Minnesota is one of the country's heaviest users of USDA's Rural Energy for America Program (REAP). USAspending shows 544 REAP grants in Minnesota from FY2024 to FY2026, and the hub reports that in February 2024 USDA announced $53.8 million for 495 Minnesota REAP projects, more than any other state. Yet Census counts only nine solar and other renewable generation businesses in the state, six of them solar with nine employees between them (computed), because the arrays REAP pays for belong to farms, wineries, grocers and manufacturers counted in their own industries. The rule effective 16 October 2026 changed how that money flows: a REAP grant now follows 12 months of operation, is capped at 25% of cost and $500,000, and can no longer finance construction. A Minnesota solar feasibility study now mostly supports the loan that builds the system.
Data current as of November 2026.
The REAP rule effective 16 October 2026, applied to a Minnesota project
USDA published the final rule with comment period on 1 October 2026 (91 FR 62600), effective 16 October 2026, after rescinding the FY2025 to FY2027 funding notice in April 2026 (91 FR 20090). Its main terms, all from the rule text as summarised on the site's national renewable energy page:
| Topic | Rule effective 16 October 2026 | What it means for a Minnesota solar study |
|---|---|---|
| Timing | Project Period ends 12 to 24 months before the application (12 to 36 in the first window) | Build first, apply for the grant later |
| Data | 12 months of actual production and 12 months of pre-installation data | The study's production estimate is later checked against meter data |
| Award size | $1,500 minimum; $500,000 maximum for renewable systems, $250,000 for efficiency | Large arrays get a smaller share |
| Cost share | At least 75% of project cost from other sources | Grant at most 25% |
| Combined funding | Grant plus REAP guaranteed loan at most 75% of cost | Caps the loan if a grant is planned |
| Cropland | Ground-mount solar on Cropland (7 CFR 718.2) ineligible; no retrofits of such systems | Site screening comes first on farms |
| Foreign components | Systems with any component from a foreign adversary under 15 CFR 791.4 ineligible (except installed before publication) | Country-of-origin list for every component |
| Sizing | Ground-mount systems must match historical energy use; storage at most 120% of prior annual use | Load analysis is required |
| Economics | Simple payback may not exceed useful life | Payback is an eligibility test |
| Exclusions | EV chargers, retail energy dispensing, stand-alone storage, storage retrofits, distribution-only projects; one location per application | Scope these out |
| Applicant and installer | One application per federal fiscal year per highest-level owner group; site held 12 months before the Project Period; installer licensed with three similar installations | Ownership and installer evidence |
| Competition | No state competitions: one for requests of $20,000 or less, one national for the rest | Minnesota projects compete nationally |
As of 7 November 2026 no new REAP funding notice under the rule had appeared in the Federal Register. A lender should therefore underwrite a Minnesota project without the grant and treat any award as a later prepayment or reserve.
Program fit and when a study is required
The REAP guaranteed loan finances the up-front cost: up to 75% of eligible costs and $25 million per borrower, with an FY2026 guarantee of 80%, a 1.0% fee and 0.25% retention (91 FR 11272; national page). The national page notes that a REAP loan needs a technical report and a feasibility study when the lender or Agency deems one necessary, and that a REAP grant needs a resource assessment or a study in its place. B&I's compulsory study applies to new businesses borrowing more than $1,000,000 (7 CFR 5001.306(a)(3)(i)), but the hub states that since a USDA letter of 19 August 2025 wind and solar projects are ineligible for B&I in Minnesota; this page follows the hub and treats B&I as unavailable for stand-alone solar until the lender confirms otherwise. The hub also points to Minnesota's statewide Commercial PACE program as an alternative for energy work. A conventional bank loan is the other comparison, and Community Facilities can fund renewable systems only where they serve an essential community facility, as the national page notes. SBA 7(a) has made eight loans to Minnesota generation businesses since FY2010. The hub reports a USDA pause on guarantees for biodigester projects through 31 December 2026.
Borrowers and owners above 20% must clear the federal tax, debt, judgment and debarment screen in 7 CFR 5001.127(a), and the hub reports that the new REAP rule disqualifies applicants with any gambling income.
Solar and renewable generation in Minnesota: market evidence
Minnesota: solar and other renewable power generation, supply and rural footprint
| Measure | Minnesota | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 8 → 9 (+12.5%) | 405 → 942 |
| Per 100,000 residents (2023) | 0.2 | 0.3 |
| Average employees per establishment | 9.2 | 12.3 |
| Average annual pay per employee | $132,735 | $138,631 |
| Share of establishments in non-metro counties | 0.0% (0 in 0 counties) | |
| Share of state population in non-metro counties (2025) | 21.9% |
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Computed: Minnesota renewable generation businesses by type, 2019 and 2023 (Census CBP state files)
| Type (NAICS) | Establishments 2019 → 2023 | Employees 2019 → 2023 | Average pay 2023 |
|---|---|---|---|
| Solar electric power generation (221114) | 8 → 6 | 111 → 9 | $125,778 |
| Biomass electric power generation (221117) | n/a → 3 | n/a → 74 | $133,581 |
Minnesota: SBA lending to solar and other renewable power generation
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 0 | $0 | 0 | $0 |
| FY2017 to FY2019 | 1 | $280,000 | 0 | $0 |
| FY2020 to FY2023 | 6 | $4.1 million | 0 | $0 |
| FY2024 to FY2026 | 1 | $300,000 | 0 | $0 |
Average 7(a) loan, FY2020 to FY2026: $621,743. Minnesota had fewer than 30 seasoned 7(a) loans for solar and other renewable power generation; nationally, 12.9% of 31 FY2010 to FY2016 loans were charged off, on average 51 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
The Census figures say almost nothing about REAP demand, and that is the finding. Solar generation businesses fell from eight to six between 2019 and 2023 and their employment from 111 to 9; the apparent growth to nine establishments comes from three biomass plants with 74 employees (computed). The county file places four establishments in one metro county, so the pack's 0.0% non-metro share reflects the file, not the location of Minnesota's solar. SBA's eight 7(a) loans, averaging $621,743 in FY2020 to FY2026, financed generation businesses, not the farm and business arrays that REAP funds.
A lender reviewing a Minnesota REAP project therefore cannot benchmark it against local generation firms. The evidence must come from the host business: its utility bills, load profile, roof or site, and the production estimate for the specific array.
Regional comparables (other states' figures, labelled)
Computed: solar and renewable generation businesses in Minnesota, Wisconsin and Iowa (each state's pack and pack JSON)
| Measure | Minnesota | Wisconsin | Iowa |
|---|---|---|---|
| Establishments, 2019 → 2023 | 8 → 9 | 4 → 5 | 0 → 7 |
| Per 100,000 residents (2023) | 0.2 | 0.1 | 0.2 |
| Average employees per establishment | 9.2 | 8.4 | 21.1 |
| Average annual pay per employee | $132,735 | $128,000 | $152,784 |
| Establishments placed in the county file / non-metro among them | 4 / 0 | 0 / 0 | 0 / 0 |
| SBA 7(a) loans, FY2010 to FY2026 | 8 | 3 | 2 |
| SBA 504 loans, FY2010 to FY2026 | 0 | 0 | 0 |
| SBA 7(a) and 504 loans, FY2020 to FY2026 (count; average) | 7; $621,743 | 3; $426,667 | 1; $302,700 |
The neighbours show the same thinness: Wisconsin has five generation businesses and three SBA loans averaging $426,667, Iowa seven businesses and one loan. On the site's national renewable page, Iowa leads REAP grant awards in FY2024 to FY2026 with 586 and Minnesota follows with 544, so REAP activity, not generation businesses, is where the region's solar lending happens.
National benchmarks
Nationally, 942 solar and other renewable generation establishments had paid employees in 2023, up from 405 in 2019, and SBA approved 138 7(a) loans averaging $478,591 and 17 504 loans averaging $638,588 in FY2020 to FY2026 (computed from the pack). The national seasoned 7(a) loss rate is high: 12.9% of 31 loans approved in FY2010 to FY2016 were charged off, on average 51 months after approval. The national renewable page also reports 6,722 REAP grant awards across the states in FY2024 to FY2026.
Evidence the study must build
- Load and bills. Twelve months or more of utility bills and interval data, and 12 months of pre-installation data for the grant application.
- Production estimate. Array design, orientation, shading and expected output, with degradation, ready to be reconciled against 12 months of meter data.
- Tariff and interconnection. The utility's rate schedule and interconnection terms, which set the value of each kilowatt-hour (Minnesota utility specifics are not in the inputs).
- Site screening. Roof structure or ground site, and confirmation that a ground mount is not on Cropland under 7 CFR 718.2.
- Components. Country of origin for each major component under 15 CFR 791.4.
- Installer. State licence and at least three similar installations; procurement under 2 CFR 200.318 to 200.327.
Rural footprint and eligibility in Minnesota
For REAP guaranteed loans, the rural definition in 7 CFR 5001.3 applies, as it does to B&I: the site must lie outside any city of more than 50,000 residents in the 2020 census and its attached urbanized area, and eligibility cannot be granted subject to later compliance. Farm sites almost always pass; rural small businesses in regional centres need the usual check against Rochester, St. Cloud, Duluth and the Twin Cities urbanized area. Agricultural producers have their own REAP eligibility rules, which are not restated here. The hub's named Minnesota awards are in Spring Valley (Fillmore County), St. Charles (Winona County) and Stewartville (Olmsted County). See the Minnesota USDA page.
Worked example (illustrative)
Inputs. An installed project cost of $1,000,000, chosen for illustration because Minnesota has fewer than ten SBA loans in this code and the REAP structure, not SBA, governs. Column one assumes no grant; column two assumes a 25% grant ($250,000) will be awarded after 12 months of operation, which limits the REAP guaranteed loan so that grant plus loan stay within 75% of cost. FY2026 REAP guarantee terms apply (80%, 1.0% fee, 0.25% retention). The rate is an assumed 7.0% fixed over 20 years with monthly payments; neither the rate nor the useful life has been quoted by a lender or engineer.
Computed: REAP guaranteed loan with and without a later grant (Python, exact to the cent)
| Line | No grant planned | Grant of 25% expected later |
|---|---|---|
| Installed project cost (illustrative) | $1,000,000.00 | $1,000,000.00 |
| REAP grant, at most 25% of cost and $500,000 | $0.00 | $250,000.00 |
| REAP guaranteed loan (grant plus loan at most 75% of cost) | $750,000.00 | $500,000.00 |
| Owner cash and other funds | $250,000.00 | $250,000.00 |
| Guaranteed amount (REAP FY2026: 80%) | $600,000.00 | $400,000.00 |
| Upfront guarantee fee (1.0%) | $6,000.00 | $4,000.00 |
| Retention fee on the balance after 12 payments (0.25%) | $1,464.32 | $976.21 |
| Annual debt service (7.0%, 20 years, illustrative) | $69,776.90 | $46,517.94 |
| Energy savings plus sales needed for 1.25x | $87,221.13 | $58,147.42 |
| Simple payback if savings equal that 1.25x figure | 11.47 years | 17.20 years |
| Coverage if production is 15% below the estimate | 1.06x | 1.06x |
| Coverage at a rate 2 points higher | 1.08x | 1.08x |
Without a grant, the business borrows $750,000 and needs $87,221.13 a year of energy savings and sales for 1.25x, a simple payback of 11.47 years on the full cost. If a grant is planned, the loan falls to $500,000 and the required savings to $58,147.42, but the owner must fund the $250,000 grant portion until the award arrives a year or more later, and the payback on those lower savings, 17.20 years, must still be shorter than the system's useful life. Production 15% below estimate takes coverage to 1.06x in both cases. For a Minnesota project the practical lesson is to size the loan on the no-grant case.
What a lender-grade solar feasibility study in Minnesota must prove
- The site and applicant are eligible, including the Cropland and single-location tests.
- Historical energy use that justifies the system size, and storage within 120% of prior use.
- A production estimate with design basis, ready for reconciliation with meter data.
- Tariff and interconnection terms and the resulting annual savings and sales.
- Simple payback shorter than useful life, with the useful life evidenced.
- Component origins and installer qualifications under the new rule.
- Debt service coverage on the REAP loan without the grant, and the bridge for any grant expected later.
- Stress cases for production, tariff changes and rates.
Hiring a USDA solar feasibility study consultant in Minnesota
Under the new rule, a Minnesota solar study usually supports a REAP guaranteed loan or a bank loan, with the grant application following once the system has a year of data. The USDA feasibility study consultant should be independent of the installer, the equipment supplier and the lender, and able to reconcile engineering estimates with utility data.
The cost page prices REAP work in two tiers: $4,900 to $8,500 over four to five weeks where the REAP loan is under $600,000, and $7,500 to $11,500 over five to seven weeks for a guaranteed loan above $600,000 with full projections and coverage analysis. Grant application drafting and engineering are not included. Bring 12 months or more of utility bills, the installer's proposal and design, component origin details, site or roof information, ownership documents and the lender's terms, then request a REAP study proposal; the contact page says a senior analyst replies within one business day.
Minnesota REAP precedents (as listed on the hub)
- Four Daughters Winery, Spring Valley (Fillmore County): $167,500 (2024) for a 207 kilowatt solar array.
- Miller's Market, St. Charles (Winona County): $64,000 for a 50 kilowatt array.
- Mark and Karen Goldberg, Stewartville (Olmsted County): nearly $78,000 (2024) for a farm wind turbine.
All were awarded under the rules before 16 October 2026. Under the current rule, comparable projects would apply after a year of operation, and their grants would be capped at 25% of cost.
Last updated 2026-11-08