USDA Feasibility Study for General and Advanced Manufacturing in Montana

    NAICS 31-33

    Montana has 1,393 manufacturing establishments, 123.2 per 100,000 residents against 84.5 nationally, and it added 35 plants from 2019 to 2023 while the national count fell. The plants are small, averaging 15.7 employees against 43.4 for the country, and their SBA record is better than the national one: 4.0 percent of Montana's FY2010 to FY2016 manufacturing 7(a) loans were charged off, against 6.4 percent nationally. A USDA manufacturing feasibility study for a Montana project builds on that record with what a B&I reviewer needs most for a small rural plant: contracted or documented demand, a cost model at Montana wages, and evidence that the operator can run the expanded plant.

    Manufacturing in Montana: market evidence

    Montana: manufacturing establishments (all), supply and rural footprint

    MeasureMontanaUnited States
    Establishments, 2019 → 20231,358 → 1,393 (+2.6%)287,626 → 284,452
    Per 100,000 residents (2023)123.284.5
    Average employees per establishment15.743.4
    Average annual pay per employee$64,517$73,202
    Share of establishments in non-metro counties45.9% (632 in 30 counties)
    Share of state population in non-metro counties (2025)44.7%

    Non-metro counties with the most manufacturing establishments (all) (2023): Flathead County (193); Ravalli County (95); Lake County (41); Silver Bow County (37); Lincoln County (29); Park County (28).

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    Reading the manufacturing numbers. Density 1.46 times the national rate, combined with growth of 2.6 percent against a national decline of 1.1 percent, shows a manufacturing base that is expanding by adding small firms rather than large plants. Payroll per establishment is $1,010,832 against $3,174,395 nationally, less than a third, and pay per employee is $64,517, 11.9 percent below the U.S. $73,202. For a pro forma those numbers cut both ways. Labour is cheaper, but a plant planning 50 or more workers in a county where the typical manufacturer employs 16 will have to show where those workers come from, at what wage, and how long hiring takes. A reviewer will also question any projection that assumes national productivity or margins from plants three times larger.

    What the 1,393 plants make

    Wood products (149 establishments), food manufacturing excluding meat (111), meat and poultry processing (66) and beverages from breweries, wineries and distilleries (108) account for 434 of the 1,393, or 31.2 percent; each has its own Montana page linked below, with data specific to that subsector. The other 959 establishments span the remaining manufacturing subsectors, which the pack does not break out, so a study must build its own competitor and customer list by product.

    Where the plants are

    The county file places 1,378 plants. Gallatin County leads with 245 (19.03 per 10,000 residents), then Flathead with 193 (16.72), Yellowstone 170 (9.84) and Missoula 146, against 12.17 statewide. Among non-metro counties, Ravalli (95 plants, 19.55 per 10,000), Fergus (23, 19.45), Custer (21, 17.45) and Sanders (23, 16.36) have manufacturing densities above Billings' county. Those are the places where a supplier, a skilled workforce and a used-equipment market exist, and where a study can find comparable operators.

    Demand drivers, revenue and costs

    Demand for a Montana plant usually comes from outside the state, so the market section is about customers, not population: named buyers, purchase orders or letters of intent, distributor agreements, and the plant's price and freight position against competitors closer to the buyer. Revenue is volume times price by product line; costs are materials, labour at Montana pay levels, energy, freight in and out, maintenance and overhead. Capital items are land and building, production equipment, installation, utility upgrades (three-phase power, natural gas, water and wastewater), and working capital for inventory and receivables, which B&I can finance.

    Rural footprint and B&I eligibility in Montana

    Non-metro counties hold 632 of the placed plants (45.9 percent) against 44.7 percent of the population, 123.6 per 100,000 non-metro residents against 117.8 in metro counties; the six leading non-metro counties hold 423 of them, two thirds. The eligibility test under 7 CFR 5001.3 is narrower than the county split suggests. Just four Montana cities pass 50,000 residents (Billings 121,239; Missoula 78,903; Great Falls 60,208; Bozeman 58,814), and only they and the urbanized areas touching them are off limits. Plants elsewhere in Gallatin, Yellowstone, Missoula and Cascade counties, and in Helena (35,138), can qualify. The metro counties hold 699 plants in those four counties plus Lewis and Clark, so the parcel check decides many Montana manufacturing deals. The Montana state guide sets out the place list.

    Regional comparison

    Montana's density of 123.2 plants per 100,000 residents is the highest among its neighbours' packs (South Dakota 112.7, Idaho 107.3, Wyoming 102.6, North Dakota 88.3), but its plants are the smallest: 15.7 employees against 17.0 in Wyoming, 32.3 in Idaho, 42.1 in North Dakota and 45.8 in South Dakota. Wyoming pays more ($87,572 per employee), Idaho about the same ($69,546). A study that borrows labour or productivity benchmarks from a neighbour must adjust for plant size.

    Program fit

    B&I is USDA's core manufacturing product: plant construction or purchase, equipment, and working capital, with terms up to the useful life of the assets and 40 years at most (5001.402). SBA 7(a) is the volume lender in Montana, with 300 manufacturing loans since FY2010, and SBA 504 has financed 31 projects, generally owner-occupied buildings and long-life equipment with 10 to 20 percent down (13 CFR 120.910). REAP can fund efficiency equipment or on-site renewable systems once a plant has 12 months of data. Larger plants meet two further conditions: a guaranteed loan above $1,000,000 tied to more than 50 new jobs needs the Department of Labor's concurrence under 5001.306(a)(1), and, as the site's national pages read Part 5001, no guarantee may relocate jobs between areas or add capacity an industry cannot absorb.

    Financing benchmarks: USDA B&I next to SBA

    Montana: SBA lending to manufacturing establishments (all)

    Period7(a) loans7(a) dollars504 loans504 dollars
    FY2010 to FY2016176$60.9 million18$11.3 million
    FY2017 to FY201946$11.2 million2$385,000
    FY2020 to FY202357$30.0 million9$9.4 million
    FY2024 to FY202621$14.6 million2$1.8 million

    Average 7(a) loan, FY2020 to FY2026: $571,846. Average 504 loan: $1.0 million. Of the 176 7(a) loans approved in FY2010 to FY2016 for Montana manufacturing establishments (all), 4.0% were charged off (national: 6.4% of 27,078), on average 71 months after approval.

    Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).

    TermUSDA B&I, fiscal 2026Source
    Guarantee, loans under $5 million85%91 FR 11272
    Guarantee, $5 million to $25 million80%91 FR 11272
    Upfront guarantee fee3.0% of the guaranteed amount91 FR 11272; 7 CFR 5001.454
    Annual retention fee0.55% of the guaranteed share of principal outstanding on December 3191 FR 11272; 7 CFR 5001.455
    Reduced-fee loans (criteria in 5001.454)1.0% fee, 0.50% retention, 80% guarantee91 FR 11272
    Guarantee issued before construction is completeadditional 0.50% fee91 FR 11272; 7 CFR 5001.454
    Maximum loan per borrower$25 million7 CFR 5001.406(c)
    Termuseful life of the collateral, 40 years at most, no balloon7 CFR 5001.402
    Interest ratenegotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans7 CFR 5001.401
    Equity, existing business10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost7 CFR 5001.105(d)(1)
    Equity, new business20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete7 CFR 5001.105(d)(3), (d)(4)
    Independent feasibility studyrequired above $1,000,000 for a new business; at the Agency's discretion otherwise7 CFR 5001.306(a)(3)
    SBA 7(a), for comparison85% guarantee up to $150,000, 75% above13 CFR 120.210
    SBA 504, for comparisonborrower injection 10%; 15% if new or single purpose; 20% if both13 CFR 120.910

    What it means for a Montana plant. The Montana loss record is the strongest single argument a sponsor has: 7 of 176 seasoned loans charged off (4.0 percent against 6.4 percent nationally), on average 71 months after approval. Loan sizes are small but rising: the 7(a) average went from $345,944 in FY2010 to FY2016 to $525,584 in FY2020 to FY2023 and $697,414 in FY2024 to FY2026, while the yearly count fell from about 25 to 7. Montana's 78 manufacturing 7(a) loans in FY2020 to FY2026 were 0.38 percent of the U.S. total, in line with its population. At the $571,846 average, a B&I application would use the streamlined process for loans of $600,000 or less (5001.306(b)); a new plant of a few million dollars uses the full process and needs an independent study.

    Worked example (illustrative)

    Loan A, $575,000, rounds Montana's $571,846 average manufacturing 7(a) loan of FY2020 to FY2026, an equipment or expansion loan for an existing plant. Loan B, $3,000,000, is an illustrative new plant. Both use an illustrative 7.50 percent fixed rate and 20-year amortization.

    Input or resultLoan ALoan B
    Loan amount$575,000.00$3,000,000.00
    Guarantee percentage (fiscal 2026 tier)85%85%
    Guaranteed amount$488,750.00$2,550,000.00
    Upfront guarantee fee (3.0% of the guaranteed amount)$14,662.50$76,500.00
    Upfront fee if the guarantee issues before construction is complete (+0.50%)$17,106.25$89,250.00
    First annual retention fee (0.55% of the guaranteed share of the balance after 12 payments)$2,627.83$13,710.39
    Interest rate (illustrative, fixed)7.50%7.50%
    Amortization (years, no balloon)2020
    Monthly payment$4,632.16$24,167.80
    Annual debt service (NOI for 1.00x, break-even on debt)$55,585.93$290,013.55
    NOI for 1.25x coverage$69,482.41$362,516.94
    Coverage at that NOI if the rate is 2 points higher1.08x1.08x
    Coverage at that NOI if the term is 5 years shorter1.09x1.09x
    Equity, new business, 25% of total project cost (5001.105(d)(4))$191,666.67$1,000,000.00
    Total project cost on that basis$766,666.67$4,000,000.00
    Equity, new business, 20% balance sheet route if this loan is the only liability$143,750.00$750,000.00
    Equity, existing business, 10% of project cost (5001.105(d)(1))$63,888.89$333,333.33
    Independent feasibility study (5001.306(a)(3))streamlined path (5001.306(b)); study at the lender's or Agency's discretionrequired for a new business (5001.306(a)(3)(i))

    Debt-to-payroll and per-job tests. Loan A's annual debt service, $55,585.93, equals 5.50 percent of the average Montana plant's payroll of $1,010,832, a load most established plants can carry. Loan B's $290,013.55 equals 28.69 percent of that average payroll, so a new plant of that size must be far larger than the typical Montana manufacturer or far more profitable. If Loan B's plant employs an illustrative 25 people, it must generate $14,500.68 of net operating income per employee for 1.25x coverage. A two-point rate rise drops coverage to 1.08x, and a 15-year amortization to 1.09x, which is why equipment-heavy plants need terms matched to asset life.

    What a lender-grade manufacturing feasibility study in Montana must prove

    1. Named customers and documented demand: purchase orders, letters of intent or contracts, and the share of output each covers.
    2. A competitor and pricing analysis that includes freight from Montana to the buyer against rivals closer to the market.
    3. A production plan with capacity, yields and ramp-up months, tied to equipment specifications.
    4. A labour plan at Montana pay ($64,517 per employee on average), showing the local labour pool and training time, especially for plants above the 15.7-employee average.
    5. Utility capacity (power, gas, water, wastewater) confirmed by the providers.
    6. A five to ten year projection with coverage, break-even volume and sensitivity to price, volume and input costs.
    7. Management depth and, for a new business, the sponsor's record in the product.
    8. Parcel eligibility under 5001.3, and the job count for any Department of Labor review.

    Risks and mitigants in Montana

    Customer concentration is the most common weakness in small-plant studies; the mitigant is contract terms and a downside case without the largest buyer. Freight distance raises delivered cost for many Montana products, so pricing must be tested at the buyer's door. Skilled labour is scarce in small counties, and wages may need to rise above the state average to staff a new plant. Winter weather affects construction schedules and inbound freight. Specialised equipment appraises below cost, and 5001.203 deducts going-concern value before collateral is discounted, so equity and personal guarantees carry more weight.

    Process, documents and what gets a study returned

    A plant's study enters USDA review attached to the lender's application, and Montana's Rural Development state office examines it before committing. The sponsor provides customer evidence, equipment quotes, the construction or acquisition budget, historical statements for an existing plant, personal financial statements, and guarantees from 20 percent owners (5001.204). Studies are returned when demand rests on market size rather than buyers, when labour is assumed rather than sourced, or when projections depart from history without explanation, which 5001.202 asks the lender to substantiate.

    Program example

    The inputs hold no Montana manufacturing financing. For a worked plant example, the site's Alabama supply-chain case study appears in the links; it is not a Montana project.

    Hiring a USDA manufacturing feasibility study consultant in Montana

    A new manufacturing company borrowing over $1,000,000 under B&I must have a study by an independent manufacturing feasibility study consultant acceptable to the Agency (5001.306(a)(3)(i)). An expansion by an established Montana plant, or a smaller loan, leaves the decision to the Agency and the lender. The cost page frames a plant engagement as customer and market research, a technical and site review, a multi-year financial model with stress cases, and management and economic chapters, handed over as PDF, Word and Excel files with a single revision; six to seven weeks is typical, seven to nine for loans above $10 million or unusual products. Engineering and environmental reports are separate. The sponsor supplies customer documents, quotes, budgets and any history. For a Montana plant, the right USDA feasibility study consultant will ask for the customer documents first, because demand evidence decides more manufacturing files than any other section.

    Request a scoped proposal on the contact page. Tell it where the plant will be, what it will make, the program and cost band, and who the lender is; a senior analyst is due to reply within one business day, says the page.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Does USDA require a feasibility study for a manufacturing project in Montana?

    A start-up manufacturer seeking a B&I guarantee above $1,000,000 must file one, written by an independent consultant USDA accepts; the rule is 7 CFR 5001.306(a)(3)(i). Montana's average manufacturing 7(a) loan was $571,846 in FY2020 to FY2026, so many expansions sit under the line, where the Agency may still require a study if the application lacks information. New plants of any size are usually asked for one.

    What does a manufacturing feasibility study consultant cost?

    Plant studies on the site's cost page fall in two bands: $6,900 to $12,500 for an established product and site, and $10,500 to $14,500 once the loan exceeds $10 million, the product is unusual or several sites are involved. Most Montana plants, at 15.7 employees on average, fit the standard band. The fee is quoted as a fixed amount before work starts.

    How long does it take?

    Expect roughly a month and a half for a standard plant study and up to nine weeks for a complex one, by the cost page's timetable, or three to four weeks on a paid rush. Manufacturing studies run long when customer contracts are still in negotiation or when utility capacity needs confirmation from the provider. The lender then files the report with its application.

    Who can prepare a USDA manufacturing study?

    An independent, qualified consultant acceptable to the Agency (5001.306(a)(3)(i)), with no interest in the equipment sale, the construction contract or the loan. An equipment vendor's throughput study is useful technical input but cannot be the feasibility study. USDA keeps no approved list. For a new plant, the state office will expect customer interviews conducted by the author.

    How long is the study valid?

    Part 5001 attaches no expiry. USDA's informal data window is about 18 months according to the cost page, and plant appraisals over a year old fail 5001.203. For manufacturers the trigger for an update is commercial: a lost or new customer, a price change in the main input, or a change in the equipment plan.

    Can the same manufacturing study serve an SBA lender and USDA?

    Yes in most cases. SBA can call for one under 13 CFR 120.160(b); a plant study written for USDA already meets that bar. Montana manufacturers used SBA 7(a) 78 times and 504 11 times in FY2020 to FY2026. Name both lenders as intended users and keep one projection. Expect the SBA lender to raise the same customer-concentration questions.

    Does a Montana plant need Department of Labor approval?

    Only for larger projects: USDA seeks Department of Labor concurrence when a guaranteed loan exceeds $1,000,000 and the project creates more than 50 jobs (5001.306(a)(1)). With the average Montana plant at 15.7 employees, most projects stay below that. The study should state the job count and its basis either way.

    How does Montana's SBA loss record help an application?

    It gives the lender a Montana-specific benchmark. Only 4.0 percent of 176 Montana manufacturing 7(a) loans from FY2010 to FY2016 were charged off, against 6.4 percent nationally, with losses on average 71 months after approval. A study can cite that record, but it still has to show this plant's coverage through year six, when losses tend to occur.

    Can a plant near Bozeman or Billings get B&I?

    Not inside either city or its contiguous urbanized area, since both exceed 50,000. Gallatin County has 245 plants and Yellowstone 170, and sites outside the urbanized areas can qualify. Belgrade and other towns near the excluded cities need a parcel-level check for contiguity before the study is scoped. Plants inside the excluded areas are not shut out of federal guarantees: SBA's 7(a) and 504 programs carry no rural test.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates (state, county and incorporated places): https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, OneRD Guaranteed Loanmaking and Servicing, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD annual notice of guarantee fee rates, retention fee rates and guarantee percentages for FY2026 (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 90 FR 57351, OneRD guaranteed loan regulation technical amendments, December 11, 2025 (govinfo): https://www.govinfo.gov/content/pkg/FR-2025-12-11/html/2025-22567.htm
    8. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    9. Site cost and timeline page: /usda-feasibility-study-cost; contact page: /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours