USDA Feasibility Study for Solar and Renewable Energy (REAP) in Arkansas

    NAICS 221114

    Arkansas rural businesses and farms took 70 REAP grants in FY2024 to FY2026, according to USAspending, and the hub lists awards from $223,914 for a lumber company to $1,000,000 for a 1.27 MW factory system in Manila. Those grants were made under rules that no longer apply. Since 16 October 2026 a REAP grant is at most 25 percent of project cost and $500,000 for a renewable system, and the project must be built and running with 12 months of data before the owner applies. Arkansas added its own change earlier: Act 278 of 2023 moved new systems from one-to-one net metering to avoided-cost export credits. A USDA solar feasibility study in Arkansas therefore has to show that the system pays its own way on self-consumed power, financed by a loan and equity, with any grant treated as later upside.

    Solar and renewable energy in Arkansas: market evidence

    Arkansas: solar and other renewable power generation, supply and rural footprint

    MeasureArkansasUnited States
    Establishments, 2019 → 20230 → 11 (n/a)405 → 942
    Per 100,000 residents (2023)0.40.3
    Average employees per establishment20.012.3
    Average annual pay per employee$134,800$138,631
    Share of state population in non-metro counties (2025)38.0%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Why the market table is thin, and what replaces it. The Census category counts power-generating businesses (solar, wind and other renewable generation), not the farms, factories and shops that install a system for their own use. Arkansas had 11 such establishments in 2023 with 220 employees, and none in the 2019 file under the same codes, so the 2019 to 2023 change cannot be computed. No county has three or more, so none is published. SBA has made one Arkansas 7(a) loan in the category since FY2010, for $14,100. For a REAP project, the market evidence is the borrower's own energy use, its utility tariff and the export credit for surplus power, not a count of generators.

    Regional context (computed)

    StateGeneration establishments, 2023Per 100k residentsSBA 7(a) loans since fiscal 2010
    Arkansas110.41
    Missouri30.12
    Mississippi80.31
    Louisiana70.20

    Computed from each state's own pack (Census County Business Patterns 2023; SBA 7(a) FOIA data as of 30 Sep 2026); neighbouring figures are theirs. Tennessee's pack reports implausible employment for this category and is left out.

    Every neighbouring state has the same thin record, which confirms that SBA and Census data say little about on-site solar. Nationally, only 31 SBA 7(a) loans in the category were approved in FY2010 to FY2016, and 4 of them (12.9 percent) were charged off, on average 51 months after approval: a small sample, but a reminder that a lender will want the energy model tested hard.

    The rule that now shapes every Arkansas project

    REAP itemRule effective 16 October 2026What the Arkansas study must show
    TimingProject Period ends 12 to 24 months before the application (12 to 36 in the first window)the loan finances construction; the grant comes later, if at all
    Data12 months of actual production or savings and 12 months of pre-installation datametered results reconciled with the estimate
    Grant size$1,500 minimum; $500,000 maximum for renewable systems, $250,000 for efficiencya smaller share of large systems
    Cost sharegrant at most 25% of project costthe remaining 75% from loan and equity
    Combined REAP fundinggrant plus REAP guaranteed loan at most 75% of costa large guaranteed loan leaves little room for a grant
    Croplandground-mount solar or wind on cropland ineligiblesite screening on Delta farms first
    Sizingground-mount systems must match historical use; storage at most 120% of prior annual useload analysis is mandatory
    Economicssimple payback no longer than useful lifepayback is an eligibility test
    ExclusionsEV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projectsscope these out
    Foreign componentsparts from a foreign adversary under 15 CFR 791.4 make a solar or wind system ineligiblecountry of origin for every component
    Applicantone application per federal fiscal year per highest-level owner; site controlled 12 months before the Project Periodownership and site control evidence
    Installerslicensed in the state, three similar installations; procurement under 2 CFR 200.318 to 200.327installer qualifications
    Competitionno state competitions: one for requests of $20,000 or less, one nationalthe national scoring factors drive the case

    From the REAP final rule, 91 FR 62600 (1 Oct 2026), as summarised in FACTS_REAP_RULE.md.

    Rural footprint and eligibility in Arkansas

    Thirty-eight percent of Arkansans live in non-metro counties, and REAP is built for them: rural small businesses and agricultural producers. A REAP guaranteed loan uses the Part 5001 rural-area definition (7 CFR 5001.3), which removes cities over 50,000 at the 2020 census and their contiguous urbanized areas; Arkansas has nine such cities. The cropland rule matters more in Arkansas than in most states, because Delta row-crop farms are the obvious place for a ground-mount array and the rule now excludes ground-mount solar on cropland as defined in 7 CFR 718.2. Rooftop and non-cropland ground mounts on poultry, aquaculture and processing sites remain open. The Arkansas state page lists the excluded cities and area offices.

