Montana has 1,393 manufacturing establishments, 123.2 per 100,000 residents against 84.5 nationally, and it added 35 plants from 2019 to 2023 while the national count fell. The plants are small, averaging 15.7 employees against 43.4 for the country, and their SBA record is better than the national one: 4.0 percent of Montana's FY2010 to FY2016 manufacturing 7(a) loans were charged off, against 6.4 percent nationally. A USDA manufacturing feasibility study for a Montana project builds on that record with what a B&I reviewer needs most for a small rural plant: contracted or documented demand, a cost model at Montana wages, and evidence that the operator can run the expanded plant.
Manufacturing in Montana: market evidence
Montana: manufacturing establishments (all), supply and rural footprint
| Measure | Montana | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 1,358 → 1,393 (+2.6%) | 287,626 → 284,452 |
| Per 100,000 residents (2023) | 123.2 | 84.5 |
| Average employees per establishment | 15.7 | 43.4 |
| Average annual pay per employee | $64,517 | $73,202 |
| Share of establishments in non-metro counties | 45.9% (632 in 30 counties) | |
| Share of state population in non-metro counties (2025) | 44.7% |
Non-metro counties with the most manufacturing establishments (all) (2023): Flathead County (193); Ravalli County (95); Lake County (41); Silver Bow County (37); Lincoln County (29); Park County (28).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Reading the manufacturing numbers. Density 1.46 times the national rate, combined with growth of 2.6 percent against a national decline of 1.1 percent, shows a manufacturing base that is expanding by adding small firms rather than large plants. Payroll per establishment is $1,010,832 against $3,174,395 nationally, less than a third, and pay per employee is $64,517, 11.9 percent below the U.S. $73,202. For a pro forma those numbers cut both ways. Labour is cheaper, but a plant planning 50 or more workers in a county where the typical manufacturer employs 16 will have to show where those workers come from, at what wage, and how long hiring takes. A reviewer will also question any projection that assumes national productivity or margins from plants three times larger.
What the 1,393 plants make
Wood products (149 establishments), food manufacturing excluding meat (111), meat and poultry processing (66) and beverages from breweries, wineries and distilleries (108) account for 434 of the 1,393, or 31.2 percent; each has its own Montana page linked below, with data specific to that subsector. The other 959 establishments span the remaining manufacturing subsectors, which the pack does not break out, so a study must build its own competitor and customer list by product.
Where the plants are
The county file places 1,378 plants. Gallatin County leads with 245 (19.03 per 10,000 residents), then Flathead with 193 (16.72), Yellowstone 170 (9.84) and Missoula 146, against 12.17 statewide. Among non-metro counties, Ravalli (95 plants, 19.55 per 10,000), Fergus (23, 19.45), Custer (21, 17.45) and Sanders (23, 16.36) have manufacturing densities above Billings' county. Those are the places where a supplier, a skilled workforce and a used-equipment market exist, and where a study can find comparable operators.
Demand drivers, revenue and costs
Demand for a Montana plant usually comes from outside the state, so the market section is about customers, not population: named buyers, purchase orders or letters of intent, distributor agreements, and the plant's price and freight position against competitors closer to the buyer. Revenue is volume times price by product line; costs are materials, labour at Montana pay levels, energy, freight in and out, maintenance and overhead. Capital items are land and building, production equipment, installation, utility upgrades (three-phase power, natural gas, water and wastewater), and working capital for inventory and receivables, which B&I can finance.
Rural footprint and B&I eligibility in Montana
Non-metro counties hold 632 of the placed plants (45.9 percent) against 44.7 percent of the population, 123.6 per 100,000 non-metro residents against 117.8 in metro counties; the six leading non-metro counties hold 423 of them, two thirds. The eligibility test under 7 CFR 5001.3 is narrower than the county split suggests. Just four Montana cities pass 50,000 residents (Billings 121,239; Missoula 78,903; Great Falls 60,208; Bozeman 58,814), and only they and the urbanized areas touching them are off limits. Plants elsewhere in Gallatin, Yellowstone, Missoula and Cascade counties, and in Helena (35,138), can qualify. The metro counties hold 699 plants in those four counties plus Lewis and Clark, so the parcel check decides many Montana manufacturing deals. The Montana state guide sets out the place list.
Regional comparison
Montana's density of 123.2 plants per 100,000 residents is the highest among its neighbours' packs (South Dakota 112.7, Idaho 107.3, Wyoming 102.6, North Dakota 88.3), but its plants are the smallest: 15.7 employees against 17.0 in Wyoming, 32.3 in Idaho, 42.1 in North Dakota and 45.8 in South Dakota. Wyoming pays more ($87,572 per employee), Idaho about the same ($69,546). A study that borrows labour or productivity benchmarks from a neighbour must adjust for plant size.
Program fit
B&I is USDA's core manufacturing product: plant construction or purchase, equipment, and working capital, with terms up to the useful life of the assets and 40 years at most (5001.402). SBA 7(a) is the volume lender in Montana, with 300 manufacturing loans since FY2010, and SBA 504 has financed 31 projects, generally owner-occupied buildings and long-life equipment with 10 to 20 percent down (13 CFR 120.910). REAP can fund efficiency equipment or on-site renewable systems once a plant has 12 months of data. Larger plants meet two further conditions: a guaranteed loan above $1,000,000 tied to more than 50 new jobs needs the Department of Labor's concurrence under 5001.306(a)(1), and, as the site's national pages read Part 5001, no guarantee may relocate jobs between areas or add capacity an industry cannot absorb.
Financing benchmarks: USDA B&I next to SBA
Montana: SBA lending to manufacturing establishments (all)
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 176 | $60.9 million | 18 | $11.3 million |
| FY2017 to FY2019 | 46 | $11.2 million | 2 | $385,000 |
| FY2020 to FY2023 | 57 | $30.0 million | 9 | $9.4 million |
| FY2024 to FY2026 | 21 | $14.6 million | 2 | $1.8 million |
Average 7(a) loan, FY2020 to FY2026: $571,846. Average 504 loan: $1.0 million. Of the 176 7(a) loans approved in FY2010 to FY2016 for Montana manufacturing establishments (all), 4.0% were charged off (national: 6.4% of 27,078), on average 71 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| Term | USDA B&I, fiscal 2026 | Source |
|---|---|---|
| Guarantee, loans under $5 million | 85% | 91 FR 11272 |
| Guarantee, $5 million to $25 million | 80% | 91 FR 11272 |
| Upfront guarantee fee | 3.0% of the guaranteed amount | 91 FR 11272; 7 CFR 5001.454 |
| Annual retention fee | 0.55% of the guaranteed share of principal outstanding on December 31 | 91 FR 11272; 7 CFR 5001.455 |
| Reduced-fee loans (criteria in 5001.454) | 1.0% fee, 0.50% retention, 80% guarantee | 91 FR 11272 |
| Guarantee issued before construction is complete | additional 0.50% fee | 91 FR 11272; 7 CFR 5001.454 |
| Maximum loan per borrower | $25 million | 7 CFR 5001.406(c) |
| Term | useful life of the collateral, 40 years at most, no balloon | 7 CFR 5001.402 |
| Interest rate | negotiated, fixed or variable, no higher than the lender's similar non-guaranteed loans | 7 CFR 5001.401 |
| Equity, existing business | 10% balance sheet equity (or debt to equity of 9:1), or 10% of project cost | 7 CFR 5001.105(d)(1) |
| Equity, new business | 20% balance sheet equity (or 4:1), or 25% of project cost; 25% (or 3:1) when the guarantee issues before construction is complete | 7 CFR 5001.105(d)(3), (d)(4) |
| Independent feasibility study | required above $1,000,000 for a new business; at the Agency's discretion otherwise | 7 CFR 5001.306(a)(3) |
| SBA 7(a), for comparison | 85% guarantee up to $150,000, 75% above | 13 CFR 120.210 |
| SBA 504, for comparison | borrower injection 10%; 15% if new or single purpose; 20% if both | 13 CFR 120.910 |
What it means for a Montana plant. The Montana loss record is the strongest single argument a sponsor has: 7 of 176 seasoned loans charged off (4.0 percent against 6.4 percent nationally), on average 71 months after approval. Loan sizes are small but rising: the 7(a) average went from $345,944 in FY2010 to FY2016 to $525,584 in FY2020 to FY2023 and $697,414 in FY2024 to FY2026, while the yearly count fell from about 25 to 7. Montana's 78 manufacturing 7(a) loans in FY2020 to FY2026 were 0.38 percent of the U.S. total, in line with its population. At the $571,846 average, a B&I application would use the streamlined process for loans of $600,000 or less (5001.306(b)); a new plant of a few million dollars uses the full process and needs an independent study.
Worked example (illustrative)
Loan A, $575,000, rounds Montana's $571,846 average manufacturing 7(a) loan of FY2020 to FY2026, an equipment or expansion loan for an existing plant. Loan B, $3,000,000, is an illustrative new plant. Both use an illustrative 7.50 percent fixed rate and 20-year amortization.
| Input or result | Loan A | Loan B |
|---|---|---|
| Loan amount | $575,000.00 | $3,000,000.00 |
| Guarantee percentage (fiscal 2026 tier) | 85% | 85% |
| Guaranteed amount | $488,750.00 | $2,550,000.00 |
| Upfront guarantee fee (3.0% of the guaranteed amount) | $14,662.50 | $76,500.00 |
| Upfront fee if the guarantee issues before construction is complete (+0.50%) | $17,106.25 | $89,250.00 |
| First annual retention fee (0.55% of the guaranteed share of the balance after 12 payments) | $2,627.83 | $13,710.39 |
| Interest rate (illustrative, fixed) | 7.50% | 7.50% |
| Amortization (years, no balloon) | 20 | 20 |
| Monthly payment | $4,632.16 | $24,167.80 |
| Annual debt service (NOI for 1.00x, break-even on debt) | $55,585.93 | $290,013.55 |
| NOI for 1.25x coverage | $69,482.41 | $362,516.94 |
| Coverage at that NOI if the rate is 2 points higher | 1.08x | 1.08x |
| Coverage at that NOI if the term is 5 years shorter | 1.09x | 1.09x |
| Equity, new business, 25% of total project cost (5001.105(d)(4)) | $191,666.67 | $1,000,000.00 |
| Total project cost on that basis | $766,666.67 | $4,000,000.00 |
| Equity, new business, 20% balance sheet route if this loan is the only liability | $143,750.00 | $750,000.00 |
| Equity, existing business, 10% of project cost (5001.105(d)(1)) | $63,888.89 | $333,333.33 |
| Independent feasibility study (5001.306(a)(3)) | streamlined path (5001.306(b)); study at the lender's or Agency's discretion | required for a new business (5001.306(a)(3)(i)) |
Debt-to-payroll and per-job tests. Loan A's annual debt service, $55,585.93, equals 5.50 percent of the average Montana plant's payroll of $1,010,832, a load most established plants can carry. Loan B's $290,013.55 equals 28.69 percent of that average payroll, so a new plant of that size must be far larger than the typical Montana manufacturer or far more profitable. If Loan B's plant employs an illustrative 25 people, it must generate $14,500.68 of net operating income per employee for 1.25x coverage. A two-point rate rise drops coverage to 1.08x, and a 15-year amortization to 1.09x, which is why equipment-heavy plants need terms matched to asset life.
What a lender-grade manufacturing feasibility study in Montana must prove
- Named customers and documented demand: purchase orders, letters of intent or contracts, and the share of output each covers.
- A competitor and pricing analysis that includes freight from Montana to the buyer against rivals closer to the market.
- A production plan with capacity, yields and ramp-up months, tied to equipment specifications.
- A labour plan at Montana pay ($64,517 per employee on average), showing the local labour pool and training time, especially for plants above the 15.7-employee average.
- Utility capacity (power, gas, water, wastewater) confirmed by the providers.
- A five to ten year projection with coverage, break-even volume and sensitivity to price, volume and input costs.
- Management depth and, for a new business, the sponsor's record in the product.
- Parcel eligibility under 5001.3, and the job count for any Department of Labor review.
Risks and mitigants in Montana
Customer concentration is the most common weakness in small-plant studies; the mitigant is contract terms and a downside case without the largest buyer. Freight distance raises delivered cost for many Montana products, so pricing must be tested at the buyer's door. Skilled labour is scarce in small counties, and wages may need to rise above the state average to staff a new plant. Winter weather affects construction schedules and inbound freight. Specialised equipment appraises below cost, and 5001.203 deducts going-concern value before collateral is discounted, so equity and personal guarantees carry more weight.
Process, documents and what gets a study returned
A plant's study enters USDA review attached to the lender's application, and Montana's Rural Development state office examines it before committing. The sponsor provides customer evidence, equipment quotes, the construction or acquisition budget, historical statements for an existing plant, personal financial statements, and guarantees from 20 percent owners (5001.204). Studies are returned when demand rests on market size rather than buyers, when labour is assumed rather than sourced, or when projections depart from history without explanation, which 5001.202 asks the lender to substantiate.
Program example
The inputs hold no Montana manufacturing financing. For a worked plant example, the site's Alabama supply-chain case study appears in the links; it is not a Montana project.
Hiring a USDA manufacturing feasibility study consultant in Montana
A new manufacturing company borrowing over $1,000,000 under B&I must have a study by an independent manufacturing feasibility study consultant acceptable to the Agency (5001.306(a)(3)(i)). An expansion by an established Montana plant, or a smaller loan, leaves the decision to the Agency and the lender. The cost page frames a plant engagement as customer and market research, a technical and site review, a multi-year financial model with stress cases, and management and economic chapters, handed over as PDF, Word and Excel files with a single revision; six to seven weeks is typical, seven to nine for loans above $10 million or unusual products. Engineering and environmental reports are separate. The sponsor supplies customer documents, quotes, budgets and any history. For a Montana plant, the right USDA feasibility study consultant will ask for the customer documents first, because demand evidence decides more manufacturing files than any other section.
Request a scoped proposal on the contact page. Tell it where the plant will be, what it will make, the program and cost band, and who the lender is; a senior analyst is due to reply within one business day, says the page.
Last updated 2026-11-08
USDA Feasibility, Inc.