Six in ten Mississippi manufacturing establishments that Census assigns to a county, 1,201 plants, operate outside metropolitan counties, and the average plant employs 73.8 people, 70 percent more than the national average. Rural Mississippi is a factory economy, and the largest B&I amount in the hub's list of Mississippi precedents, $25,000,000 for Altex Tube's steel tubing mill in Columbus, went to a manufacturer. A USDA manufacturing feasibility study in Mississippi has to justify a plant of that scale to a lender and to Rural Development: its markets and contracts, its construction budget, its labour supply and the cash flow that carries a Business and Industry (B&I) guarantee.
Manufacturing in Mississippi: market evidence
Mississippi: manufacturing establishments (all), supply and rural footprint
| Measure | Mississippi | United States |
|---|---|---|
| Establishments, 2019 → 2023 | 2,072 → 1,981 (-4.4%) | 287,626 → 284,452 |
| Per 100,000 residents (2023) | 67.3 | 84.5 |
| Average employees per establishment | 73.8 | 43.4 |
| Average annual pay per employee | $60,075 | $73,202 |
| Share of establishments in non-metro counties | 60.8% (1,201 in 56 counties) | |
| Share of state population in non-metro counties (2025) | 50.0% |
Non-metro counties with the most manufacturing establishments (all) (2023): Lee County (118); Pontotoc County (64); Jones County (53); Lauderdale County (52); Lowndes County (50); Monroe County (43).
Sources: U.S. Census Bureau, County Business Patterns 2019 and 2023 (state and county files; establishments with paid employees; employment and payroll suppressed in some cells); Vintage 2025 county population estimates; OMB metropolitan statistical area delineation, July 2023. Non-metro county is a proxy for USDA rural eligibility, not the eligibility test itself.
Fewer, larger plants. Mississippi has 20 percent fewer manufacturing establishments per resident than the nation but much bigger ones, 73.8 workers on average against 43.4, and the plant count fell by 91 between 2019 and 2023, a 4.4 percent decline against 1.1 percent nationally. The 146,261 manufacturing employees earn $60,075 on average, 82.1 percent of the U.S. figure, and the average plant's payroll is about $4.44 million (computed from the pack). Those numbers set two expectations for a pro forma. First, a new or expanding plant competes for labour with large established employers, so a study that staffs a 74-person line at a wage below $60,075 must show where the workers come from and why they stay. Second, the low plant count growth means new capacity is more likely to come from relocation or expansion than from a growing base of small shops, and a reviewer will ask whether the project's demand is backed by customer contracts or only by market share assumptions.
Rural footprint and B&I eligibility in Mississippi
The non-metro share of manufacturing, 60.8 percent across 56 counties, is well above the 50.0 percent of residents who live there. Lee County alone holds 118 plants; Pontotoc, Jones, Lauderdale, Lowndes and Monroe follow with 43 to 64 each. The hub names Toyota's plant at Blue Springs in Union County, aerospace work near Stennis and forest products as anchors.
Eligibility turns on 7 CFR 5001.3: an area is rural unless it lies within a city or town of more than 50,000 at the latest decennial census or the urbanized area adjoining one. The 2020 Census put three Mississippi cities over that threshold, Jackson, Gulfport and Southaven. The hub's eligibility section treats the Tupelo, Meridian, Columbus–Starkville, Hattiesburg and Pascagoula areas as eligible and the Jackson suburbs and DeSoto County's Memphis-area towns as presumptively excluded. Industrial parks near Jackson need particular care: the hub notes that the Madison County data center sites need a map check, and the same applies to any plant site in the Jackson urbanized fringe. Rural Development will not approve an application conditioned on a later eligibility finding.
Section 5001.127 screens the company and its people: a manufacturer is ineligible while it, a controlling owner or any holder of more than 20 percent is subject to an unpaid federal court judgment, owes delinquent federal income tax or federal debt, or is suspended or debarred. A plant project above $1,000,000 that will create more than 50 jobs also needs Department of Labor concurrence under 5001.306(a)(1), which matters in a state where the average plant employs 73.8 people.
Program fit for a Mississippi manufacturer
- B&I is the main USDA path for plant construction, expansion, equipment and working capital, up to $25 million per borrower (5001.406(c)), with 85 percent guarantees below $5 million and 80 percent from $5 million to $25 million.
- SBA 7(a) has carried 263 Mississippi manufacturing loans since FY2010, averaging $812,368 since FY2020, with a 75 percent guarantee ceiling above $150,000.
- SBA 504 suits an owner-occupied building and long-life equipment: four Mississippi manufacturing 504 loans since FY2010. A limited-purpose plant or a business under two years old contributes 15 percent, or 20 percent if both apply (13 CFR 120.910).
- REAP under the October 2026 rule can co-fund energy efficiency at an operating plant (efficiency grants are limited to a quarter of project cost, at most $250,000, and are paid only once a year of post-installation data exists).
- Community Facilities does not finance a private plant. The hub notes that Mississippi has no Commercial PACE law and that Delta Regional Authority co-funding is available across the Delta counties, with parts of the state in the Appalachian Regional Commission and Southeast Crescent Regional Commission footprints.
Financing benchmarks: USDA B&I next to SBA
Mississippi: SBA lending to manufacturing establishments (all)
| Period | 7(a) loans | 7(a) dollars | 504 loans | 504 dollars |
|---|---|---|---|---|
| FY2010 to FY2016 | 141 | $50.0 million | 1 | $1.6 million |
| FY2017 to FY2019 | 53 | $25.0 million | 0 | $0 |
| FY2020 to FY2023 | 43 | $31.5 million | 1 | $748,000 |
| FY2024 to FY2026 | 26 | $24.6 million | 2 | $3.1 million |
Average 7(a) loan, FY2020 to FY2026: $812,368. Average 504 loan: $1.3 million. Of the 141 7(a) loans approved in FY2010 to FY2016 for Mississippi manufacturing establishments (all), 10.6% were charged off (national: 6.4% of 27,078), on average 76 months after approval.
Source: SBA 7(a) and 504 FOIA loan data, as of 30 Sep 2026 (project state; disbursed loans only; cancelled and undisbursed loans excluded).
| B&I term | Fiscal 2026 rule | Source |
|---|---|---|
| Guarantee | 85% for loans below $5 million; 80% for $5 million to $25 million | 91 FR 11272 |
| Upfront fee / retention | 3.0% of the guaranteed amount / 0.55% a year (reduced: 1.0% / 0.50%) | 91 FR 11272 |
| Guarantee before construction completion | upfront fee plus 0.50%; equity injected before guaranteed funds | 91 FR 11272; 7 CFR 5001.205(e)(2) |
| Maximum | $25 million per borrower | 7 CFR 5001.406(c) |
| Term | useful life, not over 40 years; first full principal and interest within 3 years | 7 CFR 5001.402 |
| Equity | 10% existing; 10% new with qualifying sales contracts; 25% new with construction-period guarantee; 20% or 25% other new | 7 CFR 5001.105(d) |
| Study | required for a new business above $1 million | 7 CFR 5001.306(a)(3)(i) |
B&I terms summarised from the FY2026 notice and 7 CFR Part 5001.
What the lending record says. SBA manufacturing loans in Mississippi are small relative to the plants: $812,368 on average since FY2020, enough for a machine line or a small building, not a new factory. Larger projects therefore go to B&I, where the $25 million ceiling and terms to useful life fit plant economics. The seasoned loss rate is the caution: 10.6 percent of 141 Mississippi loans charged off against 6.4 percent nationally, on average 76 months after approval. Those losses arrived in the sixth and seventh years, which is when equipment wears out, contracts come up for renewal and customers relocate; a study must show the plant survives a contract loss in that window. Across every industry, USAspending records only eight Mississippi B&I guarantees in fiscal 2024 through 2026, so each plant file is reviewed with few recent state comparisons.
Worked example (illustrative)
Loan A is $810,000, the Mississippi FY2020 to FY2026 average manufacturing 7(a) loan ($812,368) rounded, to an existing manufacturer for equipment and a building addition, priced for illustration at 7.25 percent and amortised over 15 years. Loan B, also illustrative, is a $7,500,000 loan for a new plant built under a construction-period guarantee, at 7.00 percent over 25 years, which puts it in the 80 percent tier.
| Input or result | Loan A: existing plant, equipment | Loan B: new plant, construction |
|---|---|---|
| Loan amount | $810,000.00 | $7,500,000.00 |
| Program and fee schedule | B&I, fiscal 2026 notice | B&I, fiscal 2026 notice |
| Guarantee percentage | 85% | 80% |
| Guaranteed amount | $688,500.00 | $6,000,000.00 |
| Upfront guarantee fee | $20,655.00 | $180,000.00 |
| Upfront fee if the guarantee is issued before construction is complete (+0.50%) | $24,097.50 | $210,000.00 |
| First annual retention fee (guaranteed share of the balance after 12 payments) | $3,641.72 | $32,495.16 |
| Interest rate (illustrative, fixed) | 7.25% | 7.00% |
| Amortization, years (no balloon) | 15 | 25 |
| Monthly payment | $7,394.19 | $53,008.44 |
| Annual debt service | $88,730.27 | $636,101.28 |
| NOI needed for 1.25x coverage | $110,912.84 | $795,126.60 |
| Coverage on that 1.25x NOI if the rate were 2 points higher | 1.11x | 1.05x |
| Equity, existing business, 10% of project cost (5001.105(d)(1)) | $90,000.00 | $833,333.33 |
| Equity, new business with qualifying sales contracts, 10% of project cost (5001.105(d)(2)) | $90,000.00 | $833,333.33 |
| Equity, new business with guarantee issued before completion, 25% balance-sheet route (5001.105(d)(3)) | $270,000.00 | $2,500,000.00 |
| Equity, new business, 25% of project cost (5001.105(d)(4)) | $270,000.00 | $2,500,000.00 |
| Total project cost on that basis | $1,080,000.00 | $10,000,000.00 |
Computed in Python from the inputs shown; guarantee tier, fees and retention rate from 91 FR 11272; equity routes from 7 CFR 5001.105(d)(1) to (4).
Reading the equity rows. Each row shows what one route of 5001.105(d) would require for that loan, assuming the loan is the only debt. An existing manufacturer (Loan A) needs $90,000 on the 10 percent project-cost route. A new company building Loan B's plant needs $2,500,000 if the guarantee issues before completion, under (d)(3); if instead it holds sales contracts covering debt service for at least the loan term and the guarantee issues after completion, (d)(2) allows 10 percent, $833,333.33. That gap of about $1.67 million is the value of signed offtake contracts, and it is why the study must analyse them clause by clause.
Tier and fee effects. Loan B's guarantee is 80 percent, $6,000,000; the same project borrowing $4,999,999 would carry 85 percent, $4,249,999.15. Its upfront fee is $180,000.00, or $210,000.00 with the construction-period surcharge. At 1.25x, Loan B needs $795,126.60 of cash flow a year, about $10,745 for each of 74 jobs, the state's average plant size. Two points of extra rate would leave that cash flow covering debt 1.05 times, so a variable-rate structure needs a cap or a cushion.
What a lender-grade manufacturing feasibility study in Mississippi must prove
- Customers and contracts: who buys the output, on what terms and for how long, with letters of intent or signed agreements; a supplier plant for an automotive or aerospace customer must show the customer's volumes and sourcing commitments.
- Market size and share, with pricing evidence from comparable products and an explanation of how the plant wins business from existing suppliers.
- Technical feasibility: process design, equipment capacity, utilisation ramp and yield, confirmed by engineers or equipment vendors.
- Construction budget and schedule confirmed by a qualified independent consultant, a firm fixed-price contract and a bonded or vetted contractor, all required for a construction-period guarantee under 5001.205(e)(2).
- Labour supply within commuting distance, wage rates against the $60,075 state average and training costs.
- Raw material and energy supply contracts and price exposure.
- Working capital and start-up losses through stabilisation, with quarterly cash flow during construction and start-up (5001.202).
- Collateral: equipment and real estate values, with special-purpose buildings discounted realistically.
- A sixth- and seventh-year downside case matching the 76-month loss timing in the SBA record.
Risks and mitigants in Mississippi
Customer concentration is the classic risk for supplier plants; mitigants are multi-year contracts, customer diversification and guarantees. Construction overruns are handled by contingency, fixed-price contracts and equity injected first. Labour competition from large employers is mitigated by wage analysis and training commitments. Energy cost and supply risk call for utility letters. Federal timing: the hub reports a pause on loan note guarantees for biodigester and controlled-environment agriculture projects from 14 April through 31 December 2026, and a continuing resolution through 11 December 2026.
Who files, what the sponsor assembles and why plant studies fail
Your lender files with Rural Development's Mississippi state office, which the hub places in Jackson. The sponsor supplies the business plan, customer contracts or letters of intent, equipment quotes, construction contract and schedule, engineering reports, environmental reviews, historical financials for an existing company, owner financial statements and management resumes. Studies come back when demand rests on industry growth rates rather than customers, when construction budgets lack independent confirmation, or when start-up losses and working capital are understated.
Mississippi program example
Altex Tube LLC, Columbus (B&I, 2022): $25,000,000 for a steel tubing mill, as listed in the Mississippi hub's precedent file from USDA Rural Development releases and program charts. It shows a Mississippi manufacturer financed at the B&I per-borrower maximum. It is a public USDA record, not an engagement of this firm, and its terms beyond the amount and purpose are not stated in the inputs. The hub also lists AWS's $10 billion Madison County campus and Compass's $10 billion Meridian project as data center anchors; those are private investments, not USDA financings.
Hiring a USDA manufacturing feasibility study consultant in Mississippi
Rule 5001.306(a)(3)(i) requires a feasibility study by an independent consultant acceptable to the Agency whenever a new business seeks a guaranteed loan above $1,000,000, with the scope set by USDA. Loan B's new plant is squarely inside that rule. An existing manufacturer financing equipment, as in Loan A, is at the Agency's discretion, though a lender looking at a 10.6 percent seasoned loss rate will usually want independent market and technical analysis.
Large plant projects tend to fall in the cost page's complex B&I band, $10,500 to $14,500 over seven to nine weeks, or in its OneRD complex band of $9,500 to $18,000 when several programs or USDA-flagged risks are involved; smaller equipment loans fit the standard band. The study reconciles with, but does not replace, the engineering, environmental and appraisal work, which the cost page lists as separate scopes. Deliverables include the report, the Excel model, sensitivity cases and a written acceptance guarantee.
When choosing a manufacturing feasibility study consultant, ask how the study will test your customer contracts and construction budget. The homepage explains what an outside USDA feasibility study consultant contributes to a B&I file. Describe the plant, site, jobs, project cost and lender on the contact page to receive a fixed-fee proposal.