    The borrower must clear 7 CFR 5001.127 for the guaranteed loan (a farm or firm with unpaid federal court judgments, overdue federal tax or loans, or a federal debarment, counting its principal owners, cannot borrow), and the REAP rule adds its own applicant limits: one application per fiscal year per highest-level owner and its affiliates, and site control for at least 12 months before the Project Period.

    Program fit

    REAP now works in two steps. First, the system is financed and built, using the REAP guaranteed loan (80 percent guarantee, 1.0 percent fee and 0.25 percent retention in FY2026) under 7 CFR 5001, which FACTS_REAP_RULE.md says USDA names as the source for up-front costs, or a bank loan and equity. Second, after the Project Period and 12 months of data, the owner may compete for a grant of up to 25 percent of cost, subject to the 75 percent combined cap. The hub puts Arkansas's position plainly: solar pencils only on self-consumption, with REAP treated as possible upside rather than construction capital. Whether B&I can finance a solar system is not settled in the inputs, so this page uses the REAP guaranteed loan. SBA 7(a) and 504 can finance a business's own system as equipment or real estate improvement. Utility tariffs (Entergy, SWEPCO, OG&E or an electric cooperative, as the hub lists) set the value of each kilowatt-hour saved.

    Financing benchmarks: USDA B&I next to SBA

    Arkansas: SBA lending to solar and other renewable power generation

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY20160$00$0
    FY2017 to FY20190$00$0
    FY2020 to FY20231$14,1000$0
    FY2024 to FY20260$00$0

    Average 7(a) loan, FY2020 to FY2026: $14,100. Arkansas had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermREAP guaranteed loan, fiscal 2026B&I, fiscal 2026 (for comparison)
    Guarantee80%85% below $5 million
    Upfront fee1.0% of guaranteed amount3.0%
    Annual retention0.25%0.55%
    Fee if guarantee issues before completionadditional 0.50%additional 0.50%
    Combined with REAP grantgrant plus loan at most 75% of costnot applicable
    Rural test7 CFR 5001.37 CFR 5001.3

    Fee rates from 91 FR 11272; the 75 percent cap from 91 FR 62600.

    What it means for an Arkansas system. SBA data give no benchmark: one $14,100 loan in Arkansas, and a national average of $478,591 across 138 loans in FY2020 to FY2026. The REAP guaranteed loan is cheaper to guarantee than B&I (1.0 percent against 3.0 percent upfront), but the combined cap means a borrower who takes a large REAP loan leaves less room for a grant. The owner must decide before construction whether to finance 75 percent with debt and forgo the grant, or finance 50 percent and bridge the other 25 percent with cash until a grant that may not be awarded.

    Worked example (illustrative)

    Both cases use an illustrative $1,000,000 system at an Arkansas farm or plant, financed with a REAP guaranteed loan at a hypothetical 7.25 percent fixed rate over 20 years. Case 1 borrows 75 percent and takes no grant. Case 2 borrows 50 percent and assumes the owner later wins the maximum 25 percent grant, keeping grant plus loan at 75 percent.

    Input or resultCase 1: loan onlyCase 2: loan plus maximum grant
    Total project cost (illustrative)$1,000,000.00$1,000,000.00
    REAP grant (at most 25% of cost, $500,000 cap)$0.00$250,000.00
    Loan amount$750,000.00$500,000.00
    Program and fee scheduleREAP guaranteed loan, fiscal 2026REAP guaranteed loan, fiscal 2026
    Guarantee percentage80%80%
    Guaranteed amount$600,000.00$400,000.00
    Upfront guarantee fee rate1.00%1.00%
    Upfront guarantee fee$6,000.00$4,000.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$9,000.00$6,000.00
    Annual retention fee rate0.25%0.25%
    First annual retention fee (on the guaranteed share of the balance after 12 payments)$1,465.35$976.90
    Interest rate (illustrative, fixed)7.25%7.25%
    Amortization in years (no balloon)2020
    Monthly payment$5,927.82$3,951.88
    Annual debt service (NOI for 1.00x)$71,133.84$47,422.56
    NOI for 1.25x coverage$88,917.30$59,278.20
    Quarterly debt service$17,783.46$11,855.64
    Coverage at that NOI if the rate is 2 points higher1.08x1.08x
    Coverage at that NOI if NOI falls 15%1.06x1.06x
    Owner funds needed (cost less loan and grant)$250,000.00$250,000.00

    Computed in Python from the inputs shown; REAP guaranteed loan rates from 91 FR 11272; grant and cap from 91 FR 62600.

