Education & Training · Community Facilities
Rural education and workforce development infrastructure supports the long-term viability of rural communities. USDA Community Facilities financing supports K-12 school districts, community colleges, career and technical education centers, adult education operations, and distance learning infrastructure. This page covers facility types, workforce needs assessment methodology, revenue structure, community college partnership frameworks, and five-component feasibility work for rural education projects, together with the Community Facilities rules confirmed from the current regulations, national enrollment and school data, and worked examples for a nonprofit school and a for-profit training center.
Request a Proposal · Read CF Program
Short answer
An education facility feasibility study for USDA is the report that shows Rural Development and the lender that a rural school, college center or training facility will enroll enough students, and receive enough tuition, per-pupil funding, taxes or contracts, to run the building and repay the debt for the life of the loan. Public bodies, nonprofits and tribes use Community Facilities (CF): CF direct loans and grants are limited to cities, towns and unincorporated areas of 20,000 people or fewer and always need a financial feasibility report [3][4]; CF guaranteed loans use the 50,000-population rural test, need a financial feasibility report, and need an independent feasibility study above $1,000,000 for a new entity or new activity [1]. For-profit schools and training companies use Business and Industry (B&I), which lists educational or training facilities not eligible for CF [1].
Rural schools are a large market: in fall 2022, 27,688 of the country's 99,388 public schools (27.9%) were in rural locales, enrolling 9.99 million students [12]. Private education and training businesses are far more metropolitan: of 88,369 private schools, junior colleges, technical and trade schools and other instruction providers placed in a county in 2023, 5.6% were in non-metro counties [5][6][7]. USAspending shows 1,717 Community Facilities awards in the 50 states and DC from FY2024 to FY2026 [10]. Data current as of November 2026.
| Question | Answer |
|---|---|
| Primary program | USDA Community Facilities: direct loans, grants and guaranteed loans for public bodies, nonprofits and tribes [1][3][4] |
| Population limit | CF direct and grants: towns of 20,000 or less [3][4]; CF guaranteed: outside cities over 50,000 and their urbanized areas, with funds reserved first for places of 20,000 or less [1] |
| CF guaranteed terms, FY2026 | 80% guarantee; 1.25% fee; 0.50% annual retention fee; up to $100 million per borrower [1][2] |
| CF direct terms | Rate set quarterly in three tiers (poverty line rate up to 5%, intermediate up to 7%, market); term up to 40 years, the useful life or state law, whichever is less [3] |
| Is a study required? | CF: a financial feasibility report always; an independent study over $1,000,000 to a new entity or new activity [1][3]. B&I: an independent study over $1,000,000 to a new business [1] |
| For-profit schools and training | B&I, which lists educational or training facilities when not eligible for CF [1]; FY2026 85% under $5 million [2] |
| Fee and timeline on this site | Community Facilities studies $6,900 to $12,000 (6 to 8 weeks); combined loan and grant packages $9,500 to $18,000 (7 to 10 weeks) [13] |
Rural Education Infrastructure as Economic Development
Rural education facility projects occupy an unusual position in USDA's portfolio. They are among the most durable asset classes: K-12 districts, community colleges, and workforce development institutions operate on multi-decade time horizons, with revenue sustainability rooted in statutory funding structures rather than commercial markets. They also carry some of the highest community impact of any CF-financed asset class. Rural school consolidations, community college satellite development, and career and technical education facility investment directly shape the workforce pipeline that rural economic development depends on.
The analytical work behind rural education feasibility differs from commercial facility work on multiple dimensions. Service population analysis replaces commercial market analysis: enrolled students rather than paying customers, projected enrollment rather than captured market share. Revenue sustainability rests on state aid formulas, property tax bases, and federal grant streams rather than tuition and fee revenue alone. Competitive analysis addresses other educational providers and program alternatives rather than commercial substitutes. For workforce development and CTE facilities, employer partnership documentation and workforce gap analysis carry weight that no commercial market analysis parallels.
The rest of this page walks through the six education facility categories CF supports, workforce needs assessment methodology for CTE and training projects, revenue structure analysis, community college partnership frameworks, the five-component analytical work applied to education projects, and the failure modes we see most often in studies that trigger USDA reviewer challenges. For adjacent rural community infrastructure, see the childcare feasibility study page and the broader CF program page.
As a feasibility study company organized around USDA lending, we scope education facility engagements against the specific program the project routes through, whether B&I, Community Facilities, REAP, or another OneRD guarantee.
What the study is, and when USDA requires one
Community Facilities has three tracks, and each has its own study rule. The financial feasibility report is the common thread: USDA wants proof that taxes, assessments, revenues, fees or other income will cover operation and maintenance, debt payments and reserves [1][3].
| Financing route | Study rule | Source |
|---|---|---|
| CF direct loan | Every applicant provides a financial feasibility report by a qualified firm or individual; a firm with no interest in the facility's management or construction prepares it when the project depends on its own revenues or USDA asks | 7 CFR 1942.17(h)(1) |
| CF grant | The grant is limited to the minimum needed for feasibility, judged on the same revenue tests | 7 CFR 3570.61(d) |
| CF guaranteed loan | A financial feasibility report by a qualified firm or individual acceptable to the Agency, always | 7 CFR 5001.304 |
| CF guaranteed, over $1,000,000 to a new entity or an entity conducting a new activity | An independent feasibility study by a qualified consultant; the Agency sets the scope | 5001.304(a)(4)(i) |
| CF guaranteed, other loans | A financial feasibility analysis (which may be the lender's credit evaluation) for loans of $25 million or less to existing facilities, loans secured by general obligation bonds or tax revenue, or borrowers whose three years of audited statements show they can pay; otherwise a financial feasibility study with an examination opinion under AICPA attestation standards | 5001.304(a), (b) |
| B&I loan over $1,000,000 to a new business (for-profit school or training center) | Independent study by a qualified consultant acceptable to the Agency | 5001.306(a)(3)(i) |
| SBA 7(a) or 504 (for-profit only) | SBA may require a feasibility study | 13 CFR 120.160(b) |
Part 5001 defines a feasibility study as an independent consultant's opinion on the economic, market, technical, financial and management feasibility of the project [1]. A charter school opening its first campus, a nonprofit academy adding a high school it has never run, or a community college opening a center in a new county are each new activities for this rule. The examination opinion is a different product: an accountant's attestation under AICPA standards by a preparer carrying professional liability insurance, required when none of the analysis conditions is met [1]. Sponsors should find out early which report their lender and the State Office expect.
Which program fits which school
| Borrower | Best-fitting route | Why | Watch-outs |
|---|---|---|---|
| Public school district in a town of 20,000 or less | CF direct loan, often with a CF grant | Long term, rates tied to municipal bond yields or below for lower-income areas [3][4] | Must certify it cannot borrow elsewhere at reasonable rates and terms [3]; many districts can, through tax-exempt bonds |
| Public school district in a larger rural area | Tax-exempt bonds; CF guaranteed only for taxable debt | CF guaranteed interest cannot be tax-exempt [1] | The guarantee rarely beats a tax-exempt bond |
| Nonprofit private school, charter school or academy | CF direct (20,000 or less) or CF guaranteed (rural under 50,000) | Nonprofits with significant community ties are eligible borrowers; education is excluded from "inherently commercial" [1][3] | Charter term and renewal, enrollment, state funding |
| Public or nonprofit community college center | CF direct, grant or guaranteed | Community and educational facilities are essential community facilities [1][3] | Parent-institution support, enrollment by program |
| Mission-driven economic development organization running a training incubator | CF guaranteed | Business incubators that provide training and workforce development are listed CF facilities when not inherently commercial [1] | Must show the listed support services |
| For-profit school, trade school or training company | B&I; SBA 7(a) or 504 | B&I lists educational or training facilities not eligible for CF [1] | New-business equity of 20% to 25% [1] |
| Distance learning equipment | Distance Learning and Telemedicine grant | Equipment grants with a 15% match; buildings and land are not eligible [11] | Annual competition |
Community Facilities rules confirmed from the current regulations
Who may borrow
CF guaranteed borrowers must be public bodies, tribes or nonprofits; a corporation organized under for-profit law may qualify if it will be operated on a not-for-profit basis for the life of the loan; nonprofits other than public bodies and tribes need significant ties to the service area, shown by association with or control by a public body or by broadly based local membership [1]. Every CF guaranteed borrower certifies that it cannot finance the project from its own resources or commercial credit without the guarantee, and provides a certification of support from each affected local government [1]. CF direct applicants meet parallel tests: public bodies, nonprofits with significant ties, and tribes, with the credit-elsewhere certification [3].
What CF will and will not finance at a school
| Item | Treatment | Rule |
|---|---|---|
| Classrooms, labs, gymnasiums, libraries, cafeterias, career and technical centers | Eligible community, social, educational or cultural facilities | 5001.103(a)(3); 1942.17(d) |
| Playground and recreation components of a school | Eligible as part of an otherwise non-recreational facility | 5001.103(a)(10) |
| Educational telecommunications equipment | Eligible when not eligible for RUS financing | 5001.103(a)(6) |
| Renewable energy for the school's own use | Eligible if it serves the facility, sells no power, and includes a technical report | 5001.103(a)(8) |
| Space leased to commercial tenants | Allowed if under 25% of floor space and related to the school's purpose | 5001.103(d) |
| Buying an existing building | Allowed with an appraisal showing a fair price and a plan to improve it or avoid a loss of service | 5001.103(e) |
| Initial operating expenses, working capital, recurring costs | Not with CF guaranteed loan funds | 5001.122(m) |
| Construction completed before applying | Ineligible for CF guarantees | 5001.116(c) |
| Rooms used for inherently religious instruction or worship | Ineligible; religious organizations may take part if religious activities are separate | 5001.115(r) |
| Sale-leaseback mainly to retire the seller's debt | Ineligible | 5001.116(e) |
Population tests
| Track | Population limit | Source |
|---|---|---|
| CF direct loans | Not in a city or town of more than 20,000 under the most recent decennial census | 1942.17(b)(1)(i)(B), (b)(2)(iii) |
| CF grants | A city, town or unincorporated area of 20,000 or less | 3570.53 |
| CF guaranteed loans | The 5001.3 rural area: outside cities or towns over 50,000 and their contiguous urbanized areas; funds reserved first for places of 20,000 or less (100% of the first $200 million, 50% of the next $200 million, 25% above $400 million), released on 1 July for places up to 50,000 | 5001.3, 5001.103(c), 5001.316(e) |
| B&I (for-profit) | The 5001.3 rural area | 5001.3 |
CF guaranteed priority points
Applications score up to 55 points: 15 for a community under 20,000; 10 for a public safety, health clinic, early education, primary or secondary education facility; 5, 10 or 15 for committing other funds of 5% to 19%, 20% to 49% or 50% and more; and up to 15 Administrator points from a National Office reserve [1]. A rural K-12 or early learning project in a small town that brings half its own funding starts with 40 points.
CF direct loan terms
| CF direct rate tier (7 CFR 1942.17(f)) | Who qualifies | Rate rule |
|---|---|---|
| Poverty line rate | Project needed to meet a health or sanitary standard and service-area median household income below the poverty line or below 80% of the state non-metro median (health care facilities exempt from the standard test) | Not more than 5% a year |
| Intermediate rate | Service-area median household income not more than 100% of the state non-metro median, project not eligible for the poverty rate | Poverty rate plus half the gap to the market rate, not more than 7% |
| Market rate | All other loans | Set from the average of the Bond Buyer index for the four weeks before the first Friday of the last month before the quarter |
| Prime or unique farmland surcharge | Project uses or builds on prime or unique farmland | Plus 2 percentage points on the rate above |
The repayment period may not exceed the useful life of the facility, the limit in state statute, or 40 years, whichever is less; principal may be deferred for up to 36 months after the first interest installment [3]. Borrowers pledging facility revenue ordinarily build a reserve equal to one average installment, at a tenth of the total a year [3]. Rural Development publishes the rates each quarter; this page uses an illustrative rate below and does not state the current quarter's figures.
CF grant shares
Grants may supplement CF loans for up to 75% of project cost on a graduated scale tied to community size and the median household income of the population served, compared with the state's non-metropolitan median [4]:
| Maximum grant share | Community population | Median household income of the population served | Most grant on a $4,000,000 project | Left to loans and other funds |
|---|---|---|---|---|
| 75% | 5,000 or less | below the higher of the poverty line or 60% of state non-metro median household income | $3,000,000 | $1,000,000 |
| 55% | 12,000 or less | below the higher of the poverty line or 70% | $2,200,000 | $1,800,000 |
| 35% | 20,000 or less | below the higher of the poverty line or 80% | $1,400,000 | $2,600,000 |
| 15% | the section says 50,000 or less; the subpart's rural definition stops at 20,000 | below the higher of the poverty line or 90% | $600,000 | $3,400,000 |
CF grants cannot pay initial operating expenses, refinance debt, pay interest, or fund commercial rental space beyond a minor part of the facility [4]. Grant scoring awards 30 points for communities of 5,000 or less and 30 for incomes below 60% of the state non-metro median, plus 10 each for health care and public safety projects [4]; education earns no project-type points in the grant rule, which makes the income and population tests decisive for schools.
CF guaranteed terms
| Term | Rule |
|---|---|
| Guarantee | 80% for FY2026; 90% is the regulatory ceiling [1][2] |
| Guarantee fee / annual retention fee | 1.25% of the guaranteed amount / 0.50% of the guaranteed share of principal [2] |
| Extra fee if guarantee issued before construction completion | 0.50% [2] |
| Maximum per borrower | $100 million of CF guaranteed loans [1] |
| Term | Useful life of the project or collateral, up to 40 years or state law, whichever is less; no balloon [1] |
| Tax status | Interest may not be tax-exempt; a guaranteed loan cannot secure a tax-exempt issue [1] |
| Interest during construction | Up to three years until the facility is self-supporting [1] |
Six Education Facility Categories
Rural education facilities span multiple institutional categories with distinct regulatory frameworks, funding structures, and operational characteristics. CF program fit varies by category and applicant entity type.
K-12 Public School Facilities
Rural public school districts use CF financing for facility construction, major renovations, consolidation projects, and specialty facility additions (career and technical education centers, athletic facilities, performing arts spaces). Service population analysis works from enrolled student counts and projected enrollment trajectories. Revenue sustainability rests on property tax base, state aid formulas, and bond capacity rather than commercial revenue streams.
Career and Technical Education (CTE)
Dedicated career and technical education facilities, welding programs, automotive training, agricultural technology, healthcare training centers, and similar skills-based programs. Often structured through school districts, community colleges, or regional CTE consortia. Increasingly central to rural workforce development strategies and frequently paired with employer partnerships for curriculum development and graduate placement.
Community College Campuses and Centers
Rural community college campus construction, satellite center development, and specialty program facilities (nursing, allied health, trades, agricultural sciences). Community colleges serve rural workforce development more directly than four-year institutions and qualify as essential community facilities under CF. Partnership structures with K-12 districts for dual enrollment and with employers for apprenticeship programs extend impact.
Adult Education and Training Centers
Adult basic education, GED preparation, English language learning, workforce retraining, and career transition programs. Often operated by school districts, community colleges, nonprofit workforce development organizations, or public body workforce development councils. Small-to-mid-scale facilities typically serving specific community need populations.
Distance Learning and Technology Infrastructure
Broadband infrastructure, distance learning equipment, video conferencing systems, and technology platforms enabling rural access to programs not available locally. USDA operates the Distance Learning and Telemedicine (DLT) grant program specifically for this purpose, often layered with CF facility financing to deliver integrated rural education infrastructure.
Specialty Education Facilities
Early childhood centers (see also the dedicated Childcare feasibility page), special education facilities, alternative education programs, and charter schools where nonprofit-structured. Each carries distinct regulatory frameworks and program considerations but qualifies for CF where the applicant structure and rural location align with program requirements.
National market evidence: rural schools and the education economy
Public schools by locale
The National Center for Education Statistics counts every public school and assigns it a locale. Rural and town locales are not the USDA population tests, but they are the best national picture of where rural students are and how their numbers are moving.
| Locale | Schools, fall 2012 | Schools, fall 2022 | Enrollment fall 2012 (thousands) | Enrollment fall 2022 (thousands) | Enrollment change | Average school size, 2022 | Pupils per teacher, 2022 |
|---|---|---|---|---|---|---|---|
| All public schools | 98,454 | 99,388 | 49,520 | 49,308 | -0.4% | 514 | 15.4 |
| City | 26,545 | 27,008 | 15,026 | 14,656 | -2.5% | 560 | 15.8 |
| Suburban | 30,922 | 30,998 | 19,661 | 19,179 | -2.5% | 638 | 15.7 |
| Town (all) | 13,530 | 12,894 | 5,681 | 5,306 | -6.6% | 436 | 15.1 |
| Town, remote | 4,641 | 3,922 | 1,741 | 1,423 | -18.3% | 388 | 14.8 |
| Rural (all) | 27,457 | 27,688 | 9,152 | 9,994 | +9.2% | 372 | 14.6 |
| Rural, fringe | 10,368 | 11,578 | 5,193 | 6,260 | +20.5% | 560 | 15.5 |
| Rural, distant | 10,545 | 9,952 | 2,920 | 2,752 | -5.8% | 285 | 13.6 |
| Rural, remote | 6,544 | 6,158 | 1,039 | 983 | -5.4% | 164 | 12.2 |
Source: NCES, Digest of Education Statistics 2023, table 214.40 (Common Core of Data, fall 2012 and fall 2022); changes computed here [12].
The headline, rural enrollment up 9.2% in a decade, hides the pattern that matters for USDA. All of the growth is in rural fringe areas, the rural land at the edge of urbanized areas, where enrollment rose 20.5%. Distant and remote rural schools lost 5.8% and 5.4% of their students, and remote towns lost 18.3%. Rural fringe locations are often the places that fail USDA's population tests, because they sit beside urbanized areas; the communities that pass the CF 20,000 test most easily are the distant and remote ones where enrollment is shrinking. A rural school study therefore cannot borrow a national growth story. It has to project enrollment from the district's own births, kindergarten cohorts, transfers and housing starts, and test the debt against decline.
Small schools are also expensive schools. A remote rural school averaged 164 students and 12.2 pupils per teacher in fall 2022, against 514 and 15.4 nationally [12]. Fixed costs spread over fewer students are why the enrollment stress test later on this page breaks even close to the base case.
Private schools and training providers (County Business Patterns)
County Business Patterns counts private establishments with paid employees; public schools and public colleges are government and are not included [5]. That makes it the right source for nonprofit private schools, charter operators organized as private entities, and for-profit training businesses, the borrowers whose markets a study has to prove; the industry definitions are Census's 2022 NAICS descriptions [8].
| Census industry (NAICS) | Establishments 2019 | Establishments 2023 | Change | Avg employees | Avg pay | Non-metro (share of county-placed) | Rural concentration index |
|---|---|---|---|---|---|---|---|
| Elementary and secondary schools, private (611110) | 22,381 | 23,201 | +3.7% | 50.7 | $48,283 | 1,742 of 21,776 (8.0%) | 0.59 |
| Junior colleges, private (611210) | 779 | 681 | -12.6% | 69.0 | $44,716 | 0 of 395 (0.0%) | 0.00 |
| Colleges and universities, private (611310) | 4,088 | 3,989 | -2.4% | 466.9 | $56,181 | 51 of 3,056 (1.7%) | 0.12 |
| Technical and trade schools (6115) | 8,256 | 8,962 | +8.6% | 12.2 | $52,858 | 185 of 8,187 (2.3%) | 0.17 |
| Other schools and instruction (6116) | 54,753 | 59,138 | +8.0% | 8.5 | $24,788 | 2,983 of 58,011 (5.1%) | 0.38 |
| Educational support services (611710) | 9,663 | 12,227 | +26.5% | 11.6 | $61,473 | 242 of 11,088 (2.2%) | 0.16 |
| Child care services (624410) | 77,713 | 82,162 | +5.7% | 12.7 | $29,695 | 9,578 of 81,180 (11.8%) | 0.87 |
County Business Patterns 2019 and 2023; non-metro share on establishments the 2023 county file places in a county, OMB July 2023 delineation; rural concentration index is the non-metro share of establishments divided by the 13.6% non-metro share of population [5][6][7].
| Measure | United States |
|---|---|
| Establishments with paid employees, 2019 | 86,169 |
| Establishments with paid employees, 2023 | 91,982 |
| Change, 2019 to 2023 | +5,813 (+6.7%) |
| States (incl. DC) with at least one establishment, 2023 | 51 |
| Establishments per 100,000 residents, 2023 | 27.3 |
| Paid employees, 2023 (mid-March) | 1,836,083 |
| Annual payroll, 2023 | $77.16 billion |
| Average employees per establishment | 20.0 |
| Average annual pay per employee | $42,023 |
| Establishments the county file places in a county | 88,369 (96.1% of the national total) |
| Of those, in non-metro counties | 4,910 (5.6%) in 586 counties |
| Share of U.S. population living in non-metro counties, 2025 | 13.6% |
| Rural concentration index (non-metro share of establishments / non-metro share of population) | 0.41 |
Private education is concentrated in metropolitan counties: the combined set of private K-12 schools, junior colleges, technical and trade schools and other instruction providers has a rural concentration index of 0.41, and private junior colleges have no non-metro establishments in the county file at all. Private K-12 schools are the most rural of the group (8.0% non-metro), and child care (11.8%) is closer to the population. The gap is the market case for CF and B&I education projects in rural areas: few private providers, long travel distances to the nearest college or trade school, and employers who cannot find trained workers locally. It is also the risk: without competitors there are no local comparables for tuition, enrollment or completion rates, so the study has to build them from state data and from similar programs elsewhere. Technical and trade schools average $52,858 in pay per employee, a useful check on an instructor wage line.
Top states for private education and training providers
| State | Private K-12 schools (611110) | Technical and trade schools (6115) | Other schools and instruction (6116) | Combined (incl. junior colleges) | Non-metro share | USDA Community Facilities awards FY2024 to FY2026 | Related state page |
|---|---|---|---|---|---|---|---|
| California | 2,752 | 1,155 | 9,140 | 13,159 | 1.1% | 51 | California childcare page |
| Texas | 1,621 | 846 | 4,661 | 7,162 | 2.1% | 40 | Texas childcare page |
| New York | 1,766 | 427 | 4,717 | 6,963 | 2.4% | 93 | New York childcare page |
| Florida | 1,785 | 771 | 4,263 | 6,871 | 1.1% | 21 | Florida childcare page |
| New Jersey | 809 | 225 | 2,412 | 3,466 | 0.0% | 14 | New Jersey childcare page |
| Illinois | 886 | 359 | 2,156 | 3,422 | 2.9% | 37 | Illinois childcare page |
| Pennsylvania | 1,140 | 295 | 1,806 | 3,279 | 6.0% | 101 | Pennsylvania childcare page |
| Georgia | 715 | 227 | 1,716 | 2,685 | 5.0% | 24 | Georgia childcare page |
| Massachusetts | 538 | 187 | 1,917 | 2,659 | 2.0% | 21 | Massachusetts childcare page |
| Ohio | 843 | 283 | 1,466 | 2,629 | 7.1% | 75 | Ohio childcare page |
| Washington | 434 | 265 | 1,907 | 2,622 | 5.6% | 41 | Washington (no state childcare page yet) |
| North Carolina | 674 | 212 | 1,711 | 2,614 | 10.0% | 87 | North Carolina childcare page |
County Business Patterns 2023 [5]; USAspending Community Facilities award counts, FY2024 to FY2026 [10].
States where private education providers are most rural
| Rank | State | Non-metro establishments | County-placed establishments | Non-metro share | State population in non-metro counties | Leading non-metro counties |
|---|---|---|---|---|---|---|
| 1 | Vermont | 216 | 305 | 70.8% | 64.7% | Washington County (43); Windham County (40); Bennington County (23) |
| 2 | Maine | 174 | 409 | 42.5% | 39.8% | Kennebec County (39); Knox County (29); Hancock County (26) |
| 3 | New Hampshire | 200 | 541 | 37.0% | 36.9% | Merrimack County (69); Grafton County (46); Cheshire County (24) |
| 4 | Mississippi | 126 | 358 | 35.2% | 50.0% | Lauderdale County (16); Lowndes County (15); Pike County (12) |
| 5 | Alaska | 67 | 232 | 28.9% | 32.2% | Kenai Peninsula Borough (27); Juneau City and Borough (11); Sitka City and Borough (9) |
| 6 | Montana | 79 | 309 | 25.6% | 44.7% | Flathead County (36); Ravalli County (12); Park County (11) |
| 7 | Idaho | 118 | 502 | 23.5% | 25.9% | Latah County (24); Bonner County (20); Blaine County (14) |
| 8 | Iowa | 101 | 530 | 19.1% | 37.6% | Sioux County (18); Marion County (9); Cerro Gordo County (8) |
| 9 | Hawaii | 91 | 494 | 18.4% | 19.8% | Hawaii County (55); Kauai County (36) |
| 10 | New Mexico | 59 | 391 | 15.1% | 32.6% | Taos County (11); Eddy County (9); Grant County (6) |
States with at least 200 county-placed establishments (47 states) [5][7].
Non-metro counties with the most private schools and training providers
| Rank | Non-metro county | Private schools and training providers, 2023 |
|---|---|---|
| 1 | Merrimack County, NH | 69 |
| 2 | Hawaii County, HI | 55 |
| 3 | Grafton County, NH | 46 |
| 4 | Washington County, VT | 43 |
| 5 | Nevada County, CA | 42 |
| 6 | Windham County, VT | 40 |
| 7 | Kennebec County, ME | 39 |
| 8 | Teton County, WY | 39 |
| 9 | La Plata County, CO | 37 |
| 10 | Sussex County, DE | 37 |
Financing evidence: Community Facilities activity
USAspending counts USDA awards by program, not by facility type. From 1 October 2023 to 30 September 2026 it shows 1,717 Community Facilities awards (425 loans and 1,292 grants) in 51 states with data, against 643 B&I guaranteed loans [10]. The states with the most:
| State | CF loans | CF grants | CF awards (loans and grants) | B&I guaranteed loans (for comparison) |
|---|---|---|---|---|
| Pennsylvania | 40 | 61 | 101 | 11 |
| New York | 48 | 45 | 93 | 28 |
| North Carolina | 35 | 52 | 87 | 33 |
| Michigan | 19 | 61 | 80 | 20 |
| Ohio | 35 | 40 | 75 | 21 |
| Alabama | 23 | 48 | 71 | 9 |
| Tennessee | 38 | 31 | 69 | 13 |
| California | 7 | 44 | 51 | 35 |
| Maine | 5 | 44 | 49 | 4 |
| Minnesota | 22 | 26 | 48 | 5 |
| Oklahoma | 10 | 37 | 47 | 37 |
| Iowa | 10 | 35 | 45 | 2 |
| All 51 states with data | 425 | 1,292 | 1,717 | 643 |
Grants outnumber loans three to one in the count, but grants are small and capped by the income and population tests; for most school projects the loan carries the cost and the grant fills a gap. SBA does not lend to nonprofits [9], and public schools are government entities, so there is no SBA loss history for the borrowers CF serves. For-profit training businesses (technical and trade schools) can use SBA, and the lender will compare a B&I request with a 7(a) or 504 alternative.
Workforce Gap Analysis for CTE and Workforce Development
Career and technical education and workforce development facility projects depend on rigorous workforce gap analysis. Four analytical dimensions carry particular weight in documenting the workforce case for the project.
Regional Workforce Gap Analysis
The foundation of CTE and workforce development feasibility is quantitative workforce gap analysis. BLS Occupational Employment and Wage Statistics (OEWS), Department of Labor workforce projections, state workforce board data, and regional employer surveys all document the gap between workforce supply and demand by occupation. Rural workforce gaps often concentrate in specific trades (welding, electrical, HVAC, healthcare support occupations, agricultural technology), and projects addressing documented gaps score materially better than projects with generic workforce framing.
Employer Partnership Documentation
Workforce development projects benefit substantially from documented employer partnerships. Letters of commitment from regional employers (not just letters of support) specifying hiring intentions, internship commitments, curriculum development involvement, or equipment donations strengthen feasibility substantially. Employer partnerships convert abstract workforce demand into concrete hiring pipelines that the feasibility analysis can document.
Industry Cluster Alignment
Rural workforce development often aligns with specific regional industry clusters: agricultural processing, healthcare systems, manufacturing corridors, energy sector activity, or tourism operations. Feasibility work documents the specific cluster alignment and quantifies cluster-specific workforce needs. Projects disconnected from identifiable regional industry clusters face harder scrutiny regardless of workforce intent.
Graduate Placement and Outcome Measurement
Feasibility work addresses how the program will measure graduate outcomes: placement rates, wage outcomes, retention in the region, and employer satisfaction. Specific measurement commitments score better than aspirational outcome statements. Credible evaluation frameworks often involve third-party outcome research or state longitudinal data system integration.
Education Revenue Structure
Rural education facilities operate on revenue structures materially different from commercial facilities. Six revenue streams cover most institutional types, with the specific mix varying by entity structure, program focus, and state funding environment.
| Revenue Stream | Notes |
|---|---|
| Tuition and Fees | Direct revenue from enrolled students. Rural community college tuition typically $3,500 to $6,500 annually (in-district); adult education and CTE tuition varies substantially. Revenue stability depends on enrollment trajectory. |
| State Aid Formulas | K-12 and community college operations depend substantially on state aid formulas. Formula structures vary by state but typically incorporate enrollment, property wealth, and local effort measures. Feasibility financial projections model state aid contributions realistically based on the specific state formula applicable to the project. |
| Federal Grant Programs | Title I, Title III, Perkins CTE funding, Pell Grants (flowing to students), TRIO programs, and similar federal grant streams support specific populations and programs. Grant dependency must be modeled with appropriate sustainability analysis across the projection period. |
| Local Property Tax Base | K-12 and some community college operations depend on local property tax revenue. Feasibility analysis for these operations requires property tax base analysis, millage rate analysis, and bond capacity assessment. |
| Workforce Development Grants | State workforce development funding, Department of Labor grants, regional workforce board contracts, and specialty training grants. Project-specific funding that can support specific program launches but typically does not provide sustainable operating revenue. |
| Employer Training Contracts | Contracted training services provided to specific employers. Often structured through community college workforce divisions. Revenue structure approximates commercial service delivery but typically operates at thin margins given nonprofit mission. |
For a CF loan the projection must rest on taxes, assessments, revenues, fees or other sources sufficient for operation and maintenance, debt and reserves, and must allow for any interest rate adjustment in the note [1][3]. Grants that end before the loan does belong in the downside case, not the base case.
Community College Partnership Frameworks
Community college involvement strengthens rural education facility feasibility across multiple partnership structures. Four structures cover most viable partnership configurations.
Dual Enrollment and Pathways
Rural K-12 districts often partner with regional community colleges for dual enrollment, allowing high school students to earn college credit. Facility projects supporting dual enrollment may qualify for CF financing through either partner entity depending on ownership structure. Pathway programs (guaranteed transfer, early college high schools, career pathway sequences) strengthen the feasibility case by demonstrating integration with regional post-secondary infrastructure.
Satellite Campuses and Extension Centers
Community colleges frequently develop satellite facilities serving rural markets too distant from main campuses for daily student commuting. Satellite facilities typically offer a subset of college programs (general education, specific CTE programs, adult education) rather than full curriculum. Feasibility work addresses the specific program mix, enrollment sustainability at the satellite scale, and integration with main campus operations.
Employer-Partnership Facilities
Facilities co-located with or operated in partnership with specific regional employers. Manufacturing training facilities, healthcare system education partnerships, and agricultural industry training centers all represent this category. Employer partnership often provides equipment, curriculum input, and graduate placement commitments. Feasibility analysis models partnership structure explicitly.
Regional Cluster Alignment
Community college facility development increasingly aligns with regional industry cluster development. Healthcare training clusters in communities anchored by regional medical centers, agricultural technology training in agricultural processing hubs, energy workforce training in energy corridor communities. Feasibility work documents the cluster alignment as strategic rationale beyond generic workforce framing.
Distance learning grants next to facility financing
The Distance Learning and Telemedicine program in 7 CFR part 1734 funds telecommunications-based distance learning that reaches students and teachers in rural areas [11]. Grant applicants put up a matching contribution of at least 15% of the grant, generally in cash; grants may not pay for land, buildings or building construction, site development, salaries, or recurring operating costs; and the Administrator sets maximum and minimum grant amounts each year [11]. In practice CF finances the classrooms and DLT equips them, and the two applications should describe the same enrollment and program plan.
Worked examples (illustrative)
Illustrative only. Example A is a for-profit welding and commercial driver training center borrowing under B&I at an assumed 7.50% fixed rate over 20 years. Example B is a nonprofit school borrowing under CF guaranteed at an assumed 7.00% fixed rate over 30 years. The third column shows the same school under a CF direct loan at an illustrative 4.75% over 40 years; the actual rate depends on the quarter and on the rate tier the service area qualifies for [3].
| Item | Example A: B&I, for-profit training center | Example B: CF guaranteed, nonprofit school | Same school, CF direct (comparison) |
|---|---|---|---|
| Loan amount | $3,200,000 | $9,000,000 | $9,000,000 |
| Borrower | For-profit welding and CDL training company (new business) | Nonprofit private or charter school with significant community ties | Same nonprofit, town of 20,000 or less |
| Rate and term (assumed) | 7.50% fixed, 20 years | 7.00% fixed, 30 years | 4.75% illustrative, 40 years |
| Guarantee | 85% ($2,720,000) | 80% ($7,200,000) | None (USDA is the lender) |
| Up-front guarantee fee | 3.0%: $81,600 | 1.25%: $90,000 | None |
| Annual retention fee, year 1 | 0.55%: $14,624 | 0.50%: $35,634 | None |
| Annual debt service | $309,348 | $718,527 | $503,018 |
| Net revenue available for debt service at 1.25x | $386,685 | $898,158 | $628,773 |
| Debt service reserve | Lender policy | Lender policy | One average installment ($503,018), built at one-tenth a year ($50,302) |
| Equity or contribution | New business: 25% of cost ($1,066,667 on $4,266,667) or 20% balance-sheet equity | No B&I equity table for CF; lender and Agency set it; other funds committed earn priority points | Applicant contributions and other funds; grant if income and population qualify |
| Study rule | Independent study required over $1,000,000 to a new business | Financial feasibility report always; independent study over $1,000,000 to a new entity or new activity | Financial feasibility report by a qualified firm or individual |
The comparison shows why CF direct is the first call for an eligible school in a town of 20,000 or less: on the same $9,000,000, the CF direct payment is $215,508 a year lower than the guaranteed loan, about $6,465,246 over 30 years, before counting the guarantee and retention fees. CF direct money is limited and allocated by state, and the application takes longer; the guaranteed loan is the route when direct funds are short or the community is between 20,000 and 50,000. Example A, the for-profit training center, needs about $386,685 of net operating income for 1.25 times coverage and, as a new business, about $1,066,667 of equity under the 25% of cost test.
Stress test (Example A)
| Scenario | Net operating income | Debt service coverage |
|---|---|---|
| Base case at 1.25x | $386,685 | 1.25x |
| NOI down 10% | $348,016 | 1.12x |
| NOI down 20% (break-even) | $309,348 | 1.00x |
| NOI down 30% | $270,679 | 0.87x |
| Variable rate 1 point higher, re-amortized | $386,685 | 1.16x (debt service $333,244) |
| Variable rate 2 points higher, re-amortized | $386,685 | 1.08x (debt service $357,938) |
| Variable rate 3 points higher, re-amortized | $386,685 | 1.01x (debt service $383,378) |
The asset-specific test: enrollment and per-student revenue
A school's costs are mostly teachers and buildings, which do not shrink when enrollment does. The table runs Example B through an enrollment model with stated illustrative assumptions: a 420-seat school enrolling 400 students at base, $12,500 of tuition or per-pupil public funding per student, $250,000 of other income, $2,100 of variable cost per student, and fixed costs of $3,511,842 set so the base case covers debt 1.25 times.
| Enrolled students | Share of 420-seat capacity | Revenue | Net revenue for debt service | Coverage (Example B) |
|---|---|---|---|---|
| 420 | 100% | $5,500,000 | $1,106,158 | 1.54x |
| 400 | 95% | $5,250,000 | $898,158 | 1.25x |
| 380 | 90% | $5,000,000 | $690,158 | 0.96x |
| 360 | 86% | $4,750,000 | $482,158 | 0.67x |
| 340 | 81% | $4,500,000 | $274,158 | 0.38x |
| 320 | 76% | $4,250,000 | $66,158 | 0.09x |
| 300 | 71% | $4,000,000 | -$141,842 | -0.20x |
Coverage falls to break-even at about 383 students, 91% of capacity and only 17 students below the base case. A cut in per-student funding has the same effect:
| Cut in per-student revenue | Revenue per student | Net revenue for debt service | Coverage (400 students) |
|---|---|---|---|
| 0% | $12,500 | $898,158 | 1.25x |
| 2% | $12,250 | $798,158 | 1.11x |
| 5% | $11,875 | $648,158 | 0.90x |
| 8% | $11,500 | $498,158 | 0.69x |
Three conclusions follow for any school study. Enrollment must be projected by grade from the feeder population, not assumed at capacity, and the NCES data above show why: distant and remote rural enrollment has been falling. The per-student revenue line needs its own source, the state formula for public and charter schools or the tuition and discount history for private schools, with the downside case at the next budget cut. And the lender will want a debt service reserve and a covenant tied to enrollment, because the margin between 1.25 times and 1.00 times is a few dozen students.
The Five Components, Applied to Education Facilities
The 7 CFR Part 5001 five-component framework applies to USDA education facility feasibility studies under CF guaranteed loan engagements. The direct-loan CF track applies parallel analytical expectations. The breakdown below covers how each component looks in the rural education context.
Component 1: Economic Feasibility
Regional economic base, industry composition, employment projections by occupation, labor force demographics, and educational attainment trajectories. Census ACS, BLS OEWS, state workforce board data, and regional economic development plans.
Component 2: Market Feasibility (Service Population)
Target student population analysis (K-12 enrollment projections, community college service area population by age cohort, adult education target population). Workforce gap analysis for CTE and workforce development facilities. Competitive educational provider inventory. Enrollment projections with realistic ramp and stabilization assumptions.
Component 3: Technical Feasibility
Site suitability, facility design meeting state educational facility standards, specialty program infrastructure (lab spaces, industry-standard equipment, technology systems), ADA compliance, and regulatory approval. For distance learning infrastructure, broadband capacity and technology integration. Reconciliation with architectural and engineering work.
Component 4: Financial Feasibility
Multi-year projection with revenue by stream (tuition, state aid, grants, local tax base, contracts), operating expense structure dominated by personnel, and debt service coverage analysis appropriate to the specific entity type. For tax-supported entities, property tax base analysis and bond capacity. For community college satellites, revenue-sharing structure with parent institution.
Component 5: Management Feasibility
Institutional leadership capacity, board or district governance, academic and program leadership, and specialty program staffing (CTE instructors, adult education coordinators, workforce development staff). For partnership projects, partnership governance structure and responsibility allocation. Institutional accreditation status where applicable.
Education facility risks, regulators and how the study tests them
| Risk | Regulator or rule | How the study tests it |
|---|---|---|
| Charter shorter than the loan, or not renewed | State charter authorizer | Charter term, renewal history, authorizer's closure record; a covenant or guarantee covering the gap |
| Enrollment decline in distant and remote areas | None; demographic risk | Cohort projection by grade, births, transfers; decline scenario |
| State aid formula change or funding cut | State legislature and education agency | Formula modeled line by line; cut scenario |
| Accreditation or program approval delayed | Accreditor; state education or workforce agency | Approval timeline before enrollment ramps |
| Employer partner leaves | None; market risk | Letters of commitment, diversity of employers, placement data |
| Accessibility | Private schools are places of public accommodation under 28 CFR part 36; public schools fall under the rules for public entities [14] | Accessible design in the budget |
| Project on prime or unique farmland | CF direct rate rule [3] | Site screen; the CF direct rate rises by 2 points |
| Construction before application or approval | 5001.116(c); 1942.17(d)(1)(v) [1][3] | No construction obligations before the commitment unless approved |
| Religious use of financed space | 5001.115(r) [1] | Separate space and schedule for religious activities |
| Population above the CF direct or grant limit | 1942.17, 3570.53 [3][4] | Decennial census figure for the city or town, checked first |
Where Education Studies Fail Review
Eight patterns in education facility feasibility studies that trigger USDA reviewer challenges, plus three more seen in lender files. Enrollment optimism and workforce framing generalization dominate this list.
- Enrollment projections at aspirational levels without documented demand analysis from service population data
- Workforce gap analysis limited to generic 'workforce shortage' framing without occupation-specific documentation
- Employer partnerships cited through letters of support rather than letters of commitment with specific hiring intentions
- State aid formula modeling applied incorrectly for the specific state; generic assumptions rather than formula-specific calculations
- Community college satellite economics modeled without parent institution revenue-sharing structure documented
- Technology and distance learning infrastructure costs underestimated, particularly ongoing platform and equipment refresh
- Outcome measurement commitments expressed aspirationally without specific metrics, targets, or evaluation framework
- Regulatory approval status (state department of education, community college accreditation, program-specific approvals) assumed rather than documented
- A charter school's loan term set without addressing charter renewal
- Grant income that ends before the loan treated as permanent
- The wrong report type: a lender's financial feasibility analysis where the rule calls for an independent study or an examination opinion
Process, timeline and documents
CF direct and grant applications start with a preapplication to the Rural Development office, scored on population, income, project type and other funds committed [3][4]. CF guaranteed and B&I applications come from the lender: eligibility check, study and appraisal, credit evaluation, State Office application, conditional commitment, closing and the loan note guarantee [1].
| Phase | Timing on this site's schedule | What happens |
|---|---|---|
| Scoping and proposal | Before engagement | Fifteen-minute call; written proposal with scope, timeline and firm fixed fee |
| Kickoff and data request | Week 1 | Engagement letter, data request within 48 hours, kickoff with the board, lender and architect |
| Service population and demand | Weeks 2 to 4 | Enrollment history and projection, feeder population, competing providers, workforce gap analysis |
| Modeling and draft | Weeks 4 to 6 | Revenue by stream, staffing, debt structures compared, sensitivity tables |
| Delivery and review | Weeks 6 to 8 | Draft, one round of revisions, final PDF and Word report with Excel workbook |
| Acceptance | After delivery | Revisions at no added cost until USDA or the lender accepts the report |
Schedule and terms as this site's cost and contact pages state them [13][15]. Documents to have ready: three years of audited statements, enrollment by grade for five to ten years, the charter or accreditation documents, the state funding formula worksheet or tuition schedule, board resolutions, the architect's preliminary report and cost estimate, letters from employers and partner institutions, and the local government certification of support that CF requires [1].
Education facility pages by state
The site does not yet have state education facility pages. Its state childcare pages, in 46 states, carry the nearest state data and each state's Community Facilities rules and precedents: Alabama, Alaska, Arizona, California, Colorado, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Louisiana, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, Montana, Nebraska, Nevada, New Hampshire, New Jersey, New Mexico, New York, North Carolina, North Dakota, Ohio, Oklahoma, Oregon, Pennsylvania, Rhode Island, South Carolina, South Dakota, Texas, Utah, Vermont, Virginia, West Virginia, Wyoming, Hawaii, Idaho.
Hiring an education facility feasibility study consultant for USDA
For CF guaranteed loans over $1,000,000 to a new entity or activity, and B&I loans over $1,000,000 to a new business, the study must come from an independent qualified consultant acceptable to the Agency [1]. The consultant should not be the architect, the builder, the bond underwriter or the lender. Ask any USDA feasibility study consultant which report the lender and State Office expect (analysis, independent study or examination opinion), how enrollment will be projected by grade, and how the state funding formula will be modeled.
On this site an engagement includes all five Part 5001 components, a five to ten year projection with sensitivity analysis, the service area and demand drivers, a competitive supply inventory, comparable operator benchmarks, a management assessment, PDF and Word reports with an Excel workbook, a kickoff and a midpoint call, one round of revisions and a written acceptance guarantee; appraisals, environmental, engineering, legal work and grant application drafting are separate [13]. The site does not say it issues AICPA examination opinions.
Start Your Education Facility Feasibility Study
Fifteen-minute scoping call, written proposal inside one business day, firm fixed fee before you sign. Every education facility engagement carries our written acceptance guarantee [15]. Request Proposal
Program examples, honestly labelled
This site's state guides report Community Facilities support for schools and training centers; these are program evidence, not the firm's work, and the amounts are as those pages state them [16]:
| State guide | Program | Recipient and year | Amount | Purpose |
|---|---|---|---|---|
| Utah | CF direct loans | Valley Academy, Soldier Hollow Charter, Utah Charter Academies, Maria Montessori Academy and one other, 2017 | $29,550,000 | Charter school facilities |
| Tennessee | CF | Ivy Academy, Hamilton County, 2025 | $5,093,000 | Career-technology center |
| Indiana | CF direct loan | Hanover Educational Properties LLC, Hanover, 2018 | $4,290,000 | Residence hall acquisition |
| Idaho | CF grant | College of Southern Idaho, Jerome, 2026 | $3,300,000 | Workforce training center for food processing technology |
| Hawaii | CF guarantee | South Maui Learning Ohana, Kihei Public Charter School, 2020 | $1,775,000 | Charter school |
The site's engagement listings include a charter school addition financial feasibility study for a CF guaranteed loan in Kansas, $5M to $25M, prepared with enrollment and revenue analysis [17]. Its long-form case study on early learning is the closest worked model: Childcare Center Feasibility Study for USDA Financing: Early Learning Capacity in Rural Maine (Read case study) [17].
Related Resources
- CF Feasibility Study: USDA Community Facilities program. Primary financing framework for rural public and nonprofit education facilities.
- Childcare & Early Learning: Adjacent CF asset class. Early childhood education and K-12 infrastructure often integrate at community level.
- Rural Healthcare: Adjacent CF asset class. Healthcare workforce training often integrates with rural healthcare operations and community colleges.
- B&I Feasibility Study for for-profit schools and training companies, and USDA Feasibility Study Cost & Timeline.
- USDA Feasibility Studies for Nonprofit Organizations.
Related Analysis and Guides
- Flagship research: The USDA Rural Capital Atlas — 2026 Edition (Read article)
- Programs: USDA Community Facilities Program Explained (Read article)
- Asset classes: Rural Child Care Facility Feasibility (Read article)
How 7 CFR Part 5001 decides your file
Every USDA guaranteed loan passes through nine regulatory gates, and the feasibility study decides most of them. Our full framework sets out each gate, the current fiscal year fees and guarantee levels, and what the Agency looks for in the report. Read the USDA Feasibility Study Framework · Flagship research, 2026 edition: USDA Rural Capital Atlas, 38 asset classes, program comparisons, capital stacks, lender performance and credit forensics. More answers in the Full FAQ.
Data current as of November 2026.
USDA Feasibility, Inc.