USDA Feasibility Study for Cold Storage and Warehousing in Mississippi

    NAICS 493120

    Mississippi has 13 refrigerated warehouses with a paid staff, four fewer than in 2019, and SBA's records show no loan to a Mississippi cold storage business in any year from FY2010 to FY2026. That is the starting point for a USDA cold storage feasibility study in Mississippi: a state that grows broilers and catfish at national scale has almost no independent cold storage capacity in public data, and no local loan history for a lender to lean on. The study has to build the evidence itself, from processors' volumes and contracts, before a Business and Industry (B&I) guarantee can be underwritten.

    Cold storage in Mississippi: market evidence

    Mississippi: refrigerated warehousing, supply and rural footprint

    MeasureMississippiUnited States
    Establishments, 2019 → 202317 → 13 (-23.5%)1,350 → 1,367
    Per 100,000 residents (2023)0.40.4
    Average employees per establishment14.148.4
    Average annual pay per employee$46,350$56,901
    Share of establishments in non-metro counties0.0% (0 in 0 counties)
    Share of state population in non-metro counties (2025)50.0%

    Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.

    The scarcity is the finding. Thirteen warehouses employing 183 people is a small industry, and its average size, 14.1 employees against 48.4 nationally, describes small local facilities rather than the large public refrigerated warehouses that serve national food distribution. The count fell by almost a quarter in four years while the national total edged up 1.3 percent. Per resident, Mississippi matches the national density of 0.4, but that average hides the fact that most cold capacity in a poultry and catfish state sits inside processing plants, which Census counts as food manufacturing, not warehousing. The 0.0 percent non-metro figure does not mean there is no rural cold storage: the county file places only 3 of the 13 warehouses, all in one metro county, because counties with one or two establishments are suppressed. For a lender, the consequences are concrete. There are no local comparables for rates or utilisation, no local operators to benchmark staffing, and no history of how a Mississippi cold store performs through a downturn. Pay of $46,350, 81.5 percent of the national level, is the only usable state benchmark.

    Regional comparison

    StatePayroll establishments 2023Change since 2019Per 100k residentsStaff per siteAverage paySBA 7(a) loans, 2020-26Average 7(a) loan, 2020-26
    Mississippi13-23.5%0.414.1$46,3500none
    Alabama20-4.8%0.430.2$55,1180none
    Louisiana9-43.8%0.223.4$60,0570none
    Tennessee19-5.0%0.367.3$51,3961$995,000
    Arkansas19-20.8%0.655.4$52,0061$5,000,000
    United States1,367+1.3%0.448.4$56,90132$1,424,256

    Computed from each state's own pack (Census County Business Patterns 2019 and 2023; SBA 7(a) FOIA data as of 30 Sep 2026); neighbouring states' figures are theirs.

    The region confirms the pattern rather than filling the gap. Louisiana lost 43.8 percent of its payroll cold stores and Arkansas 20.8 percent; Alabama, Tennessee and Arkansas operate larger facilities (30 to 67 employees on average), consistent with distribution-scale warehouses that Mississippi lacks. Across the five states SBA made two cold storage loans in FY2020 to FY2026, one each in Tennessee ($995,000) and Arkansas ($5,000,000).

    Rural footprint and B&I eligibility in Mississippi

    Demand for rural cold storage in Mississippi comes from the sectors the hub describes: poultry, the state's first commodity for 31 years at $3.73 billion in 2025, and farm-raised catfish, with more than 65 percent of U.S. production concentrated in the Delta and Black Prairie. The hub also points to logistics corridors around the Port of Gulfport and the Tennessee-Tombigbee Waterway.

    Under 7 CFR 5001.3, the only ground B&I excludes is a city or town that the most recent full census counted above 50,000, plus the urbanized area running into it. That matters here. The Mississippi hub lists Gulfport (72,926 in 2020) as over the line, and regards Biloxi as probably part of the Gulfport urbanized area, so a cold store at or near the port will rarely qualify; inland sites on the waterway or in the Delta usually will, subject to a parcel determination. Jackson and Southaven, the other two cities above 50,000, and their suburbs are also excluded, which removes the most obvious distribution locations.

    Ownership screens in 5001.127 reach through the warehouse company to its people: an owner in control, or one above 20 percent, who has an unpaid federal court judgment, overdue federal tax, unpaid federal debt or a debarment makes the company ineligible. Holders of a fifth or more of the company give guarantees sized to their stake (5001.204).

    Program fit

    • B&I is the main USDA path; the hub states that it finances cold chain capacity across eligible counties, up to $25 million per borrower.
    • SBA 7(a) and 504 have no Mississippi cold storage history in FY2010 to FY2026; nationally 504 can suit an owner-occupied warehouse, with 15 or 20 percent borrower contribution for a new or special-purpose property (13 CFR 120.910).
    • REAP can share the cost of refrigeration efficiency at a facility already operating, or a rooftop array sized to the facility's historical use, with the grant held to a quarter of cost under the rule in force since 16 October 2026.
    • C-PACE is off the table, because, per the hub, Mississippi never enacted a Commercial PACE statute.
    • Sales or storage contracts with processors reduce B&I equity for a new business to 10 percent under 5001.105(d)(2), a lever specific to contract-backed cold storage.

    Financing benchmarks: USDA B&I next to SBA

    The Mississippi pack carries no SBA lending table for refrigerated warehousing because there is nothing to tabulate: zero 7(a) and zero 504 loans from FY2010 to FY2026. The benchmarks therefore come from the national record (32 loans averaging $1,424,256 in FY2020 to FY2026; 5.3 percent of 38 seasoned FY2010 to FY2016 loans charged off, on average 76 months after approval, a small sample but the only loss benchmark there is) and from the B&I terms below. An average-size national loan sits in the 85 percent tier; a regional distribution warehouse of $5 million or more drops to 80 percent, and the $25 million cap limits B&I to part of the very largest projects.

    B&I termFiscal 2026 ruleSource
    Guarantee85% below $5 million; 80% for $5 million to $25 million91 FR 11272
    Upfront and retention fees3.0% of the guaranteed amount; 0.55% a year91 FR 11272
    Construction-period guarantee+0.50% fee; independent budget confirmation; equity in first91 FR 11272; 7 CFR 5001.205(e)(2)
    Termuseful life, 40 years at most7 CFR 5001.402
    Equity, new business10% with qualifying contracts; 25% with a construction-period guarantee; otherwise 20% or 25%7 CFR 5001.105(d)
    Studyrequired above $1 million for a new business7 CFR 5001.306(a)(3)(i)

    B&I terms summarised from the FY2026 notice and 7 CFR Part 5001.

    Worked example (illustrative)

    With no Mississippi SBA cold storage loans, Loan A uses the national FY2020 to FY2026 average ($1,424,256) rounded to $1,420,000, priced for illustration at 7.25 percent and repaid over 20 years. Loan B is an illustrative $8,000,000 regional warehouse at 7.00 percent over 25 years, in the 80 percent tier.

    Input or resultLoan A: national average sizeLoan B: illustrative regional warehouse
    Loan amount$1,420,000.00$8,000,000.00
    Program and fee scheduleB&I, fiscal 2026 noticeB&I, fiscal 2026 notice
    Guarantee percentage85%80%
    Guaranteed amount$1,207,000.00$6,400,000.00
    Upfront guarantee fee$36,210.00$192,000.00
    Upfront fee if the guarantee is issued before construction is complete (+0.50%)$42,245.00$224,000.00
    First annual retention fee (guaranteed share of the balance after 12 payments)$6,485.13$34,661.51
    Interest rate (illustrative, fixed)7.25%7.00%
    Amortization, years (no balloon)2025
    Monthly payment$11,223.34$56,542.34
    Annual debt service$134,680.07$678,508.03
    NOI needed for 1.25x coverage$168,350.08$848,135.04
    Coverage on that 1.25x NOI if the rate were 2 points higher1.08x1.05x
    Equity, new business with qualifying sales contracts, 10% of project cost (5001.105(d)(2))$157,777.78$888,888.89
    Equity, new business with guarantee issued before completion, 25% balance-sheet route (5001.105(d)(3))$473,333.33$2,666,666.67
    Equity, new business, 25% of project cost (5001.105(d)(4))$473,333.33$2,666,666.67
    Total project cost on that basis$1,893,333.33$10,666,666.67

    Computed in Python from the inputs shown; guarantee tiers and fees from 91 FR 11272; equity routes from 7 CFR 5001.105(d)(2) to (4), assuming the guaranteed loan is the only debt.

    Per-pallet test. For an illustrative 1,500 pallet positions, Loan A's 1.25x NOI of $168,350.08 equals $112.23 per position per year, about $9.35 a month after power, labour, maintenance, insurance and management. Loan B at an illustrative 8,000 positions needs $106.02 a position a year. The study has to show storage and handling revenue per position, at a realistic average utilisation, that clears costs by those margins.

    Contracts and equity. If a new warehouse company holds storage contracts with processors adequate to service debt for at least the loan term, Loan B's equity falls from $2,666,666.67 to $888,888.89, a difference of $1,777,777.78 (5001.105(d)(2)). A construction-period guarantee, however, puts a new business on the 25 percent route under (d)(3), so the sequencing of contracts, construction and the guarantee changes the equity bill.

    Stress. A two-point rate increase cuts Loan B's coverage to 1.05x; a 20 percent fall in NOI, such as a lost anchor customer, takes coverage to 1.00x.

    Evidence the study must build when local comparables are thin

    • Volume letters from processors: poultry, catfish, egg or produce shippers committing tonnage or pallet positions, with seasonality.
    • Contract terms: take-or-pay or reserved-space agreements, length and pricing, which also drive the equity route.
    • A capacity inventory built by calling processors, distributors and the few public cold stores in the region, including in-plant freezers.
    • Rate evidence from operators in neighbouring states and from shippers' current costs, since Mississippi has no published local rates.
    • Utility letters confirming power availability and rates, with demand charges.
    • Traffic and logistics analysis: distance to processors, interstates, the Tennessee-Tombigbee Waterway or rail.
    • Operator interviews on staffing; Mississippi averages 14.1 employees per cold store at $46,350.

    What a lender-grade cold storage feasibility study in Mississippi must prove

    1. Committed volume from creditworthy customers, not a share of the state's farm output.
    2. Revenue per pallet position and utilisation, supported by contracts and regional rates.
    3. Engineering of the refrigeration system and its energy use, from engineers or vendors.
    4. A construction budget confirmed by an independent consultant and a fixed-price contract, if the guarantee issues during construction.
    5. Staffing and safety for the refrigeration system, with costs budgeted.
    6. Parcel eligibility, especially for sites near the excluded Gulfport and Jackson urbanized areas.
    7. Resilience to customer loss, with a downside case.

    Risks, process and returned studies

    A cold store that depends on one processor carries that processor's risk; diversified contracts and contract length are the mitigants. Power outages and equipment failure threaten inventory; backup power and insurance address them. The lender files with Rural Development's state office in Jackson, as the hub lists it. The sponsor supplies contracts and letters of intent, engineering and budget, utility letters, site control and owner financials. Studies are returned when demand is sized from statewide production totals or utilisation is assumed at full capacity.

    National program example (outside Mississippi)

    On the site's national cold storage page, the cited example is Origo Cold Storage in Madera County, California, with a $35 million USDA guaranteed loan paired with $17 million of C-PACE financing for a 254,000 square foot temperature-controlled facility, made under the since-discontinued Food Supply Chain program. Two differences matter for Mississippi: the amount exceeds the $25 million B&I per-borrower cap, and Mississippi has no C-PACE law. It is a California record, reported as the site states it, and not work performed by this firm. No Mississippi cold storage financing appears among the hub's precedents.

    Hiring a USDA cold storage feasibility study consultant in Mississippi

    Both example loans would trigger the rule for a new company: above $1,000,000, 7 CFR 5001.306(a)(3)(i) makes a study by an outside consultant, qualified and acceptable to USDA, a condition of the guarantee. With no Mississippi loan history in this class, a lender is likely to want one for an existing operator's expansion too.

    With no state comparables, this is the kind of work the cost page prices as complex: from $10,500 up to $14,500, typically seven to nine weeks, since operators and shippers have to be reached one by one. The engagement covers customer and volume analysis, regional rate benchmarks, downside and base projections, a review of the operator's team, the workbook and the written acceptance guarantee; refrigeration engineering and appraisal are separate.

    A cold storage feasibility study consultant should ask first for your customer letters and your power quote. The homepage describes the independent USDA feasibility study consultant role that USDA's rule envisages. For a fixed-fee proposal, describe the site, capacity, temperature zones, customers, budget and lender on the contact page.

    Last updated 2026-11-08

    David Miller, CPA

    USDA Feasibility, Inc.

    Frequently Asked Questions

    Will USDA require a feasibility study for a Mississippi cold store?

    For a new business with a B&I loan over $1,000,000, yes: 7 CFR 5001.306(a)(3)(i). The national average SBA cold storage loan was $1,424,256 in FY2020 to FY2026, above that line. Because Mississippi has no SBA cold storage loans on record since FY2010 and only 13 payroll warehouses, lenders and USDA will usually want a study even when the rule does not require it.

    What does a cold storage feasibility study consultant cost in Mississippi?

    Budget for the upper, complex tier of the site's fees, $10,500 to $14,500, because Mississippi offers no local rate or utilisation comparables and processors must be interviewed. The proposal fixes the fee. For context, USDA's upfront guarantee fee on the $1,420,000 example is $36,210.00, or $42,245.00 where the guarantee is issued while the building is still under construction.

    How long does a Mississippi cold storage study take?

    Plan on seven to nine weeks, the cost page's schedule for complex engagements; a rush is possible at a premium. Collecting volume letters from processors and rate evidence from operators in neighbouring states takes most of the time; a sponsor with signed customer letters and an engineering budget can move faster.

    Who can prepare a cold storage study for USDA?

    Whoever writes it must satisfy 5001.306(a)(3)(i): qualified in the Agency's view and independent of the warehouse company, its customers, its contractor and the lender. Refrigeration engineers and equipment vendors supply the technical design, load calculations and energy estimates, and their reports can be attached, but only the independent author can conclude that the cold store is feasible. Each application's author is judged by Rural Development; no pre-approved list exists.

    How long is a cold storage study valid?

    Part 5001 sets no expiry for the study itself. The cost page reports that USDA reviewers generally expect data from within about 18 months, and the rule on appraisals is stricter: one year (5001.203). Customer contracts, power tariffs and construction prices can change faster than either, so a Mississippi cold storage study should be refreshed whenever the filing date moves by a season.

    Can one cold storage study serve SBA and USDA lenders?

    Yes. Name both lenders and run both structures through the model; SBA lenders hold their own right to demand a study (13 CFR 120.160(b)). With no Mississippi SBA cold storage loans in the record, and only two in the five-state region since FY2020, both lenders will rely on the study's customer evidence rather than precedent.

    Can a cold store near the Port of Gulfport get B&I?

    Usually not. Gulfport counted 72,926 at the 2020 Census, above the 50,000 limit in 5001.3, and the hub treats Biloxi as likely inside the Gulfport urbanized area. A site must be outside the city and its urbanized area to qualify. Inland locations along the Tennessee-Tombigbee Waterway or in the Delta, near poultry and catfish processors, usually screen as eligible.

    Why are there so few cold storage businesses in a big poultry and catfish state?

    Most cold capacity in Mississippi likely sits inside processing plants, which Census counts as food manufacturing, not warehousing; the 13 payroll warehouses are small, averaging 14.1 employees. That leaves independent capacity thin. A project can fill a real gap, but it must prove demand with processors' commitments, because no statewide statistic shows unmet cold storage need.

    Sources

    1. U.S. Census Bureau, County Business Patterns 2019 and 2023, state and county files: https://www2.census.gov/programs-surveys/cbp/datasets/
    2. U.S. Census Bureau, Vintage 2025 population estimates: https://www2.census.gov/programs-surveys/popest/datasets/2020-2025/
    3. Office of Management and Budget, metropolitan and micropolitan delineation, July 2023: https://www2.census.gov/programs-surveys/metro-micro/geographies/reference-files/2023/delineation-files/list1_2023.xlsx
    4. U.S. Small Business Administration, 7(a) and 504 FOIA loan data, as of 30 Sep 2026: https://data.sba.gov/dataset/7-a-504-foia
    5. 7 CFR Part 5001, CFR 2026 edition (govinfo): https://www.govinfo.gov/content/pkg/CFR-2026-title7-vol15/xml/CFR-2026-title7-vol15-part5001.xml
    6. 91 FR 11272, OneRD FY2026 fee and guarantee notice (govinfo): https://www.govinfo.gov/content/pkg/FR-2026-03-09/html/2026-04581.htm
    7. 13 CFR Part 120, SBA business loan programs: https://www.ecfr.gov/current/title-13/chapter-I/part-120
    8. REAP final rule, 91 FR 62600 (1 Oct 2026): https://www.govinfo.gov/content/pkg/FR-2026-10-01/html/2026-20178.htm
    9. Alabama, Louisiana, Tennessee and Arkansas refrigerated warehousing packs (same Census and SBA sources, each state's own figures)
    10. Poultry, catfish, port and waterway context and 2020 Census city counts, as cited on the Mississippi hub
    11. Site pages: /cold-storage-feasibility-study-usda, /usda-feasibility-study-cost, /contact

    Data current as of November 2026.

    Ready to Start Your USDA Project?

    Get your free consultation today and take the first step toward securing USDA funding for your rural development project.

    Our USDA feasibility study consultants scope every engagement against the five Part 5001 components in a free consultation.

    Get Your Free Consultation

    Fill out the form below and we'll contact you within 24 hours to discuss your project.

    We'll respond within 24 hours