    Savings test. The system must produce annual savings (avoided purchases at the retail tariff plus export credits at avoided cost) net of operating and maintenance costs of at least $88,917.30 in Case 1 for 1.25x coverage, or $59,278.20 in Case 2. Under Act 278, power exported to the grid earns avoided-cost credits, so the study counts self-consumed kilowatt-hours at the retail rate and exports at the lower credit; oversizing a system raises exports and lowers savings per kilowatt-hour.

    Payback test. At the Case 1 savings level, simple payback on the $1,000,000 cost is 11.2 years; at the Case 2 level, 16.9 years. Under the new rule, payback must not exceed the system's useful life, so the study states the useful life it relies on and shows the calculation.

    Bridge test. In Case 2 the owner funds $500,000 at completion and recovers $250,000 only if the grant is awarded, at least 12 months later. The owner's net contribution is $250,000.00 in both cases; what changes is debt service ($71,133.84 against $47,422.56 a year) and who carries the risk that the grant is not awarded.

    Building the energy case without local comparables

    • Twelve months or more of utility bills and interval data, by meter, and the pre-installation baseline the rule requires.
    • The applicable tariff and Act 278 export credit for the borrower's utility, and whether the site is on legacy net metering (systems interconnected before 30 September 2024 kept one-to-one credit, per the hub).
    • A production estimate for the specific array, reconciled to load so that exports are minimised.
    • A cropland determination for any ground-mount site, and a country-of-origin list for every component.
    • Installer qualifications (state licence, three similar installations) and procurement records.
    • For storage, prior annual use, since storage is capped at 120 percent of it.

    What a lender-grade solar feasibility study in Arkansas must prove

    1. Load-matched self-consumption modelling, the first item in the hub's reviewer test.
    2. A no-grant base case that covers debt service.
    3. The utility tariff and export credit, by utility.
    4. The build-first REAP sequence: financing, construction, 12 months of data, then a grant application.
    5. Eligibility under the new rule: not cropland ground-mount, no excluded uses, no foreign-adversary components, one site, one application per owner per year.
    6. Simple payback within useful life.
    7. Installer qualifications and procurement.
    8. Interconnection approval and timing.

    Risks and mitigants in Arkansas

    Export economics are the main Arkansas risk after Act 278; the mitigant is sizing to load. Grant risk is real because the program is now a national competition; the mitigant is a no-grant base case. Hail and severe storms call for insurance priced on current quotes. Equipment supply risk now includes the foreign-component rule. Agricultural loads vary with seasons and markets, so poultry houses and fish farms should model load by month.

    Documents and the review path

    The owner provides utility bills and interval data, the installer's proposal and qualifications, component lists with origin, the site's land use and cropland status, interconnection application, and business and owner financial statements; the lender's REAP loan application then goes to Little Rock. Energy studies are sent back when they count export at retail rates, assume the grant in the base case, ignore the cropland rule, or rely on a production estimate never reconciled to load.

    Arkansas program example

    The hub lists REAP grants made in October 2024, under the earlier rules: Zy-Ax Qozb LLC, Manila, $1,000,000 for a 1.27 MW factory solar system; Keo Fish Farms ($751,842), Saul Minnow Farms ($699,821), Twin Lakes Farm II in Earle ($655,800), Mountain Top Poultry in Floral ($375,000), South Central Pallets in Hatfield ($250,000) and Mountain Home Lumber ($223,914). That round paid more than $6.6 million to 21 Arkansas projects. Several of those amounts exceed today's $500,000 cap, and all were granted before a project had to be built and operating, so they show the type of borrower, not the terms now available. The list is USDA's; none of these was this firm's engagement.

    Hiring a USDA solar feasibility study consultant in Arkansas

    A REAP guaranteed loan sits in Part 5001, so the Part 5001 study rule follows it: above $1,000,000 to a start-up borrower, the independent study is compulsory, and below that the Agency chooses. Most Arkansas farm and plant systems are below that size, but lenders still expect an energy model that survives without the grant.

    The site's cost page prices REAP studies at $4,900 to $8,500 over four to five weeks where the loan is under $600,000, as in Case 2, and at $7,500 to $11,500 over five to seven weeks for guaranteed loans above $600,000, as in Case 1, which adds full projections, debt service coverage and interconnection and rate modelling. Grant application drafting is not included. A solar feasibility study consultant in Arkansas should begin with your utility bills and tariff. Our homepage outlines what a USDA feasibility study consultant checks on energy projects.

    Request a proposal on the contact page (program USDA REAP) with the site, utility, annual use, planned system size and cost.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does an Arkansas REAP solar project need a feasibility study?

    For a REAP guaranteed loan above $1,000,000 to a new business, Part 5001 requires an independent study. For smaller loans the lender and USDA decide, and under the October 2026 rule the energy assessment, metered data and payback test do much of the same work. Lenders financing construction before any grant will usually want the model tested independently.

    What does a solar feasibility study consultant cost in Arkansas?

    The cost page lists REAP studies at $4,900 to $8,500 when the loan is under $600,000 and $7,500 to $11,500 for guaranteed loans above $600,000, fixed in the proposal. USDA's upfront fee on the $750,000 Case 1 loan is $6,000.00, at the REAP rate of 1.0 percent of the guaranteed share.

    How long does a REAP solar study take?

    Four to five weeks for the smaller REAP scope and five to seven weeks for a guaranteed loan above $600,000, on the cost page, and a faster schedule can be bought. Having twelve months of interval data and the utility's tariff and export terms ready at kickoff is the main way to stay on schedule.

    Who can prepare a solar study for a REAP loan?

    A consultant with energy-modelling experience who is independent of the installer, the equipment suppliers or the lender, and whom Rural Development will accept; there is no published roster. The installer's production estimate is an input to test, and the rule separately requires a state-licensed installer with three similar installations, so the study and the installation are different roles.

    How long is a solar feasibility study valid?

    The study has no regulatory expiry, though USDA reviewers want data under about 18 months old, per the cost page. Under the new REAP rule the grant application uses actual production and savings data from the first 12 months of operation, so the pre-construction study supports the loan and the later application relies on metered results.

    Can one study serve an SBA loan and a REAP guaranteed loan?

    In principle, with both lenders named and both loans modelled. Arkansas has only one SBA 7(a) loan in the generation category since FY2010, so SBA financing of on-site systems is more often classed under the borrower's own industry. The REAP version adds the rule's eligibility tests, the combined 75 percent cap and the payback test.

    Is the REAP grant still 50 percent?

    No. Under the rule effective 16 October 2026, a grant covers at most 25 percent of project cost, with a $500,000 maximum for renewable systems and $250,000 for efficiency, and grant plus REAP guaranteed loan may not exceed 75 percent of cost. The grant is paid only after the project has been built and has 12 months of operating data.

    Can an Arkansas row-crop farm put ground-mount solar on cropland?

    Not with REAP. The October 2026 rule makes ground-mount solar or wind on cropland, as defined in 7 CFR 718.2, ineligible, and bars retrofits of such systems. Rooftop systems on barns, poultry houses or shops, and ground mounts on land that is not cropland, remain possible, so the study begins with a site screen.

    How does Act 278 change the numbers?

    According to the hub, Act 278 of 2023 moved new Arkansas systems from one-to-one net metering to avoided-cost export credits, while systems interconnected before 30 September 2024 kept one-to-one credit. Power used on site still saves the retail rate, but exported power earns less, so systems should be sized to the owner's load and modelled hour by hour or month by month.

    Sources

    1. USDA RBCS, REAP final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026: https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    2. USDA RBCS, Notice of Rescission of Funding Opportunity for REAP, 91 FR 20090 (15 Apr 2026): https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm
    3. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    4. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    5. U.S. Census Bureau, County Business Patterns 2019 and 2023: https://www2.census.gov/programs-surveys/cbp/datasets/
    6. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    7. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    8. USAspending.gov, prime awards by assistance listing (10.868), FY2024 to FY2026: https://www.usaspending.gov/
    9. Hub sources reused: net metering and Act 278 (https://www.uaex.uada.edu/environment-nature/energy/solar/net-metering.aspx); USDA RD Arkansas REAP release, October 2024 (https://www.rd.usda.gov/newsroom/news-release/updated-21-rural-arkansas-projects-receive-more-66-million-federal-clean-energy-investments)
    10. Packs for Missouri, Mississippi and Louisiana (same Census and SBA sources, each state's own figures)
    11. Site pages: /renewable-energy-feasibility-study-usda, /usda-reap-feasibility-study, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.