, so collateral is discounted heavily and the lender relies on cash flow, guarantees and equity.

    Lender package and common reasons for return

    The sponsor supplies the business plan, customer contracts or letters of intent, equipment quotes and layout, site and utility letters, permits, three years of financial statements for an existing company, interim statements, personal financial statements and management resumes. The lender submits the B&I application to Rural Development in Little Rock. Studies are returned when they assume full utilisation in year one, cite announced megaprojects as guaranteed demand, use state average wages for a high-wage county, or omit working capital for receivables.

    Arkansas program example

    Zy-Ax Qozb LLC, Manila (USDA REAP grant, 2024): $1,000,000 for a 1.27 MW solar system serving a factory, part of an October 2024 round that funded 21 Arkansas projects with more than $6.6 million, according to the hub. It shows USDA energy funding reaching a Mississippi County manufacturer. It was awarded under the earlier REAP rules; under the rule effective 16 October 2026 the grant cap for renewable systems is $500,000 and 25 percent of cost. It is a public record, not an engagement of this firm. The hub names no Arkansas manufacturing B&I guarantee; USAspending lists 7 B&I guaranteed loans statewide for FY2024 through FY2026, all sectors combined.

    Hiring a USDA manufacturing feasibility study consultant in Arkansas

    For a newly formed manufacturer with a B&I guarantee above $1,000,000, Part 5001 requires a study from an independent qualified consultant acceptable to the Agency, and the Agency sets its scope (5001.306(a)(3)(i)); Loan B is in that position. An established company expanding with a smaller loan is in the Agency's discretion, which is often exercised when a new product line or new customer base changes historic cash flow (5001.306(a)(3)(ii)).

    The site's cost page puts a standard B&I engagement (loans of $1 million to $10 million, established asset class, single site) at $6,900 to $12,500 over six to seven weeks, and complex engagements (above $10 million, multi-site, phased or limited data) at $10,500 to $14,500 over seven to nine weeks. The fee is fixed in a written proposal and covers the economic, market, technical, financial and management components, the projection model, sensitivity tables and the acceptance guarantee; engineering, environmental assessments and appraisals are separate engagements. A manufacturing feasibility study consultant should ask early for your customer contracts and equipment quotes, since those two documents decide most of the review. The homepage explains what to expect from a USDA feasibility study consultant on an industrial file.

    Send the plant location, products, job count, project cost and lender status through the contact page; a senior analyst replies within one business day, according to the page.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does an Arkansas manufacturing project need a USDA feasibility study?

    A new business borrowing more than $1,000,000 with a B&I guarantee must have one; that is the fixed rule in Part 5001. Existing Arkansas manufacturers are in the Agency's discretion, which is usually exercised when an expansion changes the company's products, customers or cash flow. Since the typical Arkansas manufacturing 7(a) loan was $756,763 in FY2020 to FY2026, larger B&I plant loans commonly cross the line.

    How much does a manufacturing feasibility study consultant cost in Arkansas?

    The cost page quotes $6,900 to $12,500 when the plant is a standard B&I engagement and $10,500 to $14,500 when it is complex, and the fee is fixed before signing. A single-site plant with clear customers fits the standard band; a phased plant, a project above $10 million or a new process with few comparable operations is complex. On the $6,000,000 example loan, USDA's upfront guarantee fee is $144,000.00, which puts the study fee in proportion.

    How long does an Arkansas manufacturing study take?

    The cost page schedules standard engagements at six to seven weeks and complex ones at seven to nine; a compressed three to four week delivery costs 20 to 35 percent more. The schedule depends on how quickly customer contracts, equipment quotes and utility letters arrive. If the project will create more than 50 jobs on a loan above $1,000,000, the Department of Labor step adds time to the overall closing.

    Who can prepare a manufacturing study that USDA accepts?

    An independent consultant with the knowledge and experience for the task and acceptable to the Agency, with no interest in the borrower, equipment vendors, contractor or lender. There is no USDA certification for consultants; acceptability is judged on the file by the Little Rock reviewers. Engineering reports and vendor performance guarantees are inputs to the technical section but do not replace the study.

    How long does a manufacturing feasibility study stay valid?

    Part 5001 does not date-stamp a study. The cost page's guidance is that USDA looks for data no older than about 18 months, and a plant appraisal used at closing cannot be more than a year old (5001.203). Customer contracts and commodity prices change faster than that, so a study whose contract schedule or price deck is stale should be updated before the conditional commitment.

    Can the same study support an SBA 504 and a USDA B&I loan?

    Yes, if both lenders are named as users and the model shows both structures. Arkansas manufacturers used 7(a) for 90 loans and 504 for 7 in FY2020 to FY2026, and SBA may require a feasibility study for either (13 CFR 120.160(b)). B&I adds the rural test, Part 5001 equity, the five-component study standard and, for large job counts, the Department of Labor step.

    Can a supplier to the Osceola steel or Camden defense projects rely on those projects for demand?

    Only with contracts or strong letters of intent. The hub reports a $1.9 billion U.S. Steel facility in Osceola and munitions and missile expansion around Camden, but announced projects can slip, and construction-phase demand ends. The study should model the supplier's revenue from signed volumes, run a delay case, and show how the plant performs if the anchor customer buys less than planned.

    Does Smackover lithium create B&I opportunities in South Arkansas?

    Possibly, for service, fabrication and logistics firms, but the hub notes that the Standard Lithium and Equinor South West Arkansas project, targeting 22,500 tonnes a year and first production in 2028, had not taken a final investment decision as of May 2026. A lender will treat lithium-dependent demand as speculative until contracts exist, and the study should show a case with no lithium revenue.

    Can my plant qualify for the reduced 1 percent B&I fee?

    It may, if it meets one of the 5001.454 criteria the hub lists: a distressed or persistent-poverty location, local ownership with a natural-resource value-added product, a new market for existing local businesses, or a multi-jurisdictional strategic plan. Reduced-fee authority is capped each year, so the lender requests it and USDA decides. On Loan B, the fee would fall from $144,000.00 to $48,000.00.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. REAP final rule, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. USAspending.gov, prime awards by assistance listing, FY2024 to FY2026: https://www.usaspending.gov/
    10. Hub sources reused: U.S. Steel Osceola (https://www.arkansasonline.com/news/2026/apr/29/new-big-river-steel-facility-to-cost-19b-support/), MISA (https://www.arkansasedc.com/news-events/newsroom/detail/2026/04/23/misa-to-open-steel-processing-plant-in-mississippi-county), R2S Camden (https://www.arkansasedc.com/news-events/newsroom/detail/2025/11/21/r2s-opens-new-manufacturing-facility-in-east-camden--arkansas), Smackover lithium (https://www.sec.gov/Archives/edgar/data/0001537137/000117184326003677/exh_991.htm), USDA RD Arkansas REAP release, October 2024 (https://www.rd.usda.gov/newsroom/news-release/updated-21-rural-arkansas-projects-receive-more-66-million-federal-clean-energy-investments)
    11. Site pages: /industrial-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours