Grain dryer efficiency and roof-mount solar feasibility: Montana USDA Feasibility Study Case Study

    Last updated 2026-11-08

    How to read this case study. The engagement summary reflects the published record. Client names, actual costs, loan terms and proprietary data are confidential, so the project budget, market sizing and financial projections below are a modeled example built from public data for this project type and location. They show the analysis a lender-grade study performs, not the client's figures.

    Data current as of November 2026.

    Engagement summary

    This engagement paired two projects at one agricultural site in Sidney, Montana: replacing a propane grain dryer with a high-efficiency unit, and adding a roof-mounted solar array. It was prepared in 2024 for a community bank using a REAP guarantee, and it was built on documented historical energy use. The rules have changed twice since then. USDA rescinded the FY2025 to FY2027 REAP funding notice in April 2026 [2], and a new REAP rule took effect on 16 October 2026 [1]. This page therefore describes the engagement type, models a project of this kind in Richland County, and shows how it is financed and what a study must prove under the rule in force now.

    ItemPublished record
    ProgramUSDA Rural Energy for America Program (REAP)
    Asset class (as indexed)Manufacturing
    ProjectGrain dryer efficiency and roof-mount solar
    LocationSidney, Montana (Richland County)
    RegionMountain West
    Loan size tierUnder $5M
    Year prepared2024
    Lender typeCommunity bank with REAP guarantee
    OutcomePrepared with documented historical energy use

    Sources: the site's engagement index [12]; county from Census place files [6].

    The record also describes the deliverables: a baseline energy audit of historical kilowatt-hours and propane use per bushel for the existing dryer, with the projected efficiency change for the replacement, and a solar system sized with NREL's PVWatts method at an average of about 4.5 peak sun-hours a day. Those inputs carry straight into the model below. The record also lists the grant caps and cost-share terms of the FY2025 to FY2027 notice under which the study was written. That notice was rescinded on 15 April 2026 [2], and none of its terms is used here.

    The question the lender and USDA needed answered

    A grain dryer upgrade and a rooftop array look like small projects, but together they ask a lender three separate questions.

    1. Are the savings real? A dryer's fuel use swings with the harvest. A wet year can double the propane bill and a dry year can nearly erase it, so savings claimed from a single season prove little. The study has to rebuild the baseline from several years of propane invoices, scale tickets and moisture logs, and express it per bushel and per point of moisture removed.
    2. Does the solar array fit the load? On a grain farm, electricity demand peaks at harvest in autumn, while solar output peaks in summer. An array sized to annual kilowatt-hours can still export much of its output at a low credit. The study has to show the share of output the site will use itself.
    3. Who repays the loan? Energy savings rarely cover the debt service on a dryer by themselves. The lender is underwriting the farm, and the study has to show the farm's global cash flow carries the new payment with room to spare.

    Why a study at all? Under 7 CFR part 5001, a REAP guaranteed loan for a renewable energy system needs a technical report, and a feasibility study when the lender or the Agency deems one necessary [3]. Since 16 October 2026, a REAP grant needs an energy audit for efficiency projects above $80,000 and a resource assessment, or a feasibility study in its place, for renewable systems [1]. The new rule also turned the simple payback calculation into an eligibility test: a project whose payback exceeds its useful life cannot receive a grant [1]. A dual-component project needs a study that holds the audit, the production model and the lender's credit case together, with the same numbers in each.

    What changed for this engagement type on 16 October 2026

    TopicRule effective 16 October 2026 [1]What it means for a dryer-plus-solar project
    TimingProject Period must end 12 to 24 months before the grant application (12 to 36 months in the first window)The loan builds the project; a grant can only follow a season of operation
    Data12 months of actual savings or production plus 12 months of pre-installation dataThe dryer's first harvest after installation becomes the evidence
    Award size$500,000 for renewable systems, $250,000 for efficiency, at most 25% of costThe efficiency cap binds on dryers costing more than $1 million
    Combined fundingGrant plus REAP guaranteed loan at most 75% of project costA loan at 75% leaves no room for a later grant
    Loan aloneA REAP guaranteed loan without a grant is capped at 75% of eligible costs, with at least 25% from the borrower (7 CFR 5001.406(d))The owner funds at least a quarter even when no grant is planned [3]
    CroplandGround-mount solar or wind on Cropland is ineligible for a grantRoof mounting keeps the array eligible; a field array would not be
    Foreign componentsSolar systems with any component from a foreign adversary under 15 CFR 791.4 are ineligibleA country-of-origin list for modules, inverters and racking
    EconomicsSimple payback must not exceed useful lifeEach component is tested on its own
    ApplicantOne application per federal fiscal year from each highest-level ownerDryer and solar may need to be sequenced across years
    GamblingAny gambling income bars a grant; the loan keeps only the 15% test in 5001.127(b)A revenue screen before scoping

    Project description (modelled)

    The modelled operation dries and stores grain at a single farmstead near Sidney. The project has two components, installed together between harvests so that neither disrupts a fall season.

    Component 1, energy efficiency improvement. The existing propane tower dryer is replaced with a dryer of similar capacity (a 1,500-bushel-an-hour class) with heat recovery, variable-speed fans and moisture-based discharge control. The model assumes 500,000 bushels dried a year, taken from 23% to 15% moisture. That removes 5.78 pounds of water from each bushel on the standard 56-pound corn bushel. The existing dryer is assumed to use 2,600 BTU per pound of water removed and the replacement 1,450, a 44.2% fuel cut. The engagement record cites USDA REAP recipient surveys reporting fuel-cost cuts of up to 50% for high-efficiency dryers. We have not verified that figure, and the model stays below it.

    Component 2, renewable energy system. A 75 kW (DC) array goes on the roofs of the shop and machine shed, sized to the electricity the site will still buy once the new dryer's fans run on variable-speed drives. The array does not touch cropland, which keeps it outside the new grant rule's ground-mount bar.

    Timeline. Audit and design in late winter, bids and loan approval in spring, removal of the old dryer and installation in June and July, commissioning before the first fall harvest, solar energised in August. Under the 2026 rule the grant clock starts when the Project Period ends. The earliest grant application therefore follows twelve months of metered results: the first harvest with the new dryer and a full solar year.

    Energy baseline and dryer savings

    InputModel valueRange testedHow a real study sets it
    Bushels dried per year500,000300,000 to 650,000Scale tickets and dryer logs, at least three harvests
    Crop modelledCorn, 56 lb per bushel at 15.5% moistureSmall grains dried in wet yearsCrop records; each crop modelled separately
    Average moisture in / out23% / 15%5 to 10 points removedMoisture tester logs by load
    Water removed per bushel (computed)5.78 lbn/aComputed from moisture in and out
    Existing dryer fuel use2,600 BTU per lb of water2,300 to 2,900Energy audit: metered propane against bushels and moisture
    Replacement dryer fuel use1,450 BTU per lb of water1,300 to 1,700Manufacturer rating, adjusted by the auditor
    Propane heating value91,500 BTU per gallonn/aEngineering constant (approximate)
    Propane price, delivered$1.75 per gallon$1.25 to $2.50Three years of propane invoices
    Dryer electricity, existing / replacement0.30 / 0.24 kWh per bushel+/- 25%Utility bills, motor nameplates, fan curves
    Avoided electricity value$0.115 per kWh$0.09 to $0.14The serving utility's tariff
    LineExisting dryerReplacement dryerChange
    Water removed per year (lb)2,891,9792,891,9790
    Propane (gallons per year)82,17645,829-36,347
    Propane (MMBtu per year)7,5194,193-3,326
    Dryer electricity (kWh per year)150,000120,000-30,000
    Propane cost$143,809$80,201-$63,608
    Electricity cost$17,250$13,800-$3,450
    Energy cost per bushel dried$0.322$0.188-$0.134
    Annual energy savings, year 1$67,058

    The per-bushel line is the one a farm lender reads first. On these assumptions the existing dryer spends about $0.322 in energy per bushel dried and the replacement $0.188, a saving of $0.134 per bushel. The engagement record cites a propane drying cost of about $0.42 a bushel to remove 10 points of moisture, set against a market moisture discount of about $0.65 a bushel for the same wet grain. That spread explains why farms dry at all, and the study should test it against the farm's own sale records. We have not verified those figures. The record also notes that roughly 75% to 80% of Montana producers use propane-fired dryers; that figure is also unverified, and a study should not rest on it.

    Solar production and sizing

    InputModel valueBasis
    Peak sun-hours per day4.5Figure cited in the engagement record for the site; a real study runs an hourly production model for the exact roof
    Performance ratio (losses for temperature, soiling, snow, wiring, inverter)0.80Assumption; snow cover on low-pitch roofs is tested separately
    Year-1 output per kW (computed)1,314 kWhPeak sun-hours x 365 x performance ratio
    Degradation0.5% a yearAssumption; module warranty sets it
    Installed cost$2.40 per watt plus $20,000 fixed (structural review, interconnection, engineering)Assumption with a $2.10 to $3.00 range; installer bids set it
    Site load before / after the dryer project245,000 / 215,000 kWhAssumption; twelve months or more of utility bills set it
    Value of output used on site$0.115 per kWhAssumption; tariff energy and demand charges
    Value of exported output$0.040 per kWhAssumption; the utility's net metering or export tariff
    Operation and maintenance$20 per kW a yearAssumption, including an inverter reserve
    Useful life used for the payback test25 yearsAssumption tied to module warranty

    Right-sizing is where a grain-farm array is won or lost. The table below runs four sizes through the same assumptions. The share of output used on site falls as the array grows, because summer production meets a load that peaks in autumn.

    Array (DC)Year-1 output (kWh)Output as share of post-project loadAssumed share used on siteInstalled cost with 5% contingency (model)Year-1 energy valueSimple paybackPayback within 25-year life?
    50 kW65,70031%80%$147,000$6,57022.4 yearsYes
    75 kW98,55046%70%$210,000$9,11623.0 yearsYes
    100 kW131,40061%60%$273,000$11,16924.4 yearsYes
    150 kW197,10092%45%$399,000$14,53627.4 yearsNo

    The 75 kW array produces 98,550 kWh in year one, 46% of the site's post-project load of 215,000 kWh, and passes the payback test with two years to spare. At 150 kW the array would cover 92% of annual kilowatt-hours on paper, but more than half its output would be exported at a low credit, and payback would run past the module life. A ground-mounted system would also have to show "commensurate historical energy usage" to be eligible for a grant [1]. The roof system faces no such test, but the economics impose the same discipline. A real study replaces the assumed on-site shares with an hourly match of modelled production against twelve months or more of interval meter data.

    Project cost and sources and uses (modelled)

    No construction-cost database sits behind these numbers. Each line is an assumption stated with a range, and a real study replaces it with the dryer manufacturer's quote, the installers' bids, the electrician's estimate and the utility's interconnection terms.

    Line itemModel amountRangeSource in a real study
    Efficiency: High-efficiency dryer with heat recovery, delivered (1,500 bushels an hour class)$620,000$540,000 to $720,000Equipment quotes
    Efficiency: Foundation, wet-bin and leg tie-ins, conveyor changes$85,000$60,000 to $120,000Contractor bid
    Efficiency: Electrical service upgrade and variable-speed fan drives$48,000$35,000 to $70,000Electrician bid
    Efficiency: Propane piping, burner controls and moisture sensors$30,000$20,000 to $40,000Contractor bid
    Efficiency: Removal of the existing dryer$12,000$8,000 to $20,000Contractor bid
    Efficiency: Engineering and permits$14,000$8,000 to $20,000Engineer proposal
    Efficiency: contingency (7.5% of hard cost)$60,6755% to 10%Lender and engineer judgment
    Efficiency: energy audit (required above $80,000 for a grant)$9,000$5,000 to $15,000Auditor proposal
    Efficiency subtotal$878,675
    Solar: Modules, inverters, racking and installation, 75 kW DC$180,000$157,500 to $225,000Installer bids ($2.10 to $3.00 per watt)
    Solar: Roof structural review and any reinforcement$6,000$3,000 to $25,000Structural engineer
    Solar: Interconnection, metering and utility study$9,000$5,000 to $20,000Utility interconnection agreement
    Solar: Design engineering and production model$5,000$3,000 to $8,000Engineer proposal
    Solar: contingency (5% of hard cost)$10,0005% to 10%Lender and engineer judgment
    Solar subtotal$210,000
    Feasibility study (within the cost page band for REAP loans above $600,000)$9,500$7,500 to $11,500Fixed-fee proposal
    Loan closing, legal and lien searches$6,000$4,000 to $10,000Lender estimate
    Total eligible project cost (model)$1,104,175
    Cost outside the eligible budgetModel amountWho pays and why
    REAP guarantee fee (1.0% of the guaranteed portion, Structure A)$6,625Borrower at closing; FY2026 REAP rate [4]
    Interest during a four-month installation (half drawn on average, Structure A)$10,006Borrower from operating cash; installation sits between harvests
    Annual retention fee, year 1 (0.25% of guaranteed principal outstanding)$1,656Lender, usually passed to the borrower [4]
    Working capital for propane during the first harvestNone addedFuel spend falls; the farm operating line already carries it

    Two ways to finance it

    Structure A borrows the maximum REAP guaranteed loan, 75% of eligible cost, and plans no grant. Structure B borrows less and leaves room under the 75% combined cap for a REAP grant on the dryer, applied for after twelve months of savings data. Under the rule's one-application-per-fiscal-year limit, the solar component is left to a later year or to no grant at all.

    UsesAmountSources: Structure A (loan only)AmountSources: Structure B (loan, later grant)Amount
    Dryer efficiency project$878,675REAP guaranteed loan (75% of eligible cost)$828,100REAP guaranteed loan$608,500
    Roof-mount solar$210,000Owner contribution (25%)$276,075Owner cash at construction$495,675
    Feasibility study$9,500REAP grant$0REAP grant applied for 12 to 24 months after completion (efficiency part)$219,600
    Closing and legal$6,000Owner cash returned if the grant is awarded-$219,600
    Total eligible project cost$1,104,175Total$1,104,175Total net of grant, if awarded$1,104,175
    Test under the rule effective 16 October 2026Efficiency (dryer)SolarSource
    Component cost (model)$878,675$210,000Budget table
    25% of cost$219,669$52,500Cost share at least 75% [1]
    Program maximum$250,000$500,000[1]
    Largest possible grant$219,669$52,500Lower of the two lines above
    Room left under the 75% combined cap if the loan is at 75% (Structure A)$0$0Grant plus loan at most 75% [1]
    Structure B: grant modelled$219,600$0 (one application per fiscal year; solar left to a later year or none)Applicant rule [1]
    Earliest application12 months after the Project Period ends, with 12 months of savings data12 months of production dataTiming rule [1]

    Structure B looks cheaper, but it asks the owner for $495,675 at construction instead of $276,075, and it returns $219,600 only if a competitive national grant is awarded a year or more later. The new rule runs one national competition for requests over $20,000 [1], and as of 7 November 2026 no funding notice under the rule had appeared. A lender should underwrite Structure B on its own debt service, treat the grant as an upside that may never arrive, and test the farm's liquidity for the bridge. For most borrowers Structure A is the base case and Structure B is the option.

    Market analysis

    A dryer and an array sell nothing, so the market section of this study answers a different question from a hotel or a meat plant study. It asks whether the operation's grain volume, crop mix and moisture history support the savings, and whether the regional energy market makes the avoided costs durable. The demand drivers are the acres the farm or its customers harvest, the moisture at harvest, the price of propane delivered to the farm and the electric tariff. The competitive question is whether the farm's drying cost per bushel keeps it in line with the elevators and neighbours who would otherwise dry or discount its grain.

    The site and the rural test

    MeasureValueSource
    Sidney city population, April 2020 estimates base6,338Census Vintage 2025 subcounty estimates [6]
    Sidney city population, July 2025 estimate6,217Census Vintage 2025 subcounty estimates [6]
    Richland County population, April 2020 estimates base11,488Census Vintage 2025 county estimates [6]
    Richland County population, July 2025 estimate11,377Census Vintage 2025 county estimates [6]
    Richland County OMB status, July 2023 delineationNon-metropolitanOMB list1_2023 [7]
    Montana counties that are non-metropolitan46 of 56OMB list1_2023 [7]
    Montana cities above 50,000 (2020 estimates base)Billings (117,147); Missoula (74,190); Great Falls (60,481); Bozeman (53,596)Census Vintage 2025 subcounty estimates [6]
    Richland County manufacturing establishments with payroll, 202312 (368 employees)County Business Patterns 2023 [5]
    Of which food manufacturing3 (206 employees)County Business Patterns 2023 [5]

    Sidney is far below the 50,000-person line in 7 CFR 5001.3. Montana's four cities above that line are Billings, Missoula, Great Falls and Bozeman, and none of them, nor any urbanized area around them, reaches Richland County. Under OMB's 2023 delineation, Richland County is one of Montana's 46 non-metropolitan counties out of 56. The rural test is applied to the latest decennial census, so the study should cite the 2020 Census count and a dated USDA eligibility map determination for the parcel. The estimates base above is the same April 2020 benchmark, but it is a proxy for the census count, not the count itself. The engagement record also cites a 46.6% rural population share for Montana. The data pack's measure, residents of non-metro counties, puts the share at 44.7% in 2025. These are different definitions, and the study should say which one it uses.

    Rural manufacturing and agricultural processing in Montana

    The site indexes this engagement under manufacturing, and the state data pack for Montana manufacturing describes the rural business base the community bank lends to. Grain drying on a farm is agricultural production, which County Business Patterns does not count, so these tables describe the lender's market, not the farm itself.

    Montana: manufacturing establishments (all), supply and rural footprint

    MeasureMontanaUnited States
    Establishments, 2019 → 20231,358 → 1,393 (+2.6%)287,626 → 284,452
    Per 100,000 residents (2023)123.284.5
    Average employees per establishment15.743.4
    Average annual pay per employee$64,517$73,202
    Share of establishments in non-metro counties45.9% (632 in 30 counties)
    Share of state population in non-metro counties (2025)44.7%

    Non-metro counties with the most manufacturing establishments (all) (2023): Flathead County (193); Ravalli County (95); Lake County (41); Silver Bow County (37); Lincoln County (29); Park County (28).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Montana has more manufacturers per resident than the nation (123.2 per 100,000 against 84.5), but they are small: 15.7 employees on average against 43.4 nationally. Nearly half sit in non-metro counties. Richland County's 12 manufacturing establishments employ 368 people, and 3 food manufacturers account for 206 of them, which ties local industry to the crops grown around it. For this study the useful benchmark is pay. Montana's average manufacturing wage of $64,517 sets the cost of the electricians and millwrights who install and maintain the equipment, and of any seasonal labour the drying operation already carries.

    The state data pack for solar and renewable generation shows no Montana establishment with payroll whose main activity is solar generation, in 2019 or 2023. That is expected. A farm array belongs to the farm, not to a separate generating company, and it is why REAP award data, not Census counts, measure rural energy activity in the state.

    REAP activity in Montana and its neighbours

    StateREAP grantsREAP grant dollarsAverage grantDollars per residentRank per residentREAP guaranteed loansB&I guaranteed loans
    Montana74$2,959,654$39,995$2.7334 of 5301
    North Dakota55$11,261,321$204,751$14.454 of 5302
    South Dakota78$12,309,780$157,818$13.885 of 5313
    Wyoming37$2,881,629$77,882$5.0018 of 5303
    Idaho93$21,643,985$232,731$11.777 of 53010

    USAspending prime awards by place of performance, FY2024 to FY2026, for REAP (10.868) and B&I (10.768); dollars per resident use the population figures in the USAspending data; ranks are among the 53 states and territories with REAP grant dollars [9]. These awards were made under the pre-2026 rules.

    Montana's 74 REAP grants averaged $39,995, against $204,751 in North Dakota and $232,731 in Idaho. The state ranks 46th of 53 in REAP grant dollars and 34th per resident. The pattern points to many small efficiency and solar grants and few large ones, and to an untapped share of larger projects like a dryer replacement. No Montana REAP guaranteed loan appears in the period, and the Montana hub notes a single B&I loan award [13]. A Montana reviewer may have little recent in-state precedent for a REAP-guaranteed dryer loan, so the study has to carry its own evidence.

    Financing benchmark: SBA lending to Montana manufacturers

    Montana: SBA lending to manufacturing establishments (all)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY2016176$60.9 million18$11.3 million
    FY2017 to FY201946$11.2 million2$385,000
    FY2020 to FY202357$30.0 million9$9.4 million
    FY2024 to FY202621$14.6 million2$1.8 million

    Average 7(a) loan, FY2020 to FY2026: $571,846. Average 504 loan: $1.0 million. Of the 176 7(a) loans approved in FY2010 to FY2016 for Montana manufacturing establishments (all), 4.0% were charged off (national: 6.4% of 27,078), on average 71 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    The modelled REAP loan of $828,100 sits above the average Montana manufacturing 7(a) loan of $571,846. Seasoned losses in the state ran below the national rate (4.0% against 6.4%). Neither figure describes farm lending directly, but both give a community bank's credit committee a frame for a loan of this size outside the state's cities.

    Prices the study must source, not assume

    The model's propane price ($1.75 a gallon delivered), electricity value ($0.115 a kWh) and export credit ($0.04 a kWh) are labelled assumptions. A lender-grade study uses the farm's own invoices for at least three heating seasons, the serving utility's current tariff and export terms (an investor-owned utility or a rural electric cooperative, depending on the parcel), and a written note on when those tariffs next come up for review. The sensitivity tables below show how far each price can move before the case fails.

    Financial feasibility

    Five-year pro forma at project level

    Line (Structure A)Year 1Year 2Year 3Year 4Year 5
    Propane savings (price +2% a year)$63,608$64,880$66,177$67,501$68,851
    Dryer electricity savings (+2.5% a year)$3,450$3,536$3,625$3,715$3,808
    Solar energy value (0.5% degradation)$9,116$9,268$9,423$9,581$9,742
    Total energy benefit$76,174$77,684$79,225$80,797$82,401
    Solar operation and maintenance-$1,500-$1,500-$1,500-$1,500-$1,500
    Insurance on new equipment (0.35% of hard cost)-$3,532-$3,532-$3,532-$3,532-$3,532
    Property tax increment-$1,500-$1,500-$1,500-$1,500-$1,500
    Net project benefit (project NOI)$69,642$71,152$72,693$74,266$75,870
    REAP loan debt service (7.25%, 15 years)-$90,713-$90,713-$90,713-$90,713-$90,713
    Retention fee if passed to borrower-$1,656-$1,593-$1,525-$1,451-$1,372
    Project-level coverage (NOI / debt service and fee)0.75x0.77x0.79x0.81x0.82x

    The project does not pay for itself at the project level, and the study should say so plainly. On the model, energy benefits net of new costs reach $69,642 in year one against $92,369 of debt service and retention fee: 0.75 times coverage, rising to 0.82 times by year five as propane and power prices escalate. That is normal for an efficiency project on a 15-year amortisation. It does not mean the project fails. It means the repayment source is the farm.

    Global coverage: the farm carries the loan

    YearFarm cash flow before project (model)Project NOICash availableExisting debt service (model)New REAP debt service and feeTotal debt serviceCoverage before projectGlobal coverage after project
    Year 1$640,000$69,642$709,642$390,000$92,369$482,3691.64x1.47x
    Year 2$640,000$71,152$711,152$390,000$92,306$482,3061.64x1.47x
    Year 3$640,000$72,693$712,693$390,000$92,238$482,2381.64x1.48x
    Year 4$640,000$74,266$714,266$390,000$92,164$482,1641.64x1.48x
    Year 5$640,000$75,870$715,870$390,000$92,086$482,0861.64x1.48x

    The farm's cash flow and existing debt service above are modelled placeholders, because they are the client's confidential figures. The method is the point. Part 5001 asks the lender for a global credit evaluation, with historical and projected debt service coverage for the borrower and its affiliates [3]. Here, adding the new loan takes modelled coverage from 1.64 times to 1.47 times in year one, and the dryer savings recover part of the drop every year after.

    Term choice

    Term (7.25% fixed, Structure A loan)Annual debt serviceWith year-1 retention feeProject-level coverage, year 1Global coverage, year 1Useful-life check (5001.402)
    10 years$116,664$118,3200.59x1.40xWithin the dryer and module lives
    15 years$90,713$92,3690.75x1.47xWithin the dryer and module lives
    20 years$78,541$80,1970.87x1.51xWithin the dryer and module lives

    The term must stay within useful life, with no balloon, under 5001.402 [3]. A 20-year term lifts project-level coverage to 0.87 times and global coverage to 1.51 times, but it matches the dryer's assumed 20-year life exactly, leaving nothing in reserve if the dryer wears out early. Fifteen years keeps a margin. The study should state the useful life it relies on for each component and cite the manufacturer's evidence for it.

    Payback: the grant eligibility test

    ComponentProject cost (model)Year-1 energy valueSimple paybackUseful life assumedPasses the grant test?
    Dryer efficiency$878,675$67,05813.1 years20 yearsYes
    Roof-mount solar, 75 kW$210,000$9,11623.0 years25 yearsYes
    Whole project including study and closing costs$1,104,175$76,17414.5 yearsn/an/a

    Each component passes on the model, but not by the same margin. The dryer pays back in 13.1 years against a 20-year life. The solar array needs 23.0 years against 25. Part 5001 defines simple payback as total project cost divided by the annual dollar value of energy produced or saved, excluding one-time benefits and tax credits [3], and the new REAP rule makes it a hard test for the grant [1]. A thin solar margin is a warning that a lower export credit or a weaker production year could disqualify that component from a grant even though the loan is unaffected.

    Break-even and stress tests

    Break-even test (year 1, Structure A)ValueModel baseMargin
    Propane price for project-level 1.00x$2.38 per gallon$1.7536%
    Propane price for project-level 1.25x$3.01 per gallon$1.7572%
    Bushels dried for project-level 1.00x (8 points, $1.75 propane)669,459500,00034%
    Farm cash flow before project for global 1.00x$412,727$640,000-36%
    Farm cash flow before project for global 1.25x$533,319$640,000-17%
    Bushels dried5 points removed: NOI (coverage)8 points (base)10 points
    300,000$27,613 (0.30x)$42,819 (0.46x)$53,632 (0.58x)
    400,000$35,956 (0.39x)$56,231 (0.61x)$70,648 (0.76x)
    500,000$44,298 (0.48x)$69,642 (0.75x)$87,664 (0.95x)
    650,000$56,813 (0.62x)$89,759 (0.97x)$113,188 (1.23x)

    Harvest moisture is the largest variable in this project. A dry year with 5 points removed on 300,000 bushels cuts project NOI to $27,613. A wet year with 10 points on 650,000 bushels raises it to $113,188. A study that presents one year's savings as permanent will be sent back. The model's 500,000 bushels at 8 points is meant as a multi-year average, and the audit must show the years behind it.

    Propane price per gallonReplacement dryer at 1,700 BTU/lbAt 1,450 (base)At 1,300
    $1.25$41,591 (0.45x)$51,468 (0.56x)$57,395 (0.62x)
    $1.50$48,703 (0.53x)$60,555 (0.66x)$67,667 (0.73x)
    $1.75$55,814 (0.60x)$69,642 (0.75x)$77,939 (0.84x)
    $2.10$65,770 (0.71x)$82,364 (0.89x)$92,320 (1.00x)
    $2.50$77,149 (0.84x)$96,903 (1.05x)$108,755 (1.18x)
    Fixed rateBudget as modelledOverrun 10%Overrun 20%
    6.25%$86,860; owner $276,075; global 1.49x$95,545; owner $303,692; global 1.46x$104,240; owner $331,210; global 1.44x
    7.25%$92,369; owner $276,075; global 1.47x$101,605; owner $303,692; global 1.44x$110,852; owner $331,210; global 1.42x
    8.25%$98,061; owner $276,075; global 1.45x$107,866; owner $303,692; global 1.43x$117,683; owner $331,210; global 1.40x
    9.25%$103,929; owner $276,075; global 1.44x$114,321; owner $303,692; global 1.41x$124,725; owner $331,210; global 1.38x

    Because the loan stays at 75% of cost, a 20% overrun raises the owner's share to $331,210 as well as the debt service. With rates at 9.25% and a 20% overrun together, global coverage still holds at 1.38 times on the model. Under 5001.401 the rate is negotiated, fixed or variable [3]. A fixed rate removes one variable from a project whose savings already move with weather and fuel markets.

    Delay case (Structure A, year 1)BaseDryer misses first harvest
    Dryer savings in year 1$67,058$0
    Solar value in year 1$9,116$9,116
    Project NOI$69,642$2,584
    Debt service and fee$92,369$92,369
    Global coverage1.47x1.33x
    Extra interest if the loan sits fully drawn for six idle months$0$30,019
    REAP grant timing (Structure B)12 to 24 months after completionGrant application moves back one fiscal year

    A missed harvest is the delay that matters. If the dryer is not running by the first fall, year-one project NOI falls to $2,584 and global coverage to 1.33 times. If the loan sits fully drawn through the idle months, another $30,019 of interest accrues. The schedule protects against this by ordering the dryer early, installing in summer and making completion before harvest a condition of the construction contract.

    Export credit per kWhOutput 15% below modelOutput as modelledOutput 10% above
    $0.02$7,246; payback 29.0 years$8,525; payback 24.6 years$9,377; payback 22.4 years
    $0.04$7,748; payback 27.1 years$9,116; payback 23.0 years$10,027; payback 20.9 years
    $0.06$8,251; payback 25.5 years$9,707; payback 21.6 years$10,678; payback 19.7 years

    Equity and loan-size tests

    TestRequirementModel result (Structure A)Source
    REAP guaranteed loan sizeAt least $5,000 and at most 75% of eligible project costs$828,100 = 75.0% of $1,104,1757 CFR 5001.406(d) [3]
    Borrower contributionAt least 25% of total eligible project costs, with or without a grant$276,075 = 25.0%7 CFR 5001.406(d) [3]
    REAP loans to one borrowerAt most $25 million, guaranteed and unguaranteed portions together$828,1005001.406(d)(1) [3]
    Grant plus loanAt most 75% of Project CostStructure B: $828,100 = 75.0%4280.122(b)(20) [1]
    Studies, technical reports and audits inside the loanAt most 10% of the loan in total$18,500 = 2.2% of the loanPart 5001 [3]
    Closing balance sheet and equity certificationLender certifies at closingPro forma closing balance sheet in the study5001.306(a)(2) [3]

    The 25% contribution applies whether or not a grant is ever sought, a point the record's older program summary did not capture. A REAP guaranteed loan on its own may not exceed 75% of eligible project costs, and the borrower must show at least 25% [3]. Separately, grant and loan together may not exceed 75% of project cost [1]. An existing farm meets the equity test with cash or with documented contributions to eligible costs. The lender certifies the equity at closing against a closing balance sheet [3].

    Technical and environmental feasibility

    The technical case rests on three documents that must agree with one another: the energy audit, the solar production model and the engineer's technical report.

    • Dryer. The audit measures the existing dryer's fuel use per pound of water removed from metered propane deliveries, bushel counts and moisture logs, not from a nameplate. The replacement's rating comes from the manufacturer and is adjusted for the site's grain, ambient air and operating practice. The study confirms the new dryer is commercially available new equipment (used equipment is ineligible for a REAP loan [3]), that the wet-holding and leg capacity match its throughput, and that the electrical service can carry the variable-speed fans.
    • Solar. A structural review confirms the roofs can carry the array and snow loads. The production model uses the exact azimuth, tilt and shading of each roof. The interconnection agreement and export tariff come from the serving utility. Every module, inverter and racking component needs a country-of-origin record, because a solar system with any component from a foreign adversary cannot receive a grant [1].
    • Installer. For a grant, the installer must be licensed in the state and have at least three similar installations, and procurement follows 2 CFR 200.318 to 200.327 [1].
    • Environmental. A dryer replacement on an existing pad and a rooftop array disturb little ground, but REAP grants carry environmental review requirements [1], and the study should place that review in the schedule. The engineer's completion certificate is required for projects of $200,000 or more [1].
    • Cropland. The rooftop location matters. Had the farm put the array in a field, a ground-mounted system on Cropland as defined in 7 CFR 718.2 would be ineligible for a REAP grant, and a later retrofit of such a system would be too [1]. That bar applies to grants, not to REAP guaranteed loans [3].

    Management and governance feasibility

    The study assesses whether the operation can run the new dryer at its rated efficiency and keep the records REAP now depends on. Points it covers: who operates the dryer at harvest and how they are trained on the new controls; the maintenance schedule for burners, fans and heat-recovery surfaces; who watches the solar monitoring portal and acts on faults; and who keeps the twelve months of post-installation data a grant application must show [1]. Ownership matters too. A REAP grant counts applications per highest-level owner, including entities its owners own, and requires site ownership or a lease of at least 12 months before the Project Period [1]. If the farm operates through several entities, the study names the applicant, the site owner and any lease between them, and screens all of them under 5001.127 (federal judgments, delinquent federal debt, debarment, and the gambling and other income tests) [3]. Part 5001 treats an applicant as an agricultural producer when at least 50% of its gross income, averaged over five years, comes from agricultural operations [3]; the study shows the income history that supports that status, or treats the applicant as a rural small business instead.

    Economic and community impact (modelled)

    Measure (modelled)ValueBasis
    Propane no longer burned each year36,347 gallons (3,326 MMBtu)Dryer savings table
    Grid electricity displaced each year128,550 kWhDryer fan savings plus year-1 solar output
    Energy spending retained by the farm, year 1$76,174Pro forma, before O&M
    Energy spending retained over a 15-year loan term$1,316,0612% propane and 2.5% power escalation, 0.5% solar degradation
    Construction spend likely to go to regional trades$244,000Site work, electrical, piping, removal, about 30% of solar installation as labour, structural and interconnection
    Share of eligible cost spent locally22%Of the modelled total eligible cost
    Permanent jobs addedNone claimedAn efficiency and self-supply project keeps an existing operation competitive; it is not a hiring project

    The community case for a project like this is energy dollars kept on the farm and spent locally. On the model, the farm stops buying 36,347 gallons of propane a year, keeps about $1.32 million of energy spending over a 15-year loan term and puts about $244,000 of its construction budget into regional trades. The study should not claim new permanent jobs. Its honest claim is that a lower drying cost keeps an existing operation, and the grain it handles, competitive. REAP's 2026 scoring rewards energy saved per award dollar, the share of energy replaced and environmental benefits [1], and the modelled figures above are the evidence base for those points if a grant is sought later.

    Risks and mitigants

    RiskEffect on the caseMitigant the study documents
    Dry harvests reduce drying volumeSavings fall by a third or more in a dry yearMulti-year baseline per bushel-point; global coverage test; no reliance on one season
    Propane price fallsSavings and payback weakenPrice sensitivity; break-even at $2.38 a gallon for project-level 1.00x; farm carries the loan
    Replacement dryer underperforms its ratingSavings shortfallPerformance guarantee in the purchase contract; commissioning test at first harvest
    Installation misses harvestYear-one savings lost, extra interestEarly equipment order, summer installation, completion before harvest in the contract
    Export credit lower than assumedSolar payback exceeds module lifeSizing to on-site use; export-credit sensitivity; tariff review date noted
    Snow or roof structure limits the arrayLower output or added costStructural review; snow-loss allowance in the performance ratio
    Foreign-adversary component in the arraySolar grant ineligibleCountry-of-origin list before purchase
    Grant not awarded or delayedOwner bridge not repaidStructure A as base case; grant treated only as upside
    One-application-per-year ruleDryer and solar cannot share one grant yearSequence applications; confirm with the state office
    Interest rate rises before closingHigher debt serviceFixed rate; rate sensitivity; Agency approval of any rate change between commitment and closing [3]
    Gambling or other ineligible income in an affiliated entityGrant barScreen all entities under 5001.127 and the 2026 grant rule

    What the five Part 5001 components showed

    The feasibility study elements in Appendix A to subpart D of part 5001 [10] give the study its structure. For a project of this kind, on the model:

    ComponentWhat it tests hereWhat the modelled study shows
    EconomicInputs (grain volume, moisture, propane, power), contracts and cost against benefitSavings of $67,058 a year on the dryer and $9,116 from the array; dryer payback 13.1 years
    MarketWhether the energy has a use and the avoided costs are durableAll solar output offsets site load or is credited under the tariff; drying cost falls by $0.134 a bushel
    TechnicalCommercial availability, installer record, equipment life, construction riskNew commercially available equipment; rooftop array off cropland; installation between harvests
    FinancialRepayment source, equity, sensitivityProject-level coverage 0.75x; global coverage 1.47x; 25% owner contribution
    ManagementOperation, maintenance, monitoring and reportingNamed operator, maintenance plan, data retention for a later grant

    Why studies like this are returned

    • Savings claimed from a single harvest, usually the wettest on record.
    • A baseline built from the dryer nameplate rather than metered propane and bushels.
    • Solar output modelled at nameplate or with no snow and soiling losses.
    • Export credited at the retail rate without tariff support.
    • Debt service shown as covered by the grant, or by energy savings alone.
    • A loan sized above 75% of eligible costs, or a grant planned on top of a 75% loan.
    • No country-of-origin record for solar components.
    • An energy audit, technical report and study that use different costs or outputs.

    Program terms that applied

    TermREAP guaranteed loan (FY2026)B&I guaranteed loan under $5 million (FY2026)Source
    Guarantee80%85%91 FR 11272 [4]
    Upfront guarantee fee1.0% of the guaranteed portion3.0%[4]
    Annual retention fee0.25% of guaranteed principal outstanding0.55%[4]
    Extra fee if the guarantee issues before construction is complete0.50%0.50%[4]
    Loan size$5,000 to 75% of eligible project costs; $25 million per borrowerUp to $25 million per borrower5001.406(c), (d) [3]
    Borrower moneyAt least 25% of eligible project costs10% (existing business) to 25% (new business with construction)5001.406(d); 5001.105(d) [3]
    TermUseful life, at most 40 years, no balloonSame5001.402 [3]
    RateNegotiated; fixed, variable or bothSame5001.401 [3]
    Rural testOutside cities over 50,000 and their contiguous urbanized areas (latest decennial census)Same5001.3 [3]
    Gambling screenMore than 15% of gross revenue from gambling bars the loanSame5001.127(b) [3]
    Feasibility studyWhen the lender or Agency deems it necessary; technical report requiredRequired over $1,000,000 to a new business5001.306(a)(3), 5001.307 [3]

    Fees are charged on the guaranteed portion: the REAP guarantee fee is the loan times the 80% guarantee times 1.0%, and the annual retention fee is 0.25% of guaranteed principal outstanding at the end of December [4]. These FY2026 rates apply to loans obligated in FY2026 unless a later appropriation changes them [4]. The loan in this engagement was prepared under earlier notices, so a current borrower should confirm the rates for the year of obligation. B&I is shown for comparison only. The 2026 CFR still lists solar and other renewable energy systems as B&I uses where REAP cannot finance them or REAP funds are unavailable (5001.105(b)(21)) [3]. A USDA press release of 19 August 2025 announced a policy on solar on farmland, so ask the Rural Development state office before planning a B&I guarantee for a solar project.

    Lessons for sponsors of similar projects

    1. Lead with the dryer. On these assumptions the efficiency project carries the economics, with a payback of 13.1 years. The array adds a smaller, thinner-margin benefit and should be sized to on-site use, not to roof area.
    2. Build the baseline from several harvests. Gather three or more years of propane invoices, scale tickets and moisture logs before the audit starts. A per-bushel-point baseline survives a reviewer's questions; a single-season saving does not.
    3. Plan for 25% of your own money. A REAP guaranteed loan alone stops at 75% of eligible cost, and a later grant cannot be stacked on top of a 75% loan.
    4. Treat the grant as a later reward. Under the 2026 rule the grant arrives, if at all, after a full season of metered results and a national competition. Underwrite without it.
    5. Keep the array on a roof, and know its parts. A roof location avoids the cropland bar, and a country-of-origin list avoids the foreign-component bar.
    6. Install between harvests. The single most costly delay is a dryer that misses the first fall.
    7. Sequence applications. One grant application per fiscal year per highest-level owner means a dual project may need two years of applications; confirm with the state office.
    8. Model the farm, not just the project. The lender's decision rests on global coverage, so give the analyst historical financial statements and existing debt schedules at kickoff.

    A REAP study for a loan above $600,000 is listed on the site's cost page at $7,500 to $11,500 and 5 to 7 weeks, and below $600,000 at $4,900 to $8,500 and 4 to 5 weeks, each as a firm fixed fee in a written proposal [11]. For a dryer, solar or combined REAP project in Montana or elsewhere, an independent USDA feasibility study consultant can scope the audit, production model and credit case together.

    Request a scoped proposal for your REAP feasibility study at the contact page.

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Can a grain dryer replacement get REAP financing under the October 2026 rule?

    Yes, as an energy efficiency improvement. The REAP guaranteed loan under 7 CFR part 5001 can finance up to 75% of eligible project costs, with at least 25% from the borrower. A grant of at most 25% of cost and $250,000 for efficiency projects can follow only after the dryer has run for at least 12 months and the applicant can show 12 months of savings and 12 months of pre-installation data. Used equipment is ineligible for the loan, and an energy audit is required for an efficiency grant above $80,000.

    How does a feasibility study document a grain dryer's historical energy use?

    It rebuilds fuel use per bushel and per point of moisture removed from several harvests of propane invoices, scale tickets and moisture logs, then converts that into BTU per pound of water removed. That figure is compared with the replacement dryer's rating, adjusted for the site. Expressing savings per bushel-point lets the study show what happens in a dry year and a wet year, which a lender needs because drying volume can swing by half between seasons.

    Why doesn't the energy saving alone cover the REAP loan payment?

    Efficiency equipment usually repays over its life, not over a short loan. In the modelled case, net savings of about $69,600 a year meet only 0.75 times the $92,369 of annual debt service and retention fee on a 15-year loan. Part 5001 asks the lender for a global credit evaluation, so the farm's whole cash flow is the repayment source. The model's global coverage stays at 1.47 times. The study shows both figures and does not hide the first.

    How big should a roof-mount solar array on a grain farm be?

    Big enough to serve load the site actually uses, not as big as the roof allows. Grain farms use most of their power at harvest and in winter aeration, while solar peaks in summer, so a larger array exports more output at a low credit. In the model a 75 kW array covers 46% of annual load and pays back in 23.0 years; a 150 kW array would exceed a 25-year module life and fail the REAP grant payback test.

    Can I put ground-mounted solar on cropland and still get REAP?

    Not a REAP grant. Since 16 October 2026, a ground-mount solar photovoltaic system or wind turbine on Cropland, as defined in 7 CFR 718.2, is ineligible for a grant, and so is a retrofit of such a system. The bar is in the grant rule, and the REAP guaranteed loan rules in part 5001 contain no cropland restriction. A rooftop array, as in this engagement, avoids the issue. Solar components from a foreign adversary are also ineligible for a grant.

    Can the dryer and the solar array share one REAP grant application?

    Possibly not in the same year. The 2026 rule allows no more than one application per federal fiscal year from each highest-level owner and the entities its owners own, and it sets separate caps of $250,000 for efficiency and $500,000 for renewable systems. Whether one application may combine both components is a question for the Rural Development state office. The modelled plan seeks a grant for the dryer first and leaves the solar component to a later year or to no grant.

    How much equity does a REAP guaranteed loan need?

    At least 25% of total eligible project costs. A REAP guaranteed loan on its own may not exceed 75% of those costs under 7 CFR 5001.406(d), whether or not a grant is planned. If a grant is also awarded, grant and loan together may not exceed 75% of project cost. On the modelled $1,104,175 project, the owner puts in $276,075. Planning a later grant means borrowing less and bridging more cash until the grant arrives.

    Do I need a feasibility study for a REAP guaranteed loan?

    A technical report is required for a renewable energy system loan, and a feasibility study is required when the lender or the Agency deems one necessary. Lenders often ask for one on dual-component projects because the audit, production model and credit case have to agree. For a grant, a feasibility study can stand in for the resource assessment on a renewable system. This site's cost page lists REAP studies at $4,900 to $11,500 depending on loan size.

    Is Sidney, Montana eligible as a rural area?

    On the data in this study, yes. Sidney had 6,338 residents in the Census April 2020 estimates base, far below the 50,000 limit in 7 CFR 5001.3, and Richland County is non-metropolitan under OMB's 2023 delineation. Montana's cities above 50,000 are Billings, Missoula, Great Falls and Bozeman, none near the county. The test uses the latest decennial census and the USDA eligibility map, so the study should attach a dated map determination for the parcel.

    What happened to REAP applications prepared under the earlier rules?

    USDA rescinded the FY2025 to FY2027 REAP funding notice on 15 April 2026. Applicants without a fully executed financial assistance agreement must reapply under the rule effective 16 October 2026. That rule pays grants only after a project has operated, caps them at 25% of cost, and limits grant plus loan to 75%. A study prepared under the earlier notice, like this 2024 engagement, needs its financing and grant assumptions rebuilt before it supports a new application.

    Sources

    [1] USDA RBCS, Unleashing American Energy and Economic Prosperity; Rural Energy for America Program (REAP), final rule with comment period, 91 FR 62600 (1 Oct 2026), effective 16 Oct 2026; sections 4280.120, 4280.122, 4280.125, 4280.131, 4280.140. https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm (accessed 7 Nov 2026)

    [2] USDA RBCS, Notice of Rescission of Funding Opportunity for the Rural Energy for America Program, 91 FR 20090 (15 Apr 2026). https://www.govinfo.gov/content/pkg/FR-2026-04-15/html/2026-07332.htm (accessed 7 Nov 2026)

    [3] 7 CFR part 5001, OneRD Guaranteed Loans (CFR 2026 edition, title 7 vol. 15, revised 1 Jan 2026), sections 5001.3, 5001.105, 5001.106, 5001.127, 5001.202, 5001.306, 5001.307, 5001.401, 5001.402, 5001.406, 5001.454, 5001.455. https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml (accessed 8 Nov 2026)

    [4] USDA, OneRD Annual Notice of Guarantee Fee Rates, Periodic Retention Fee Rates, Loan Guarantee Percentage and Fee for Issuance of the Loan Note Guarantee Prior to Construction Completion for Fiscal Year 2026, 91 FR 11272 (9 Mar 2026). https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm (accessed 6 Nov 2026)

    [5] U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files. https://www2.census.gov/programs-surveys/cbp/datasets/ (accessed 7 Nov 2026)

    [6] U.S. Census Bureau, Vintage 2025 population estimates, county and subcounty (city and town) totals. https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/ (accessed 8 Nov 2026)

    [7] OMB metropolitan and micropolitan statistical area delineation file, July 2023 (list1_2023). https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx (accessed 7 Nov 2026)

    [8] U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026. https://data.sba.gov/dataset/7-a-504-foia (accessed 7 Nov 2026)

    [9] USAspending.gov, award counts and amounts by place of performance for Assistance Listings 10.768 (B&I) and 10.868 (REAP), 1 Oct 2023 to 30 Sep 2026, API v2. https://api.usaspending.gov/api/v2/search/spending_by_award_count/ (accessed 7 Nov 2026)

    [10] OneRD Guaranteed Loan Regulation, 85 FR 42494 (14 Jul 2020), appendix A to subpart D of part 5001, Elements of an Acceptable Feasibility Study. https://www.govinfo.gov/content/pkg/FR-2020-07-14/pdf/2020-13991.pdf (accessed 7 Nov 2026)

    [11] usda-feasibility-study.com, USDA Feasibility Study Cost & Timeline (site page). https://usda-feasibility-study.com/usda-feasibility-study-cost (read 7 Nov 2026)

    [12] usda-feasibility-study.com, USDA Feasibility Study Engagements (published engagement record). https://usda-feasibility-study.com/engagements (read 11 Nov 2026)

    [13] usda-feasibility-study.com, USDA Feasibility Study Consultant in Montana (state hub). https://usda-feasibility-study.com/montana (read 13 Nov 2026)

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours